The Corps of Engineers is evaluating the Federal Highway Administration (FHWA)/North Dakota Department of Transportation (NDDOT) Draft Environmental Impact Statement (DEIS) for the US Highway 85, I-94 Interchange at Belfield to Watford City Bypass Project and determined there was a need for a standalone 404(b)(1) Analysis. this notice is to inform interested parties of the availability of the document and solicit comments.
The Corps of Engineers is evaluating the Federal Highway Administration (FHWA)/North Dakota Department of Transportation (NDDOT) Draft Environmental Impact Statement (DEIS) for the US Highway 85, I-94 Interchange at Belfield to Watford City Bypass Project and determined there was a need for a standalone 404(b)(1) Analysis. this notice is to inform interested parties of the availability of the document and solicit comments. The 62-mile project begins at the I-94 interchange and extends north to the Watford City Bypass (McKenzie County Road 30). The proposed action is to expand this section from a two-lane to four-lane highway with flexible design options. It also includes rehabilitation or replacement of the historic Long X Bridge over the Little Missouri River.
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
SECTION 404(b)(1)ALTERNATIVES ANALYSIS
NWO-2015-00767-BIS
U.S. Highway 85
I-94 Interchange to Watford City Bypass
U.S. Army Corps of Engineers
Omaha District
North Dakota Regulatory Office
1
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
CONTENTS
Acronyms .............................................................................................................................................................. 6
1.
INTRODUCTION ....................................................................................................................................... 8
1.1 SECTION 404(B)(1) REGULATORY BACKGROUND ...................................................................... 8
1.2
ORGANIZATION OF THE REPORT ............................................................................................ 12
2. DESCRIPTION OF PROPOSED PROJECT ........................................................................................... 13
2.1 PROPOSED ACTIVITIES .................................................................................................................... 17
2.1.1 ROADWAY RECONSTRUCTION AND/OR REMOVAL OF STRUCTURES AND FILL: ... 17
2.1.2
TEMPORARY STRUCTURES OR FILLS NECESSARY FOR CONSTRUCTION
ACTIVITIES .............................................................................................................................................. 17
2.2
AVOIDANCE, MINIMIZATION AND COMPENSATION............................................................ 18
2.2.1 AVOIDANCE................................................................................................................................... 18
2.2.2 MINIMIZATION............................................................................................................................... 18
2.2.3 COMPENSATION .......................................................................................................................... 19
3.0 BASIC AND OVERALL PURPOSE ........................................................................................................ 21
3.1 BASIC PROJECT PURPOSE AND WATER DEPENDENCY........................................................ 21
3.2 OVERALL PROJECT PURPOSE ....................................................................................................... 21
4.0 ALTERNATIVES CONSIDERED ............................................................................................................ 22
4.1
ALTERNATIVE A: NO ACTION ................................................................................................... 24
4.2
ELEMENTS COMMON TO ALT B, C, D, E, AND F................................................................... 27
4.2.1 ACTIVITIES IN WATERS OF THE U.S...................................................................................... 32
4.3 ALTERNATIVE B - 4-LANE SECTION ON EXISTING ALIGNMENT DIVIDED, DEPRESSED
MEDIAN W/OPTIONS (APPLICANT'S PREFERRED) .......................................................................... 34
4.4 ALTERNATIVE C: 4-LANE DIVIDED, FLUSH MEDIAN ................................................................. 35
4.5 ALTERNATIVE D: SUPER 2 HIGHWAY WITH PASSING AND TURN LANES ......................... 38
4.6 ALTERNATIVE E: REHABILITATION OF EXISTING ROADWAY WITH WIDER SHOULDERS
........................................................................................................................................................................ 39
4.7 ALTERNATIVE F: 4-LANE SECTION ON EXISTING ALIGNMENT UNDIVIDED ...................... 41
4.8 ALTERNATIVES OUTSIDE OF THE EXISTING ALIGNMENT ..................................................... 43
4.8.1 ALTERNATIVE G - 4-LANE OUTSIDE EXISTING ALIGNMENT 1-2 MILES AWAY ...... 43
2
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.8.2 ALTERNATIVE H: 4-LANE OUTSIDE EXISTING ALIGNMENT WITH TWO LANES 1-2
MILES AWAY ........................................................................................................................................... 44
4.9 ALTERNATIVE I: 6-LANE HIGHWAY ................................................................................................ 45
4.10 ALTERNATIVE J: ELEVATED ROADWAY .................................................................................... 46
4.11 ALTERNATIVE K: ONE-WAY PAIR................................................................................................. 46
4.12 ALTERNATIVE L: CONSTRUCT A PIPELINE ............................................................................... 47
4.13 ALTERNATIVE M: PUBLIC TRANSIT ............................................................................................. 48
5.0 ALTERNATIVES ANALYZED IN DETAIL.............................................................................................. 49
5.1 ALTERNATIVES CONSIDERED BUT REJECTED ......................................................................... 49
5.2 ALTERNATIVES CARRIED FORWARD ........................................................................................... 52
6.0 EXISTING SITE CONDITIONS (NDDOT 2018a) ................................................................................. 54
6.1 SETTING AREA 1: RP 75.7 TO RP 91.4 .......................................................................................... 54
6.2 SETTING AREA 2: RP 91.4 TO RP 92.0 .......................................................................................... 54
6.3 SETTING AREA 3: RP 92.0 TO RP 107.6 ........................................................................................ 54
6.4 SETTING AREA 4: RP 107.6 .............................................................................................................. 54
6.5 SETTING AREA 5: RP 107.6 TO RP 121.4 ...................................................................................... 55
6.6 SETTING AREA 6: RP 121.4 TO RP 130.0 ...................................................................................... 55
6.7 SETTING AREA 7: RP 130.0 TO RP 139.5 ...................................................................................... 55
6.8 EXISTING SITE CONDITIONS (AQUATIC RESOURCE FUNCTIONS) ..................................... 55
7.0 IMPACT ANALYSIS .................................................................................................................................. 56
7.1. PHYSICAL AND CHEMICAL CHARACTERISTICS OF THE AQUATIC ECOSYSTEM .......... 56
7.1.1. SUBSTRATE ................................................................................................................................. 56
7.1.2. SUSPENDED PARTICULATES/TURBIDITY ........................................................................... 57
7.1.3 WATER............................................................................................................................................ 58
7.1.4. CURRENT PATTERNS AND WATER CIRCULATION .......................................................... 58
7.1.4. NORMAL WATER LEVEL FLUCTUATIONS ........................................................................... 58
7.2. BIOLOGICAL CHARACTERISTICS OF THE AQUATIC ECOSYSTEM ..................................... 59
7.2.1. THREATENED AND ENDANGERED SPECIES ..................................................................... 59
7.2.2. FISH, CRUSTACEANS, MOLLUSK, AND OTHER AQUATIC ORGANISMS .................... 61
7.2.3. WILDLIFE VALUES ...................................................................................................................... 62
3
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
7.3. SPECIAL AQUATIC SITES (WETLANDS, MUD FLATS, VEGETATED SHALLOWS, RIFFLE
AND POOL COMPLEXES, CORAL REEFS, SANCTUARIES, AND REFUGES)............................. 63
7.3.1 SANCTUARIES AND REFUGES ................................................................................................ 63
7.3.2 WETLANDS .................................................................................................................................... 63
7.3.3. BIOLOGICAL AVAILABILITY OF POSSIBLE CONTAMINANTS IN DREDGED OR FILL
MATERIAL ................................................................................................................................................ 64
7.4. HUMAN USE CHARACTERISTICS OF THE AQUATIC ECOSYSTEM ..................................... 64
7.4.1. WATER SUPPLY AND CONSERVATION ............................................................................... 64
7.4.2. RECREATIONAL AND COMMERCIAL FISHERIES .............................................................. 64
7. 4.3. WATER RELATED RECREATION ........................................................................................... 65
7.4.4. AESTHETICS ................................................................................................................................ 65
7.4.5. TRAFFIC AND TRANSPORTATION PATTERNS .................................................................. 66
7.4.6. NOISE ............................................................................................................................................ 66
7.4.7. SAFETY ......................................................................................................................................... 68
7.4.8. RECREATION ............................................................................................................................... 70
7.4.9. NAVIGATION ................................................................................................................................ 70
7.4.10. ENERGY NEEDS ....................................................................................................................... 70
7.4.11. MINERAL NEEDS ...................................................................................................................... 71
7.4. 12. ECONOMICS ............................................................................................................................. 71
7.4.13. FOOD AND FIBER PRODUCTION ......................................................................................... 74
7.4.14. PRIME AND UNIQUE FARMLAND ......................................................................................... 74
7.4.15. CONSIDERATION OF PROPERTY OWNERSHIP .............................................................. 75
7.4.16. LAND USE ................................................................................................................................... 75
7.4.17. HISTORIC PROPERTIES ......................................................................................................... 76
7.4.18. PARKS, NATIONAL AND HISTORICAL MONUMENTS, NATIONAL SEASHORES,
WILDERNESS AREAS, RESEARCH SITES, AND SIMILAR AREAS ............................................ 77
7.3.19. AIR QUALITY .............................................................................................................................. 79
7.4. EVALUATION AND TESTING ........................................................................................................... 80
7.5. CUMULATIVE IMPACTS .................................................................................................................... 80
8.0 ACTIONS TO MINIMIZE ADVERSE EFFECTS ................................................................................... 81
8.1. PLANNING AND DESIGN .................................................................................................................. 81
4
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
9.0 COMPENSATORY MITIGATION............................................................................................................ 82
10.0. CONCLUSION ........................................................................................................................................ 82
11.0. LITERATURE CITED............................................................................................................................. 85
APPENDIX 1: ALTERNATIVES MATRIX ................................................................................................................ 88
APPENDIX 2: CORPS ALTERNATIVES ANALYSIS TABLE AND ALTERNATIVES CARRIED FORWARD. .................... 90
APPENDIX 3: LOCATION AND IMPACTS OF ROADWAY CROSSINGS REQUIRING A CWA
SECTION 404 AUTHORIZATION UNDER ALT B AND C. ....................................................................... 92
Figure 1: Project Location .............................................................................................................................. 16
Figure 2: Typical Section for Divided, Depressed Median......................................................................... 34
Figure 3: Typical Section for Divided, Flush Median .................................................................................. 36
Figure 4: US Highway 85 Setting Areas ....................................................................................................... 54
Table 1: Alternatives considered during review........................................................................................... 24
Table 2: Alternative A matrix for addressing purpose and need............................................................... 27
Table 3: Alternative B matrix for addressing Purpose and Need.............................................................. 35
Table 4: Alternative C matrix for addressing purpose and need. ............................................................. 37
Table 5: Alternative D matrix for addressing Purpose and Need ............................................................. 39
Table 6: Alternative E matrix for addressing Purpose and Need.............................................................. 41
Table 8: Alternative G matrix for addressing Purpose and Need ............................................................. 43
Table 9: Alternative H matrix for addressing Purpose and Need ............................................................. 44
Table 10: Alternative J matrix for addressing Purpose and Need ............................................................ 46
Table 11: Alternative L matrix for addressing Purpose and Need ............................................................ 48
Table 12: Alternative M matrix for addressing Purpose and Need ........................................................... 49
Table 13: Alternatives considered but rejected. ......................................................................................... 50
Table 14: Alternatives carried forward for further consideration. .............................................................. 53
Table 15: Threatened and Endangered Species (USFWS) ...................................................................... 60
Table 16: Common Noise Levels................................................................................................................... 67
Table 17: Common noise levels associated with highway construction equipment. ............................. 68
Table 18: Summary of Prime Farmland and Farmland of Statewide Importance. ................................. 75
Table 19: Permanent ROW/Easement on Private and Federal Lands ................................................... 75
Table 20: Pending Permits within the Lower Little Missouri (HUC 10110205), Middle Little Missouri
(HUC 10110203), and the Upper Heart (HUC 10130202) watersheds. .................................................. 81
Table 21: Mitigation Ratios ............................................................................................................................ 82
Table 22: Comparison of probability of accidents between Alt B and C .................................................. 83
5
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
ACRONYMS
Alternative
average daily traffic
American Association of State Highway and Transportation
Officials
A-weighted decibels
Best Management Practices
Alt
ADT
Bureau of Economic Analysis
BEA
Clean Water Act
Conservations Measures
Corrugated steel pipe
CWA
CM
CSP
Council for Environmental Quality
CEQ
Department of the Army
Draft Environmental Impact Statement
Endangered Species Act
Energy Information Administration
Environmental Impact Statement
Federal Highway Administration
Feet
Final Environmental Impact Statement
Greenhouse Gas
Horizontal Directional Drilling
Hydrological Unit Code
I
Interactive Highway Safety Design Model
Land and Resource Management Plans
least environmentally damaging practicable alternative
Level of Service
Little Missouri National Grasslands
Little Missouri River
Management Area
Memorandum of Agreement
million vehicle miles traveled
Mountain Standard Time
National Ambient Air Quality Standards
National Environmental Policy Act
National Forest System
DA
DEIS
ESA
EIA
EIS
FHWA
FT
FEIS
GHG
HDD
HUC
Interstate
IHSDM
LRMP
LEDPA
LOS
LMNG
LMR
MA
MOA
MVMT
MST
NAAQS
NEPA
NFS
6
AASHTO
dBA
BMPs
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
National Highway System
National Park Service
National Register of Historic Places
Noise Abatement Criteria
North Dakota
North Dakota Department of Transportation
North Dakota Game and Fish Department
North Dakota Highway 200
NHS
NPS
NRHP
NAC
ND
NDDOT
NDGF
ND-200
North Dakota Highway Patrol
NDHP
North Dakota Industrial Commission
North Dakota State Historic Preservation Office
North Dakota Tourism Department
Particulate Matter
Programmatic Biological Assessment
Record of Decision
Reference Point (on roadway)
Reinforced concrete box
Reinforced concrete box culvert
Reinforced concrete pipe
Right of Way
Safe, Accountable, Flexible, Efficient Transportation Equity Act
State Ambient Air Quality Standards
State Historical Society of North Dakota
Statewide Transportation Improvement Program
Storm Water Pollution Prevention Plan
Structural plate pipe corrugated
Theodore Roosevelt Expressway
Theodore Roosevelt National Park
U.S. Army Corps of Engineers
U.S. Environmental Protection Agency
U.S. Forest Service
U.S. Highway 85 Project
United States Department of Agriculture
Water Quality Certification
Waters of the United States
NDIC
NDSHPO
NDTD
PM
PBA
ROD
RP
RCB
RCBC
RCP
ROW
SAFETEA-LU
SAAQS
SHSND
STIP
SWPPP
SPPC
TRE
TRNP
Corps
EPA
USFS
Project
USDA
WQC
WOUS
7
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
1. INTRODUCTION
The North Dakota Department of Transportation (NDDOT), in conjunction with the
Federal Highway Administration (FHWA), is proposing to re-construct the U.S. Highway
85, I-94 Interchange to Watford City Bypass project between Belfield and Watford City,
North Dakota. The approximately 62 miles of highway will be constructed as a four-lane
highway and will replace the existing Long X Bridge crossing of the Little Missouri River.
The U.S. Highway 85 corridor has experienced significant increases in traffic volume
since 2010, largely due to the increase in oil and gas exploration in the North Dakota
Bakken Region.
NDDOT and FHWA have prepared a Draft Environmental Impact Statement (DEIS) for
the project, which was released for public comment on May 25, 2018 and ended June
25, 2018. The U.S. Army Corps of Engineers (Corps) participated as a Cooperating
Agency and has provided information and comments specific to its expertise and
authority.
1.1 SECTION 404(B)(1) REGULATORY BACKGROUND
The purpose of the Guidelines developed by the U.S. Environmental Protection Agency
(EPA) pursuant to Section 404(b)(1) of the Clean Water Act (CWA) is to restore and
maintain the chemical, physical, and biological integrity of waters of the United States
(WOUS) through the control of discharges of dredged and fill material. 40 Code of
Federal Regulations (CFR) § 230.1(a). Fundamental to these Section 404(b)(1)
Guidelines is the precept that dredged or fill material should not be discharged into the
aquatic ecosystem, unless it can be demonstrated that such a discharge will not have
an unacceptable adverse impact either individually or in combination with known and/or
probable impacts of other activities affecting the ecosystems of concern. 40 CFR §
230.1(c).
Section 404 of the CWA authorizes the Corps to issue permits for the discharge of
dredged or fill materials into WOUS, defined at 33 CFR Part 328, which includes
wetlands, coastal and inland waters, lakes, rivers, and streams, including adjacent
wetlands and tributaries.
8
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
The Section 404(b)(1) Guidelines (40 CFR Part 230 et seq.) are a significant part of the
substantive environmental criteria used by the Corps to evaluate permit applications
involving the discharge of dredged or fill material into WOUS. The Section 404(b)(1)
Guidelines at 40 CFR § 230.10 impose four restrictions which must be satisfied in order
to make a finding that a proposed discharge of dredged or fill material complies with the
Section 404(b)(1) Guidelines. The Section 404(b)(1) Guidelines generally state that no
discharge of dredged or fill material shall be permitted if:
1. There is a practicable alternative to the proposed discharge which would have
less adverse impact on the aquatic ecosystem, so long as the alternative does
not have other significant adverse environmental consequences;
2. The discharge would:
a) Cause or contribute, after consideration of disposal site dilution and
dispersion, to violations of any applicable State water quality standard;
b) Violate any applicable toxic effluent standard or prohibition under Section 307
of the CWA;
c) Jeopardize the continued existence of species listed as endangered or
threatened under the Endangered Species Act of 1973, as amended, or result
in likelihood of the destruction or adverse modification of a habitat which is
determined by the Secretary of Interior or Commerce, as appropriate, to be a
critical habitat under the Endangered Species Act of 1973, as amended; or
d) Violate any requirement imposed by the Secretary of Commerce to protect any
marine sanctuary designated under title III of the Marine Protection, Research,
and Sanctuaries Act of 1972;
3. The discharge would cause or contribute to significant degradation of the
WOUS. Findings of significant degradation related to the proposed discharge
shall be based upon appropriate factual determinations, evaluations, and tests
required by subparts B and G, after consideration of subparts C through F, with
9
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
special emphasis on the persistence and permanence of the effects outlined in
those subparts;
4. And, unless appropriate and practicable steps have been taken which will
minimize potential adverse impacts of the discharge on the aquatic ecosystem.
An alternative is practicable "if it is available and capable of being done after taking into
consideration cost, existing technology, and logistics in light of the overall project
purposes." 40 CFR §§ 230.10(a), 230.3(q). "If it is otherwise a practicable alternative, an
area not presently owned by an applicant which could reasonably be obtained, utilized,
expanded or managed in order to fulfill the basic purpose of the proposed activity may
be considered." 40 CFR § 230.10(a)(2).
The term "special aquatic sites," as defined by the Section 404(b)(1) Guidelines,
includes "geographic areas, large or small, possessing special ecological characteristics
of productivity, habitat, wildlife protection, or other important and easily disrupted
ecological values." 40 CFR § 230.3. The Section 404(b)(1) Guidelines specifically name
sanctuaries and refuges, wetlands, mud flats, vegetated shallows, coral reefs, and riffle
and pool complexes as special aquatic sites. Each of these six special aquatic sites are
defined in subpart E of the 404(b)(1) Guidelines.
If the proposed activity would involve a discharge into a special aquatic site, such as a
wetland, the Section 404(b)(1) Guidelines distinguish between those projects that are
water dependent and those that are not. A water-dependent project is one that requires
access to or proximity to or siting within a special aquatic site to achieve its basic
purpose, such as a marina. A non-water-dependent project is one that does not require
access to or proximity to or siting within a special aquatic site to achieve its basic
purpose, such as a housing development or road construction.
The Section 404(b)(1) Guidelines establish two presumptions for projects that propose a
discharge into a special aquatic site. First, it is presumed there are practicable
alternatives to non-water dependent projects, "unless clearly demonstrated otherwise."
40 CFR § 230.10(a)(3). Second, "where a discharge is proposed for a special aquatic
10
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
site, all practicable alternatives to the proposed discharge which do not involve a
discharge into a special aquatic site are presumed to have less adverse impact on the
aquatic ecosystem, unless clearly demonstrated otherwise." 40 CFR § 230.10(a)(3).
The thrust of the Section 404(b)(1) Guidelines is that applicants should design proposed
projects to meet the overall project purpose while avoiding impacts on aquatic
environments. This approach is emphasized in a Memorandum of Agreement (MOA)
between the EPA and the Department of the Army (DA) concerning the determination of
mitigation under the Section 404(b)(1) Guidelines (EPA 1990), as modified by the Corps
and EPA Final Mitigation Rule promulgated at 33 CFR Parts 325, 332; 40 CFR Part
230. The MOA articulates the Section 404(b)(1) Guidelines' "sequencing" protocol as
first, avoiding impacts; second, minimizing impacts; and third, providing practicable
compensatory mitigation for unavoidable impacts and no overall net loss of functions
and services.
In addition to the 404(b)(1) guidelines, 33 CFR 320.4 General policies for evaluating
permit applications, also requires the Corps to consider a Public Interest Review, which
considers the probable impacts, including cumulative impacts, of the proposed activity
on public interest, carefully weighing all factors which are relevant in each particular
case. The Corps decision on whether to authorize the proposal, and if so, the
conditions under which it will be considered are determined by the outcome of this
general balancing act. Among the factors considered, including cumulative impacts, are
conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shore erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the
people. For activities involving 404 discharges, a permit would be denied if the
discharge that would be authorized by such a permit would not comply with the
404(b)(1) guidelines.
11
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
1.2
ORGANIZATION OF THE REPORT
This Section 404(b)(1) alternatives analysis is the Corps' evaluation of the information
provided in the Draft Environmental Impact Statement (DEIS), 4(f) analysis and
technical reports provided with the DEIS. It incorporates information from the DEIS prior
to the completion of a Final Environmental Impact Statement (FEIS), in order to
complete the Section 404 review concurrent with the FHWA Record of Decision (ROD).
The Section 404(b)(1) alternatives analysis is intended to be a stand-alone document.
The DEIS was prepared by FHWA (as the lead federal agency) and NDDOT in
accordance with the requirements of the National Environmental Policy Act (NEPA) (42
USC 4341 et seq.) and in conformance with the Council for Environmental Quality
(CEQ) regulations implementing NEPA.
This document provides information and analysis that allows the Corps to make a
determination of the least environmentally damaging practicable alternative (LEDPA).
Section 1 provides the Introduction, including the proposed project background, CWA
Section 404(b)(1) regulatory background, and this organization section. Section 2
provides the Description of Proposed Project. Section 3 discusses the Basic and Overall
Project Purpose. Section 4 discusses Alternatives that will be carried forward and those
that were rejected by the Corps and do not warrant further analysis. Section 5 discusses
Alternatives analyzed in detail. Section 6 discusses the Existing Conditions as it relates
to WOUS. Section 7 discusses the Impact Analysis, as set forth in Subparts C through
H of the Section 404(b)(1) Guidelines. Section 8 presents Actions to Minimize Adverse
Effects. Section 9 discusses Compensatory Mitigation for unavoidable impacts to
WOUS. Section 10 is the Corps conclusion on the 404(b)(1) analysis. Section 11
presents the Literature Cited.
12
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
2. DESCRIPTION OF PROPOSED PROJECT
The U.S. Highway 85 Project (project) encompasses approximately 62 miles of roadway
in Stark, Billings, and McKenzie counties, North Dakota. (Figure 1, Project Location
Map.) The project begins at the Interstate 94 (I-94) interchange and extends north to the
Watford City Bypass (McKenzie County Road 30). The proposed project would expand
this segment of U.S. Highway 85 from two-lanes to a four-lane highway and rehabilitate
or replace the historic Long X Bridge over the Little Missouri River. The goal of the
project is to maintain and follow the existing U.S. Highway 85 alignment, utilizing the
existing infrastructure to minimize potential impacts on environmental, socioeconomic,
and human-made resources, to the maximum extent practicable. The project is being
led by the FHWA in cooperation with the NDDOT. The FHWA and NDDOT are
functioning as joint lead agencies and are the primary entities responsible for
compliance with the NEPA for which the Draft EIS has been prepared. In addition, the
proposed project has three (3) cooperating agencies: the National Park Service (NPS),
Corps, and U.S. Forest Service (USFS).
The project is part of a larger overall effort by the NDDOT and FHWA to expand U.S.
Highway 85 to four lanes between I-94 and ND Highway 2. Funding for the proposed
project would need to be authorized and the project would need to be added or
amended to the Statewide Transportation Improvement Program (STIP). Funding has
been programmed for the Long X Bridge portion of the project, and the Long X Bridge is
currently listed in the STIP and scheduled for construction in 2019. Currently, it is
anticipated that the first phase of the project would include the Long X Bridge with
approximately 1-mile of approach roadways on each side of the bridge. This may
include construction of the bighorn sheep underpass at RP 126.1. Funding has not
been identified for any additional projects, however, following completion of the Long X
Bridge section, the second priority would be constructing the roadway from the northern
end of the corridor from the Watford City Bypass to the ND 22 intersection. The final
phase would include construction of the new roadway from ND 22 intersection, south to
I-94. It is anticipated that the actual construction projects would occur in 8 to 10-mile
sections.
13
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
The project would include a system of wildlife crossings throughout the Badlands area,
which is intended to improve habitat connectivity and reduce the potential for wildlifevehicle collisions. Immediately adjacent to USFS-managed lands, two wildlife
underpasses and the Long X Bridge would facilitate bighorn sheep and other wildlife
movement. In addition to improving habitat connectivity for wildlife in general, fencing
associated with the crossings would allow for the reintroduction of bighorn sheep
northeast of the Long X Bridge. As such wildlife habitat would be improved within the
Little Missouri National Grasslands (LMNG) and Badlands. The following are the
proposed locations for the wildlife crossing structures:
·
Wildlife crossing underpass at RP 122.5
·
Wildlife crossing underpass at RP 126.1
·
Long X Bridge (i.e., wildlife crossing underpass with water-flow) at RP 126.6.
·
Wildlife fencing along both sides of US Highway 85 with jump-outs from RP
120.9 to RP 128.9.
The project would also include the construction of an 8-ft wide, asphalt shared use path
with potential trailheads, along U.S. 85 from the planned Watford City trail system to
McKenzie County Road 34. The trail would be located on the east side of the highway
and be open to non-motorized use, such as bicyclists and pedestrians.
The proposed project would require a CWA Section 404 permit. An Aquatic Resource
Delineation Report and request for a Jurisdictional Determination was submitted to the
Corps in August of 2016. The Corps responded on November 3, 2016 with both a
Preliminary and Approved Jurisdictional Determination for WOUS with the proposed
project area.
The proposed discharges of fill material into WOUS would be associated with the
construction of two additional lanes, resulting in a 4-lane highway; culvert extensions
and the replacement/rehabilitation of the Long X Bridge across the Little Missouri River.
The WOUS locations throughout the corridor are listed in the table in Appendix 3 and
the anticipated impacts associated with construction activities for Alternatives B and C.
Alternative F has a similar footprint but with less impacts. These were not provided to
14
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
the Corps as NDDOT did not carry this alternative forward because of safety concerns.
The Corps has estimated the impacts based on the assumed width of a median.
The
median widths for each alternative are as follows: Alt B 52-ft; Alt C 20-ft; and Alt F
approximately 6-ft. The permanent impact acreages provided in the table represent the
footprint of the culvert, bridge, ditch/channel and any associated erosion protection that
would be constructed at each WOUS crossing. The temporary impacts provided in
Appendix 3 represent the additional area within the WOUS needed for access and
equipment maneuvering in order to construct the culvert, bridge or ditch/channel. Once
construction is completed, all temporary disturbance areas within the WOUS would be
restored to pre-construction ground elevations, contours, and conditions as much as
possible. All WOUS would be conveyed across the highway under the proposed project
and existing drainage configurations would be maintained. No flows would be cut-off
resulting in permanent impacts from downstream loss.
15
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Figure 1: Project Location
16
2.1 PROPOSED ACTIVITIES
The project includes several regulated activities relative to the reconstruction of U.S.
Highway 85, which are all required in order for the project to be completed. These
specific activities would result in a discharge of fill material into aquatic resources and
result in both permanent and temporary impacts throughout the 62-mile corridor. The 4lane project would include the following:
2.1.1 ROADWAY RECONSTRUCTION AND/OR REMOVAL OF
STRUCTURES AND FILL:
This activity includes the reconstruction of an existing roadway which would result in
material removal and a discharge of fill material in order to maintain the structural
integrity and operational capacity of the roadway for adequate drainage, flood hazard
reduction, and overall public safety. Deviations in the filled area may result from
changes in materials, construction techniques, requirements of other regulatory
agencies, or current design and safety standards which would be necessary for
reconstruction to occur. Throughout the 62-mile corridor, the existing roadway would be
widened to provide a safer highway for the traveling public. These activities would
require fill material to be placed in regulated aquatic resources. Culverts would be
replaced during construction, incidental to roadway widening. These culverts may
consist of corrugated steel pipes and/or larger reinforced concrete box culverts. NDDOT
and FHWA have also proposed wildlife crossings, some of which, may be constructed in
areas crossing WOUS. These areas provide migration corridors and ecological
connectivity for both aquatic and terrestrial organisms. The Long X Bridge which
crosses the Little Missouri River, would be replaced with a new four-lane bridge east of
the existing bridge.
2.1.2 TEMPORARY STRUCTURES OR FILLS NECESSARY FOR
CONSTRUCTION ACTIVITIES
This includes temporary fills and other work, including the use of temporary mats,
necessary to conduct any of the reconstruction activities above. Appropriate measures
must be taken to maintain normal downstream flows and minimize flooding to the
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
maximum extent practicable, when temporary discharges, including cofferdams, are
necessary for maintenance activities, access fills, or temporary dewatering. Temporary
fills must consist of non-erodible materials and be placed in a manner that will not be
eroded by expected high flows. After conducting the reconstruction activity, temporary
fills must be removed in their entirety and the affected areas returned to preconstruction contours, elevations and replanted with appropriate native seed mix.
