PHASE 2- LONG DISTANCE SEDIMENT PIPELINE AT THE MISSISSIPPI RIVER IN JEFFERSON, PLAQUEMINES AND LAFOURCHE PARISHES.
NAME OF APPLICANT: Jefferson Parish Public Works Department, c/o APTIM, Atten: Charlotte Liner, 2503 Petroleum Drive, in Houma, Louisiana 70363.
LOCATION OF WORK: Project site is located in Jefferson, Plaquemines, and Lafourche Parishes, within Mississippi River, between 60 to 67 miles above Head of Passes, in Louisiana, as shown on the attached drawings.
POB (Phase 2-pipeline corridor): Latitude: 29.602633 Longitude: -90.071328
POE (Phase 2-pipeline corridor): Latitude: 29.554822 Longitude: -90.217261
Hydrologic Unit Codes: 08090100 Lower Mississippi River - New Orleans and 080900301 East Central Louisiana Coastal.
CHARACTER OF WORK: Dredge for sediment within the Mississippi River at the notated Alliance Anchorage and Willis Point Anchorage borrow areas in order to create a pipeline access corridor and emergent marsh. The purpose of the project is to: 1) obtain renewable sediment resources, 2) establish an adequate access corridor that supports equipment mobilization for long distance sediment conveyance, and 3) restore intertidal wetlands. Phase 2 will incorporate previously permitted borrow areas and pipeline routes (MVN-2009-1353-EFF) to deliver sediment to the new Phase 2 corridor. Phase 2 will extend the existing Phase I corridor an additional 12.6 miles. Project implementation will require excavation and deposition of approximately 3,833,790 cubic yards of native material and the deposition of approximately 800 cubic yards of crushed stone or gravel and 696 cubic yards of rock.