2.2 AVOIDANCE, MINIMIZATION AND COMPENSATION
2.2.1 AVOIDANCE
It was determined by the applicant that complete avoidance of WOUS was not
practicable. The Corps has determined that in order to meet the overall purpose and
need, complete avoidance is not practicable. To utilize the existing transportation
corridor, it is necessary to impact WOUS predominantly through culvert extensions and
road widening.
2.2.2 MINIMIZATION
Throughout the extensive planning and design phases of the project, numerous
alternatives were considered by the applicant to minimize impacts to WOUS and other
major environmental impacts. Alternative alignments were considered during the DEIS
that reduced environmental impacts (including those to WOUS) while still meeting the
project's purpose and need. Later during design, options were considered to further
minimize impacts to WOUS. Examples of design considerations that minimized impacts
included limiting the number of piers in the Little Missouri River to the minimum
necessary for the replacement of the Long X Bridge, reducing slopes necessary for the
construction of a new roadway and countersinking box culverts and large pipes to allow
for the re-establishment of natural substrate. Minimization during preliminary design was
also developed for the badlands portion of the project. Retaining walls have been
included in order to eliminate large fill slopes that would have otherwise resulted in more
impacts to several wetlands and tributaries. Flexible design options have been included
in the DEIS to further minimize impacts at the time the Corps makes a final decision on
those phases of the project requiring authorization under Section 404 of the Clean
Water Act.
18
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Further minimization would occur with the implementation of Best Management
Practices (BMP's). Some examples of this include the use of fiber rolls and silt curtains
to limit the effects associated with the discharge of fill material on adjacent and
downstream aquatic resources. An Individual Section 401 Water Quality Certification
would be obtained by the applicant and include measures to ensure impacts to water
quality are minimized. In addition, a Storm Water Pollution Prevention Plan (SWPPP)
would be developed by NDDOT and implemented during construction. Since there is no
regulatory time limit defining temporary impacts, the Omaha District has determined 12
months as a reasonable time limit for temporary impacts, such as temporary fills, to be
removed and the discharge sites restored to original contours.
Once execution of the project begins, culverts and corrugated pipes would be placed 1ft below the existing channel bottom at locations captured by the North Dakota Regional
Conditions for the 2017 Nationwide Permitting Program. This allows for the reestablishment of natural substrate, ensuring sediment related functions and fish
passage would remain following construction activities. This is a general form of
minimization often used within the State of North Dakota to ensure there are no
permanent loss of streams with the installation of concrete box culverts and corrugated
pipes.
2.2.3 COMPENSATION
Wetland mitigation for the project is anticipated to be accomplished through the creation
of wetland mitigation site(s) and/or purchasing credits at a wetland mitigation bank or in
lieu fee program. Mitigation would be determined during final design and permitting.
Primarily, resources to be impacted include palustrine emergent wetlands, intermittent
and ephemeral streams (unnamed tributaries), and larger perennial rivers such as the
Little Missouri River. Compensation for impacts to streams and other waters may be
required.
As per the 2008 Final Mitigation Rule, the fundamental objective of compensatory
mitigation is to offset environmental losses resulting from the unavoidable impacts to
WOUS authorized by DA permits. The Corps must determine the compensatory
19
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
mitigation to be required for a DA permit, based on what is practicable and capable of
compensating for the aquatic resource functions that would be lost as a result of the
permitted activity. In making this determination, the Corps must assess the likelihood
for ecological success and sustainability, the location of the compensation site relative
to the impact site and their significance within the watershed, and the costs of the
compensatory mitigation project. In many cases, the environmentally preferable
compensatory mitigation may be provided through mitigation banks or in-lieu fee
programs because they usually involve consolidating compensatory mitigation projects
where ecologically appropriate, consolidating resources, providing financial planning
and scientific expertise. Compensatory mitigation requirements must be commensurate
with the amount and type of impact that is associated with a particular DA permit.
For individual permits, the permittee must prepare a draft mitigation plan and submit it to
the Corps for review. The approved mitigation plan must contain performance
standards that will be used to assess whether the project is achieving its objectives.
Performance standards should relate to the objectives of the compensatory mitigation
project, so that the project can be objectively evaluated to determine if it is developing
into the desired resource type, providing the expected functions, and attaining any other
applicable metrics (e.g., acres). For the U.S. Highway 85 project, a complete mitigation
plan would be required and impacts would be mitigated at a minimum of a 1:1 ratio.
It should be noted that several factors may affect the amount of impacts for this project.
The Corps is anticipating new guidance and rule-making on the definition of Waters of
the U.S. prior to the permitting phase of the project. This would require a re-evaluation
of the impacts during the permitting phase as well. It is unknown at this time whether
that would result in a decrease or increase in potential impacts of the proposed project.
Approved jurisdictional determinations are valid for a 5-year period, so additional
phased projects may need to be re-evaluated.
20
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
3.0 BASIC AND OVERALL PURPOSE
3.1 BASIC PROJECT PURPOSE AND WATER DEPENDENCY
The basic project purpose comprises the fundamental, essential, or irreducible purpose
of the proposed project, and is used by the Corps to determine whether the applicant's
project is water dependent (i.e., whether it requires access or proximity to or siting
within a special aquatic site). The basic project purpose for the proposed project is road
construction, which is not water dependent. As noted in Section 1.1, the Section
404(b)(1) Guidelines at 40 CFR § 230.10(a)(3) set forth two rebuttable presumptions
when the activity associated with a discharge is proposed in a special aquatic site, as
defined at 40 CFR Part 230, subpart E. The U.S. Highway 85 project would result in a
discharge of fill material into special aquatic sites.
3.2 OVERALL PROJECT PURPOSE
The overall project purpose serves as the basis for the Corps' Section 404(b)(1)
alternatives analysis and is determined by further defining the basic project purpose in a
manner that more specifically describes the applicant's goals and accounts for logistical
considerations for the project while also considering the public's perspectives, and
which allows a reasonable range of alternatives to be analyzed. It is critical that the
overall project purpose be defined to provide for a meaningful evaluation of alternatives.
It should not be so narrowly defined as to give undue deference to the applicant's
wishes, thereby unreasonably limiting the consideration of alternatives. Conversely, it
should not be so broadly defined as to render the evaluation unreasonable and
meaningless.
The overall purpose of this project is to reconstruct 62 miles of U.S. Highway 85, a twolane highway, to a four-lane highway in order to improve system linkage within the
region and state; improve safety; to address social demands created by the rise in traffic
volumes and influx of people; facilitate economic development; improve roadway
reliability; and provide highway capacity to accommodate current and future traffic
volumes.
21
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.0 ALTERNATIVES CONSIDERED
The FHWA and NDDOT have prepared a Draft EIS with the Corps, National Park
Service, and the U.S. Forest Service as cooperating agencies. During the FHWA EIS
process, a multidisciplinary process was undertaken to identify a range of reasonable
alternatives to be studied in detail in the EIS. The process involved identifying,
comparatively screening, and eliminating alternatives based on:
· Input from the public
· A multidisciplinary set of criteria evenly applied
· The historical context of the proposed action
· Projected conditions with and without the alternatives being considered
FHWA and NDDOT developed an Alternatives Methodology to document the process of
identifying, evaluating, and advancing reasonable alternatives for further analysis with
an overall goal of identifying the preferred alternative (NDDOT 2018b). The Alternatives
Methodology included a three-phase screening process that considered
recommendations from previous reports and studies; project purpose and need; project
constraints, design criteria and standards; and engineering and environmental impact
analysis. Development of this Alternatives Methodology is being driven by the
environmental review process required under SAFETEA-LU; whereby, the lead agency,
in cooperation with cooperating and participating agencies, is required to determine the
methodology and level of detail for consideration of a reasonable range of alternatives
(FHWA 2005). The three phases included:
·
Phase I: Develop Full Range of Reasonable Alternatives
o Step 1: Define Range of Reasonable Alternatives
o Step 2: Consider Recommendations from Previous Reports and Studies
o Step 3: Screen for Consistency with Project Purpose and Need/Project
Goals
o Step 4: Summarize Findings and Conduct Phase II.
·
Phase II Desktop Review of Reasonable Alternatives
o Step 1: Screen for Consistency with Project Constraints and Design
Criteria and Standards
22
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
o Step 2: Consider Comments Received from Agencies and Public
Alternatives Workshop
o Step 3: Summarize Findings and Conduct Phase III.
·
Phase III Engineering and Environmental Impact Analyses of Reasonable
Alternatives
o Step 1: Conduct Engineering Analysis
o Step 2: Conduct Environmental Impact Analysis
o Step 3: Recommend Preferred Alternative.
The following table lists the alternatives considered during the review process. These
will be discussed in detail in this section.
23
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 1: Alternatives considered during review.
Alternative
Description
Corridor Alternatives
A
No Action
B
4-lane section on existing alignment divided, depressed median w/options
(Applicant preferred)
C
4-lane section on existing alignment divided flush median with options
D
Super Highway with passing and turning lanes
E
Rehabilitation of existing roadway with wider shoulders
F
4-lane section on existing alignment undivided
G
4-lane outside existing alignment 1-2 miles away
H
4-lane outside existing alignment with two lanes 1-2 miles away
I
6-lane highway
J
Elevated roadway
K
One-way pair
L
Construct a pipeline
M
Public Transit
4.1 ALTERNATIVE A: NO ACTION
The No Action alternative (Alt A) would not expand the existing highway capacity
between I-94 to the Watford City Bypass or replace or rehabilitate the existing Long X
Bridge. Alt A can be used, however, as a baseline for evaluation of impacts of the
potential build alternatives. The 105 miles between U.S. Highway 85 between I-94
north to the junction of U.S. Highway 2, the northern 43 miles from Watford City to
Williston has been expanded from 2-lanes to 4-lanes. Alt A does not provide for a
system linkage with a continuous 4-lane highway between I-94 and Watford City.
Passing lanes are currently limited to a 7-mile stretch of highway through the Badlands
that contains a southbound climbing lane south the Little Missouri River (LMR) and a
northbound climbing lane north of the LMR. The limited passing opportunities on a 2lane highway can result in drivers engaging in risk-taking behavior when faced with slow
moving trucks through much of the corridor.
There are currently three bridge structures located along the existing alignment crossing
the South Branch of the Green River, the LMC, and Spring Creek. The bridges over the
South Branch of the Green River and Spring Creek are three-span, concrete bridges
with no overhead height restrictions. These two bridges are overall in good conditions.
24
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
The Long X Bridge over the LMC is a three-span, steel truss bridge with a height
restriction of 16-ft. The height restriction forces over-height vehicles to detour around
the Long X Bridge via ND 22. Based on the final destination, this can result in an
average of 50 additional highway miles traveled one-way. Between July of 2013 and
July 2015, a total of 263 over-height permits were submitted to the NDDOT and denied
due to the existing height restrictions. Since 2011, there have been 7 major incidents of
over-height vehicles hitting the Long X Bridge resulting in one instance of full closure for
5-days for analysis and repair, three instances of over-night closures of approximately 2
weeks each for repairs, and one planned closure to repair the most recent damage.
This results in both social and economic impacts on all user groups. In addition to overheight vehicles, more than 24,000 legally permitted over-width vehicles crossed the
Long X Bridge from January of 2014 to November of 2015. Although most of these
loads were able to cross the bridge without a disruption to traffic, 1200 of these required
a temporary closure of the opposing traffic lane to accommodate the loads.
Alt A would maintain the existing infrastructure as it is today and no highway expansion
would occur. This alternative does not meet the purpose and need of the long-term
transportation system linkage of the region. This highway is one of the primary arterial
roadways accessing the Bakken Oilfields of western North Dakota. Over the past
several years, the average daily traffic (ADT) volumes along this roadway has increased
substantially from less than 2000 vehicles a day prior to 2009, to over 5000 in 2014.
There was a decline in ADT from 2014 to 2016, but traffic has increased since the low in
2016 (NDDOT 2018a).
The purpose of the proposed action is to provide a transportation corridor that would
address the social demands created by the rise in traffic volumes and influx of people,
and facilitate economic development within the region by providing an efficient and
reliable highway system. The proposed project must also accommodate a mix of
industrial, agricultural and passenger traffic, while providing reasonable
accommodations for oversized loads and passing opportunities for the traveling public.
The proposed project would also improve system linkage within the region and state by
expanding the existing highway on the current alignment to create a continuous 4-lane
25
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
highway from the I-94 Interchange to U.S. Highway 2. The proposed project would also
improve safety along the project corridor for the traveling public while accommodating
current and future highway capacity. The purpose and need also includes improving
the highway reliability through addressing the height and width restrictions of the Long X
Bridge and slope stability and landslide issues along the corridor. The purpose and
need would also address the occurrence of wildlife/vehicle related crashes and
minimize wildlife habitat fragmentation.
26
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 2: Alternative A matrix for addressing purpose and need.
Purpose and Need
Alt A
Address social demands created by the rise in traffic volumes
and influx of people, and facilitate economic development within
the region by providing an efficient and reliable highway system
Does not address increase in traffic volumes or alleviate
the need for closures at the Long X Bridge
Accommodate a mix of industrial, agricultural, and passenger
traffic, while providing reasonable accommodations for oversized
loads and ample passing opportunities for the traveling public
Does not meet the need for accommodating oversized
loads at the Long X Bridge
Improve system linkage within the region and state by expanding
the existing highway on essentially its current alignment to create
a continuous four-lane highway from the I-94 interchange to US
Highway 2
Does not provide a 4-lane roadway between I-94 and
Watford City.
Improve safety along the project corridor for the traveling public
Does not improve safety.
Provide highway capacity to accommodate current and future
traffic volumes
Does not increase capacity
Satisfy transportation demands associated with the US Highway
85 corridor, while maintaining compatibility with federal land
management agencies
Does not satisfy increasing transportation demands.
Improve roadway reliability by addressing current height and
Does not meet the need for accommodating oversized
width restrictions associated with the Long X Bridge and slope
stability and landslide issues along the roadway corridor
loads at the Long X Bridge or address landslide and slope
stability
Reduce the potential for wildlife/vehicle-related crashes, and
minimize wildlife habitat fragmentation
Does not address wildlife
Alt A will be carried forward as the baseline conditions within the corridor.
4.2 ELEMENTS COMMON TO ALT B, C, D, E, AND F
Most of the build alternatives have common characteristics that will be addressed in this
section. The major difference in all of the build alternatives is the width and design of
the median. Alt B would have a divided, flush median of 52-ft; Alt C would have a
divided flush median of 20-ft in width, Alt D would include widening of the highway for
passing and turn lanes; Alt E would widen the shoulders; and Alt F would include 2
additional lanes with a barrier. The goal of the project is to provide a safe corridor for
the traveling public from the Interchange of I-94 to Watford City, where U.S. Highway 85
continues north towards Williston, North Dakota. Alternatives B, C and F consist of a 427
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
lane roadway with a divided median to provide additional area between the roadway
sections. The applicant has indicated that traffic volumes and the associated updates to
the corridor require additional safety considerations when designing a 4-lane roadway.
This includes efforts to prevent head on collisions by physically separating the roadway
or providing appropriate space between lanes of opposing traffic. Methods associated
with the construction of the roadway remain similar throughout the existing corridor.
It is anticipated that each segment would take two construction seasons to complete,
with the first season consisting of utility relocation, culvert installation, topsoil removal,
grading, graveling, seeding, and erosion-control. The second season would consist of
paving (i.e., surfacing), pavement marking, and permanent sign installation and
associated safety items. The first stage of construction would include establishing work
zones, staging areas, and temporary work zone traffic-control signing. Temporary
erosion-control devices would be installed as necessary, prior to any ground-disturbing
activities. Staging areas and borrow sources would be cleared and topsoil would be
removed and stockpiled for use during reclamation. Temporary fencing would be
installed along pastures used for livestock grazing, and fencing would be provided at all
times along the Theodore Roosevelt National Park (TRNP) North Unit.
Roadway construction would begin by removing the existing topsoil in areas where the
roadway would be expanded (Alt C) or constructed adjacent to the existing alignment
(Alt B). The topsoil would be stockpiled and replaced after grading operations have
occurred. Best construction practices would be used to prevent erosion. After the topsoil
is removed and salvaged, earthwork grading operations would begin. These operations
include a combination of hauling and placing fill material (i.e. soil) in areas that require
additional material and removing excess material in cut areas. Work on approaches (i.e.
field drives, section lines, and private driveways) would include placement of fill material
to widen existing approaches and to construct new approaches as necessary. During
the grading operations, drainage structures (i.e. culverts) would be extended and/or
installed as required through the roadway and approaches to maintain existing drainage
patterns. Once the grading operations are completed the following activities would
occur:
28
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
·
Gravel would be placed on the surface of the roadway
·
Topsoil would be replaced
·
Seeding and erosion-control protection (i.e. seeding, straw mulch)
would be installed
·
Permanent fencing would be installed
The roadway would be paved the following construction season. Timing of construction
activities would be limited in proximity to the TRNP North Unit. Timing restrictions
would extend from reference point (RP) 126 to RP 130. In this area, regular construction
activities (i.e. all activities except pile driving) would be limited to 7 am to 9 pm MST.
Certain construction activities would require work outside of these times. The contractor
would be required to notify the NDDOT prior to working outside of the established times,
and the NDDOT would notify the NPS. Should construction fall behind schedule,
sustained 24-hour construction may be required. In the event that sustained 24-hour
construction becomes necessary, the NDDOT would coordinate with the NPS prior to
commencing this schedule.
Prior to developing the Special-Use Permit for temporary construction activities on NPSmanaged lands, there would be discussions regarding extenuating circumstances that
may necessitate 24-hour construction and additional conditions that may accompany
24-hour construction. In the realignment areas and reconstruction areas (i.e. Badlands,
near Watford City, and Fairfield [Option FF-1]), it is anticipated the existing roadway
surfacing would be removed during grading operations and a temporary paved surface
would be in-place during the winter months until the final paving operation occurs the
following construction season. Upon completion of roadway paving and pavement
marking, permanent signs (i.e. curve warning signs, speed limit signs) and associated
safety items would be installed to complete the project.
Construction of the shared use path could be completed in conjunction with construction
of the roadway. Grading operations for the trail could occur concurrently with the
grading operations of the new roadway. The surfacing of the trail could occur the
29
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
following construction season when the roadway is surfaced or at a later date
depending on when funding for the path is received.
During preliminary design and development of the DEIS, wildlife migration patterns and
overall use of the surrounding area were considered. NDDOT and FHWA have
incorporated three wildlife crossings within the Badlands segment of the proposed
project. This particular area provides highly valued habitat among terrestrial species, on
both sides of U.S. Highway 85. Specifically, these crossings would provide ecological
connectivity between habitats for Big horn sheep (Ovis canadensis), Whitetail deer
(Odocoileus virginianus), and Mule deer (Odocoileus hemionus). One wildlife underpass
would be constructed below the new Long X Bridge to maintain the riparian corridor and
promote safe passage for wildlife in the area surrounding TRNP.
The wildlife crossing underpass at RP 122.5 has been designed for Mule deer
(Odocoileus hemionus) and would consist of a concrete box culvert approximately 10-ft
tall, 20-ft wide and 136-ft lone. Construction would likely be completed in two stages.
First, the contractor would construct a portion of the structure while traffic is using the
existing roadway and/or a temporary bypass within the existing ROW. Traffic would then
be moved to travel over the completed first stage while the rest of structure is built.
Construction activities would consist of excavation of the existing roadway embankment
down to the bottom of box culvert elevation, placement of culvert foundation materials,
and placement of the precast culvert sections. Following completion of culvert
construction, the culvert would be backfilled, and the roadway section above would be
constructed
The wildlife crossing underpass at RP 126.1 is designed specifically for Big horn sheep
(Ovis canadensis) underpass and would consist of a structure that is a minimum of 15-ft
tall, 40-ft wide and would have a length of approximately 150-ft . Construction would
likely be completed in two stages. First, the contractor would construct a portion of the
structure while traffic is using the existing roadway and/or a temporary bypass within the
existing ROW. Traffic would then be moved to travel over the completed first stage
while the rest of structure is built. Construction activities would consist of excavation of
30
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
the existing roadway embankment down to the foundation elevation, pile driving,
placement of foundation materials, and construction of the concrete structure. Following
completion of structure construction, the structure would be backfilled, and the roadway
section above would be constructed.
A third wildlife crossing would be incorporated into the design of the Long X Bridge at
RP 126.6. The banks below the existing bridge provide relatively flat benches,
approximately 80-ft wide on each bank, and the bridge provides approximately 30-ft and
19-ft clearance over the benches on the southern and northern banks, respectively.
New bridges constructed as part of Options LX-1, LX-2 or LX-3 (discussed under Alt B)
would be designed to maintain the bench width and would provide approximately 4-ft
less vertical clearance due to the need to match the roadway profile of the existing
bridge. The options are not discussed in this document. Please refer to the DEIS for
further information.
The Long X Bridge is expected to be replaced with a 4-lane structure over the Little
Missouri River. The bridge would be part of the mitigation required for Section 106.
Bridge substructures (i.e., piers and abutments) would be constructed of concrete and
supported by a deep foundation system. The deep foundation system could consist of
driven piles or drilled shafts. A pier is a bridge component used to support the part of
the bridge that carries traffic (superstructure). A typical pier consists of foundation piling,
footing, and columns (or wall). There would be a total of four piers: one on the south
bank of the river, two in the river channel, and one on the north bank of the river.
Construction of supporting piers and footings in the Little Missouri River would be
accomplished using cofferdams or earthen ring dikes. Once the cofferdams or ring dikes
are in place, the contractor would need to excavate the channel bottom inside the
cofferdam to the required pier foundation elevation. The deep foundation would be
installed in the ground and the concrete footing would be placed on top of the
foundation. After the footing and pier column are constructed, the excavated material
would be backfilled and any excess material would be removed from the channel and
disposed of at an approved location. The bridge superstructure would consist of a
31
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
reinforced concrete deck, supported by either pre-stressed concrete or steel-plate
girders. Upon completion of construction, all temporary fills and structures would be
removed and the stream bed and banks would be restored to pre-construction
condition.
Land pier construction would be similar, except cofferdams or ring dikes would not be
needed. Construction activities would include excavation to the bottom of the footing,
approximately 6 to 8 feet below the existing ground surface. Rock riprap (i.e., loose
stone used to form a protective mat) would be added at the northern abutment (i.e.,
bridge end) and all piers to reduce stream channel erosion. Any riprap installed within
the designated wildlife crossing area on the northern bank of the Little Missouri River
would be covered with topsoil, and all other riprap would be covered 1-foot below the
channel bottom elevation.
To facilitate access for construction equipment, materials, and labor forces, the bridge
contractor would need to place temporary fill in the channel to construct a causeway or
bypass. River flow would be maintained by installing temporary culverts or by leaving
part of the channel open. Depending on the water depths at the time of construction, the
contractor may construct a temporary work bridge in lieu of a causeway. As with
roadway construction, the timing of bridge construction activities would be limited in
proximity to the TRNP North Unit, and work outside of the timing restrictions may be
required. In addition to the timing restriction for regular construction activities, pile
driving activities in this area would be limited to 7:00 a.m. to 6:00 p.m. MST.
4.2.1 ACTIVITIES IN WATERS OF THE U.S
There were 429 wetlands and 6 rivers, streams and drainage areas identified within the
proposed project area. Approximately 164.08 acres of wetlands were delineated and
13.55 acres of rivers, streams and drainage areas identified within the project area. Of
the waters within the project area, 230 were determined to be jurisdictional. This
includes linear slope wetlands, palustrine emergent wetland depressions, and streams
(perennial, intermittent and ephemeral). As previously discussed, this also includes the
Little Missouri River which is bisected by U.S. Highway 85 in the badlands portion of the
32
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
project. Based on the aquatic resource information, several activities would occur in
WOUS.
Culverts and corrugated pipes would be replaced and extended throughout the project.
Some resources flow under the roadway and those connections would be maintained.
Riprap would be placed at the culvert and pipe ends to prevent scouring and erosion.
The installation of the culverts and pipes, riprap, and other inert material (soil) used for
the completion of the project would occur within regulated waterways.
The Long X Bridge may require temporary approach fills in order to install piers for the
new bridge structure. However, temporary fills associated with bridge construction
would be removed and the area restored to preconstruction conditions. The footprint of
the piers and riprap that would be installed to prevent erosion around the piers, would
be located within the Little Missouri River. Other temporary features, such as
cofferdams, would be utilized during construction and removed following the completion
of construction activities.
Wetland depressions located along the roadway would require fill to be placed during
earthwork activities to establish a grade for the wider roadway. This extended footprint
into regulated waters would require the deposition of fill material by grading equipment
and excavators. Some excavating activities may occur outside of wetland boundaries,
while others may require temporary matting and access during construction activities.
The proposed wildlife crossings would be located in areas where U.S. Highway 85
crosses regulated water resources. During design and development of the DEIS, it was
determined that providing larger culverts in areas containing WOUS would maintain
flows and allow both terrestrial and aquatic organisms the ability to move freely under
the roadway. Temporary impacts associated with the use of heavy equipment in these
areas is anticipated.
33
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.3 ALTERNATIVE B - 4-LANE SECTION ON EXISTING
ALIGNMENT DIVIDED, DEPRESSED MEDIAN W/OPTIONS
(APPLICANT'S PREFERRED)
Alternative B (Alt B) includes expanding from 2 to 4-lanes on the existing alignment for
62-miles with a divided, depressed, center median of approximately 52-ft shoulder to
shoulder (See Figure 2). The roadway would be designed for a posted speed limit of
70-mph and would have two 12-ft wide driving lanes in each direction. The outside
paved shoulders would be a minimum of 8-ft wide with inside paved shoulders of 4-ft
wide minimum making a total roadway width of 124-ft. This alternative would utilize the
existing two lanes as a one-way direction and construct two adjacent lanes. The
existing roadway would require widening to accommodate the 8-ft wide shoulders. The
slope across the roadway (super-elevation) would need to be corrected with an asphalt
overlay and one existing crest vertical curve would need to be reconstructed to meet the
proposed design seed of 70-mph. NDDOT (2016) created a detailed Map Book as part
of a roadway constraints assessment to determine which side of the existing roadway
would be the most optimal for expansion based on a number of criteria. The goal of this
assessment was to avoid impacts on existing resources (e.g. homes, buildings, large
utilities, cultural resources) while minimizing the number of crossovers (i.e. transitions
from expanding on one side of the existing roadway to expanding on the other). Table 4
addresses Alt B and the purpose and need of the proposed project.
Figure 2: Typical Section for Divided, Depressed Median.
34
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 3: Alternative B matrix for addressing Purpose and Need
Purpose and Need
Alt B
Address social demands created by the rise in traffic
Addresses increase in traffic volumes and
eliminates the need for closures of the Long X
Bridge with the inclusion of Alt 4 under Long X
Bridge Alternatives
volumes and influx of people, and facilitate economic
development within the region by providing an efficient
and reliable highway system
When coupled with Alt 4 for the Long X Bridge
provides for reasonable accommodations for
over-sized loads.
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its
Provides for 4-lanes between I-94 and U.S. 2
interchange
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Reduces the potential for head-on collisions and
improves safety within the corridor
Provide highway capacity to accommodate current and
Increases capacity for present and future
transportation demands
future traffic volumes
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility
with federal land management agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the Long
X Bridge and slope stability and landslide issues along
Satisfies increasing transportation demands and
maintains compatibility with federal land
management agencies
Meets the need for accommodating oversized
loads at the Long X Bridge or address landslide
and slope stability
the roadway corridor
Addresses wildlife connectivity issues
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
Alt B meets the purpose and need of the proposed project and will be carried forward
for additional analysis.
4.4 ALTERNATIVE C: 4-LANE DIVIDED, FLUSH MEDIAN
This alternative would expand the highway to a divided, 4-lane section with a flush
center median. An example of a typical section of this alternative is shown in Figure 3:
Typical Section for Divided, Flush Median. Expansion associated with Alt C would occur
35
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
equally to both sides of the existing roadway. As an additional safety measure, rumble
strips would be installed within non-turning lane segments of the flush, center median to
discourage drivers from using the center median as a passing lane. Design criteria for
Alt C include the following:
·
Roadway would have a design speed, as well as a posted speed limit, of 65 mph.
·
Roadway section would consist of two 12-foot wide driving lanes in each
direction.
·
Outside paved shoulders would be a minimum of 8 feet wide.
·
Opposing directions of traffic would be separated by a paved, 20-foot-wide, flush
median.
·
Total width from outside shoulder to outside shoulder would be 84 feet.
Alternatives B and C would begin at the northern end of the I-94 interchange. To tie the
project into the two-lane typical section south of the I-94 interchange, restriping of the
interchange would be required. The addition of a U.S. Highway 85 northbound lane
would be achieved by adding a free-flowing right-hand turn lane to the I-94 westbound
off-ramp. Conversely, the addition of a U.S. Highway 85 southbound lane would be
achieved by adding a designated right-hand turn lane onto the I-94 westbound on-ramp.
Table 5 includes a discussion on how Alt C meets the purpose and need of the
proposed project.
Figure 3: Typical Section for Divided, Flush Median
36
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 4: Alternative C matrix for addressing purpose and need.
Purpose and Need
Alt C
Address social demands created by the rise in
traffic volumes and influx of people, and facilitate
economic development within the region by
providing an efficient and reliable highway system
Addresses increase in traffic volumes and
eliminates the need for closures of the Long X
Bridge with the inclusion of Alt 4 under Long X
Bridge Alternatives
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
When coupled with Alt 4 for the Long X Bridge
provides for reasonable accommodations for
over-sized loads.
Improve system linkage within the region and
state by expanding the existing highway on
essentially its current alignment to create a
continuous four-lane highway from the I-94
interchange to US Highway 2
Provides for 4-lanes between I-94 and U.S. 2
interchange
Improve safety along the project corridor for the
traveling public
Reduces the potential for head-on collisions and
improves safety within the corridor
Provide highway capacity to accommodate
current and future traffic volumes
Increases capacity for present and future
transportation demands
Satisfy transportation demands associated with
the US Highway 85 corridor, while maintaining
compatibility with federal land management
agencies
Satisfies increasing transportation demands and
maintains compatibility with federal land
management agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the
Long X Bridge and slope stability and landslide
issues along the roadway corridor
Meets the need for accommodating oversized
loads at the Long X Bridge or address landslide
and slope stability
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat
fragmentation
Addresses wildlife connectivity issues
Alt C meets the purpose and need of the proposed project and will be carried forward
for additional analysis.
37
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.5 ALTERNATIVE D: SUPER 2 HIGHWAY WITH PASSING AND
TURN LANES
A Super 2 Highway would include a periodic passing lane that is added to a 2-lane rural
highway to allow passing of slower vehicles. The passing lane would alternate from one
direction of travel to the other within a section of roadway, allowing for passing
opportunities in both directions. A Super 2 project can be introduced on an existing twolane roadway where there is a significant amount of slow moving traffic, limited sight
distance for passing, and/or the existing traffic volume has exceeded the two-lane
highway capacity, creating the need for vehicles to pass on a more frequent basis.
Table 6 includes a discussion on how Alt F meets the purpose and need of the
proposed project. This alternative would have less impacts to WOUS because culverts
along the existing highway would require minimal widening of approximately 12-20-ft to
accommodate passing and turn lanes. This alternative is estimated to have less than
1.0 acres of WOUS impacts.
38
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 5: Alternative D matrix for addressing Purpose and Need
Purpose and Need
Alt D
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
Does not address increase in traffic volumes.
development within the region by providing an efficient and
reliable highway system
Does provide for opportunities to pass slow-moving
vehicles on a limited basis. Most likely would still
require replacing the Long X Bridge.
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample passing
opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its current
alignment to create a continuous four-lane highway from the
I-94 interchange to US Highway 2
Does improve the flow of traffic with turn lanes and
passing lanes. However, it does not meet the
purpose and need to provide a continuous system
linkage with U.S. 85 north of Watford City
May increase the occurrence of head-on collisions
within the corridor. However, does alleviate the
risk-taking associated with passing and provides
turn lanes for added safety.
Improve safety along the project corridor for the traveling
public
Does increase capacity when vehicles can pass
slow-moving vehicles, but would not address future
traffic needs
Provide highway capacity to accommodate current and
future traffic volumes
Satisfies increasing transportation demands and
maintains compatibility with federal land
management agencies
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility with
federal land management agencies
Improve roadway reliability by addressing current height and
width restrictions associated with the Long X Bridge and
slope stability and landslide issues along the roadway
corridor
Reduce the potential for wildlife/vehicle-related crashes, and
minimize wildlife habitat fragmentation
Assuming that the Long X Bridge replacement
would be a priority, this Alternative would address
over-sized loads. However, it may not be sufficient
to address slope stability and landslide issues.
Does not address wildlife connectivity issues
4.6 ALTERNATIVE E: REHABILITATION OF EXISTING ROADWAY
WITH WIDER SHOULDERS
Alt E would use the existing roadway and add 8-ft shoulders to each direction of
the highway. Major rehabilitation of a roadway is the planned strategy in which
39
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
major work is performed to bring a highway up to an acceptable condition to
extend the service life and provide operational improvements (i.e. adding turn
lanes). Major rehabilitation projects may include reclaiming the existing surface
material and base along with the placement of additional surface material and/or
work necessary to return an existing roadway, including shoulder, bridges, the
roadside and appurtenances to a condition of structural functional adequacy.
On these projects the roadway elevation may change, shoulders may be added,
and fore-slope corrections may be made. The roadway would be resurfaced and
safety improvements would be completed as required. A crash analysis would
be complete and cost effective enhancements would be addressed. This
alternative would result in minimal impacts to WOUS, similar to Alt D. Table 7
provides an analysis of Alt E and the purpose and need of the proposed project.
40
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 6: Alternative E matrix for addressing Purpose and Need
Purpose and Need
Alt E
Address social demands created by the rise in traffic
Does not address increase in traffic volumes.
volumes and influx of people, and facilitate economic
development within the region by providing an efficient and
reliable highway system
Does not provide for opportunities to pass slowmoving vehicles. Most likely would still require
replacing the Long X Bridge.
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample passing
opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its current
alignment to create a continuous four-lane highway from the
I-94 interchange to US Highway 2
Does not improve the flow of traffic. Does not meet
the purpose and need to provide a continuous system
linkage with U.S. 85 north of Watford City
Improve safety along the project corridor for the traveling
public
Improves safety through providing wider shoulders,
but does not address head-on collisions or slow
moving vehicles on roadway.
Provide highway capacity to accommodate current and
future traffic volumes
Does not address current and future transportation
needs
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility with
Does not address the transportation demands on the
current roadway.
federal land management agencies
corridor
Assuming that the Long X Bridge replacement would
be a priority, this Alternative would address over-sized
loads. However, it may not be sufficient to address
slope stability and landslide issues.
Reduce the potential for wildlife/vehicle-related crashes, and
Does not address wildlife connectivity issues
Improve roadway reliability by addressing current height and
width restrictions associated with the Long X Bridge and
slope stability and landslide issues along the roadway
minimize wildlife habitat fragmentation
4.7 ALTERNATIVE F: 4-LANE SECTION ON EXISTING
ALIGNMENT UNDIVIDED
This alternative is similar to Alt B and C with the construction of two additional lanes for
a total of 4-lanes of highway. This alternative would have overall less impacts because
the median width would be a minimum of 4-6-ft wide. This alternative would result in
impacts to WOUS with the addition of two 12-ft traveling lanes and one 8-ft shoulder
41
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
(assuming the shoulder on the existing two lane highway can be used for the
northbound lane).
Table 7: Alternative F matrix for addressing Purpose and Need
Purpose and Need
Alt F
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an
efficient and reliable highway system
Addresses increase in traffic volumes and
eliminates the need for closures of the Long X
Bridge with the inclusion of Alt 4 under Long X
Bridge Alternatives
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
When coupled with Alt 4 for the Long X Bridge
provides for reasonable accommodations for oversized loads.
Improve system linkage within the region and state
by expanding the existing highway on essentially its
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Provides for 4-lanes between I-94 and U.S. 2
interchange Does improve the flow of traffic. Does
meet the purpose and need to provide a continuous
system linkage with U.S. 85 north of Watford City
Improve safety along the project corridor for the
traveling public
Improves safety, but does not address head-on
collisions
Provide highway capacity to accommodate current
and future traffic volumes
Does address current and future transportation
needs
Satisfy transportation demands associated with the
US Highway 85 corridor, while maintaining
compatibility with federal land management agencies
Does address the transportation demands on the
current roadway. However, does not address some
of the safety concerns associated with the existing
highway.
Improve roadway reliability by addressing current
height and width restrictions associated with the Long
X Bridge and slope stability and landslide issues
along the roadway corridor
The Long X Bridge would be replaced with a larger
structure, therefore, addressing concerns with oversized loads.
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
Would still address wildlife connectivity although the
benefits may be reduced from a wider highway for
underpasses
42
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.8 ALTERNATIVES OUTSIDE OF THE EXISTING ALIGNMENT
4.8.1 ALTERNATIVE G - 4-LANE OUTSIDE EXISTING ALIGNMENT 1-2
MILES AWAY
Alternative G was eliminated early in the scoping and preliminary alternatives analysis
because it would require the purchase of additional right-of-way and construction of a
new roadway through an area that is undisturbed. It does meet the purpose and need
of the proposed project by providing for current and future transportation demands,
facilitating economic development, provides system linkage, and would be safer than
the existing highway. Approximately 932 acres of additional right-of-way and property
would need to be acquired for this alternative. This alternative will not be carried
forward.
Table 7: Alternative G matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an efficient
and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample passing
opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its current
alignment to create a continuous four-lane highway from
the I-94 interchange to US Highway 2
Improve safety along the project corridor for the traveling
public
Provide highway capacity to accommodate current and
future traffic volumes
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility with
federal land management agencies
Improve roadway reliability by addressing current height
and width restrictions associated with the Long X Bridge
and slope stability and landslide issues along the roadway
corridor
Reduce the potential for wildlife/vehicle-related crashes,
and minimize wildlife habitat fragmentation
43
Alt G
Addresses increase in traffic volumes and
eliminates the need for closures of the Long X
Bridge with the inclusion of Alt 4 under Long X
Bridge Alternatives
When coupled with Alt 4 for the Long X Bridge
provides for reasonable accommodations for
over-sized loads.
Provides for 4-lanes between I-94 and U.S. 2
interchange Does improve the flow of traffic.
Does meet the purpose and need to provide a
continuous system linkage with U.S. 85 north of
Watford City
Improves safety, but does not address head-on
collisions
Does address current and future transportation
needs
Does address the transportation demands on
the current roadway. However, does not
address some of the safety concerns
associated with the existing highway.
The Long X Bridge would be replaced with a
larger structure, therefore, addressing concerns
with over-sized loads.
Would still address wildlife connectivity
although the benefits may be reduced from a
wider highway for underpasses
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.8.2 ALTERNATIVE H: 4-LANE OUTSIDE EXISTING ALIGNMENT WITH
TWO LANES 1-2 MILES AWAY
Alternative H was eliminated early in the scoping and preliminary alternatives analysis
because it would require the purchase of additional right-of-way and construction of a
new roadway through an area that is undisturbed. The existing two lanes would be
converted to one direction following completion of the new 2-lane section. It does meet
the purpose and need of the proposed project by providing for current and future
transportation demands, facilitating economic development, provides system linkage,
and would be safer than the existing highway. Approximately 466 acres of additional
right-of-way and property would need to be acquired for this alternative. This alternative
will not be carried forward.
Table 8: Alternative H matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an efficient
and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Provide highway capacity to accommodate current and
future traffic volumes
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility
with federal land management agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the Long
X Bridge and slope stability and landslide issues along
the roadway corridor
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
44
Alt H
Addresses increase in traffic volumes and
eliminates the need for closures of the Long X
Bridge with the inclusion of Alt 4 under Long X
Bridge Alternatives
When coupled with Alt 4 for the Long X Bridge
provides for reasonable accommodations for oversized loads.
Provides for 4-lanes between I-94 and U.S. 2
interchange Does improve the flow of traffic. Does
meet the purpose and need to provide a continuous
system linkage with U.S. 85 north of Watford City
Improves safety, but does not address head-on
collisions
Does address current and future transportation
needs
Does address the transportation demands on the
current roadway. However, does not address some
of the safety concerns associated with the existing
highway.
The Long X Bridge would be replaced with a larger
structure, therefore, addressing concerns with oversized loads.
Would still address wildlife connectivity although the
benefits may be reduced from a wider highway for
underpasses
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.9 ALTERNATIVE I: 6-LANE HIGHWAY
This alternative would use the existing alignment and expand the existing 2-lane
highway to 6-lanes. Since the highway expansion would take place on the existing
corridor, the impacts would be very similar to the other build alternatives using the
existing highway (Alt B, C, D, E, and F). The impacts to WOUS would be slightly
greater because of a wider highway. This alternative would meet the purpose and
need, but would be excessive and is unnecessary based on current and future traffic
projections.
Table 10: Alternative I matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in
traffic volumes and influx of people, and facilitate
economic development within the region by
providing an efficient and reliable highway
system
Accommodate a mix of industrial, agricultural,
and passenger traffic, while providing
reasonable accommodations for oversized loads
and ample passing opportunities for the traveling
public
Improve system linkage within the region and
state by expanding the existing highway on
essentially its current alignment to create a
continuous four-lane highway from the I-94
interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Provide highway capacity to accommodate
current and future traffic volumes
Satisfy transportation demands associated with
the US Highway 85 corridor, while maintaining
compatibility with federal land management
agencies
Improve roadway reliability by addressing
current height and width restrictions associated
with the Long X Bridge and slope stability and
landslide issues along the roadway corridor
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat
fragmentation
45
Alt I
Would be excessive and unnecessary to meet
current and future traffic projections; would not be a
cost-effective solution.
Does provide for opportunities to pass slow-moving
vehicles. Long X Bridge would be replaced with at
least a 4-lane bridge
Does improve the flow of traffic. Does meet the
purpose and need to provide a continuous system
linkage with U.S. 85 north of Watford City
Improves safety, and does address head-on
collisions or slow moving vehicles on roadway.
Does address current and future transportation
needs
Does address the transportation demands on the
current roadway.
The Long X Bridge would be replaced with a larger
structure, therefore, addressing concerns with oversized loads.
Would still address wildlife connectivity although the
benefits may be reduced from a wider highway for
underpasses
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
4.10 ALTERNATIVE J: ELEVATED ROADWAY
Alternative J would involve converting the existing U.S. 85 highway to one-way traffic
and constructing an elevated roadway above the existing U.S. 85 highway with 2-lanes
running in the opposite direction, very similar to I-70 between Grand Junction and
Glenwood Springs in Colorado. Alternative J is an expensive alternative that does not
adequately address the purpose and need of the project. Alternative J will not be
carried forward in the Alternatives Analysis.
Table 9: Alternative J matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an
efficient and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
Improve system linkage within the region and state
by expanding the existing highway on essentially its
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Provide highway capacity to accommodate current
and future traffic volumes
Satisfy transportation demands associated with the
US Highway 85 corridor, while maintaining
compatibility with federal land management agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the
Long X Bridge and slope stability and landslide
issues along the roadway corridor
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
Alt J
Addresses increase in traffic volumes.
problematic with snow removal.
Would have height and width restrictions.
Provides for 4-lanes between I-94 and U.S. 2
interchange Does improve the flow of traffic.
Does meet the purpose and need to provide a
continuous system linkage with U.S. 85 north of
Watford City
Improves safety, but as above could increase
problems with snow removal.
Does address current and future transportation
needs
Does address the transportation demands on
the current roadway. Does address some of
the safety concerns associated with the existing
highway.
The Long X Bridge would be replaced with a
larger structure, therefore, addressing concerns
with over-sized loads. But the elevated
roadway would create additional over-sized
load restrictions
An elevated roadway would limit the
constructability of wildlife over/under crossings.
4.11 ALTERNATIVE K: ONE-WAY PAIR
This alternative would utilize U.S. Highway 83 as a one-way with two-lanes and ND 22
as a one way with two lanes either north or southbound. Although it is recognized that
this alternative was eliminated early in the scoping of the Draft EIS because of logistics
46
May be
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
associated with residents that live along either highway, the Corps has determined that
it would carry it forward as a minimal impact alternative. Alt D would have fewer
impacts to WOUS and provide for safety because of the reduced head-on collisions that
would occur on a one-way highway. It would also be relatively easy to implement
without a large expenditure of money. However, the logistics may be problematic for
locals who would have to travel further to access arterial roads to return home. This
alternative will not be carried forward.
Table12: Alternative K matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in
traffic volumes and influx of people, and facilitate
economic development within the region by
providing an efficient and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
Improve system linkage within the region and state
by expanding the existing highway on essentially its
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Provide highway capacity to accommodate current
and future traffic volumes
Satisfy transportation demands associated with the
US Highway 85 corridor, while maintaining
compatibility with federal land management
agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the
Long X Bridge and slope stability and landslide
issues along the roadway corridor
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
Alt K
Alternative K does provide for increased
current and future traffic volumes, but it fails
to provide an efficient highway system. The
traveling public would have to travel an
additional 20 or 30 miles daily to access the
one-way sections of U.S. 85.
Would accommodate oversized loads with
the replacement of the Long X Bridge.
Provides for 4-lanes between I-94 and U.S.
2 interchange Does not improve the flow of
traffic. Does not meet the purpose and
need to provide a continuous system
linkage with U.S. 85 north of Watford City
Improves safety as the one-way corridors
would reduce head-on collisions.
Does address current and future
transportation needs
Does address the transportation demands
on the current roadway. Does address
some of the safety concerns associated with
the existing highway.
The Long X Bridge would be replaced with a
larger structure, therefore, addressing
concerns with over-sized loads.
Using the existing roadway with some
improvements may not allow for wildlife
structures to be built.
4.12 ALTERNATIVE L: CONSTRUCT A PIPELINE
Alternative L would construct an additional pipeline to the Bakken Oil Fields to alleviate
some of the truck traffic on U.S. 85. This would not address the current and future
traffic predicted to occur within the highway alignment. It would also not address the
47
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
safety concerns within the alignment and there would still be the potential for head-on
collisions because of a lack of passing ability. This alternative does not take into
account that much of the truck traffic is related to oilfield support services, which would
continue even with a pipeline. Alternative L will not be carried forward for further
analysis.
Table 10: Alternative L matrix for addressing Purpose and Need
Alt L
Alternative L does not provide for increased current and
future traffic volumes, and it fails to provide an efficient
highway system.
Purpose and Need
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an efficient
and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample passing
opportunities for the traveling public
A pipeline does not address any current or future traffic
volumes. It assumes that the driving factor is simply oil
trucks transporting oil, which is not the case. Truck traffic
associated with all oilfield services would still continue.
Improve system linkage within the region and state by
expanding the existing highway on essentially its current
alignment to create a continuous four-lane highway from
the I-94 interchange to US Highway 2
Improve safety along the project corridor for the traveling
public
Provide highway capacity to accommodate current and
future traffic volumes
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility with
federal land management agencies
Improve roadway reliability by addressing current height
and width restrictions associated with the Long X Bridge
and slope stability and landslide issues along the roadway
corridor
Reduce the potential for wildlife/vehicle-related crashes,
and minimize wildlife habitat fragmentation
Does not meet the purpose and need to provide a
continuous system linkage with U.S. 85 north of Watford
City
May reduce the truck traffic on the highway but not
significantly.
Does not address current and future transportation
needs
Does not address the transportation demands on the
current roadway. Does not address the safety concerns
associated with the existing highway.
Alt L does not provide a reliable transportation corridor
that alleviates current and future height and width
restrictions.
Does not reduce the probability of wildlife/vehicle
related crashes.
4.13 ALTERNATIVE M: PUBLIC TRANSIT
Alternative M would provide for public transit within the 62-mile alignment. Many of the
National Parks currently have some form of public transit available during the busy
summer months (e.g., Zion, Yosemite, Denali and Bruce National Parks. This
alternative would not address the long-term traffic demands of the corridor. Alternative
M will not be carried forward in the alternatives analysis.
48
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 11: Alternative M matrix for addressing Purpose and Need
Purpose and Need
Address social demands created by the rise in traffic
volumes and influx of people, and facilitate economic
development within the region by providing an efficient
and reliable highway system
Accommodate a mix of industrial, agricultural, and
passenger traffic, while providing reasonable
accommodations for oversized loads and ample
passing opportunities for the traveling public
Improve system linkage within the region and state by
expanding the existing highway on essentially its
current alignment to create a continuous four-lane
highway from the I-94 interchange to US Highway 2
Improve safety along the project corridor for the
traveling public
Provide highway capacity to accommodate current and
future traffic volumes
Satisfy transportation demands associated with the US
Highway 85 corridor, while maintaining compatibility
with federal land management agencies
Improve roadway reliability by addressing current
height and width restrictions associated with the Long
X Bridge and slope stability and landslide issues along
the roadway corridor
Reduce the potential for wildlife/vehicle-related
crashes, and minimize wildlife habitat fragmentation
Alt M
Alternative L does not provide for increased current
and future traffic volumes, and it fails to provide an
efficient highway system.
Public transit does not address any current or future
traffic volumes. Public transit only addresses some
of the privately owned vehicles and assumes that
people, when given the opportunity, would prefer
public transit. Many rural residents would still have
to drive to get to a bus stop. This would cause
some issues with logistics and require additional
impacts from park and ride lots and bus stops.
Does not meet the purpose and need to provide a
continuous system linkage with U.S. 85 north of
Watford City
May reduce the traffic on the highway but not
significantly.
Does not address current and future transportation
needs
Does not address the transportation demands on
the current roadway. Does not address the safety
concerns associated with the existing highway.
Alt M does not provide a reliable transportation
corridor that alleviates current and future height and
width restrictions.
Does not reduce the probability of wildlife/vehicle
related crashes.
5.0 ALTERNATIVES ANALYZED IN DETAIL
5.1 ALTERNATIVES CONSIDERED BUT REJECTED
Table 16 provides a summary of the several of the alternatives discussed in Section 4.0
that do not meet the Corps criteria and will not be carried forward for further analysis.
These alternatives, for a variety of reasons, do not meet the applicant's purpose and
need and are either cost prohibitive or logistically not feasible. Alternatives carried
forward will be addressed in Section 5.2.
49
Table 12: Alternatives considered but rejected.
Practicability
Category
Factor
Meet the
Overall Project
Purpose
Alt D: Super 2
Highway with
passing and turning
lanes
Alt E: Rehabilitation of
existing roadway with
wider shoulders
Alt G: 4-Lane outside
existing alignment 12 miles away
Alt H: 4-Lane outside
existing alignment with two
lanes; 1-2 miles away
Alt I: 6-lane
highway
Alt J: Elevated
Roadway
Alternative L:
Pipeline
construction
Alternative K: Oneway pair
Alternative M: Public transit
No - Turning and
passing lanes
already exist and
pose safety
concerns
No - Shoulder widening
does not address safety
on the roadway
Yes
Yes
Yes
Yes
Yes
No
No
Available
Available for
Acquisition
Yes - ROW already
owned by NDDOT
Yes - ROW already
owned by NDDOT
Yes - with the
purchase of a new
corridor
Yes - with the purchase of a
new corridor
Yes - with the
purchase of a
new corridor
Yes no additional
right-of-way required
Yes no additional
right-of-way required
Yes
Yes may require additional right-of-w
park and ride lots
Logistics
Utilization of
existing road
and Right of
Way (ROW)
Yes - ROW already
owned by NDDOT
and on existing
roadway
Yes - ROW already
owned by NDDOT and
on existing roadway
No - Requires new
corridor and new
roadway
Yes - with one 2 lane portion
on existing alignment and on
constructed 1-2 miles away
Yes would use
the existing 2lane highway
Yes would use the
existing 2-lane
highway
Yes would use the
existing 2-lane
highway
No requires
outside
commitment from
oil industry
Yes
NA
Yes
Yes - using existing
access
Yes - with the original
U.S. Highway 85
corridor maintained
Yes - with the original U.S.
Highway 85 corridor
maintained
Yes - with the
original U.S.
Highway 85
corridor
maintained
Yes - with the original
U.S. Highway 85
corridor maintained
No does not provide
direct access to TRNP
from the one-way
section going north.
Would require
additional construction
and renovations to
existing arterials.
No - with current
and future traffic
projections
No - with current and
future traffic projections
Yes
Yes
Yes
Yes
Yes
NA
No
Safety
concerns
relative to
increased
traffic volumes
on Highway 85
No - Turning and
passing lanes
already exist and
pose safety
concerns
No - Shoulder widening
does not address safety
on the roadway
Yes
Yes
Yes
Yes
Yes
No does not
address any safety
concerns
No does not address any safety conc
Does reduce private vehicle usage
Minimal
impacts to
existing utilities
Yes - utilities
shifted within the
ditch section
Yes - utilities shifted
within the ditch section
Yes - with the original
Highway 85 corridor
maintained
Yes - with the original U.S.
Highway 85 corridor
maintained
Yes - with the
original U.S.
Highway 85
corridor
maintained
Yes - with the original
U.S. Highway 85
corridor maintained
Yes highways exist
and could be
retrofitted for one-way
traffic
Yes
Yes
Access to
Theodore
Roosevelt
National Park
Yes - using existing
access
Consistent with
other
design/standar
ds
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Existing
Technology
Cost
Topography
and other site
conditions
feasible for
project
construction
Reasonable
acquisition
costs
Overall
scope/project
Yes- with the
stabilization of
specific sections in
the Badlands
Yes
Yes - ~1.7 million
Yes - with the
stabilization of specific
sections in the
Badlands
Yes - with the
stabilization of
specific sections in
the Badlands
Yes - with the stabilization of
specific sections in the
Badlands
Yes - with the
stabilization of
specific sections
in the Badlands
Yes
No - requires the
purchase of a new
project corridor
No - requires the purchase
of a new project corridor
No - requires the
purchase of a
new project
corridor
Yes - ~2.7 million
No - Costs exorbitant
for a new roadway
potentially
$600/Million+
No - Costs exorbitant for a
new roadway potentially
$600/Million+
No - Costs
exorbitant for a
new roadway
potentially
$600/Million+
51
No may limit the
design capabilities in
elevating the highway.
Would be problematic
for snow removal
Yes feasible to
construct
NA no additional
information was
provided as to the
location of the
pipeline
Yes
Yes
Yes
NA would be a
decision of the oil
industry. This
would not be a
DOT issue
Yes assuming that the cost of adding
lines is no more expensive than a new
highway
No - Costs exorbitant
for the construction of
an elevated roadway $600/Million+
No -
No
No
5.2 ALTERNATIVES CARRIED FORWARD
Table 17 includes those alternatives carried forward in the 404(b)(1) analysis. All
alternatives are located within the existing alignment but have various widths associated
with the median. The existing alignment with an undivided highway is being carried
forward, but does not meet the purpose and need of the project from a safety
perspective. However, it does provide, along with Alt A, a good baseline for comparison
to the divided, depressed median and the divided flush median.
Table 13: Alternatives carried forward for further consideration.
Practicability
Category
Alt B: 4-Lane Section on existing alignment Divided depressed median w/options
*Preferred*
Alt C: 4-Lane Section on existing alignment
- Divided flush median w/options
No - Current traffic conditions
would remain and worsen in the
future
Yes
Yes
No - would not address safety
Factor
Meet the Overall
Project Purpose
Alt A: No Action
Alt F: 4-Lane section on existing alignment undivided
Available
Available for Acquisition
Yes - ROW already owned by
NDDOT
Yes - with minimal expansion of existing ROW
Yes - with minimal expansion of existing
ROW
Yes - ROW already owned by NDDOT
Logistics
Utilization of existing road and Right of
Way (ROW)
Yes - ROW already owned by
NDDOT and on existing
roadway
Yes - Utilizes existing road, with some new
ROW required
Yes - Utilizes existing road, with some new
ROW required
Yes - ROW already owned by NDDOT and on existing roadway
Access to Theodore Roosevelt National
Park
Yes - using existing access
Yes - using existing access
Yes - using existing access
Yes - using existing access
Consistent with other design/standards
No - with current and future
traffic projections
Yes
Yes
No - would not meet median design criteria
Safety concerns relative to increased
traffic volumes on Highway 85
No - Current traffic conditions
would remain
Yes
Yes
No - increased accident potential with no median
Minimal impacts to existing utilities
Yes - no impacts to utilities
Yes - utilities shifted within the ditch section
Yes - utilities shifted within the ditch
section
Yes - utilities shifted within the ditch section
Topography and other site conditions
feasible for project construction
Yes - with the stabilization of
specific sections in the
Badlands
Yes - with the stabilization of specific sections
in the Badlands
Yes - with the stabilization of specific
sections in the Badlands
Yes - with the stabilization of specific sections in the Badlands
Reasonable acquisition costs
Yes
Yes
Yes
Yes
Overall scope/project
Yes - no additional cost with no
action alternative
Yes 419 Million without options
Yes 389 Million without options
Yes - ~9.8 million
Existing
Technology
Cost
6.0 EXISTING SITE CONDITIONS (NDDOT 2018a)
The U.S. Highway 85 project corridor contains numerous uniquely distinct features and landscapes that collectively form
the overall project setting.
Please refer to Figure 1 below, which illustrates the reference points (RP) along the project corridor. The RPs are grouped
into seven setting areas for ease of discussion of the varying landscape along the corridor. An example of typical
topography within each setting area is shown in the following subsections.
Figure 4: US Highway 85 Setting Areas
6.1 SETTING AREA 1: RP 75.7 TO RP 91.4
The southern end of the project corridor begins at the I-94 interchange, along the northern edge of the City of Belfield.
According to the U.S. Census Bureau, in 2016, the estimated population of Belfield was 1,013 individuals (U.S. Census
Bureau 2016a). Like many towns in western North Dakota, Belfield has experienced population and economic growth over
the past 10 years as the result of oil and gas development. The I-94 interchange is a significant traffic volume contributor
to U.S. Highway 85, north of Belfield. Average daily traffic (ADT) volumes along U.S. Highway 85, north of the I-94
interchange, are nearly double the ADT volumes along U.S. Highway 85, south of the I-94 interchange.
Progressing north from Belfield, the landscape is dominated by rolling hills with occasional residential homes and
farmsteads, and oil and gas well pads scattered throughout. Land use along this stretch of the corridor is primarily
cropland with pasture land interspersed. The South Branch of the Green River crosses the corridor approximately 13
miles north of Belfield, while wetlands and minor drainages are located sporadically throughout. Property ownership
adjacent to this segment of the project corridor is entirely private.
6.2 SETTING AREA 2: RP 91.4 TO RP 92.0
Approximately 16 miles north of Belfield is the small unincorporated community of Fairfield. According to the U.S. Census
Bureau, in 2015, the estimated population of Fairfield and the surrounding area was 190 individuals (U.S. Census Bureau
2015a). The community of Fairfield is bisected by U.S. Highway 85 with residential and commercial properties located on
both sides. Notable places within Fairfield include Prairie Elementary School, Billings County Rural Fire Hall, Fairfield Post
Office, and Club 85. Currently, posted speed limits along U.S. Highway 85 are reduced from 65 miles per hour (mph) to
45 mph through Fairfield. This is the only community located along the project corridor that is currently subject to speed
limit reductions.
6.3 SETTING AREA 3: RP 92.0 TO RP 107.6
Continuing north from Fairfield, the landscape begins to transition gradually from primarily cropland to a mixture of
cropland and pasture land. Exposed buttes and deeper drainages emerge as the landscape begins to show signs of
erosional influences associated with the Little Missouri River. In contrast to the project corridor occurring south of Fairfield,
the project corridor occurring north of Fairfield is bordered by a combination of private and publicly-owned property under
the management of the U.S. Forest Service (USFS).
6.4 SETTING AREA 4: RP 107.6
Approximately 16 miles north of Fairfield, North Dakota Highway 200 (ND-200) intersects U.S. Highway 85. This is the
only major highway intersection along the project corridor. ND-200 runs east from this intersection to Killdeer, where it
intersects with ND 22. Similar to I-94, ND-200 is another significant traffic volume contributor to U.S. Highway 85. The
2017 ADT volumes along US Highway 85 increase from 3,880 vehicles per day, south of the ND-200 intersection, to
4,680 vehicles per day, north of the ND-200 intersection; an approximate 21 percent increase (NDDOT 2017a).
Infrastructure around this intersection includes the Sweet Crude Travel Center, located in the southeastern corner of the
intersection, as well as numerous overhead utility lines.
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
6.5 SETTING AREA 5: RP 107.6 TO RP 121.4
The landscape north of ND-200 remains relatively consistent for the next 14 miles, containing a mixture of cropland and
pasture land with both private and public land ownership. Located along this stretch of the project corridor is the
unincorporated town of Grassy Butte. Unlike Fairfield, Grassy Butte is located entirely along the western side of US
Highway 85 and is not bisected by the roadway. According to the U.S. Census Bureau, in 2015, the estimated population
of Grassy Butte and the surrounding area was 175 individuals (U.S. Census Bureau 2015a). Two notable places within
Grassy Butte include the Grassy Butte Post Office, which is listed on the National Register of Historic Places (NRHP), and
St. Peter Canisius Catholic Church.
6.6 SETTING AREA 6: RP 121.4 TO RP 130.0
Approximately 9 miles north of Grassy Butte, the landscape of the project corridor changes abruptly as it enters the
Badlands. The Badlands are characterized by highly eroded buttes and hillsides composed of soft silts and clays with
sparse vegetation. The total length of the project corridor occurring within the Badlands is approximately 7 miles.
Topographic relief in this area changes quickly as the roadway descends more than 600 feet to reach the Little Missouri
River, before ascending more than 400 feet on the north side of the Little Missouri River to climb back out of the
Badlands. Soils within this region are historically unstable due to their composition of soft silts and clays, making the area
susceptible to landslide activity. Landownership through the Badlands is a mixture of private and public. Public property
includes the LMNG (managed by the USFS) and the TRNP North Unit (managed by the NPS).
Contained within this segment is the historic Long X Bridge, which carries U.S. Highway 85 over the Little Missouri River.
The Long X Bridge was constructed in 1959 and is approximately 970 feet long. The structure has been determined
eligible for listing on the National Register of Historic Places (NRHP). Over the past 10 years, numerous over-height
vehicle collisions have damaged the portals and overhead cross members.
6.7 SETTING AREA 7: RP 130.0 TO RP 139.5
Continuing north from the Badlands, the landscape transitions back to a mixture of cropland and pasture land with entirely
private land ownership. Spring Creek crosses the corridor approximately 2 miles south of McKenzie County Road 30.
Development becomes increasingly prevalent as the corridor nears the Watford City Bypass, located just south of the
town of Watford City. Construction of the Watford City Bypass was completed in 2015 and consists of a four-lane, divided
highway with a flush, center median. The project would tie into the Watford City Bypass, whereby providing a continuous
four-lane highway along U.S. Highway 85 from the I-94 interchange to Williston.
6.8 EXISTING SITE CONDITIONS (AQUATIC RESOURCE FUNCTIONS)
Surface Water Storage: Surface water storage refers to the ability of a watercourse to provide long and short-term surface
storage which allows soil saturation (moisture), provides seasonal ponding for nutrient cycling and habitat for aquatic
organisms, reduces the peak flood discharge, and improves downstream water quality through detention of flows. Within
the project area, wetland depressions provide some surface water storage functions on the landscape. Impoundments are
located throughout the project corridor and also provide surface water storage, typically utilized for ranching activities.
Energy Dissipation: The degree of the energy of water is determined by slope, geometry, and the roughness of the
stream. Lower stream energy is associated with lower velocity which, in turn, reduces the movement of particulates,
prevents high erosion, and improves water quality (Levick et al. 2008). As flow velocity decreases from higher gradient to
lower gradient streams with larger floodplains, more energy dissipation occurs. Energy dissipation functions would be
seen in aquatic resources such as the Little Missouri River with perennial flow and intermittent tributaries found throughout
the project area. Energy dissipation functions are likely moderate to minimal, depending on specific areas along U.S.
Highway 85. The southernmost portion of the project possesses gradual gradients where little energy dissipation is
necessary. In the North portion of the project, steeper gradients are present within other tributaries to the Little Missouri
River. The badlands consists of rigorous terrain with intermittent tributaries. As a result of the steep gradients within the
badlands, tributaries rely on natural meanders to reduce the impact water has on the landscape. However, the badlands
area contains highly erodible soils resulting in downstream sedimentation.
Groundwater Recharge: Wetlands in the semi-arid northern prairie region are focal points for groundwater recharge (Van
der Kamp and Hayashi 1998). Recharge of groundwater occurs within wetland depressions throughout the project
corridor. In the 1998 study, Van der Kamp and Hayashi found that connections are continuous between ponded water in
wetlands and the surrounding water table. The Little Missouri River and its tributaries in the project area also provide
55
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
groundwater recharge functions. Although groundwater recharge in streams may be different than palustrine emergent
wetlands, they all provide vital groundwater recharge functions from an ecological and watershed perspective.
Sediment transport: Sediment transport in streams is based on several site specific factors which include flow magnitudes
and frequency, along with sediment mobility. Lower gradient streams store sediment in low to medium flow events but
provide more significant sources of sediment during high events. Typical of the intermittent and ephemeral tributaries to
the Little Missouri River in the badlands, the highly erodible soils increase turbidity during heavy precipitation events.
Sedimentation can be problematic and often occurs in lowland areas or near constructed structures where velocities are
reduced and the sediment load is dropped. Sediment can be deposited within culverts and corrugated pipes. These are
regularly cleaned out during roadway maintenance.
Biogeochemical nutrient cycling: Specific functions of biogeochemical processes include nutrient cycling and removal,
detention, and exportation of elements, compounds, and particulates (Levick et al. 2008) and is dependent on organic
matter inputs and water/sediment contact. The greater the organic matter input and water/sediment contact, the greater
the occurrence of biogeochemical processes. Particulates detained in depositional areas within the floodplain allow for
increased storage of elements, compounds, and particulates and increased nutrient processing (Levick et al. 2008).
Biogeochemical nutrient cycling is typically greater in lower gradient streams due to the increased length of time water
and sediment are in contact. Lower gradient systems can be found within the U.S. Highway 85 project area and nutrient
cycling is a major function of aquatic resources located in this region. Perennial and intermittent streams provide the
cycling, removal, and exportation of elements, compounds and particulates. Wetland basins on the landscape function as
detention ponds which store particulates and also break down elements and compounds.
Organic carbon export and storage: Export of organic carbon provides a primary source of energy for downstream food
chains (Levick et al. 2008). Headwater streams and floodplain channels store large amounts of carbon from plant matter
which is, subsequently, transported downstream during heavy precipitation events. Upland and riparian vegetation
adjacent to these headwater streams and their associated floodplains is a source of carbon. Vegetation is established
adjacent to the Little Missouri River and other aquatic resources throughout the project area. Carbon storage also occurs
within wetlands and this function is provided within the wetland basins adjacent to the proposed project.
Habitat connectivity/structure: Streams with riparian corridors provide diverse plant communities and habitat for various
types of organisms. Within the project area, no riparian habitat exists in areas such as the Little Missouri River. As
previously discussed, habitat connectivity is a major consideration for the EIS. The corridor would be maintained in a
manner to provide the necessary habitat and structure for both aquatic and terrestrial organisms utilizing the area.
7.0 IMPACT ANALYSIS
The following discussion evaluates the direct and secondary impacts of Alternatives B, C and F on environmental
resources identified in subparts C through F of the Section 404(b)(1) Guidelines.
7.1. PHYSICAL AND CHEMICAL CHARACTERISTICS OF THE AQUATIC ECOSYSTEM
Pursuant to 40 CFR Part 230 subpart C these characteristics consist of substrate, current patterns and water circulation,
suspended particulates, water, and normal water fluctuations.
7.1.1. SUBSTRATE
The substrate of the aquatic ecosystem underlies the open waters of the United States and constitutes the surface of
wetlands. It consists of organic and inorganic solid materials and includes water and other liquids or gases that fill the
spaces between solid particles. The discharge of dredged or fill material can change the physical, chemical, and biological
characteristics of the substrate through a variety of mechanisms, including changes in substrate elevation and resulting
changes in circulation, depth, currents, water fluctuations, and temperature; smothering immobile organisms or causing
mobile animals to emigrate; changing substrate characteristics that affect recolonization; and the outright destruction of
habitat.
The existing substrate varies throughout the corridor. Wetland basins are composed of loamy/clay soils with emergent
and submerged vegetation. The basins contain high volumes of organic matter, as vegetation continually breaks down.
Throughout the Badlands portion of the project, sands and clays provide a large portion of the substrate found in and
adjacent to the Little Missouri River.
56
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Alternative A: The "No Action" alternative would have no effect on the substrate found within the existing alignment. The
dynamics of sediment movement within the river channel and across the floodplain wetlands would persist in the future as
they currently exist. With No-Action, while the character of the substrate in any particular location can be expected to vary
over time in response to episodic events, the substrate in the Study Area as a whole is expected to retain a similar range
and relative abundance of sediment-substrate types and to continue along the recent trajectory of improving water quality
and higher macro-invertebrate diversity.
Impacts common to All Build Alternatives (B, C and F): All build alternatives follow the existing alignment. The primary
direct, permanent impact to substrate occurs as native substrate is removed and replaced with materials suitable for road
construction such as clay for embankments, gravel under culverts, riprap for erosion control and corrugated metal and
concrete culverts for water movement. Temporary impacts would occur as structures are constructed for dewatering and
access, or by equipment movement adjacent the footprint of the roadway embankments. As stated above, temporarily
impacted areas would be restored to preconstruction elevation and condition following construction. Minor, long term
effects will result in areas permanently impacted. Minor, short term effects will result in areas temporarily impacted.
Alternative B: Approximately 14.04 acres of jurisdictional wetlands would be permanently filled and an additional 10.29
acres would be temporarily impacted. In addition, 538 Linear Feet (LF) of streams would be permanently impacted and
an additional 2,930 LF would be temporarily impacted.
Alternative C: Approximately 9.97 acres of jurisdictional wetlands would be permanently impacted and an additional 9.33
acres will be temporarily impacted. In addition, 475 LF of streams would be permanently impacted and an additional
2,976 LF would be temporarily impacted.
Alternative F: Approximately 7.86 acres of jurisdictional wetlands would be permanently impacted and an additional 5.76
acres would be temporarily impacted during construction. In addition, 266 LF of streams would be permanently impacted
and an additional 1667 LF would be temporarily impacted.
Conclusion: The kind of impacts associated with the build alternatives does not change. The amount of impact would be
greater with Alt B because of the wider median width. Alternative C would result in less impacts as the footprint required
to widen the roadway section and construct a flushed median is narrower than required to construct a depressed median
as proposed for Alternative B. Alt F has a smaller footprint because there is only a 4-6-ft median.
7.1.2. SUSPENDED PARTICULATES/TURBIDITY
Suspended particulates consist of fine-grained (silt and smaller) mineral and organic particles. They enter the water
through natural processes and human activities including dredging and filling, and remain suspended for variable periods
depending on agitation of the water mass and the physical and chemical properties of the sediments. The concentration of
suspended sediments is indicated by turbidity. Under the Guidelines, consideration is given to the manner (timing,
magnitude, and duration) in which dredge and fill activities may directly or indirectly increase sediment input to the aquatic
ecosystem, and the resulting effects on properties including but not limited to light penetration, photosynthesis, and
primary production; oxygen depletion and its overall effects on aquatic biota; on the physiology and behavior of fish and
invertebrates; and on the aesthetic appearance of the water body.
In the project corridor, aquatic resources frequently experience rises in turbidity and suspended particulates during heavy
rain events. The northernmost portion of the project is prone to flash floods and fast moving water.
Alternative A: Under the No-Action Alternative, concentrations of suspended sediments in the river and wetlands in the
floodway would fluctuate within historic norms. Sediment would continue to be mobilized by high flows, but retained within
the banks of the river channel except during rare and relatively brief episodes of overbank flooding. Wetlands in the
floodway would continue to experience pulses of sediment in runoff during heavy rain and high flows.
Impacts common to both alternatives (B, C and F): Similar impacts would occur regardless of alternative being evaluated.
Both alternatives follow the same alignment, impact the same waterways and wetlands, and use the same construction
methodology and materials. Distance from the discharge area where particulates are suspended in the water column to
the deposition area where water slows down and particulates fall out would be dependent upon topography and flow
velocity. Aquatic species and vegetation could be smothered downstream in the deposition area. Both alternatives would
57
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
require individual Water Quality Certification under Section 401 of the Clean Water Act (WQC) and a SWPPP. Special
conditions of the permit would require compliance with WQC and SWPPP, as well as any other Best Management
Practices (BMPs) necessary to contain turbidity on-site.
Conclusion: Regardless of the alternative selected as the LEDPA, impacts from suspended sediments/turbidity would be
similar.
7.1.3 WATER
Under the Guidelines, water clarity, nutrients and chemical content, physical and biological content, dissolved gas levels,
pH, and temperature are all important aspects of surface water quality that contribute to its life-sustaining capabilities. The
discharge of dredged or fill material can change the chemistry and physical characteristics of the receiving water through
the introduction of chemical constituents in suspended or dissolved form. Changes in the clarity, color, odor, and taste of
water and the addition of contaminants can reduce or eliminate the suitability of water bodies for populations of aquatic
organisms and for human consumption, recreation, and aesthetics.
Alternative A: With the "No Action" alternative water would continue to flow in response to rain events and during spring
melt.
Impacts common to All Build Alternatives (B, C and F): All alternatives would have similar impacts to water resources.
The alternatives have various widths of medians, but the impacts occur to the same resources and would have similar
impacts only on a progressively larger scale from Alternative B with the greatest impacts, to Alternative F with the least.
Project construction would minimize potential impacts to surface water quality with implementation of a project specific
Stormwater pollution prevention plan and associated BMBs.
Conclusion: The kind of impacts associated with the build alternatives does not change. The amount of impact would be
greater with Alt B because of the wider median width. Alternative C would result in less impacts as the footprint required
to widen the roadway section and construct a flushed median is narrower than required to construct a depressed median
as proposed for Alternative B. Alt F has a smaller footprint because there is only a 4-6-ft median.
7.1.4. CURRENT PATTERNS AND WATER CIRCULATION
Current patterns and water circulation are the physical movements of water in the aquatic ecosystem. Currents and
circulation respond to natural forces as modified by basin shape and cover, physical and chemical characteristics of water
strata, and energy dissipating factors. The discharge of dredged or fill material can obstruct flow or change its direction
and velocity, affecting erosion and deposition rates; the mixing of dissolved and suspended components of the water;
water stratification; and the location, structure, and dynamics of aquatic communities.
Current patterns and water circulation would be effected, both temporarily and permanently on a minor scale. During
construction on rivers, streams and drainage features various activities would require the use of temporary cofferdams or
bypasses. Water would be temporarily redirected or pumped downstream to maintain flows, but patterns would be
restored upon construction completion. Circulation patterns in wetlands will be permanently impacted by fill.
Alternative A: With the "No Action" alternative current patterns and water circulation would remain as they are today and
there would be no effect.
Impacts common to All Build Alternatives (B, C and F): Culverts at all locations, regardless of alternative, would be placed
to maintain existing flow lines and waterway slope.
Permanent impacts to current patterns of the Little Missouri River will occur when the Long X Bridge is replaced and
bridge piers are constructed. Temporary impacts will occur as access pads/roads and cofferdams are used to facilitate
construction of the bridge piers.
Conclusions: Very similar impacts will occur regardless of the alternative selected. The only measureable difference is
the length of pipe waterways would flow through and amount of wetland permanently filled.
7.1.4. NORMAL WATER LEVEL FLUCTUATIONS
Normal water fluctuations in a natural aquatic system consist of daily, seasonal, and annual tidal and flood fluctuations in
water level. Biological and physical components of such a system are either attuned to or characterized by these periodic
58
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
water fluctuations. Discharges of dredged or fill material can alter the normal water-level fluctuations, resulting in
prolonged periods of inundation, exaggerated extremes of high and low water, or a static, non-fluctuating water level.
Such modifications can affect the physical characteristics of the system in numerous ways and can alter or destroy
ecological communities, induce populations of nuisance organisms, modify habitat, reduce food supplies, and restrict
movement of aquatic fauna, destroy spawning areas, and change adjacent upstream and downstream areas.
WOUS in the project area include wetland depressions and perennial, intermittent, and ephemeral streams. As previously
discussed, the Little Missouri River is a lower perennial stream that connects with the Missouri River. Water levels are
typically low on a daily basis during summer months with the exception of large rain events. Flash flooding in the
Badlands is a common event. The intermittent and ephemeral streams throughout the project area receive hydrology
during seasonal snow melt and heavy rain events. Linear wetland depressions that are located in relatively flat areas
provide downstream flows gradually. Low flow tributaries in North Dakota are sometimes referred to as linear wetlands as
they frequently contain wetland vegetation throughout the channel.
Alternative A: Under the No Action alternative, there would be no major changes to the floodplain geometry and water
fluctuations would continue to be primarily influenced by rain events and spring snow-melt.
Impacts common to All Build Alternatives (B, C and F): All alternatives follow the existing alignment and areas that
require culverts likely already have one in place. Unless the culverts are not properly sized, they will likely be extended as
far as necessary to accommodate construction. No measureable permanent change in daily, seasonal or annual
fluctuations should result. In areas where fill is placed in a depressional basin, storage capacity of the basin will be
reduced and water levels would be increased. Temporary structures, such as cofferdams and bypasses, could cause
changes in water fluctuations for as long as they are in place if not properly designed.
Conclusions: All build alternatives are anticipated to permanently affect daily, seasonal, or annual fluctuations in water
level, but may temporarily influence water level fluctuations in the immediate vicinity of work areas during construction.
Regardless of the alternative, temporary impacts to water level fluctuations would be minor and localized. Special
conditions for maintenance of flows and removal of temporary fills would be required to minimize impacts during
construction activities and to ensure the restoration of the area to original contours.
7.2. BIOLOGICAL CHARACTERISTICS OF THE AQUATIC ECOSYSTEM
Pursuant to 40 CFR Part 230 subparts D and E, these characteristics consist of special aquatic sites, fish, crustaceans,
mollusks, and other aquatic organisms, and wildlife values. This section also discusses the biological availability of
contaminants which has impacts to biological characteristics as well as human use characteristics.
7.2.1. THREATENED AND ENDANGERED SPECIES
An endangered species is one that is in danger of extinction throughout all or a significant portion of its range, whereas a
threatened species is one that is in danger of becoming endangered in the foreseeable future. Possible effects of the
discharge of dredged or fill material include covering or otherwise directly killing individuals; the impairment or destruction
of habitat and the resources (food, shelter, etc.) it provides; and facilitating incompatible activities.
FHWA and NDDOT have identified several threatened and endangered species within the DEIS and evaluated each
species for potential impacts associated with the development of a 4-lane roadway. The scope of analysis for FHWA and
NDDOT encompasses the entire 62-mile corridor from Belfield to Watford City. No designated critical habitat was listed as
occurring along the corridor. The species being evaluated can be found in the table below.
59
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 14: Threatened and Endangered Species (USFWS)
Species Name
ESA Status
Habitat Requirements
Presence/Absence in Project Area
Black footed-ferret
(Mustela nigripes)
Endangered
Rely exclusively on prairie dog burrows for shelter
which are located within grasslands found in North
Dakota.
Absent- Believed to be extirpated
from ND. Associated exclusively
with prairie dog towns. Potential
habitat within the project corridor
(NDGF 2016)
Gray wolf
Endangered
Wolves are habitat generalists and live throughout the
northern hemisphere. They require ungulate prey and
non-excessive human-caused mortality rates.
Present - The gray wolf has the
potential to be within the project
area during construction. There
are areas of the Badlands that
provide habitat for the gray wolf.
Endangered
The whooping crane breeds, migrates, winters, and
forages in a variety of wetland and other habitats,
including coastal marshes and estuaries, inland
marshes, lakes, ponds, wet meadows and rivers, and
agricultural fields. Whooping cranes breed and nest in
wetland habitat in Wood-Buffalo National Park, Canada.
Bulrush is the dominant vegetation type in the potholes
used for nesting, although cattail, sedge, musk-grass,
and other aquatic plants are common. Nest sites are
primarily located in shallow diatom ponds that contain
bulrush. During migration, whooping cranes use a
variety of habitats; however, wetland mosaics appear to
be the most suitable. For feeding, whooping cranes
primarily use shallow, seasonally and semi permanently
flooded palustrine wetlands and various cropland and
emergent wetlands. In Nebraska, whooping cranes also
often use riverine habitats. Wintering habitat in the
Aransas National Wildlife Refuge, Texas, includes salt
Present suitable habitat exists
within the project area for
whooping crane. The project
area is located in the primary
migration path of the whooping
crane.
(Canis lupus)
Whooping crane
(Grus americana)
marshes and tidal flats on the mainland and barrier
islands, dominated by salt grass, saltwort, smooth cordgrass, glasswort, and sea ox-eye.
Interior least tern
(Sterna antillarum)
Endangered
Primary habitat includes sandy shores and beaches or
rocky shores that are dry. Sparsely vegetated sand,
shell, and gravel beaches, sandbars, islands, and salt
flats associated with rivers and reservoirs.
Absent the Interior least tern is
found along the main stem of the
Missouri River. There is no
suitable habitat within the project
area.
Pallid sturgeon
(Scaphirhynchus
albus)
Endangered
Large rivers such as the Missouri and Mississippi. They
utilize floodplains, backwaters, chutes, sloughs, islands,
sandbars, and main channel waters within a large river
ecosystem. They prefer substrate composed of sandy
and fine bottom materials.
Absent the pallid sturgeon is
limited to the Missouri and
Yellowstone Rivers
Northern longeared bat (Myotis
septentrionalis)
Threatened
During summer, northern long-eared bats roost singly
or in colonies underneath bark, in cavities, or in
crevices of both live and dead trees. Males and nonreproductive females may also roost in cooler places,
like caves and mines. This bat seems opportunistic in
selecting roosts, using tree species based on suitability
to retain bark or provide cavities or crevices. It has also
been found, rarely, roosting in structures like barns and
sheds. Northern long-eared bats spend winter
hibernating in caves and mines, called hibernacula.
They typically use large caves or mines with large
passages and entrances; constant temperatures; and
high humidity with no air currents. Specific areas where
they hibernate have very high humidity, so much so that
droplets of water are often seen on their fur. Within
hibernacula, surveyors find them in small crevices or
cracks, often with only the nose and ears visible.
Present - Documented occurrence
within the project area (NDDOT
2017).
60
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Piping plover
(Charadrius
melodus)
Threatened
Primary habitat includes sandy shores and beaches or
rocky shores that are dry. Sparsely vegetated sand,
shell, and gravel beaches, sandbars, islands, and salt
flats associated with rivers and reservoirs.
Absent the Piping Plover is not
known to occur within the Little
Missouri River corridor.
Rufa red-knot
(Calidris canutus
rufa)
Threatened
Shorebird utilizing beaches and islands found along
rivers and on large reservoirs.
Absent similar habitat to that of
the Piping plover. Occurs within
the Missouri River corridor. Has
also been identified on large,
permanent lakes and wetlands.
No suitable habitat within the
project area.
Lives in high-quality mixed and tall grass prairies
Present suitable habitat exists
adjacent to the project area.
Threatened
Dakota skipper
(Hesperia dacotae)
Alternative A: Under the No Action alternative, there would be no major changes to impacts on listed species.
Impacts common to All Build Alternatives (B, C and F): All build alternatives considered in detail would have the similar
impacts to threatened and endangered species within regulated WOUS as all three alternatives remain along the same
alignment and would impact the same aquatic resources in a similar manner. A Programmatic Biological Assessment
(PBA) was completed on May 8, 2017, and included the effect determinations for protected species. A "No Effect"
determination was made by FHWA and NDDOT for the Interior least tern, Black-footed ferret, Pallid sturgeon, Rufa red
knot and Piping plover. A "No Effect" was also made for the designated critical habitat of Piping plover and Dakota
skipper. A "May Affect, Not Likely to Adversely Affect" determination has been made Whooping crane, Gray wolf, and the
Dakota Skipper. The Northern long-eared bat received a determination of "May Affect" and has been covered under the
4(d) Rule Streamlined Consultation process with FHWA and NDDOT.
Conclusions: The three build alternatives would have similar impacts as the same material and work would be completed
in order to construct the roadway. Conservations Measures have been addressed in the DEIS on each species to ensure
protection of the species during construction windows. These CM's are also included in project plans for general
contractors and project engineers. The Corps also accepts the determinations made by FHWA and NDDOT through the
PBA as the Corps action area is located within the FHWA designated action area.
7.2.2. FISH, CRUSTACEANS, MOLLUSK, AND OTHER AQUATIC ORGANISMS
As defined in 40 CFR 230.31, aquatic organisms in the food web include, but are not limited to, fin fish, crustaceans,
mollusks, insects, annelids, planktonic organisms, and the plants and animals they feed and depend on to thrive.
Releases of contaminants through discharge of dredged or fill material can adversely affect adults, juveniles, larvae or
eggs. Suspended particulates can bury eggs, preventing receipt of oxygenated water. They can also cause debilitation or
death to less mobile organisms by smothering and/or direct exposure to chemical contaminants contained within the
dredged materials.
The Little Missouri River and other aquatic resources such as wetlands and impoundments, support numerous aquatic
resource species. Macro and micro invertebrates are present within the Little Missouri River, providing foraging
opportunities for fish species which also occur in larger perennial river systems. Macro and micro invertebrates are also
present within the wetlands and vegetated shallows. These organisms are important in supporting the overall functions
provided by wetlands. Invertebrates also provide foraging opportunities for various waterfowl, shorebirds, and water bird
species within the state of North Dakota including, but not limited to, American bittern (Botaurus lentiginosus), American
avocet (Recurvirostra americana), Horned grebe (Podiceps auritus), Piping plover (Charadrius melodus), Least tern
(Sterna antillarum), Mallard (Anus platyrhynchos), Bufflehead (Bucephala albeola), Northern pintail (Anas acuta), Canada
goose (Branta canadensis), Greater white-fronted goose (Anser albifrons), and Lesser snow goose (Chen caerulescens).
The propose project is located in the secondary range of most of these species.
Alternative A: The distribution of fish and other aquatic species under the No-Action Alternative would be similar to the
distribution of aquatic species as described under existing conditions. Common fish and invertebrates would continue to
utilize the aquatic riverine, emergent wetland, and open water habitats.
61
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Impacts common to All Build Alternatives (B, C and F): Under the guidelines, the focus is on the manner in which
discharge of dredged or fill material can affect the overall productivity and nutrient export capability of the ecosystem.
More specifically, discharge of dredged or fill material can possibly redirect, delay, or stop the reproduction and feeding
movements of some species of fish and crustaceans, thus preventing their aggregation in accustomed places such as
spawning and nursery grounds and potentially leading to reduced populations. Further, reduction of lower trophic level
producers (i.e., detrital species) can impact the flow of energy from primary consumers to higher trophic levels (40 CFR
230.31b). Alternatives B, C and F would result in similar kinds of impacts as they would all occur on the same alignment
and result in a discharge of the same material. The difference between the three alternatives exists in the necessary
footprint to construct the new roadway. Alternative B requires a wider footprint which would result in slightly more impacts
to aquatic resources in the project area. Both short and long-term minor effects on fish, crustaceans, mollusks, and other
aquatic organisms would occur. The footprint of fill and conversion of aquatic resources to uplands would reduce the size
of each resource. Alt B requires a minimum of 124-ft for the additional 2-lanes and wider median; Alt C requires
approximately 84-ft for the highway width; and Alt F requires approximately 70-ft in width. Each alternative impacts the
same aquatic resources, but on different scales. Fish, mussels, and other aquatic species are likely to experience
mortality during construction activities and ultimately fill in WOUS. Stream impacts would be temporary in nature as
colonization from upstream sources would occur naturally. Most jurisdictional wetlands would remain on the landscape,
although smaller in size. Naturally occurring re-colonization would take place throughout the corridor.
Conclusions: The build alternatives would have a substantial impact on aquatic organisms, either temporarily during
construction or permanently after construction is complete. The alternatives would all increase the length of culverts
throughout the project alignment. As per North Dakota Regional General Conditions, all streams with intermittent and
perennial flow and a stable stream bed requires that culverts be counter-sunk with the culvert invert set below the natural
streambed according to the table included in the North Dakota Regional Conditions for the 2017 Nationwide Permitting
Program. This is to create a more natural streambed within the culvert. Following construction, aquatic organisms should
quickly re-colonize the culverted section of stream. The recolonization would be directly related to the length of the
culvert, so the longer the culvert the longer the time necessary for recovery. However, this is similar between all build
alternatives with Alt B being approximately 124-ft, Alt C being 84-ft and Alt F being 70-ft.
7.2.3. WILDLIFE VALUES
Wildlife associated with aquatic ecosystems includes resident and transient mammals, birds, reptiles, and amphibians.
The discharge of dredged or fill material can cause changes in water levels, flow and circulation, salinity, chemical
content, substrate characteristics and elevation, increased turbidity or contaminants, potentially resulting in the loss or
change of breeding and nesting areas, escape cover, travel corridors, and preferred food sources; and in conditions that
may favor the introduction of undesirable plant and animal species, disrupt the normal functions of the ecosystem, and
lead to reductions in overall biological productivity.
The proposed project is located in rural setting within western North Dakota. The surrounding land use is primarily
ranching and federally owned property such as the Dakota Prairie Grasslands and TRNP. As a result, the area provides a
lot of foraging and breeding habitat for a variety of ungulates including Bighorn sheep (Ovis Canadensis), Elk (Cervus
elaphus), Mule deer (Odocoileus hemionus), and Pronghorn (Antilocapra americana). Additionally, western North Dakota
is home to several smaller mammals which include, but are not limited to Big Brown Bat (Eptesicus fuscus), Little Brown
Bat (Myotis lucifugus), Long-eared bat (Myotis evotis), Long-legged bat (Myotis volans), Western Small-footed Myotis
(Myotis ciliolabrum), Townsend's Big-eared Bat (Corynorhinus townsendii), American Marten (Martes Americana), Badger
(Taxidea taxus), Bobcat (Lynx rufus), Coyote (Canis latrans), Eastern Spotted Skunk (Spilogale putorius), Fisher (Pekania
pennant), Gray Fox (Urocyon cinereoargenteus), Long-tailed weasel (Mustela frenata), Mink (Mustela vison), Mountain
Lion (Puma concolor), Raccoon (Procyon lotor), Red Fox (Vulpes vulpes), River Otter (Lontra canadensis), and Swift Fox
(Vulpes velox). The vast availability of natural resources make western North Dakota highly valued habitat for the
previously mentioned species.
Alternative A: The distribution, abundance, and diversity of other wildlife under the No-Action Alternative would remain
largely as they are under existing conditions.
Impacts Common to All Build Alternatives: Impacts to wildlife values are anticipated to be similar in nature between all
build alternatives. Construction activities could disturb or displace wildlife from areas immediately adjacent to the
62
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
construction area. These activities could cause mortality to individuals of the smaller, less mobile and burrowing species,
whereas, mobile species would likely disperse to surrounding areas. Individuals dispersing away from the activity would
likely experience increased risk of predation, reduced foraging opportunities or reproductive success and energetic costs.
The three alternatives remain on the existing alignment. Minor temporary and permanent effects to available habitat are
expected under each alternative as the project will require additional ROW. A wider roadway makes it more difficult for
various species to cross the roadway safely and all three alternatives would require additional measures to be in place in
order to ensure the safe passage of animals. All three alternatives address this concern with the implementation of wildlife
crossings. These crossings include large underpasses and larger culvert sizes to allow for larger and smaller mammals to
cross under the roadway. The Long X Bridge that spans the Little Missouri River would be replaced in a manner that will
provide another crossing within the riparian corridor for both terrestrial and water-dependent species.
Conclusions: The overall impact to wildlife populations would be relatively small, proportionate to the relatively small areas
of habitat affected. The 62-mile highway currently has an impact on species dispersal and habitat value along the
alignment is marginal. Human use of the corridor and the low quality of habitat within and adjacent to the highway rightof-way reduces the negative impacts to wildlife, including migratory birds. In areas temporarily impacted by construction,
wildlife species would recolonize the available habitat following completion of the project. Since the project is likely to be
phased, it is unlikely that the entire corridor would be affected at the same time, reducing the impacts on wildlife. With the
incorporation of wildlife crossings at specific locations to allow for regular migratory patterns to persist, none of the
alternatives are expected to have major effects on wildlife values. NDDOT will also include the use of wildlife fencing to
assist in the regular use of the proposed crossings and jump-outs in case larger mammals become trapped within the
roadway.
7.3. SPECIAL AQUATIC SITES (WETLANDS, MUD FLATS, VEGETATED SHALLOWS, RIFFLE
AND POOL COMPLEXES, CORAL REEFS, SANCTUARIES, AND REFUGES)
Special aquatic sites are geographic areas, large or small, possessing special ecological characteristics of productivity,
habitat, wildlife protection, or other important and easily disrupted ecological values. These areas are generally
recognized as significantly influencing or positively contributing to the general overall environmental health or vitality of the
entire ecosystem of a region (40 CFR 230.3(q-1)).
7.3.1 SANCTUARIES AND REFUGES
No areas considered sanctuaries or refuges would be impacted by the project alternatives as no sanctuaries or refuges
are located in the Study Area.
7.3.2 WETLANDS
Wetlands consist of areas that are inundated or saturated by surface or ground water at a frequency and duration
sufficient to support and that under normal circumstances do support, a prevalence of vegetation typically adapted for life
in saturated soil conditions. The discharge of dredged or fill material in wetlands is likely to damage or destroy habitat and
adversely affect the biological productivity of wetlands ecosystems by smothering, dewatering, permanently flooding, or
altering substrate elevation or the periodicity of water movement, resulting in a variety of secondary effects on wetland
biota and the functions and values that wetlands provide, including but not limited to habitat, flood protection, and water
quality.
Special aquatic sites, such as wetlands, are present in the project area. These Palustrine wetlands are located adjacent to
the existing U.S. Highway 85 roadway. Some of these features consist of natural basins while others have been
constructed and utilized by ranchers for cattle.
Alternative A: Under the No-Action Alternative, wetlands are expected to remain largely in their present locations, and to
continue to function as they do at present. Climate change is likely to result in wetlands becoming drier and probably
shrinking on average, but with increasing year-to-year variation in size and quality.
Impacts Common to All Build Alternatives: Short and long term effects on wetlands and vegetated shallows would be
expected as a result of the discharge of fill material. Within wetlands, the biological, chemical, and physical productivity
would be permanently altered with a decreased wetland area. These effects would be minimal when considering the
whole watershed; however, some productivity will be lost at the impacted sites. Short-term effects would include alteration
of flows and water circulation through wetlands. Temporary impacts such as cofferdams, berms, and the use of pumps
63
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
and/or diversion of flows would be necessary for construction to be completed. Some sites are dewatered as a general
practice to install culverts. Long-term moderate adverse impacts could be expected under all build alternatives. Changes
to hydrology could reduce the ability of wetlands to provide existing functions and services. Impacts to wetland hydrology
could degrade water quality, constrict flows, increase downstream flooding, increase peak flows, increase water level
fluctuations, and reduce water storage capacity.
Vegetated shallows within streams and rivers would experience temporary effects during construction activities when the
permittee uses cofferdams or other forms of authorized construction methods to allow work within areas of flowing water.
This would limit the productivity of vegetated shallows by smothering inundated vegetation or increasing turbidity which
would result in poor growth during construction activities. In the disturbance areas, species utilizing the vegetated
shallows would likely vacate the area and seek other vegetated shallows. Minimal long-term effects could be seen as
some of the vegetated shallows may not re-establish and function at their full capacity. However, these impacts would
remain minimal within the watershed.
Conclusions: The build alternatives would result in similar impacts to special aquatic sites such as wetlands and vegetated
shallows. The build alternatives differ in the width of the proposed highway, with Alt B being approximately 124-ft wide, Alt
C at approximately 84-ft wide and Alt F at approximately 70-ft wide. Regardless of the alternative, construction impacts
would occur to the same wetlands in differing amounts, from a culvert extensions and road widening of 84-ft for Alt B to
approximately 30-ft for Alt F.
7.3.3. BIOLOGICAL AVAILABILITY OF POSSIBLE CONTAMINANTS IN DREDGED OR FILL MATERIAL
Inert material such as clay, gravel and riprap would be utilized as fill material to expand the existing roadway and protect
reinforced culverts and pipes.
Alternative A: Under the No-Action Alternative, there would be no impact from possible contaminants in dredged or fill
material.
Impacts Common to All Build Alternatives: As a general practice, fill material would come from an approved borrow source
that is identified by NDDOT and FHWA at the time of construction. While the sites are reviewed for compliance with the
Endangered Species Act, Section 106 of the National Historic Preservation Act, Migratory Bird Act and others,
contaminant testing is not included in the review. Approved sites can be found on the NDDOT website. All build
alternatives are on the same alignment and consist of the same materials.
Conclusions: Source of materials is expected to be the same regardless of alternative selected. Inert materials will be
utilized in construction. As a result of all build alternatives utilizing the same materials and being located along the same
alignment within an existing corridor, impacts from contaminants within the fill material are anticipated to be minimal.
7.4. HUMAN USE CHARACTERISTICS OF THE AQUATIC ECOSYSTEM
Pursuant to 40 CFR Part 230 subpart F, these characteristics consist of water supply, recreational and commercial
fisheries, water related recreation, aesthetics, and parks, national and historical monuments, national seashores,
wilderness areas, research sites, and similar preserves.
7.4.1. WATER SUPPLY AND CONSERVATION
Intake systems are not regulated by the Corps on any waters potentially affected by this project. Information contained on
the North Dakota State Water Commission website indicates there are, several intake systems located on various waters
in the vicinity of the project. To ensure impacts are minimized, a permit condition could be included to ensure intake
owners downstream of any work would be notified of potential water quality or quantity changes during construction.
Impoundments, dugouts or developed springs used for livestock watering may be affected by either of the alternatives;
however, the NDDOT has committed to ensure ranchers are compensated for any impacts.
Alternative A (No Build): Under the No-Action alternative, there would be no impact to water supply and conservation.
Impacts Common to All Build Alternatives: Impacts are the same regardless of the alternative selected.
Conclusions: Impacts to water supply are anticipated to be minimal because this is not a consumptive use project.
7.4.2. RECREATIONAL AND COMMERCIAL FISHERIES
The proposed project is not located on an aquatic resources that is utilized for commercial fishing. Some recreational
fishing may occur for catfish, blue gill, and carp within the Little Missouri River around the TRNP (NPS 2017).
64
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Alternative A (No Build): Under the No-Action alternative, there would be no impact to recreational or commercial
fisheries.
Impacts Common to All Build Alternatives: All build alternatives are located on the same alignment and include the
reconstruction of the Long-X Bridge which crosses the Little Missouri River. The existing bridge would be replaced in a
similar manner under all build alternatives. Impacts to recreational fishing within the Little Missouri River would mostly be
temporary as the new bridge is constructed and the old bridge removed. Following construction, a minor change in the
location of piers within the Little Missouri River would have a minimal long term effect on recreational fishing in the area.
Conclusion: With all three build alternatives utilizing similar construction methods and materials and the lack of
commercial fisheries being located in the project, only a minor effect to recreational fishing is expected. Overall, the
impacts to recreational and commercial fisheries are anticipated to be minimal.
7. 4.3. WATER RELATED RECREATION
Water related recreation in the project area is only expected to occur within the Little Missouri River such as the use of
kayaks or canoes in some areas. The remainder of the resources do not support water related recreation immediately
adjacent to the roadway.
Alternative A (No Build): Under the No-Action alternative, there would be no impact on water related recreation.
Impacts Common to All Build Alternatives: All build alternatives would be located on the same corridor, impacts to
recreational use of the Little Missouri River are expected to be the same. Temporary impacts during construction activities
may prohibit the use of the area for safety reasons and user experience may differ from normal conditions with noise and
visual effects from equipment.
Conclusion: Due to the limited utilization of the aquatic resources in the project area for water related recreation, minimal
impacts are anticipated as a result of any of the build alternatives being presented. The project would mostly result in
temporary impacts during construction activities but general use of the area would resume following construction
activities.
7.4.4. AESTHETICS
The U.S. Highway 85 corridor is located in one of the most picturesque areas of North Dakota. The Little Missouri River
has been designated as a State Scenic River; but has not attained the same Federal designation. The U.S. 85 corridor
traverses through the Little Missouri National Grasslands (LMNG) and Theodore Roosevelt National Park (TRNP) North
Unit and is especially important in tourism in North Dakota. The LMNG covers more than one million acres in North
Dakota and borders the TRNP. The rest of the corridor is mainly rural agricultural areas with numerous small town
interspersed along the highway. Humans have altered the natural landscape through the construction of buildings,
railroads, roadways, bridges, fences utilities and industrial development, especially oil field related infrastructure. While it
is anticipated that human development and activities will continue to slowly alter visual resources in western North
Dakota, the overall visual quality of the rural setting is anticipated to persist into the future.
Under all alternatives, there would be a continuation of fugitive dust and criteria emissions from traveling vehicles, and
light pollution from headlights within the rolling prairie and Badlands landscape units.
Alternative A (No Build): Under the No-Action alternative, there would be no impact to aesthetics. However, there would
be a continuation of present fugitive dust and vehicle emissions.
Impacts Common to All Build Alternatives: All build alternatives would result in changes to the surrounding area with a
widened roadway at WOUS crossings in similar locations. Alt B would have slightly larger footprint than Alt C and F.
Temporary impacts are also expected during the construction of any build alternative. The use of heavy equipment for
grading, paving, and crane work for the bridge will be temporarily required to complete the project. The phased approach
to the project would result in only a portion of the 62-mile highway to be disturbed at any given time, reducing the overall
aesthetics impacts. For the Long X Bridge, approximately 4-miles of highway would be visually impacted including
construction activities, and ultimately a larger bridge structure within the viewshed.
Conclusion: Impacts to aesthetics would be similar regardless of which alternative is selected. The difference in median
design affects the footprint of the project, but it is difficult, if not impossible, to quantify a difference in impacts on
65
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
aesthetics. To some of the traveling public, a depressed, wide median with grass may be more pleasing visually than a
narrow median with a concrete barrier.
7.4.5. TRAFFIC AND TRANSPORTATION PATTERNS
The U.S. 85 corridor between I-94 at Belfield and Watford City has experienced a significant traffic volume increase over
the past several years. This has been driven by the increased oil and gas exploration associated with the Bakken
Formation in northwest North Dakota. The rapid increase in development of the Bakken Region has placed a strain on
local towns and communities throughout the region. U.S. 85 convers approximately 105 miles from I-94 to the junction of
U.S. 2 near Williston. Approximately 43 miles of highway has been expanded from 2-lanes to 4-lanes. The remaining 62miles within the proposed project area, is a 2-lane, undivided highway. Included in the purpose and need for the project,
is the goal of establishing a connective link by constructing a continuous 4-lane highway from the I-94 Interchange to the
Watford City Bypass. Although accident data does not indicate that U.S. 85 is subject to more crashes, it is the
perception that the disproportionately high percentage of large truck traffic relative to the average daily traffic
(approximately 33%), does increase the potential for serious accidents. The existing 2-lane highway has limited
availability of passing lanes, increasing the likelihood that drivers are more likely to engage in risk-taking behaviors to
maneuver around slow-moving vehicles.
It is anticipated that with the current growth rate in western North Dakota, the U.S. 85 corridor would begin to experience
unacceptable traffic conditions by the year 2040, accentuating the need for highway improvements throughout the
corridor.
Alternative A (No Build): Under the No-Action alternative, traffic and transportation patterns would remain the same as
they are now.
Impacts Common to All Build Alternatives: All build alternatives would provide for increased capacity with 4-lanes of traffic
between I-94 Interchange and Watford City Bypass. Each build alternative would result in acceptable traffic conditions
into the future and beyond 2040. The 4-lane highway would provide for safer road conditions by providing the opportunity
to pass slow moving vehicles.
Conclusion: All build alternatives would provide for increased capacity and safer road conditions with 4-lanes. Safety will
be addressed in Section 7.4.7.
7.4.6. NOISE
The project corridor is located primarily within an area of agricultural land use and the Badlands, with oil and gas wells,
commercial buildings and facilities, and residences (KLJ 2017). The primary existing environmental noise source
contributing to the ambient noise levels within the project area is traffic on U.S. 85. Other sources of environmental noise
include traffic on other local roadways and noise associated with oil field development and support services. Monitoring
during 2016 indicates that traffic noise ranges from 49.0 to 75.6 A-weighted decibels (dBA).
Increasing traffic volumes, vehicle speeds, or the amount of heavy truck traffic could lead to an increase in traffic noise
within the corridor. Traffic noise can be a combination of noises from engines, exhaust, aerodynamics, and tires.
Defective mufflers, truck compression braking, steep grades, terrain and vegetation near the roadway can also contribute
to traffic noise heard at the roadside. Table 14 lists common noise levels, many that are associated with highway
activities.
66
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Table 15: Common Noise Levels
Alternative A (No Build): Under the No-Action alternative ambient noise levels within the project area would continue with
slight increases with additional traffic.
Under the future (2040) nobuild scenario, traffic noise levels at receptor locations along the project corridor are predicted
to be as follows:
·
·
·
·
Segment 1: between 45.4 and 65.9 dBA
Segment 2: between 45.3 and 66.0 dBA
Segment 3: between 48.7 and 63.6 dBA
Segment 4: between 46.7 and 64.0 dBA
None of the modeled receptors would have noise levels that approach, meet, or exceed their assigned FHWA Noise
Abatement Criteria (NAC), and a 15dBA increase from existing conditions (i.e., substantial increase) would not occur at
any of the modeled receptors. (KLJ 2017).
Impacts Common to All Build Alternatives: All build alternatives would have similar impacts on noise levels within the
corridor. Noise levels vary with distance from the source of the noise. Highway traffic 50-ft from a receptor (such as a
person listening to the noise) typically produces sound levels of approximately 70 dBA. The same highway noise
measures 66 dBA at a distance of 100-ft, assuming soft ground conditions. This decrease is known as "drop-off." The
outdoor drop-off rate for line sources, such as traffic, is a decrease of approximately 4.5 dBA (for soft ground) for every
doubling of distance between the noise source and receptor (for hard ground the outdoor drop-off rate is 3 dBA for line
sources). Assuming soft ground, for point sources, such as amplified rock music, the outdoor drop-off rate is a decrease
of approximately 7.5 dBA for every doubling of distance between the noise source and receptor (for hard ground the
outdoor drop-off rate is 6 dBA for point sources).
The following levels were provided for in the Noise Analysis (KLJ 2017):
Under the future (2040) build scenario, traffic noise levels at receptor locations along the project corridor are predicted to
be as follows:
·
·
Segment 1: between 45.6 and 65.7 dBA
Segment 2 with Option FF1: between 45.4 and 66.6 dBA
67
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
·
·
·
·
·
·
Segment 2 with Option FF2: between 40.0 and 65.6 dBA
Segment 2 with Option FF3: between 38.7 and 65.7 dBA
Segment 2 with Option FF4: between 39.5 and 65.7 dBA
Segment 3 with Option INT1: between 49.0 and 63.6 dBA
Segment 3 with Option INT2: between 49.0 and 63.6 dBA
Segment 4: between 49.8 and 63.7 dBA
None of the modeled receptors would have noise levels that approach, meet, or exceed their assigned FHWA NAC, and a
15dBA increase from existing conditions (i.e., substantial increase) would not occur at any of the modeled receptors.
All build alternatives would require heavy construction equipment to operate within the highway corridor. The estimated
worst-case scenario noise level for the construction equipment proposed for the construction of the sites (at the source)
includes dump trucks (76 dBA) and backhoes (78 dBA) for a combined noise of 80 dBA (FHWA 2006). Table 15 lists
common equipment used in highway construction and the noise levels associated with the operation of the equipment. As
per the above "drop-off" rate, the further from the noise the less impact it has.
Table 16: Common noise levels associated with highway construction equipment.
Conclusion: All build alternatives would have similar noise impacts during construction. The same equipment would be
used regardless of the median width. Following completion of the project, all build alternatives would be very similar to
the existing "No Build" alternative and would only see very slight increases in noise levels.
7.4.7. SAFETY
Based on a review of available scientific literature on the subject of median widths, it was apparent that as median widths
increase, accidents decrease. Stamatiadis and others (2011) found that for every 10-ft of median width increase there
was an 8% decrease in crashes. This study also found that for every 1-ft increase in shoulder width there was a reduction
of 6% in the occurrence of accidents. Additional research (Ahmed et.al. 2015) indicated that in 2010 approximately 54%
of the 30,862 fatality accidents in the U.S. occurred on 2-lane roadways.
Based on data obtained from the NDDOT, between June 2010 and May 2015, there were a total of 342 reported crashes
that occurred along the project corridor. Of these crashes, 90 resulted in injuries and 10 resulted in fatalities. Run-off-theroad/fixed-object type crashes comprised 49 percent of the total crashes, rear-end collisions comprised 21 percent, and
head-on/opposite direction sideswipe crashes comprised 10 percent. Six of the 10 fatal crashes resulted from head-on
collisions. One area with a pattern of vehicle crashes has been identified, which is located at reference point (RP) 121,
just south of the Badlands. In this location, vehicles failing to navigate the curve has resulted in several crashes.
Although these crash numbers seem high, the actual crash rate along the project corridor during this time frame was 0.70
per million vehicle miles traveled (MVMT) as compared to a statewide average of 1.55. What these numbers fail to
68
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
account for are unreported crashes, near misses, and public perception. The two-lane highway with limited passing
opportunities and above average truck traffic promotes a greater tendency for drivers to engage in high-risk passing
behaviors. These high-risk behaviors can make drivers uncomfortable and create a perception of unsafe driving
conditions, highlighted by numerous public comments indicating avoidance of the project corridor when possible.
Another safety issue highlighted by the North Dakota Highway Patrol (NDHP) is the variable shoulder width along the
project corridor. Narrow shoulder widths along some segments of the existing roadway present safety issues when
vehicles breakdown or during law enforcement traffic stops. Narrow shoulders limit the ability to provide separation
between stopped vehicles and mainline traffic creating potential conflict points. NDHP has indicated that narrow should
widths hinder their ability to enforce traffic laws along the corridor.
In addition to safety concerns created by the presence of other drivers, the North Dakota Game and Fish Department
(NDGF) and general public have identified safety concerns associated with wildlife-vehicle interactions. For example, in
20122013, the NDGF relocated the Mormon Butte herd of bighorn sheep due to a high number of bighorn sheep vehicle
strikes.
Alternative A (No Build): Under the No-Action alternative, there would be no construction-related impacts on
communities, community services, or businesses, as no roadway construction would occur. The travelling public would
continue to experience US Highway 85 in its current, two-lane configuration. Travelers would continue to experience high
traffic volumes that are projected to increase, as well as Level of Service (LOS) that is projected to be deficient by 2040.
Reliability and capacity of the congressionally designated high-priority corridor would not be improved, and the two-lane
corridor would continue to lack opportunities for passing and turn lanes for passenger vehicles, school buses, emergency
vehicles, and heavy trucks and equipment.
There would continue to be no pedestrian or bicyclist facilities along the project corridor. Access points would remain
unconsolidated and offset. Over-height vehicles would continue to experience a height restriction at Long X Bridge,
resulting in continued detours. Over-height vehicle collisions with the Long X Bridge would continue to present a safety
hazard for the travelling public and necessitate detours. The potential head-on/opposite-direction sideswipe crashes, runoff the- road/fixed-object crashes, and wildlife-vehicle collisions would remain unchanged. Agency and public concerns
with regard to safety would not be addressed.
Alternative B (Divided, depressed median 52-ft wide): The incorporation of a depressed, center median would provide an
additional level of protection above Alt C and F. A wider median is directly associated with a reduction in head-on fatality
accidents. In addition, emergency response times and law enforcement operations would be improved with a wider
highway and ability to remove disabled vehicles from the roadway. Safety improvements also include the addition of turn
lanes and wider shoulders.
Alternative C (Divided flush median 20-ft wide): In accordance with the AASHTO Green Book (Section 7.2.11), 12- to 30foot-wide medians provide a protected storage area for left-turning vehicles at intersections. Rural medians less than 25
feet wide should be avoided, because drivers may be tempted to stop in the median with part of their vehicles unprotected
to through traffic. Using a school bus, the median should be 50 feet wide and using trucks, the median should be at least
80 feet wide.
Alternative F (Undivided highway median width of 4-6-ft): Under Alternative F, the median width would be minimal with
no barriers. This would still allow for head-on collisions and vehicle cross-over into on-coming traffic. In accordance with
the AASHTO Green Book (Section 7.2.10), undivided, multi-lane arterials have significantly more collisions than multi-lane
facilities with medians. Therefore, multi-lane, undivided facilities are discouraged, except where a median or turn lane is
not practical. If traffic volumes justify the construction of multi-lane arterials in rural areas where speeds are high, it is
generally advisable to separate opposing traffic by a median. Preferably the median should be provided in conjunction
with widening of an existing two-lane arterial into a multi-lane facility.
Conclusion: Based on the available data, Alternative B is the safest alternative. The reduction in the potential for head-on
collisions and fatality accidents is significant. As per the data above, for every 10-ft of median width increase there was
an 8% decrease in crashes. The difference between Alt F and Alt C would be 8-12% reduction in crashes, and between
Alt C and Alt B there is approximately a 24% reduction in crashes.
69
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
7.4.8. RECREATION
The TRNP North Unit and the Little Missouri National Grasslands are both located within the proposed highway corridor.
From 2012 to 2017, the TRNP North Unit averaged nearly 99,000 visitors annually, the majority of whom accessed the
park via the US Highway 85 project corridor. The TRNP North Unit offers a visitor's center, trailheads, overlooks and
pullouts, camping, picnicking, NPS employee housing, and park maintenance facilities The Little Missouri National
Grasslands (LMNG) covers an area of more than one million acres in western North Dakota. The LMNG is managed by
the US Forest Service (USFS) and borders the TRNP, which is managed by the National Park Service (NPS). The LMNG
is the largest National Grassland in the United States, highlighted by mixed-grass prairies and Badlands topography.
Each USFS managed parcel of land within the LMNG has been assigned a Management Area (MA) designation, which
defines the goals and allowable uses for the parcels. In addition, some areas are designated by the USFS as Inventoried
Roadless Areas. Inventoried Roadless Areas, the Non-motorized Backcountry Recreation MA, and Suitable for
Wilderness MA include restrictions for new roadway construction. As is the case for the TRNP North Unit, US Highway
85 borders numerous parcels and functions as one of the primary arterial roadways for accessing the LMNG.
Alternative A (No Build): Under the No-Action alternative, there would be no direct impact to recreational activities within
the U.S. 85 corridor. Impacts would result, however, in the long-term degradation of services as traffic increases without
adding any additional capacity to the highway. Access points would remain the same and may cause additional traffic
congestion.
Impacts Common to All Build Alternatives: All build alternatives would increase noise impacts during construction that
would detract from the wilderness experience. In particular, pile driving activities associated with construction of the Long
X Bridge and demolition of the existing bridge would create temporary noise impacts that would vary in degree based on
location and atmospheric conditions. In addition, NDDOT would need to expand the existing right-of-way to
accommodate the two new lanes of traffic. This would require easements from the NPS and USFS that would encroach
onto public lands. This is not anticipated to impact current recreational activities within the public lands boundaries and
would be limited to areas adjacent to the existing roadway.
Conclusion: The alternatives presented would have some impact on recreational activities. Alternative A, the No Build
Alternative, would impact the accessibility of areas within the TRNP North Unit and the LMNG. Long-term increases in
traffic volumes would have a negative effect on the overall natural experience of the public lands. All build alternatives
would adversely affect recreation during construction of the new highway, but would be short-term. Alternative F would
not provide for safe access and the occurrence of slow-moving vehicles may lead to risk-taking activities by drivers.
Alternatives B and C would be very similar in impacts, but as presented in Section 7.4.7; wider medians reduce crashes
by approximately 24%.
7.4.9. NAVIGATION
None of the build alternative or the No-Action alternative would impact navigation.
7.4.10. ENERGY NEEDS
Direct energy refers to the fuel consumed by vehicles using a given alternative transportation facility. Direct energy is
calculated based on the number of vehicles using the facility and the physical characteristics (e.g., distance, grades, and
curves) and traffic flow characteristics (e.g., congested, free flowing) of each alternative. Indirect energy consumption is
associated with the construction, operation, and maintenance of the alternative and the manufacture and maintenance of
vehicles using the facility.
Alternative A (No Build): Under Alternative A, no direct impacts on oil and gas or electricity infrastructure would be
expected, and there would be no short-term consumption of energy due to construction activities, as roadway construction
would not occur. However, Alternative A would not address the demand for an improved highway system capable of
addressing the social and economic needs of the region, which are tied to operation and maintenance of oil and gas
development.
Impacts Common to All Build Alternatives: The project would address the demand for an improved highway system
capable of addressing the social and economic needs of the region, which are tied to operation and maintenance of oil
and gas development. Traffic along the corridor is expected to grow approximately 2.5 percent each year. According to
the capacity analysis conducted as part of the Traffic Operations Report (appended by reference), expanding the existing
two-lane roadway to a four-lane roadway would improve the ability for vehicles to pass and improve the reliability of US
70
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Highway 85. Under Alternatives B, C and F, the LOS along the project corridor is projected to be between `A' and `B' by
2040. A reduction in sudden acceleration associated with passing, as well as reduced congestion, would increase fuel
efficiency along the project corridor (FHWA 2015b). Impacts on oil and gas and electricity infrastructure would occur
where relocations would be required to accommodate the new roadway footprint. Along the entire project corridor, except
for the Fairfield options, Alternative C would impact more than twice the length of electricity line compared to Alternative
B, and slightly more length of oil and gas infrastructure.
Construction activities would result in short-term consumption of energy due to on-road haul trucks transporting material,
construction commuter vehicles, and operation of construction equipment. Additional energy from electricity utilities may
be utilized for construction activities.
Conclusion: All three build alternatives have similar impacts on energy and there would be no appreciable difference.
7.4.11. MINERAL NEEDS
The most recent data available for North Dakota was found in the USGS 2012-2013 Minerals Yearbook. In 2013, non-fuel
mineral production in North Dakota was 263 million, which accounted for approximately 0.4% of the total U.S. production.
In 2013, there were 29 surface mining operations that were mining sand and gravel, clay, scoria and rock. In 2013 and
2012, North Dakota produced common clay, construction and industrial sand and gravel, crushed stone, lime, and natural
gemstones. The largest increase in quantity and value was for construction sand and gravel, which has increased steadily
since 2011.
Alternative A (No Build): Under the No-Action alternative, because it would result in no construction, would have no
impact on mineral needs.
Impacts Common to All Build Alternatives: All build alternatives would use fill material that would consist of imported clean
fill material from a commercial source and native soil from within the project area. It is expected that there is enough
material (inclusive of asphalt for roadway surfacing) available regionally, such that the proposed project is expected to
have minor impacts on mineral needs.
Conclusion: All three build alternatives have similar impacts on mineral needs.
7.4. 12. ECONOMICS
US Highway 85 is part of the National Highway System (NHS), which is a network of roadways important to the nation's
economy, defense, and mobility. In addition, US Highway 85 is classified as an Interregional System Highway, has been
designated as a High Priority Corridor by the United States Congress, and is part of the Ports-to- Plains Alliance's TRE
section. Goals and policies associated with these designations focus on mobility, reliability, and ability to support
economic activity. Of the 105 miles of US Highway 85 between I-94 and the junction of US Highway 2 (both four-lane,
east-west directional highways), the northernmost 43 miles between Williston and Watford City have been expanded from
two lanes to four lanes; the project corridor constitutes the remaining 62 miles.
Currently, industries utilizing the Long X Bridge experience a vehicle clearance of 16 feet, with an allowable vehicle height
of 15 feet, 8 inches. Within North Dakota, loads greater than 14 feet, 6 inches high are required to obtain a permit from the
NDHP. From June 2013 through December 2015, approximately 138,800 over-height permits were issued along major
roadways in western North Dakota. The Long X Bridge clearance was inadequate for 28 percent (39,000) of permit
applications. Over-height vehicles traveling along US Highway 85 are currently forced to detour around the Long X Bridge
via ND-22. Since 2011, there have been seven major incidents of over-height vehicles hitting the Long X Bridge resulting
in one instance of full closure for five days for analysis and repair, three instances of overnight closures of approximately
two weeks each for repairs, and one planned closure to repair the most recent damage. These closures force all traffic
utilizing the Long X Bridge to detour.
The economy of western North Dakota is driven by agriculture, the oil and gas industry, and tourism. Major economic
centers in western North Dakota include Williston, Dickinson, Watford City, and, to a lesser extent, Belfield, with the latter
two located immediately north and south of the project corridor, respectively. Along the project corridor, the communities
of Fairfield and Grassy Butte generate additional economic activity, along with oil and gas development, farming, and
ranching in rural areas. There are existing highway-related businesses (e.g., gas stations, motels, restaurants) located in
Belfield. Two gas stations (i.e., Cenex and Conoco), Trapper's Inn Motel & Campground, and Trapper's Kettle restaurant
are located immediately south of the I-94 interchange, with access points along US Highway 85. Various oilfield services
71
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
are located just north of the I-94 interchange. Highway-related businesses in Fairfield include a recreational vehicle park,
restaurant, and bar. The Sweet Crude Travel Center is located at the intersection of US Highway 85 and ND-200. Grassy
Butte offers a gas station, two bars, and oilfield services. In Watford City highway-related businesses include gas stations;
restaurants; hotels; and automotive, farm, and oilfield services.
The main agricultural commodities in Stark, Billings, and McKenzie counties include cattle, wheat and other grains,
oilseeds, dry beans, and dry peas. There are more than 1,600 farms spanning over 2.6 million acres in Stark, Billings, and
McKenzie counties. The total market value of agricultural commodities sold from these farms is over $300 million dollars
per year (USDA 2012a).
Due to the advancement in deep Horizontal Directional Drilling (HDD) techniques in the Bakken and Three Forks
formations, North Dakota entered its third oil boom in the early 2000s, which peaked in 2012 (NDIC 2015b, SHSND
2016). McKenzie, Billings, and Stark counties are among 17 counties in western North Dakota that are actively producing
oil and gas (Job Service North Dakota 2017). There are 322 producing or soon to be producing oil and gas wells (i.e.,
active, confidential, drilling, or permitted status) in Stark County, 590 in Billings County and 4,743 in McKenzie County
(NDI C 2018). Of these, 63 wells are within 0.5 miles of the project corridor. US Highway 85 is one of the arterial
roadways for oil and gas activity within the region for transporting goods, equipment, and personnel.
From 2009 to 2016, annual crude oil production in North Dakota increased approximately 377 percent (from 79.7 to 380.3
million barrels per year). However, oil and gas production growth has slowed in recent years, as a worldwide surplus of
crude oil caused the price of oil to fall. From 2013 to 2014, there was an approximate 21 percent annual increase in oil
production. The increase in annual production slowed to approximately 9 percent from 2014 to 2015, and production
reversed to an annual decrease of approximately 12 percent from 2015 to 2016. Oil production leveled off in 2017,
whereby there was a 1 percent increase in production from January to October compared to the same period in 2016
(NDIC 2016c, NDIC 2017).
This sharp decline in oil prices has impacted western North Dakota as oil companies have been forced to lay off workers
and significantly cut back on development of new wells. In 2014, an average of 190 active drilling rigs were operating
within the state. In 2015 and 2016, the number of active drilling rigs dropped to 91 and 35, respectively (NDIC 2017).
Although recent trends in the oil and gas industry have significantly reduced new well development, United States crude
oil production is forecasted to average 10.7 million barrels per day in 2018, which is approximately 10 percent higher than
crude oil production in 2016 (8.9 million barrels per day) (EIA 2018). In addition, approximately 11,000 wells have been
drilled in the region since 2009 (NDIC 2016a). These wells require a maintenance and operation workforce that will
remain in the area as long as the wells remain active. According to the Department of Mineral Resources, the price point
at which production from existing wells would be shut-in is 15 dollars per barrel (NDIC 2015a). Based on the level of
development and population growth that has already occurred within the region, the return to pre-2009 activity levels is
unlikely in the near future.
In 2013, a total of 24 million people visited North Dakota. These visitors generate 5 percent of state and local taxes each
year (NDTD 2015). Tourism has been active in western North Dakota since the days of Theodore Roosevelt (i.e., the
1880s). Recreationists in western North Dakota have access to vast swaths of public lands, including TRNP and LMNG.
Over 700,000 people visit the TRNP each year. Of these visitors, an average of nearly 99,000 (20122017) visit the
TRNP North Unit each year, the majority of whom accessed the park via the US Highway 85 project corridor. Outdoor
recreational opportunities in western North Dakota include backcountry and modern camping, bicycling,
canoeing/kayaking, and fishing, cross-country skiing, snowshoeing, hiking, horseback riding, wildlife viewing,
photography, fishing, and hunting (USFS Undated (d), NPS 2015c, NPS 2016, NPS 2017a, NPS 2015b).
The five-year average (2011 to 2015) median household income for Stark, Billings, and McKenzie counties was $72,099,
$70,469, and $72,794, respectively. These values are above the State of North Dakota's average of $57,181 (US Census
Bureau 2015b). There are significantly more jobs in Stark County than in McKenzie County, and significantly more jobs in
McKenzie County than Billings County. The largest employers in these counties are Mining, Quarrying, and Oil and Gas
Extraction; Construction; Government and Government Enterprises; Transportation and Warehousing; and Retail Trade
(BEA 2016).
72
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Alternative A (No Build): Under Alternative A, the project corridor would remain a two-lane highway. As such, the
anticipated benefits of the TRE (i.e., stimulation of transportation opportunities and added opportunities for economic
growth) would not occur (TRE Undated), and the reliability and capacity of the congressionally designated high-priority
corridor would not be improved.
The industries dependent on the project corridor would continue to experience US Highway 85 in its current, two-lane
configuration. Reliability and capacity would not be improved, and the two-lane corridor would continue to lack
opportunities for passing and turn lanes for all highway users. Existing height restrictions associated with the Long X
Bridge would not be addressed. Over height vehicles would continue to utilize suboptimal routes to reach their destination,
resulting in lost time and money. Additionally, the potential for over height vehicles striking the Long X Bridge would
persist. Businesses would not experience consolidation or modification of access points. Cattle passes would not be
impacted, and there would be no change to existing highway closure options for moving livestock across US Highway 85.
There would be no potential for removal of mainline traffic from traveling through Fairfield, which could result in both
positive and negative economic impacts on the community.
Under Alternative A, there would be no expenditure of local, state, or federal funds for project construction. As such, the
regional economy would not experience a temporary increase in construction employment opportunities and subsequent
increase in payroll taxes, sales receipts, and indirect purchases of goods and services that would occur if the project were
constructed.
Impacts Common to All Build Alternatives: All build alternatives would expand the existing highway to a four-lane highway.
The project would bring the TRE closer to completion and would improve the reliability and capacity of the congressionally
designated high-priority corridor. The TRE is anticipated to stimulate transportation opportunity's extending more than 100
miles from the corridor and add opportunities for economic growth (TRE Undated).
The project would improve the reliability and capacity of US Highway 85 for industries dependent upon the project corridor
by providing a four-lane highway, including opportunities for passing and turn lanes. Options LX-1, LX-2, and LX-3 may
indirectly alter travel patterns and improve reliability by relieving and/or removing height restriction constraints (i.e.,
detours and crash potential) associated with the Long X Bridge. These options have not been addressed in this document
and more information on these options may be found in the DEIS. This would reduce the likelihood of detours and
decrease or remove the potential for collisions with the bridge. These improvements have the potential to decrease the
cost of doing business as a result of less travel time and potential damage to equipment. Access would be maintained for
all businesses, although consolidation of field drive access points would likely occur. Under Alternative B, some field drive
accesses may be converted to right-in/right-out (i.e., no median crossover would be provided). Final determination of
access modifications would occur during final design and ROW negotiations. Some cropland and grazing land would be
converted into a transportation corridor. These modifications are not anticipated to result in economic impacts on
businesses.
During final design and ROW negotiations, negotiations would also occur regarding the extension of existing cattle passes
or incorporation of new cattle passes. Currently, landowners owning parcels on both sides of the highway have the ability
to coordinate with the NDHP to temporarily close the highway to traffic in order to move livestock across the highway.
With the expanded roadway under Alternatives B and C, the NDHP may be less likely to close the highway to move
livestock, which would force ranchers to utilize other measures for moving livestock. If additional cattle passes are
requested by adjacent landowners, these requests would be considered utilizing the NDDOT Cattle Pass Consideration
process (State Form Number 10155), which includes a cost/benefit analysis to determine if installation of a cattle pass is
justified. If it is not justified, the adjacent landowner would typically be required to contribute funds for construction. In
addition, for any fencing impacted during construction activities, temporary and/or replacement permanent fencing would
be provided, as necessary. The potential modifications of operations and contribution of funds for cattle passes may result
in minor economic impacts on ranching businesses. Three of the Fairfield options, Options FF-2, FF-3, and FF-4, would
remove mainline traffic from traveling through Fairfield, while Option FF-1 would maintain mainline traffic on the exiting
alignment through town. Because Option FF-1 would be similar to existing conditions, economic impacts on local
businesses are anticipated to be minor. These options have not been addressed in this document and more information
on these options may be found in the DEIS.
73
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Under Options FF-2, FF-3, and FF-4, drivers travelling along US Highway 85 desiring to stop in Fairfield would be
required to turn off of mainline US Highway 85 to access the community. This could result in fewer overall stops being
made in Fairfield, as the default condition would be to continue along US Highway 85 around Fairfield. Fewer stops in
Fairfield may result in fewer payroll taxes, sales receipts, and the indirect purchase of goods and services at local
businesses. To the contrary, a reduction in traffic volumes in the community would improve mobility within town, improve
safety, and would result in a quieter overall atmosphere. These changes may have an indirect beneficial impact on the
overall business environment, whereby the existing highway would function more like a `main street' in Fairfield.
Construction of the project would result in an expenditure of local, state, and/or federal funds for project construction.
Apart from the options, Alternative B would cost approximately $419 million, while Alternative C would cost approximately
$389 million. The Fairfield options would add approximately $12 to $17 million, the ND-200 intersection options would add
$3 to $4 million, and the Long-X Bridge options would add $35 to $40 million. In addition, the trail between McKenzie
County Road 30 and McKenzie County Road 34 would add approximately $1 million, and the wildlife crossing system
would add $7 million. Overall, the Preferred Alternative (i.e., Alternative B with Options FF-1, INT-2, and LX-3, including
the trail and wildlife crossing system) would cost approximately $479 million. The regional economy would experience a
temporary increase in construction employment opportunities and subsequent increase in payroll taxes, sales receipts,
and indirect purchases of goods and services as a result of construction activities.
During construction, travel patterns would remain similar to existing conditions, as two lanes of traffic would be maintained
and reasonable construction access to properties and roadways would be maintained. Speed limits within construction
zones would be reduced, which temporarily increase travel times, and accessing businesses would may require minor
detours. Increased travel times may result in a temporary increase in cost of doing business during construction activities.
Conclusion: All three build alternatives would have similar impacts on the economy. However, Alternatives B and C are
safer alternatives and may decrease the costs associated with accidents on highways.
7.4.13. FOOD AND FIBER PRODUCTION
Over the years, the number of farms and ranches in Stark, Billings, and McKenzie counties has decreased, while the size
of the farms and ranches has increased. According to the Census, Stark County contained 837 farms (approximately
829,547 acres), Billings County contained 197 farms (approximately 722,275 acres), and McKenzie County contained 574
farms (approximately 1,064,191 acres) in 2012. Crops produced at these farms varied from small grains to native grass;
much of which was used for cattle grazing. In addition to grazing on private land, a large amount of grazing occurs on
federal lands (USDA 2012a).
Alternative A (No Build): Alternative A (No Build): Under the No-Action alternative, there would be no impact to food and
fiber production.
Impacts Common to All Build Alternatives: All build alternatives would reduce the amount of farmland within the U.S. 85
corridor. However, the majority of farms throughout the area are cattle operations and the crops that are grown are in
support of the cattle industry. Overall, the amount of farmland conversion is minimal and would not greatly impact food
and fiber production in the state.
Conclusion: All three build alternatives would have similar impacts on food and fiber production.
7.4.14. PRIME AND UNIQUE FARMLAND
Prime farmland is land that has the best combination of physical and chemical characteristics for producing food, feed,
fiber, forage, oilseed, and other agricultural crops with minimum inputs of fuel, fertilizer, pesticides, and labor, and without
intolerable soil erosion, as determined by the Secretary of Agriculture. This may include lands currently used to produce
livestock and/or timber. Unique farmland is land other than prime farmland that is used for production of specific highvalue food and fiber crops, as determined by the Secretary of Agriculture. Examples of such crops include citrus, tree
nuts, olives, cranberries, fruits, and vegetables (USDA 2012b).
The main commodities in Stark, Billings, and McKenzie counties have been agricultural until recent years with the
expansion of oil and gas development in these areas. Even with the oil and gas boom, these counties still have a strong
agricultural base. The top agricultural commodities in these counties include wheat and other grains, oilseeds, dry beans,
and dry peas. Billings and McKenzie counties also have cattle and calves listed in their top three agricultural commodities
(USDA 2012a).
74
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Alternative A (No Build): Under the No-Action alternative, there would be no impact to prime farmlands.
Impacts Common to All Build Alternatives: All build alternatives would require the acquisition of private property for the
expansion of the existing highway. Table 16 lists the acreage impacts for each build alternative.
Table 17: Summary of Prime Farmland and Farmland of Statewide Importance.
Prime Farmland (acres)
Alternative B (without options)
Alternative C (without options)
Alternative F* (without options)
Farmland of Statewide
Importance (acres)
189.7
131.6
110.0
0.80
0.70
0.60
Not Designated as
Farmland (acres)
665.6
457.4
381.2
*Alternative F impacts are based on a percentage of the difference in width between a 4-6-ft median and a 20-ft median
Conclusion: All three build alternatives have similar impacts to prime farmland. These impacts are considered negligible
in a 62-mile corridor.
7.4.15. CONSIDERATION OF PROPERTY OWNERSHIP
Table 16 lists the private and public lands that would be required for the expansion of the existing highway. The majority
of the corridor is in private ownership.
Table 18: Permanent ROW/Easement on Private and Federal Lands
Alternative A (No Build): Under the No-Action alternative there would be no acquisition of property.
Impacts Common to All Build Alternatives: Direct land use conversion associated with Alternatives B, C and F would
primarily affect agricultural pasture and cropland. Non-agricultural grasslands, forested areas, and developed lands would
also be impacted to a lesser degree. Alternative B would impact more acreage then Alternative C and F, while Options
FF-2, FF-3, and FF-4 would impact more acreage than Option FF-1. The ND-200/ US Highway 85 intersection options
and Long X Bridge options would result in minor amounts of land use conversion, with only negligible variations between
the options. ROW acquisition for Alternatives B, C and F would be required adjacent to the existing roadway corridor. The
ND-200/US Highway 85 intersection, Fairfield, and Long X Bridge options would also require additional ROW.
Conclusion: All three build alternatives would require the acquisition of additional right-of-way to construct the additional 2lanes of roadway.
7.4.16. LAND USE
Land use along the project corridor is largely dominated by agricultural cropland and rolling grasslands, except for the 7mile stretch of corridor that traverses through the Badlands. The Badlands are characterized by highly eroded buttes and
hillsides composed of soft silts and clays with sparse vegetation. Topographic relief in this area changes quickly, and soils
within this region are historically unstable due to their composition of soft silts and clays, making the area susceptible to
landslide activity. Landownership adjacent to the project corridor is a mixture of public and private. Public lands include
the Theodore Roosevelt National Park (TRNP) North Unit, under the management of the National Park Service (NPS),
as well as numerous parcels of the Little Missouri National Grasslands (LMNG), under the management of the US Forest
Service (USFS). These lands are open to the public and provide recreational opportunities.
75
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Privately owned property along the project corridor is managed under Stark, Billings, and McKenzie counties' zoning,
except for property located within Belfield, which operates under its own zoning ordinances. Two unincorporated
communities, Fairfield and Grassy Butte, are located along the project corridor with the majority of the project corridor
being described as rural. Residential houses, farmsteads, and oil and gas wells are scattered throughout the project
corridor.
Alternative A (No Build): Under Alternative A, it is assumed that current land use trends and conditions would continue to
persist. Although Alternative A would not result in direct land use impacts, it may affect future development along the US
Highway 85 corridor. Alternative A would not comply with county or city planning documents that identify improvement of
transportation systems as one of their goals and objectives.
Impacts Common to All Build Alternatives: All build alternatives would require ROW and easement acquisition and land
use conversion for areas adjacent to the existing roadway corridor with varying acreage. The ND-200/US Highway 85
intersection, Fairfield, and Long X Bridge options would also require varying additional ROW and easements. Alternative
B would require a greater amount of conversion than Alternative C, due to the wider roadway footprint. Alternative B
would only require ROW and easement acquisition along one side of the existing roadway at most locations (except for
the Badlands segment), while Alternative C and F would require ROW and easement acquisition from both sides. The
roadway design, and ROW and easement requirements for the Badlands segment of the project corridor and the
northernmost 2 miles of the project corridor, prior to tying into the Watford City Bypass, would be the same for all
alternatives. Acquisition of a permanent easement from the USFS would be required for both alternatives. In addition, a
new Highway Easement Deed from the NPS would be required for the project that would include language for the
construction, operation, and maintenance of the expanded roadway. The project would not require additional area under
the Deed; however, an additional 0.2 acres would be added to account for a recent, unrelated landslide repair project
covered under a Special-Use Permit. It was understood by the NDDOT, FHWA, and NPS during the permitting process
for the landslide repair project that this additional area would be added to the forthcoming US Highway 85 Highway
Easement Deed.
Temporary construction easements would be required along the majority of the project corridor. In addition to the
temporary easements identified in this EIS, the contractor may require the temporary use of other areas during
construction. These areas would be used for staging and storage areas, and access routes. Any areas identified by the
contractor (i.e., not included in this EIS) would be approved through the NDDOT Material Source Approval Process. This
process is followed to obtain environmental approval on these sites to comply with all federal and state laws and
regulations. These sites would not be permitted on any federal or public lands. Land use patterns would not be
substantially impacted by temporary construction use since the affected areas would be restored following construction.
Indirect land use impacts may also occur. During and after construction, access to parcels (e.g., residential, oil and gas,
agricultural) would be maintained; however, some parcels may become too small or inconvenient to utilize for their current
use (e.g., agriculture), resulting in land use changes. Areas where this might occur are rare, since the project would follow
an existing roadway as closely as possible. The most likely scenario where existing land use abandonment may occur
would be associated with Options FF-2, FF-3, and FF-4. None of the alternatives or options are anticipated to cause
growth-inducing effects or result in regional land use pattern changes.
Conclusion: All three build alternatives have similar impacts to land use.
7.4.17. HISTORIC PROPERTIES
A Class III Cultural Resource Inventory and architectural survey were completed for the project. A total of 95 sites were
documented in the area of potential effect (APE). Through the Section 106 process, resources were either identified as
unevaluated, Eligible, or Not Eligible for inclusion on the NRHP. Unevaluated sites that had potential to be impacted by
construction of the project were evaluated in 2016 and 2017. None of these sites were determined to be Eligible for
inclusion on the NRHP, and they did not warrant preservation in-place. Therefore, none are considered a Section 4(f)
property. Sites that are Eligible for listing on the NRHP are described in Section 6.5.8 of the DEIS.
76
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Alternative A (No Build): Under Alternative A, no direct or indirect impacts on historic or archaeological resources would
be expected. The NDDOT would continue to maintain the Long X Bridge under the No Action alternative, such that the
historic integrity of the structure would remain. Mitigation for Eligible sites would not occur under Alternative A.
Impacts Common to All Build Alternatives: Following completion of evaluative testing a total of 16 sites remained
unevaluated within the survey corridor. Initial review of the construction limits for all build alternatives and options
indicated these 16 sites would not be affected. Of the nine Eligible sites, four were identified as being potentially affected
by the project. These four Eligible sites include the Gregory Homestead, Dolyniuk Homestead, TRNP North Unit Entry
Sign, and Long X Bridge. To avoid impacting the Gregory Homestead, the alignment of the roadway was shifted to the
east for both Alternatives B and C. This alignment shift allows for full avoidance of the site boundary by the project;
therefore, no impacts on the Gregory Homestead site would be expected. Alternative F was not evaluated for impacts to
cultural resources because it was eliminated for further consideration during the DEIS process. Alternative F has a
smaller footprint than Alternatives B and C and would not affect any historic properties.
Due to the nature and location of the Dolyniuk Homestead, design of the project was not able to avoid impacting the site
under Alternative B, C or F. To mitigate the permanent impact, the NDDOT, in coordination with the SHPO, has
developed a mitigation approach. This approach includes documentation of the Dolyniuk Homestead site as well as the
Gregory Homestead (32BI1149). The Dolyniuk Homestead and Gregory Homestead are located within the project
segment of lowest priority from a construction sequencing standpoint; however, due to the continually deteriorating nature
of the sites, mitigation will be completed in 2018 in order to document the greatest amount of information possible. With
this mitigation, the SHPO has concurred with a No Adverse Effect determination.
The TRNP North Unit Entry Sign cannot be avoided by Alternative B, C or F. To minimize impacts, the sign would be
removed prior to project construction. Upon project completion, the sign would be replaced, intact, in close proximity to its
original location. A Special Provision to the Construction Specifications would be drafted for the Entry Sign during final
design. The Special Provision would give concise and clear direction to the contractor for handling the Entry Sign. The
North Dakota Cultural Resource Survey documentation for the TRNP North Unit was also updated during the cultural
survey. The site form was updated because it was lacking information for historic standing structures, and adequate
descriptions and photographs. With the completed work and proposed resetting of the Entry Sign, the NDSHPO has
concurred with a No Adverse Effect determination.
Conclusion: All build alternatives would have similar impacts to historic properties as they all include the expansion of the
existing highway. The impacts of Alt B would be associated with a 32-ft median, 8-ft shoulders and 2-12-ft travel lanes,
Alt C would consist of a 20-ft median, 8-ft shoulders and 2-12-ft travel lanes, and Alt F would consist of a 4-6-ft median
with 8-ft shoulders and 2-12-ft travel lanes.
7.4.18. PARKS, NATIONAL AND HISTORICAL MONUMENTS, NATIONAL SEASHORES, WILDERNESS
AREAS, RESEARCH SITES, AND SIMILAR AREAS
The following description from the 2018 NDDOT DEIS, describes the National Park and Dakota Prairie National
Grasslands which are present within the project corridor.
"The Theodore Roosevelt National Park (TRNP) North Unit is under the management of the National Park Service
(NPS). Theodore Roosevelt National Memorial Park was established in 1947, which was re-designated by Congress in
1978 as Theodore Roosevelt National Park (NPS 2014). The purpose of the TRNP is to memorialize Theodore Roosevelt
and his conservation legacy. The significance of the TRNP lies with the Little Missouri River Badlands, which consist of a
unique, colorful, and rugged landscape formed by 65 million years of erosion that has exposed geological strata. The
Badlands include varied habitats, abundant wildlife, fossils, petrified wood, and cultural resources.
Theodore Roosevelt first visited the Badlands in 1883, where he would later establish the Elkhorn Ranch. The TRNP
currently protects more than 70,000 acres of land located in Billings and McKenzie counties, including approximately
29,920 acres of designated wilderness area, known as the Theodore Roosevelt Wilderness (NPS 2014). The park is
made up of three units: Elkhorn Ranch Unit (218 acres), TRNP North Unit (24,070 acres), and South Unit (46,159 acres)
(NPS 2015c). The project corridor intersects the eastern edge of the TRNP North Unit, where the NDDOT currently has
77
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
a Highway Easement Deed from the NPS for the US Highway 85 transportation corridor. In addition, roadways extending
from US Highway 85 along the project corridor provide access to the TRNP South Unit."
The administrative boundary of the TRNP includes public and private lands. Private land holdings, also known as
inholdings, are parcels of property that were under private ownership prior to establishment of the park's administrative
boundary. Public land holdings under the management of the NPS are open to the public, while privately owned
inholdings are not. In accordance with FHWA's Section 4(f) Policy Paper, NPS-managed parcels located within the
administrative boundary would be considered Section 4(f) properties. Privately owned property within the administrative
boundary are not open to the public and are not managed by the NPS; therefore, private lands located within the
administrative boundary of the park would not be considered Section 4(f) properties.
The NDDOT has an existing Highway Easement Deed (Deed) with the NPS for U.S. Highway 85. Due to the incorporation
of design modifications, the project would not require additional area under the Deed; however, an additional 0.2 acres
would be added to account for a recent, unrelated landslide repair project covered under a Special-Use Permit. It was
understood by the NDDOT, FHWA, and NPS during the permitting process for the landslide repair project that this
additional area would be added to the forthcoming U.S. Highway 85 Deed.
The intended use of this Deed is for the occupation and operation of a transportation corridor. Its intended use is not for
recreation, wildlife or waterfowl refuge, or preservation of a historic site. Therefore, the area within the Deed (including the
0.2-acre Special-Use Permit area) is not considered a Section 4(f) property.
The entrance to the TRNP North Unit is located off of U.S. Highway 85. Approaching the park entrance, U.S. Highway
85 includes a right-hand turn lane for southbound traffic and a climbing lane for northbound traffic. On the western side of
U.S. Highway 85, NPS lands are fenced to keep the bison in the park.
Along the project corridor there are a total of five different USFS Management Area (MA) designations assigned to the
various adjacent parcels of USFS-managed lands. All USFS-managed lands along the project corridor is publicly owned
and open to the public; however, Section 4(f) only applies to MAs that are primarily used for recreation, public park, or
wildlife and waterfowl refuge purposes.
A Land and Resource Management Plans (LRMP) is developed through public participation and provides the guiding
principles in which National Forest System (NFS) lands are managed by the USFS. Within the LRMP, each parcel of land
is assigned an MA designation. MAs are designated to ensure proper rules, guidelines, and prescriptions are
implemented to achieve desired conditions and standards applicable to each MA. These rules, guidelines, and
prescriptions were used for assessing Section 4(f) applicability for each MA. To determine the primary use of each MA
along the project corridor, the following steps were taken:
1. Identification of each of the different MAs along the project corridor.
·
DPG MA 1.2a--Suitable For Wilderness
·
DPG MA 1.31--Backcountry
Recreation Non-Motorized
·
DPG MA 3.51--Bighorn Sheep Habitat
·
DPG MA 3.65--Rangelands with Diverse Natural-Appearing Landscapes
·
DPG MA 6.1--Rangeland with Broad Resource Emphasis
2. The 2002 Record of Decision for DPG Final Environmental Impact Statement (EIS) and LRMP (USFS 2002) were
referenced to identify the primary use of the MAs.
·
DPG MA 1.2a--Suitable for Wilderness Key words from the LRMP indicate these areas are managed to protect
their wilderness character for potential future listing in the National Wilderness Preservation System. The USFS will
honor valid existing rights even if it means that roads may be constructed in these areas, and land exchanges will
be considered to resolve issues related to valid existing rights.
·
DPG MA 1.31--Backcountry Recreation Non-Motorized Key words from the LRMP indicate this area is managed to
provide recreation opportunities.
·
DPG MA 3.51--Bighorn Sheep Habitat Key words from the LRMP indicate this area is managed to provide quality
forage, cover, escape terrain, and solitude for bighorn sheep.
78
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
·
DPG MA 3.65--Rangelands with Diverse Natural-Appearing Landscapes Key words from the LRMP indicate these
areas are managed with emphasis on maintaining a naturally appearing landscape, while providing a mix of other
rangeland values and uses. These areas have fewer livestock grazing developments. Oil and gas development
may occur.
·
DPG MA 6.1--Rangeland with Broad Resource Emphasis Key words from the LRMP indicate these areas are
managed for the diversity of native plants and animals and ecological functions and processes, while providing
livestock forage and a mix of other rangeland values and uses.
3. A meeting with the USFS, FHWA, and NDDOT was held to discuss the first two steps and then identify whether or not
the MAs met the Section 4(f) requirements of recreation, Public Park, or wildlife and waterfowl refuge.
4. The MAs that were determined to be Section 4(f) property include: MA 1.31 Backcountry Recreation Non-Motorized;
MA 3.51 Bighorn Sheep Habitat; and MA 1.2a Suitable for Wilderness. Concurrence and signatures were received from
both the USFS and FHWA. Additionally, the NDDOT has existing easements with the USFS for U.S. Highway 85. The
intended use of these easements is for the occupation and operation of a transportation corridor. Its intended use is not
for recreation, wildlife or waterfowl refuge, or preservation of a historic site. Therefore, these existing easements are not
considered Section 4(f) properties.
Alternative A (No Build): Under the No-Action alternative, visitors, employees and other users of the TRNP North Unit
and LMNG would continue to experience high traffic volumes, as well as an Level of Service (LOS) that is projected to be
deficient by 2040. Access points to federal public lands would remain unconsolidated and off-set.
Alternative B: This alternative would include transportation and safety improvements throughout the corridor and provide
for additional turn lanes at the TRNP North Unit entrance, trail and potential re-alignment of the access point to Summit
Campground. The visual quality of the experience of the Badlands is not anticipated to be diminished with the
construction of the new highway. Wildlife crossings with fencing would improve safety and terrestrial habitat connectivity
on public lands. The new highway would require a renewal of the same 9.4 acre area as the existing deed, plus 0.20
acres for unrelated landslide repair project. The proposed project would require a Special-Use Permit from the NPS for
temporary access to 0.50 acres to correct landslide issues at Horseshoe Bend and additional temporary impacts on NPSmanaged lands for fencing replacement and wildlife jump-outs. In Management Area (MA) 3.65, a 4.4 acre permit would
be required and at MA 6.1, 69.2 acres would be required.
Alternative C: Alternative C would be similar to Alt B except for permanent USFS easements would be MA 3.65: 4.4
acres and MA 6.1: 53.0 acres.
Alternative F: Alt F would result in approximately 4.4 acres of impact to MA 3.65 and 44.0 acres to MA 6.1.
Conclusion: The three build alternatives would result in similar kinds of impacts to public lands. The level of impact
increases with wider median widths, which requires additional right-of-way for construction.
7.3.19. AIR QUALITY
Alternative A (No Build): Under Alternative A, emissions of criteria pollutants from vehicles traveling along the existing
roadway would continue and slightly increase as traffic volumes grow, and passing and congestion increases. However,
any increases in emissions of criteria pollutants along the corridor are not anticipated to result in visual impairment of any
Class I areas, cause or contribute to a violation of any National Ambient Air Quality Standards (NAAQS) or State Ambient
Air Quality Standards (SAAQS), or expose sensitive receptors to substantially increased Particulate Matter (PM)
concentrations. With the federal requirements for on- and off-road engines, criteria pollutant emissions from vehicles
traveling on the existing roadway are anticipated to be minor and are not expected to adversely impact North Dakota's
reasonable progress goals for 2018. In addition, under Alternative A, fugitive dust emissions resulting from the
construction of the roadway would not occur. Traffic along the roadway would continue to contribute toward United States
and North Dakota Greenhouse Gas (GHG) inventories. However, emissions from the annual traffic increase would
represent a minor contribution toward United States and North Dakota GHG inventories.
Impacts Common to All Build Alternatives: The 2016 Traffic Operations Report (appended by reference) completed for the
project indicates that traffic along this stretch of US Highway 85 is projected to grow at a rate of approximately 2.5 percent
annually regardless of if the proposed project is constructed. Therefore, operation of the project is not anticipated to be a
direct traffic contributor. According to the capacity analysis conducted as part of the Traffic Operations Report, expanding
79
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
the existing two-lane roadway to a four-lane roadway would improve the ability for vehicles to pass and improve the
reliability of US Highway 85. Following construction of the project, the LOS along the project corridor is projected to be
between `A' and `B' by 2040. Emissions of criteria pollutants from vehicles traveling along the project corridor would
continue to occur; however, these emissions may be attenuated by eliminating the need for passing maneuvers and
reducing roadway congestion. Any increases in fugitive dust or emissions of criteria pollutants associated with the annual
increase in traffic along the corridor are not anticipated to result in visual impairment of any Class I areas, cause or
contribute to a violation of any NAAQS or SAAQS, or expose sensitive receptors to substantially increased PM
concentrations.
Conclusion: With the federal requirements for on- and off-road engines and continued fugitive dust management
practices, fugitive dust and criteria pollutant emissions from vehicles traveling on the existing roadway are anticipated to
be minor and are not expected to adversely impact North Dakota's reasonable progress goals for 2018. Traffic along the
roadway would also contribute toward United States and North Dakota GHG inventories. However, emissions from the
annual traffic increase would represent a minor contribution toward United States and North Dakota GHG inventories.
Variations in air quality and climate change impacts between alternatives and options are anticipated to be negligible.
7.4. EVALUATION AND TESTING
To minimize impacts to WOUS, only fill material composed of sand, clay, rock, and gravel, or other naturally occurring
inert material from uncontaminated sources would be used. NDDOT requires that borrow material is extracted from an
approved material source site. The locations that have been approved by NDDOT and FHWA can be found on the
NDDOT website. The extraction site would be examined to assess whether it is sufficiently removed from sources of
pollution to provide reasonable assurance that the discharge material is not a carrier of contaminants. If the evaluation
described above indicates the material is not a carrier of contaminants, then the required determinations pertaining to the
presence or absence of contaminants can be made without testing. Evaluation must be in accordance with the
requirements of 40 CFR § 230.60 and, if testing is required, it must comply with the requirements of 40 CFR § 230.61. No
contaminated material would be deposited in WOUS.
7.5. CUMULATIVE IMPACTS
Cumulative impacts are the changes in an aquatic ecosystem that are attributable to the collective effect of a number of
individual discharges of dredged or fill material. Although the impact of a particular discharge may constitute a minor
change in itself, the cumulative effect of numerous such piecemeal changes can result in a major impairment of the water
resources and interfere with the productivity and water quality of existing aquatic ecosystems, 40 CFR § 230.11(g). This
section presents the requirements for cumulative impact analysis. The impacts of past, present, and reasonably
foreseeable future projects will be combined with the potential impacts for Alternatives B, C and F in each resource area's
cumulative geographic scope to determine cumulative impacts.
The proposed project is located within three 8-digit watersheds. The geographic area for this assessment is the Lower
Little Missouri (HUC 10110205), Middle Little Missouri (HUC 10110203), and the Upper Heart (HUC 10130202). These
watersheds cumulatively cover 5,691 square miles or 3,642,333 acres. All three HUC's that U.S. Highway 85 intersects
were included in this analysis.
Past and Current Actions: Past actions which have potentially involved the discharge of dredged/fill material into WOUS
primarily included the construction of housing/commercial developments, industrial facilities, and agriculture. Impacts
associated with these activities has varied from complete loss to preservation.
In the last 10 years for the three watersheds, DA permits have authorized fill in approximately 45.5 acres of WOUS with
34.5 acres of permanent loss. The Corps required compensatory mitigation for 23.5 acres of aquatic resources within the
last 10 years. The Corps also authorized approximately 13,000 LF of impacts between the three watersheds. It is
important to note that not all projects authorized by nationwide permits require notification to the Corps and not all projects
are authorized; therefore, the information above only reflects projects the Corps evaluated.
Between 1950 and 2010, North Dakota had the second lowest population growth in the Nation; however, between 2010
and 2014 North Dakota had the fastest growing population growth in the United States (Mather and Jarosz 2014). During
this time, the Corps experienced an increase in permit actions associated with the economic development. Road projects
80
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
also became a priority in western North Dakota in order to accommodate the movement of people and goods. The data
presented above is over a 10 year period; however, the majority of authorized impacts to the three watershed occurred in
response to the extraction of resources and supporting infrastructure, which escalated in the period between 2010 and
2015. Approximately 1100 acres of aquatic resources exist on the landscape and 4500 acres of land within these three
HUCS have been developed based on 2011 data (National Land Cover Data 2018). Analyzing the national land cover
data and the information above, the Corps has authorized the fill of approximately 4 percent of aquatic resources within
the three watersheds.
Reasonably Foreseeable Actions: As of September 2018, the Omaha District, North Dakota Regulatory Office, is currently
reviewing permit applications or is involved in pre-application consultations for a variety of projects proposed within the
three 8-digit HUC watersheds. Some of the pending actions below are local transportation projects. The remaining
pending permit is for an access road. Additionally, there are three actions currently in the pre-application process for
pipelines and Heart Butte Dam. Pre-application consultations occur in the early planning stages of a project and may not
result in a permit action or impacts to WOUS.
Table 19: Pending Permits within the Lower Little Missouri (HUC 10110205), Middle Little Missouri (HUC
10110203), and the Upper Heart (HUC 10130202) watersheds.
Project File Number
Project Name
Action
Type
County
HUC 8
NWO-2017-0250-BIS
NWP
McKenzie County Route 37
McKenzie
10110205
NWO-2018-0773-BIS
NWP
Stark County Bridge Replacement PCN
21764
Stark
10130202
NWP
Conoco Phillips Access Road
Dunn
10110205
SP
125th Avenue South
McKenzie
10110205
NWO-2018-01622-BIS
NWO-2018-01185-BIS
The overall project cumulative effects, discussion on the past, present, and reasonably foreseeable actions are presented
in Chapter 8 of the DEIS. Alternatives B, C and F would have similar potential cumulative impacts as all build alternatives
follow essentially the same alignment and would impact most of the same resources in similar locations and in a similar
manner. Therefore, the resource category analyses that was completed above adequately addresses impacts associated
with the two evaluated alternatives.
Overall Cumulative Impacts Conclusions: The various activities affecting resources and people in the project area as well
as the proposed action could have localized variations at the project level. Some projects consist of access roads and
other pre-application consultations include the construction and/or removal of pipelines. Those projects that involve the
reconstruction of roadways, will be completed with the same type of inert material and would follow the same procedures
discussed in this document. Other road projects would only be discharging clean fill from an approved material source
site.
Cumulative effects of most concern on aquatic resources associated with the above listed reasonably foreseeable
projects may include an increase in the loss of WOUS; impacts to fish and wildlife resources; loss of substrate; changes in
water level fluctuations and water quality; impacts to aesthetic values; parks and other protected areas; and the discharge
of pollutants. However, proper application of avoidance and minimization techniques would reduce the potential impacts
that may occur. Compensatory mitigation for unavoidable impacts would reduce the cumulative impacts by maintaining
and improving the quality and quantity of aquatic resources within the area. There would be no difference between the
alternatives regarding current and reasonably foreseeable future projects impacting WOUS.
8.0 ACTIONS TO MINIMIZE ADVERSE EFFECTS
8.1. PLANNING AND DESIGN
During the development of the DEIS, several alternatives were considered and later dismissed. The preliminary design
and planning phases considered additional impacts that would occur with a new 62 mile corridor, a few miles away from
the existing highway. NDDOT and FHWA established that less impacts would occur environmentally and logistically if the
existing corridor is utilized for the reconstruction of the roadway. Alternatives B, C and F would involve similar fill footprints
and include the extension and replacement of existing culverts. In both cases, slopes would be constructed in a manner
81
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
that would minimize the highways encroachment into wetlands, while remaining in compliance with other federal safety
regulations for the traveling public. Additional minimization would be completed during final design and permitting.
Culverts and pipes as a general practice would be placed one foot below the existing channel and bottom elevation of
aquatic resources. This ensures that natural flows would remain following construction activities and passage for aquatic
organisms would not be disrupted.
During construction, measures would be taken to reduce impacts to waters immediately adjacent to U.S. Highway 85 and
downstream aquatic resources. Turbidity, erosion, and sediment transport would be prevented through the
implementation of BMP's. Other methods used for the SWPPP and Section 401 certification compliance would also
minimize and prevent impacts to water quality.
9.0 COMPENSATORY MITIGATION
As per Section 2.2 Avoidance, Minimization and Compensation, compensatory mitigation would be required at a minimum
of a 1:1 ratio for impacts to jurisdictional waters. During the permitting phase, it would be determined whether portions of
the project would qualify for a Nationwide Permit verification or whether phases of the proposed project would be
permitted as a whole. NDDOT would be required to submit a 12-point Draft Mitigation Plan prior to the issuance of an
individual permit for the proposed project. NDDOT and FHWA have proposed approximately 12.97 acres and 8.80 acres
of compensatory mitigation for Alternatives B and C, respectively, but during final design and permitting phase may opt to
utilize a Corps approved mitigation bank. EO 11990 requires 6.54 acres and 4.89 acres of compensatory mitigation for
natural wetlands under Alternatives B and C, respectively. Alternative F would result in approximately 7.86 acres of
permanent fill in WOUS and 5.76 acres of temporary impacts.
Mitigation ratios would be established based on the proposed form of mitigation at the time of final design and permitting.
The North Dakota Wetland Mitigation Banking Guidance document would be utilized to determine the appropriate
mitigation methods and ratios. These include the following:
Table 20: Mitigation Ratios
Ratios
Methods
1:1
Restoration of a completely drained or filled wetlands by plugging the outlet and/or removing
accumulated sediment, and implementing a re-vegetation plan.
1:1
Restoration of the outer, completely drained portion of a partially drained wetland, removing
accumulated sediment, and implementing a wetland re-vegetation plan.
2:1
Restoration of the deeper portion of a partially drained wetland basin that continued to pond water
after completion of the drainage project.
2:1
Restoration of an impaired wetland by removing the sediment accumulated in the basin.
2:1
Creation of a new wetland by excavation, establishment of ditch blocks, or construction of small dams
along non-wetland drainage-ways.
5:1
Enhancement of a wetland basin by establishing and maintaining a 50-foot vegetated, upland buffer
around the perimeter of each mitigation wetland.
10:1
Preservation of existing wetland habitat as a minor component of a mitigation bank featuring restored
and/or created wetlands.
20:1
Enhancement of a mitigation tract by establishing permanent grassland cover outside of the 50-foot
buffer to square off the boundaries of a mitigation bank and develop a reasonable land use plan for
the surrounding property.
10.0. CONCLUSION
The 404(b)(1) Guidelines are the substantive environmental standards by which all Section 404 permit applications are
evaluated. The Guidelines, which are binding regulations, were published by the Environmental Protection Agency at 40
CFR Part 230 on December 24, 1980. The fundamental precept of the Guidelines is that discharges of dredged or fill
material into waters of the United States, including wetlands, should not occur unless it can be demonstrated that such
discharges, either individually or cumulatively, will not result in unacceptable adverse effects on the aquatic ecosystem.
The Guidelines specifically require that "no discharge of dredged or fill material shall be permitted if there is a practicable
alternative to the proposed discharge which would have less adverse impact on the aquatic ecosystem, so long as the
82
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
alternative does not have other significant adverse environmental consequences." 40 CFR 230.10(a). Based on this
provision, the applicant is required in every case (irrespective of whether the discharge site is a special aquatic site or
whether the activity associated with the discharge is water dependent) to evaluate opportunities for use of non-aquatic
areas and other aquatic sites that would result in less adverse impact on the aquatic ecosystem. A permit cannot be
issued, therefore, in circumstances where a less environmentally damaging practicable alternative for the proposed
discharge exists (except as provided for under Section 404(b)(2)). (40 CFR 1502.14, 33 CFR Part 325 Appendix B(7) and
40 CFR 230.5(c)). However, this regulatory statue does not limit the inherent flexibility provided in the Guidelines for
implementing these provisions.
The preamble to the Guidelines is very clear in this regard:
Of course, as the regulation itself makes clear, a certain amount of flexibility is still intended. For example, while the
ultimate conditions of compliance are "regulatory", the Guidelines allow some room for judgment in determining what must
be done to arrive at a conclusion that those conditions have or have not been met.
The Corps asked for additional information from FHWA and NDDOT regarding the safety of Alternative B over Alternative
C. Alternative B incorporates a 52-ft divided, depressed median and the overall width of the roadway would be 124-ft.
Alternative C is a divided flush median, with a width of 20-ft. The overall roadway width would be 84-ft. FHWA's
Resource Center and R & D Design Laboratory conducted a study using the Interactive Highway Safety Design Model
(IHSDM), which is a software program designed to allow transportation professionals to apply methods that generate
quantitative safety data that can be incorporated into design of roadways. The focus of the analysis was to provide a
predictive model to estimate crash performance of the two project alternatives, B and C. Both alternatives consist of
expanding the capacity of the existing U.S. Highway 85 corridor from 2-lanes to 4-lanes. The key difference between the
two alternatives is the width of the median. The following tables are the results of the model:
Table 21: Comparison of probability of accidents between Alt B and C
Alternative B Total
Alternative C
Total
First year of analysis
2015
2015
Last year of analysis
2040
2040
Evaluated length (miles)
62.2366
62.2366
Average Future Road AADT
(vpd)
5895
5895
Predicted Crashes
Comparison
Increase (%)
Total Crashes
1721.81
1794.76
4.24
Fatal and injury crashes
936.06
976.16
4.28
Property Damage only crashes
785.76
818.60
4.18
Based on the above data, the Corps has determined that Alternative B meets the purpose and need for the project,
Alternatives C and F do not appear to provide the traveling public with a "safer" road.
The Corps also looked at the WOUS impacts associated with each of the crossings along the 62-mile corridor. The
difference between Alternative B and C is a total of 4.17 acres of impacts to WOUS. Based on a 62-mile corridor, that
amounts to approximately 0.07 acres per mile of roadway. The project impacts the same resources for all build
alternatives, the difference is only in the width of the median from 6-ft to 52-ft. There are only 3 crossings under Alt B that
trigger the need for an individual permit and exceed the 0.50 acreage limit of a Nationwide 14. Out of the 112 impacted
areas for Alt B, 109 crossings would qualify for a Nationwide 14 Linear Projects. Alt C and F would have similar impacts,
with only 1 crossing requiring an individual permit.
In conclusion, based on the information provided and the public interest review; the Corps has determined that based on
the increased safety associated with a depressed, wide median of 52-ft; that Alt B is the only practicable alternative that
meets the purpose and need of the project. The overall impacts of the Applicant's preferred alternative do not significantly
degrade the aquatic resources found within the project area and are not significantly different from Alt C and F. In
addition, although the Guidelines specify that an alternative with less adverse impact on the aquatic ecosystem exists, it
83
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
can be rejected if it would have "other significant adverse environmental consequences". In this case, the Corps has
determined that although safety is not an environmental consequence it has overriding implications on society with the
reduction in usually fatal head-on collisions.
84
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
11.0. LITERATURE CITED
Ahmed, M.M., M. Abdel-Aty and J. Park. 2015. Evaluation of the Safety Effectiveness of the Conversion of Two-Lane
Roadways to Four-Lane Roadways. Transportation Research Record.
American Association of State Highway Officials (AASHTO). 2011. A policy on geometric design of highways and streets
(Green Book). Washington.
Bureau of Economic Analysis (BEA). 2016. CA25N Total Full-Time and Part-Time Employment by NAICS Industry: North
Dakota, McKenzie County, Stark County. Last updated November 17, 2016. Accessed May 26, 2017.
https://www.bea.gov/regional/index.htm
Cowan, J.P. 1994. Handbook of Environmental Acoustics. Van Nostrand Reinhold, New York.
Egan, M.D. 1988. Architectural Acoustics, McGraw-Hill Book Company
Energy Information Administration (EIA). 2018. Short-Term Energy Outlook: Forecast Highlights. Released March 2018.
Accessed March 16, 2018. https://www.eia.gov/outlooks/steo/report/
Federal Highway Administration (FHWA). 2005. Environmental Review Process Guidance.
https://www.fhwa.dot.gov/map21/docs/12mar_prop_env_proc_review_pc.pdf
Federal Highway Administration (FHWA). 2006. Construction Noise Handbook. FHWA-HEP-06-015.
https://www.fhwa.dot.gov/environment/noise/construction_noise/handbook/
Federal Highway Administration (FHWA). 2015b. Reference Sourcebook for Reducing Greenhouse Gas Emissions from
Transportation Sources. Section 6: Transportation System Management Strategies, Roundabouts. Last updated
December 22, 2015. Accessed May 15, 2017. https://www.fhwa.dot.gov/environment/
climate_change/mitigation/publications/reference_sourcebook/page06.cfm#s5
Federal Highway Administration (FHWA). 2018. Memorandum U.S. 85 Safety Analysis. FHWA Resource Center for
Safety, November 5, 2018
Fishing. (2017, August 11). Retrieved September 20, 2018, from https://www.nps.gov/thro/planyourvisit/fishing.htm
IPaC: Information for Planning and Consultation. (n.d.). Retrieved from https://ecos.fws.gov/ipac/
Job Service North Dakota. 2017. North Dakota's Oil and Gas Economy. Accessed August 16, 2017.
https://www.ndworkforceintelligence.com/gsipub/index.asp?docid=578
Mather, Mark and Beth Jarosz. 2014. US Energy Boom Fuels Population Growth in Many Rural Counties. Accessed
December 2, 2015. http://www.prb.org/Publications/Articles/2014/us-oil-rich-counties.aspx
National Land Cover Database (2018, April 16). Retrieved September 21, 2018, from
https://www.mrlc.gov/index.php
National Park Service (NPS). 2014. Foundation Document Theodore Roosevelt National Park.
National Park Service (NPS). 2015a. Environmental Assessment for the North Unit Visitor Center Replacement. Accessed
June 13, 2017.https://parkplanning.nps.gov/document.cfm?parkID=167&projectID=4824 &documentID=66118
National Park Service (NPS). 2015b. Outdoor Activities -- Theodore Roosevelt National Park. Last updated April 10,
2015. Accessed July 10, 2017. https://www.nps.gov/thro/planyourvisit/outdooractivities.htm
National Park Service (NPS). 2015c. Park Statistics. Accessed August 7, 2017.
https://www.nps.gov/thro/learn/management/statistics.htm
National Park Service (NPS). 2016. Environmental Assessment for the Communication Tower Replacement and Colocation in Theodore Roosevelt National Park. Accessed January 10, 2018.
https://parkplanning.nps.gov/documentsList.cfm?parkID=167&projectID=55468
National Park Service (NPS). 2017a. Theodore Roosevelt National Park Monthly Public Use Report (December 2008
through December 2017). Accessed February 5, 2018.
https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Monthly%20Public%20Use?Park=THRO
North Dakota Department of Transportation (NDDOT), Federal Highway Administration (FHWA). 2018a. Draft
Environmental Impact Statement: US Highway 85 I-94 Interchange to Watford City Bypass (McKenzie County
Road 30) Project 9-085(85)075 PCN 20046. Stark, Billings, and McKenzie Counties, North Dakota: Environmental
Transportation Section, Bismarck, North Dakota.
North Dakota Department of Transportation (NDDOT). 2018b. Alternatives Methodology. Prepared by KLJ. April 2018
North Dakota Department of Transportation (NDDOT). 2017. Noise Report. Prepared by KLJ.
North Dakota Department of Transportation (NDDOT). 2016. U.S. Highway 85, I-94 Interchange to Watford City Bypass
Biological Evaluation. Prepared by KLJ, September 2016.
85
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
North Dakota Department of Transportation (NDDOT). 2016. Northern Long-eared bat summer acoustic survey results.
North Dakota Department of Transportation (NDDOT). 2016. Northern Long-eared Bat Habitat Assessment & Acoustic
Survey Plan
North Dakota Department of Transportation (NDDOT). 2016. Traffic Operations Report.
North Dakota Department of Transportation (NDDOT). 2016. NDDOT Historical State Traffic Counts (2009-2016).
Accessed August 8, 2017. https://www.dot.nd.gov/business/maps-portal.htm#trafficcountsstateandcity
North Dakota Game and Fish Department (NDGF). 2016. Black-footed ferret. https://gf.nd.gov/wildlife/id/carnivores/blackfooted-ferret (Accessed 12/04/2018).
North Dakota Industrial Commission (NDIC). 2015a. North Dakota Department of Mineral Resources: House
Appropriations Committee Presentation. Accessed December 22, 2015.
https://www.dmr.nd.gov/oilgas/presentations/FullHouseAppropriations010815.pdf
North Dakota Industrial Commission (NDIC). 2015b. North Dakota Drilling and Production Statistics: Annual Production
Reports for 2009-2015. Accessed August 9, 2016. https://www.dmr.nd.gov/oilgas/stats/statisticsvw.asp
North Dakota Industrial Commission (NDIC). 2016a. Department of Mineral Resources: Drilling Statistics (Prior to 1951
2016). Accessed August 8, 2017. https://www.dmr.nd.gov/oilgas/stats/DrillStats.pdf
North Dakota Industrial Commission (NDIC). 2016c. Oil in North Dakota: 2009 Production Statistics. Accessed
August 8, 2017. https://www.dmr.nd.gov/oilgas/stats/statisticsvw.asp
North Dakota Industrial Commission (NDIC). 2017. Industrial Commission of North Dakota, Oil and Gas Division: 20142017 Monthly Statistical Updates. Accessed March 16, 2018. https://www.dmr.nd.gov/oilgas/stats/statisticsvw.asp
North Dakota Tourism Department (NDTD). 2015. North Dakota Tourism: Annual Report 2015. Accessed August 9, 2016.
http:// www.ndtourism.com/sites/default/master/files/pdf/2015ANNUALREPORT.pdf
Stamatiadis, N., D. Lord, J. Pigman, J. Sacksteder and W. Ruff. 2001 Safety Impacts of Design Element Trade-offs for
Multilane Rural Highways. American Society of Civil Engineers. 10.1061/(ASCE)TE.1943-5436.0000221
State Historical Society of North Dakota (SHSND). 2016. A History of Fossil Fuels in North Dakota. Accessed September
16, 2016. http://ndstudies.gov/energy/level1/module-2-petroleum-natural-gas/history-fossil-fuels-north-dakota
Theodore Roosevelt Expressway (TRE). Undated. About us. Accessed August 16, 2017.
http://www.trexpressway.com/AboutUs
Uhlman, K., D.P. Guertin, L. R. Levick, T. Sprouse, E. Westfall, C. Holmgren and A.P. Fisher. 2008. NEMO WatershedBased Plan Middle Gila Watershed. Water Resources Research Center, University of Arizona Tucson, Arizona.
U.S. Census Bureau. 2015a. 20112015 American Community Survey 5-Year Estimates for Fairfield and Grassy Butte,
North Dakota. Accessed August 8, 2017. https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml
U.S. Census Bureau. 2015b. 20112015 American Community Survey 5-year Estimates: Billings County, North Dakota.
Accessed May 24, 2017. https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml
U.S. Census Bureau. 2016a. 2012-2016 American Community Survey 5-Year Estimates for Grassy Butte and Watford
City, North Dakota. Accessed August 8, 2017.
https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml
U.S. Department of Agriculture (USDA). 2012a. Census of Agriculture, County Profile: McKenzie County, Billings County,
Stark County. Accessed October 24, 2017.
https://www.agcensus.usda.gov/Publications/2012/Online_Resources/County_Profiles/North_Dakota/index.asp
U.S. Department of Agriculture (USDA). 2012b. Prime and Unique Farmlands. Released March 2012. Accessed July 6,
2017. https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1187178.pdf
U.S. Environmental Protection Agency (EPA). 1980. Guidelines Preamble "Regulations vs. Guidelines". Federal
Register, December 24, 1980.
U.S. Environmental Protection Agency (EPA) and the U.S. Army Corps of Engineers (Corps). 1990. Memorandum of
Agreement. The determination of mitigation under the Clean Water Act Section 404(b)(a) Guidelines.
https://www.epa.gov/cwa-404/memorandum-agreement
U.S. Environmental Protection Agency (EPA). 1993. Memorandum: Appropriate Level of analysis required for evaluating
compliance with the Section 404 (b)(1) Guidelines Alternatives Requirements. https://www.epa.gov/cwa404/memorandum-appropriate-level-analysis-required-evaluating-compliance-section-404b1
U.S. Environmental Protection Agency (EPA). 2008. Compensatory Mitigation for losses of Aquatic Resources; Final
Rule. Federal Register, Volume 73, Number 70, Thursday, April 10, 2008.
https://www.epa.gov/sites/production/files/201503/documents/2008_04_10_wetlands_wetlands_mitigation_final_rule_4_10_08.pdf
86
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
U.S. Forest Service (USFS). Undated (d). Recreation - Dakota Prairie Grasslands. Accessed August 8, 2017.
https://www.fs.usda.gov/recmain/dpg/recreation
U.S. Geological Survey (USGS). 2013. 2012-2013 Minerals Yearbook. North Dakota.
https://minerals.usgs.gov/minerals/pubs/state/2012_13/myb2-2012_13-nd.pdf
Van der Kamp, G., & Hayashi, M. (1998). The Groundwater Recharge Function of Small Wetlands in the Semi-Arid
Northern Plains. Great Plains Research: A Journal of Natural and Social Sciences, 39-56. Retrieved September 12,
2018, from http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1362&context=greatplainsresearch
87
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
APPENDIX 1: ALTERNATIVES MATRIX
Practicability
Category
Factor
No Action
No - Current traffic
conditions would
remain and
worsen in the
future
Yes
Available for
Acquisition
Yes - ROW already
owned by NDDOT
Yes - with minimal
expansion of existing
ROW
Utilization of
existing road and
Right of Way
(ROW)
Yes - ROW already
owned by NDDOT
and on existing
roadway
Meet the Overall
Project Purpose
Available
Logistics
Alternative B: 4-Lane
Section on existing
alignment - Divided
depressed median
w/options
*Preferred*
Access to
Theodore
Roosevelt
National Park
Yes - using existing
access
Consistent with
other
design/standards
No - with current
and future traffic
projections
Safety concerns
relative to
increased traffic
volumes on
Highway 85
No - Current traffic
conditions would
remain
Yes - Utilizes existing
road, with some new
ROW required
Yes - using existing
access
Yes
Yes
Alternative C: 4-Lane
Section on existing
alignment - Divided
flush median
w/options
Super 2 Highway with
passing and turning
lanes
Rehabilitation of
existing roadway
with wider shoulders
Alternative F: 4Lane section on
existing
alignment
undivided
4-Lane outside
existing
alignment 1-2
miles away
4-Lane outside
existing alignment
with two lanes; 1-2
miles away
Yes
No - Turning and
passing lanes already
exist and pose safety
concerns
No - Shoulder
widening does not
address safety on
the roadway
No - would not
address safety
Yes
Yes
Yes - with minimal
expansion of existing
ROW
Yes - ROW already
owned by NDDOT
Yes - ROW already
owned by NDDOT
Yes - ROW
already owned by
NDDOT
Yes - with the
purchase of a
new corridor
Yes - with the
purchase of a new
corridor
Yes - ROW already
owned by NDDOT and
on existing roadway
Yes - ROW already
owned by NDDOT
and on existing
roadway
Yes - ROW
already owned by
NDDOT and on
existing roadway
Yes - with one 2
lane portion on
existing alignment
and on constructed
1-2 miles away
Yes - using existing
access
Yes - using existing
access
Yes - using existing
access
Yes - using
existing access
No - Requires
new corridor
and new
roadway
Yes - with the
original U.S.
Highway 85
corridor
maintained
Yes
No - with current and
future traffic
projections
No - with current
and future traffic
projections
No - would not
meet median
design criteria
Yes
Yes
Yes
No - Turning and
passing lanes already
exist and pose safety
concerns
No - Shoulder
widening does not
address safety on
the roadway
No - increased
accident potential
with no median
Yes
Yes
Yes - Utilizes existing
road, with some new
ROW required
88
Yes - with the
original U.S.
Highway 85 corridor
maintained
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
Existing
Technology
Cost
Minimal impacts
to existing
utilities
Topography and
other site
conditions
feasible for
project
construction
Yes - no impacts to
utilities
Yes - utilities shifted
within the ditch
section
Yes - utilities shifted
within the ditch section
Yes - with the
stabilization of
specific sections in
the Badlands
Yes - with the
stabilization of
specific sections in
the Badlands
Yes - with the
stabilization of specific
sections in the
Badlands
Reasonable
acquisition costs
Yes
Overall
scope/project
Yes - no additional
cost with no
action alternative
Yes
Yes 419 Million
without options
Yes
Yes 389 Million
without options
Yes - utilities shifted
within the ditch section
Yes - utilities shifted
within the ditch
section
Yes - utilities
shifted within the
ditch section
Yes - with the
original
Highway 85
corridor
maintained
Yes- with the
stabilization of specific
sections in the
Badlands
Yes - with the
stabilization of
specific sections in
the Badlands
Yes - with the
stabilization of
specific sections
in the Badlands
Yes - with the
stabilization of
specific sections
in the Badlands
Yes
Yes
Yes - ~1.7 million
89
Yes - ~2.7 million
Yes
Yes - ~9.8 million
No - requires
the purchase of
a new project
corridor
No - Costs
exorbitant for a
new roadway
potentially
$600/Million+
Yes - with the
original U.S.
Highway 85 corridor
maintained
Yes - with the
stabilization of
specific sections in
the Badlands
No - requires the
purchase of a new
project corridor
No - Costs
exorbitant for a new
roadway potentially
$600/Million+
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
APPENDIX 2: CORPS ALTERNATIVES ANALYSIS TABLE AND ALTERNATIVES CARRIED FORWARD.
Preliminary Alternative
Considered
Reasoning if Considered Unreasonable/Infeasible
Corps Comments
Reasonable/F
easible
Super 2 Highway with Passing Lanes and Turning
Lanes
No
Would not meet the project's purpose to improve statewide system
linkage (i.e., four-lane continuous link) connecting I-94 and U.S.
Highway 2.
Would most likely have less environmental impacts to
WOUS. Would not address safety or accommodate
present and future capacity issues.
Major Rehabilitation of Existing Roadway with
Wider Shoulders (8 feet wide) - No Passing Lanes
Added
No
Would not increase operational effectiveness or address capacityrelated deficiencies (i.e., percent time spent following) associated
with passing demand and ability. As passing demand increases on a
two-lane roadway, the available capacity decreases; thus, causing
two-lane roadway service quality to deteriorate at relatively low
demand flows.
Would most likely have less environmental impacts to
WOUS. Would not address safety or accommodate
present and future capacity issues.
Alternative B: Four-lane Section using Existing
Alignment: Divided - Depressed Median
Yes
Will be carried forward for analysis under 404(b)(1)
Alternative C: Four-lane Section using Existing
Alignment: Divided - Flush Median
Yes
Will be carried forward for analysis under 404(b)(1)
Alternative F: Four-lane Section using Existing
Alignment: Undivided
No
An undivided four-lane roadway alternative was eliminated
from detailed analysis due to the fact it would not meet the
criteria and standards regarding medians in the AASHTO
Green Book (Section 7.2.10). Undivided, multi-lane arterials
have significantly more collisions than multi-lane facilities
with medians; therefore, multi-lane, undivided facilities are
discouraged.
This alternative would have less impacts to WOUS but
does not meet the purpose and need of the proposed
project.
Four-lane Section Outside Existing Alignment:
Divided - 1 to 2 miles away; Four Lanes on New
Alignment
No
Would not utilize existing alignment.
A new alignment could result in greater impacts to
WOUS
Four-lane Section Outside Existing Alignment:
Divided - 1 to 2 miles away (Northbound or
Southbound); Two Lanes on New Alignment
No
Would not utilize existing alignment.
A new alignment could result in greater impacts to
WOUS
Six-Lane Highway
No
Would be excessive and unnecessary to meet current and future
traffic projections; would not be a cost-effective solution.
Would have greater environmental consequences than
any of the other alternatives.
Elevated Roadway
No
Would have height and width restrictions; may prohibit overpass
wildlife corridor/crossings; would not be a cost-effective solution;
would have access issues.
Would have significantly less impacts to WOUS; but
would be cost prohibitive and have impacts to the viewshed.
90
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
One-way Pair
No
Would have issues with access on and off highway.
Would have significantly less impacts to WOUS. Will be
carried forward for analysis under 404(b)(1)
Construct a Pipeline
No
Would not meet current and future traffic projections; would only
increase the capability of moving certain products and not people
and goods.
This alternative only alleviates a portion of the traffic
associated with U.S. Highway 85. Although truck traffic
is a motivating factor in the expansion of the highway;
pipelines have other environmental impacts as well that
would have to be assessed and this alternative does not
address traffic capacity or safety concerns for the
traveling public.
Public Transit System (e.g., Bus)
No
Would not meet current and future traffic projections; would only
increase the capability of moving people and not products and
goods.
This alternative has no impacts to WOUS but only
addresses a small percentage of the traffic associated
with U.S. Highway 85. It does not address concerns
with industrial and commercial vehicle use of the
corridor.
91
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
APPENDIX 3: LOCATION AND IMPACTS OF ROADWAY CROSSINGS REQUIRING A CWA SECTION 404 AUTHORIZATION UNDER ALT B AND C.
Location
Wetland
Type
Wetland
Feature
USACE
Jurisdictional
Wetlands
Alt. B
Temp.
Impact
(acres)
Alt. C
Temp.
Impact
(acres)
Alt. B
Perm.
Impact
(acres)
Alt. C
Perm.
Impact
(acres)
Reason For
Discharge
Existing Structure
Proposed
Structure Alt B
Proposed
Structure Alt C
29b
Sec. 35,
T141N,
R99W
Ditch
Artificial
Y
0.00
0.01
0.02
0.01
Roadway
widening/culvert
extension
60" x 188' RCP1
Extend 75' East
Extend 10' East
Extend 20' East
Slope
Natural
Y
0.01
0.00
0.01
0.00
Roadway
widening/culvert
extension
Extend 85' East &
32
Sec. 35,
T141N,
R99W
36" x 125' RCP
Bore Add'l 30" x
210' pipe
Bore Add'l 30" x
145' pipe
33a
Sec. 26,
T141N,
R99W
Slope
Natural
Y
0.32
0.00
0.16
0.00
Roadway
widening
NA
NA
NA
34
Sec. 22,
T141N,
R99W
Slope
Natural
Y
0.05
0.05
0.13
0.09
Roadway
widening/culvert
extension
Triple 24" x 80'
RCP
Extend 95' West
Extend 55'
West
35a
Sec. 22,
T141N,
R99W
Ditch
Artificial
Y
0.06
0.01
0.41
0.46
Roadway
widening
NA
NA
NA
35b
Sec. 22,
T141N,
R99W
Slope
Natural
Y
0.35
0.56
0.01
0.02
Roadway
widening/culvert
extension
18" x 86' RCP
Extend 20 ' West
Extend 20'
West
35c
Sec. 23,
T141N,
R99W
Ditch
Artificial
Y
0.00
0.07
0.14
0.07
Roadway
widening/culvert
extension
18" x 86' RCP
Extend 80' East
Extend 20' East
Slope
Natural
Y
0.25
0.00
0.13
0.00
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.06
0.00
0.07
0.13
Roadway
widening
NA
NA
NA
0.04
Roadway
widening/ box
culvert
installation
75' - Three span
bridge
75' - Three span
bridge
Double barrel
box culvert: 184'
long, 9' wide,
and 10' tall (each
barrel)
Double barrel
box culvert: 184'
long, 9' wide,
and 10' tall (each
barrel)
Double barrel
box culvert:
136' long, 9'
wide, and 10'
tall (each barrel)
Double barrel
box culvert:
136' long, 9'
wide, and 10'
tall (each barrel)
Wetland
Number
35d
36a
Sec. 23,
T141N,
R99W
Sec. 22,
T141N,
R99W
36b
Sec. 23,
T141N,
R99W
36d
Sec. 22,
T141N,
R99W
36e
36g
Sec. 22,
T141N,
R99W
Sec. 23,
T141N,
R99W
Riverine
Natural
Y
0.01
0.04
0.05
Riverine
Natural
Y
0.02
0.03
0.06
0.05
Roadway
widening/ box
culvert
installation
Ditch
Artificial
Y
0.25
0.06
0.15
0.34
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.13
0.00
0.28
0.00
Roadway
widening
NA
NA
NA
92
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
36h
50
Sec. 23,
T141N,
R99W
Sec. 2,
T141N,
R99W
Ditch
Artificial
Y
0.00
0.02
0.05
0.04
Roadway
widening
NA
NA
NA
Basin
Natural
Y
0.01
0.00
0.02
0.00
Roadway
widening
NA
NA
NA
Dbl 8'x5' x 86'
RCB2
NA
Extend 25'
West
Dbl 8'x5' x 86' RCB
Extend 88' East
Extend 26' East
Triple 10'x8' x 86'
RCB
Extend 88' East
Extend 26' East
Triple 10'x8' x 86'
RCB
NA
Extend 25'
West
Roadway
widening/box
culvert
extension
Roadway
widening/box
culvert
extension
Roadway
widening/box
culvert
extension
Roadway
widening/box
culvert
extension
52a
Sec. 3,
T141N,
R99W
Slope
Natural
Y
0.02
0.01
0.01
0.03
52b
Sec. 2,
T141N,
R99W
Slope
Natural
Y
0.01
0.01
0.06
0.04
274a
Sec. 35,
T142N,
R99W
Slope
Natural
Y
0.75
0.84
0.51
0.11
274b
Sec. 34,
T142N,
R99W
Slope
Natural
Y
0.36
0.33
0.06
0.15
Ditch
Artificial
Y
0.09
0.01
0.02
0.10
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.00
0.01
0.00
0.01
Roadway
widening
NA
NA
NA
274c
274d
Sec. 34,
T142N,
R99W
Sec. 34,
T142N,
R99W
78a
Sec. 2,
T142N,
R99W
Slope
Natural
Y
0.10
0.01
0.13
0.08
Roadway
widening/culvert
extension
48" x 104' RCP
Extend 70' East
Extend 90' East
78b
Sec. 3,
T142N,
R99W
Slope
Natural
Y
0.07
0.03
0.04
0.04
Roadway
widening/culvert
extension
48" x 104' RCP
Extend 35' West
Extend 20'
West
273a
Sec. 34,
T143N,
R99W
Slope
Natural
Y
0.02
0.11
0.01
0.06
Roadway
widening/
culvert
extension
72" x 152' RCP
NA
Extend 55' East
273b
Sec. 34,
T143N,
R99W
Slope
Natural
Y
0.13
0.09
0.68
0.19
Roadway
widening/culvert
extension
72" x 152' RCP
Extend 65' West
Extend 10'
West
79a
Sec. 3,
T142N,
R99W
Basin
Natural
Y
0.00
0.00
0.03
0.03
Roadway
widening/culvert
extension
72" x 88' RCP
Extend 35' East
Extend 20' East
79b
Sec. 3,
T142N,
R99W
Slope
Natural
Y
0.14
0.05
0.10
0.01
Roadway
widening/culvert
extension
72" x 88' RCP
Extend 65' West
Extend 25'
West
90b
Sec. 22,
T143N,
R99W
Slope
Natural
Y
0.00
0.10
0.00
0.05
Culvert
extension
73"x45" x 158' RC
Cattle Pass
NA
Extend 35' East
93
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
90c
Sec. 21,
T143N,
R99W
Slope
Natural
Y
0.11
0.26
0.47
94a
Sec. 21,
T143N,
R99W
Slope
Natural
Y
0.04
0.00
99a
Sec. 16,
T143N,
R99W
Slope
Natural
Y
0.09
99b
Sec. 15,
T143N,
R99W
Slope
Natural
Y
104
Sec. 9,
T143N,
R99W
Slope
Natural
Y
105a
Sec. 9,
T143N,
R99W
Ditch
Artificial
Y
0.00
0.01
105b
Sec. 10,
T143N,
R99W
Ditch
Artificial
Y
0.03
114a
Sec. 4,
T143N,
R99W
Slope
Natural
Y
0.01
114b
Sec. 3,
T143N,
R99W
Slope
Natural
Y
0.03
0.04
115b
Sec. 34,
T144N,
R99W
Slope
Natural
Y
0.11
115c
Sec. 33,
T144N,
R99W
Slope
Natural
Y
Slope
Natural
Slope
116
117a
Sec. 34,
T144N,
R99W
Sec. 28,
T144N,
R99W
0.06
Roadway
widening/culvert
extension
73"x45" x 158' RC
Cattle Pass
Extend 65' West
Extend 35'
West
0.09
0.00
Roadway
widening
NA
NA
NA
0.10
0.18
0.08
Roadway
widening/culvert
extension
72" x 72' RCP
Extend 80' West
Extend 5' West
0.02
0.04
0.04
0.05
Roadway
widening/culvert
extension
72" x 72' RCP
Extend 15' East
Extend 20' East
0.09
0.00
0.09
0.00
Roadway
widening
NA
NA
NA
0.06
0.06
Roadway
widening/culvert
extension.
64" x 80' RCP
Extend 100'
West
Extend 10'
West
0.03
0.02
0.04
Roadway
widening/culvert
extension
64" x 80' RCP
Extend 15' East
Extend 10' East
0.01
0.04
0.03
Roadway
widening/culvert
extension
64" x 136' RCP
Extend 95' West
Extend 10'
West
0.01
0.04
Roadway
widening/
culvert
extension
64" x 136' RCP
NA
Extend 20' East
0.04
0.11
0.20
Roadway
widening/culvert
extension
48"x72" x 106' RC
Cattle Pass
Extend 35' East
Extend 45' East
0.17
0.03
0.23
0.08
Roadway
widening/culvert
extension
48"x72" x 106' RC
Cattle Pass
Extend 105'
West
Extend 45'
West
Y
0.00
0.14
0.00
0.10
Roadway
widening
NA
NA
NA
Natural
Y
0.17
0.00
0.09
0.00
Roadway
widening
NA
NA
NA
118a
Sec. 28,
T144N,
R99W
Slope
Natural
Y
0.08
0.09
0.40
0.14
Roadway
widening/culvert
extension
72" x 128' RCP
Extend 95' West
Extend 25'
West
118b
Sec. 27,
T144N,
R99W
Slope
Natural
Y
0.28
0.22
0.05
0.18
Roadway
widening
72" x 128' RCP
NA
Extend 25' East
94
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
119b
Sec. 22,
T144N,
R99W
Slope
Natural
Y
0.07
0.08
0.03
0.10
Roadway
widening
NA
NA
NA
123b
Sec. 22,
T144N,
R99W
Slope
Natural
Y
0.13
0.07
0.02
0.08
Roadway
widening/culvert
extension
36" x 114' RCP
Extend 15' East
Extend 40' East
Slope
Natural
Y
0.05
0.03
0.11
0.01
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.00
0.00
0.22
0.22
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.00
0.00
0.07
0.07
Roadway
widening
NA
NA
NA
124
125
126
Sec. 22,
T144N,
R99W
Sec. 22,
T144N,
R99W
Sec. 22,
T144N,
R99W
128a
Sec. 15,
T144N,
R99W
Ditch
Artificial
Y
0.01
0.00
0.02
0.03
Roadway
widening/culvert
extension
48" x 134' RCP
Extend 15' East
Extend 20 ' East
128b
Sec. 15,
T144N,
R99W
Ditch
Artificial
Y
0.00
0.00
0.01
0.01
Roadway
widening/culvert
extension
48" x 134' RCP
Extend 110'
West
Extend 25'
West
129
Sec. 15,
T144N,
R99W
Basin
Natural
Y
0.00
0.01
0.01
0.01
Roadway
widening
NA
NA
NA
135a
Sec. 14,
T144N,
R99W
Slope
Natural
Y
0.01
0.03
0.06
0.08
Roadway
widening/culvert
extension
64" x 78' RCP
Extend 20' East
Extend 20' East
135b
Sec. 11,
T144N,
R99W
Slope
Natural
Y
0.03
0.06
0.19
0.09
Roadway
widening/culvert
extension
64" x 78' RCP
Extend 110'
West
Extend 55'
West
142a
Sec. 11,
T144N,
R99W
Slope
Natural
Y
0.02
0.04
0.06
0.08
Roadway
widening/culvert
extension
74" x 172' RCP
Extend 10' East
Extend 25' East
142b
Sec. 11,
T144N,
R99W
Slope
Natural
Y
0.08
0.01
0.17
0.11
Roadway
widening/culvert
extension
74" x 172' RCP
Extend 90' West
Extend 30'
West
Preamble
Natural
Y
0.12
0.02
0.10
0.01
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.00
0.04
0.00
0.01
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.00
0.01
0.00
0.01
Roadway
widening
72" x 56' RCP
Extend 30' East
Extend 35' East
Slope
Natural
Y
0.01
0.03
0.02
0.05
Roadway
widening
64" x 140' RCP
NA
Extend 15' East
142c
142d
143
151a
Sec. 11,
T144N,
R99W
Sec. 11,
T144N,
R99W
Sec. 11,
T144N,
R99W
Sec. 33,
T145N,
R98W
95
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
151b
153a
153b
161
Sec. 32,
T145N,
R98W
Sec. 32,
T145N,
R98W
Sec. 33,
T145N,
R98W
Sec. 29,
T145N,
R98W
Preamble
Natural
Y
0.21
0.14
0.43
0.22
Roadway
widening/culvert
extension
Basin
Natural
Y
0.06
0.03
0.11
0.05
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.00
0.00
0.01
0.01
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.03
0.03
0.10
0.03
Roadway
widening
NA
NA
NA
64" x 140' RCP
Extend 75' West
Extend 30'
West
164a
Sec. 29,
T145N,
R98W
Slope
Natural
Y
0.03
0.06
0.22
0.03
Roadway
widening/culvert
extension
36" x 220' RCP
Extend 150'
West
Extend 55'
West
164b
Sec. 29,
T145N,
R98W
Slope
Natural
Y
0.01
0.00
0.01
0.02
Roadway
widening/culvert
extension
36" x 220' RCP
Extend 20' East
Extend 50' East
Slope
Natural
Y
0.00
0.01
0.00
0.01
Roadway
widening
30" x 172' RCP
NA
Extend 30' East
Slope
Natural
Y
0.00
0.01
0.05
0.05
Roadway
widening
NA
NA
NA
166
167
Sec. 29,
T145N,
R98W
Sec. 29,
T145N,
R98W
176
Sec. 19,
T145N,
R98W
Slope
Natural
Y
0.01
0.01
0.06
0.04
Roadway
widening/culvert
extension
30" x 166' RCP
Extend 125'
West
Extend 70'
West
177
Sec. 19,
T145N,
R98W
Slope
Natural
Y
0.01
0.07
0.17
0.01
Roadway
widening/culvert
extension
30" x 104' RCP
Extend 95' West
Extend 40'
West
178
Sec. 19,
T145N,
R98W
Slope
Natural
Y
0.01
0.01
0.02
0.01
Roadway
widening/culvert
extension
30" x 94' RCP
Extend 110'
West
Extend 35'
West
Preamble
Artificial
Y
0.32
0.03
0.15
0.01
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.06
0.01
0.07
0.13
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.37
0.38
0.19
0.21
Roadway
widening
82" x 196' RCP
NA
NA
Ditch
Artificial
Y
0.02
0.01
0.06
0.08
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.09
0.05
0.23
0.07
Roadway
widening/culvert
extension
82" x 196' RCP
Extend 85' East
NA
180
187a
187b
187c
187d
Sec. 18,
T145N,
R98W
Sec. 12,
T145N,
R99W
Sec. 12,
T145N,
R99W
Sec. 12,
T145N,
R99W
Sec. 12,
T145N,
R99W
96
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
187f
187g
Sec. 12,
T145N,
R99W
Sec. 12,
T145N,
R99W
Slope
Natural
Y
0.04
0.04
0.03
0.03
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.07
0.21
1.17
0.81
Roadway
widening
NA
NA
NA
198a
Sec. 23,
T146N,
R99W
Slope
Natural
Y
0.01
0.01
0.05
0.04
Roadway
widening/culvert
extension
30" x 160' RCP
Extend 65' West
Extend 50'
West
198b
Sec. 24,
T146N,
R99W
Preamble
Natural
Y
0.01
0.06
0.15
0.10
Roadway
widening/culvert
extension
30" x 160' RCP
Extend 35' East
Extend 10' East
201b
Sec. 13,
T146N,
R99W
Slope
Natural
Y
0.08
0.06
0.32
0.25
Roadway
widening/culvert
extension
66" x 240' RCP
Extend 60' West
Extend 40'
West
202a
Sec. 14,
T146N,
R99W
Ditch
Artificial
Y
0.00
0.00
0.10
0.10
Roadway
widening
NA
NA
NA
202b
Sec. 14,
T146N,
R99W
Slope
Natural
Y
0.16
0.04
0.20
0.13
Dbl 10'x6' x 184'
RCB
Extend 98' West
Extend 41'
West
202c
Sec. 13,
T146N,
R99W
Slope
Natural
Y
0.00
0.06
0.00
0.07
Dbl 10'x6' x 184'
RCB
NA
Extend 33' East
202d
Sec. 13,
T146N,
R99W
Preamble
Natural
Y
0.00
0.12
0.00
0.04
Roadway
widening
NA
NA
NA
205b
Sec. 35,
T147N,
R99W
Slope
Natural
Y
0.11
0.10
0.27
0.12
Roadway
widening/culvert
extension
Dbl 30" x 118' RCP
Extend 85' West
Extend 40'
West
205c
Sec. 36,
T147N,
R99W
Slope
Natural
Y
0.33
0.29
0.04
0.16
Roadway
widening/culvert
extension
Dbl 30" x 118' RCP
Extend 5' East
Extend 10' East
206a
Sec. 35,
T147N,
R99W
Slope
Natural
Y
0.11
0.11
0.49
0.17
Roadway
widening/culvert
extension
48" x 144' RCP
Extend 60' West
Extend 10'
West
Slope
Natural
Y
0.00
0.09
0.00
0.16
Roadway
widening
48" x 144' RCP
NA
Extend 25' East
Ditch
Artificial
Y
0.09
0.01
0.06
0.14
Roadway
widening
NA
NA
NA
Preamble
Natural
Y
0.96
0.96
0.17
0.17
Roadway
widening
NA
NA
NA
Ditch
Artificial
Y
0.02
0.02
0.29
0.29
Roadway
widening
30" x 216' RCP
Bore Add'l 30" x
216' pipe
Bore Add'l 30" x
216' pipe
206b
206c
211a
211b
Sec. 36,
T147N,
R99W
Sec. 36,
T147N,
R99W
Sec. 25,
T147N,
R99W
Sec. 25,
T147N,
R99W
Roadway
widening/ box
culvert
extension
Roadway
widening/ box
culvert
extension
97
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
211c
215a
215b
218
236
237
Sec. 25,
T147N,
R99W
Sec. 24,
T147N,
R99W
Sec. 24,
T147N,
R99W
Sec. 13,
T147N,
R99W
Sec. 26,
T148N,
R99W
Sec. 26,
T148N,
R99W
Slope
Natural
Y
0.02
0.02
0.01
0.01
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.20
0.20
0.02
0.02
Roadway
widening
30" x 338' RCP
NA
NA
Slope
Natural
Y
0.13
0.13
0.14
0.14
Roadway
widening
30" x 338' RCP
NA
Extend 5' East
Slope
Natural
Y
0.05
0.05
0.08
0.08
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.19
0.19
0.03
0.03
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.01
0.01
0.01
0.01
Roadway
widening
NA
NA
NA
250a
Sec. 23,
T148N,
R99W
Slope
Natural
Y
0.03
0.03
0.17
0.17
Roadway
widening/culvert
extension
9.5' x 228' SPPC3
Extend 42' East
Extend 42' East
250b
Sec. 22,
T148N,
R99W
Slope
Natural
Y
0.01
0.01
0.05
0.05
Roadway
widening/culvert
extension
9.5' x 228' SPPC
Extend 46' West
Extend 46'
West
252a
Sec. 22,
T148N,
R99W
Slope
Natural
Y
0.06
0.05
0.14
0.21
Roadway
widening/culvert
extension
60" x 186' RCP
Extend 20' West
Extend 40'
West
252b
Sec. 23,
T148N,
R99W
Slope
Natural
Y
0.02
0.06
0.35
0.18
Roadway
widening/culvert
extension
60" x 186' RCP
Extend 85' East
Extend 45' East
255
Sec. 14,
T148N,
R99W
Slope
Natural
Y
0.06
0.03
0.25
0.17
Roadway
widening/culvert
extension
42" x 204' RCP
Extend 70' East
Extend 25' East
258
Sec. 15,
T148N,
R99W
Slope
Natural
Y
0.11
0.17
0.01
0.02
Roadway
widening
60" x 268' RCP
NA
Extend 15'
West
259a
Sec. 36,
T149N,
R99W
Slope
Natural
Y
0.17
0.10
0.06
0.13
Roadway
widening/culvert
extension
60" x 297' CSP4
Extend 10' West
Extend 30'
West
259b
Sec. 36,
T149N,
R99W
Slope
Natural
Y
0.06
0.05
0.24
0.12
Roadway
widening/culvert
extension
60" x 297' CSP
Extend 160' East
Extend 90' East
Slope
Natural
Y
0.03
0.01
0.10
0.05
Roadway
widening
NA
NA
NA
Slope
Natural
Y
0.01
0.01
0.01
0.02
Roadway
widening
NA
NA
NA
262
267b
Sec. 31,
T149N,
R98W
Sec. 24,
T149N,
R99W
98
U.S. Highway 85, I-94 Interchange to Watford City Bypass
SECTION 404(b)(1) ALTERNATIVES ANALYSIS
267c
Sec. 24,
T149N,
R99W
Slope
Natural
Y
0.13
0.13
0.34
0.34
Roadway
widening/culvert
extension
267d
Sec. 24,
T149N,
R99W
Slope
Natural
Y
0.12
0.12
0.02
0.02
Roadway
widening/culvert
extension
267e
Sec. 19,
T149N,
R98W
Ditch
Artificial
Y
0.03
0.03
0.01
0.01
272a
Sec. 27,
T142N,
R99W
Slope
Natural
Y
0.31
0.39
0.07
272b
Sec. 26,
T142N,
R99W
Slope
Natural
Y
0.35
0.62
0.40
totals
10.29
9.33
14.04
8' x 102' SPPC
Extend 90' West
Extend 90'
West
8' x 102' SPPC (CL)
51' West
51' West
71"x47" x 31' CSP
(Appr)
Extend 5' Bk
Extend 5' Bk
Roadway
widening/culvert
extension
71"x47" x 31' CSP
Extend 20' Ahd
Extend 20' Ahd
0.13
Roadway
widening/culvert
extension
Triple 10' x 8'
x 96' RCBC
Extend 11' West
Extend 31'
West
0.12
Roadway
widening/culvert
extension
Triple 10' x 8'
x 96' RCBC5
Extend 98' East
Extend 32' East
9.97
1 - RCP reinforced concrete pipe
2 RCB - reinforced concrete box
3 SPPC Structural plate pipe corrugated
4 CSP Corrugated steel pipe
5 RCBC reinforced concrete box culvert
99
Public Notice
Subject: Public Notice of 404 (b)(1) Analysis of U.S. 85, I-94 Interchange at
Belfield to Watford City Bypass
Action ID:
NWO-2015-00767-BIS
Comments Period: 20 December 2018 12 January 2019
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating the
FHWA/NDDOT Draft Environmental Impact Statement (DEIS) which was released for public
comment on May 25, 2018 and ended June 25, 2018. The U.S. Army Corps of Engineers
(Corps) participated as a Cooperating Agency and has provided information and comments
specific to its expertise and authority. The Corps determined there was a need for a standalone 404(b)(1) analysis (40 Code of Federal Regulations (CFR) § 230.1(a)). This notice is to
inform interested parties of the availability of this document and solicit additional comments.
This notice and the analysis document is available on the Corps web site at
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
AUTHORITY: This application is being evaluated under Section 10 of the Rivers and Harbors
Act of 1899 for structures or work in or affecting navigable waters of the United States and/or
Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the
United States.
APPLICANT:
North Dakota Department of Transportation
300 Airport Road
Bismarck, North Dakota 58504-6005
LOCATION: The US Highway 85 Project (project) encompasses approximately 62 miles of
roadway in Stark, Billings, and McKenzie counties, North Dakota. Please refer to Figure ES-1,
Project Location Map in the analysis. The project begins at the Interstate 94 (I-94)
interchange and extends north to the Watford City Bypass (McKenzie County Road 30). The
proposed action is to expand this segment of US Highway 85 from a two-lane highway to a
four-lane highway with flexible design options to avoid or minimize impacts and rehabilitate or
replace the historic Long X Bridge over the Little Missouri River.
The Corps is soliciting comments from the public, Federal, State, and local agencies and
officials, Indian tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above.
SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2015-0767BIS must be submitted to the office listed below on or before January 12, 2019
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-ODR-ND
Page 2
Action ID: NWO-2015-00767-BIS
Patricia McQueary, Project Manager
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
3319 University Drive
Bismarck, North Dakota 58504
Email: Patricia.L.Mcqueary@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable
impacts on the affected aquatic environment and the secondary and cumulative effects.
Please note that all comment letters received are subject to release to the public through the
Freedom of Information Act. If you have questions or need additional information please
contact the applicant or the Corps' project manager Patricia McQueary, (701) 255-0015
extension 2001, Patricia.L.Mcqueary@usace.army.mil.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/