Mr. Carl Uchytil, with the City and Borough of Juneau, 155 South Seward Street, Juneau, Alaska 99801, states that the project purpose is to meet the needs of the expanding cruise ship industry and its passengers by creating ample open space thereby decreasing congestion and improving pedestrian circulation. Work being discussed is the proposal to construct a pile supported deck along the waterfront to enhance waterfront cruise ship visitor accessibility through the construction of a concrete retaining wall and pile supported deck with upland features including a passenger covered shelter, open space, passenger restrooms, and a transportation staging area. The proposed work would take place within tidal waters of Gastineau Channel below the High Tide Line (+20.8 feet above the 0.0 foot contour) and the Mean High Water (+15.4 feet above the 0.l0 foot contour). The project site is located within Section 23, T. 41 S.,
R. 67 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.297498º N., Longitude -134.403391º W.; in Juneau, Alaska.Please contact Matthew Brody at (907) 790-4493, at the address shown above, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.
Mr. Carl Uchytil, with the City and Borough of Juneau, 155 South Seward Street, Juneau, Alaska 99801, states that the project purpose is to meet the needs of the expanding cruise ship industry and its passengers by creating ample open space thereby decreasing congestion and improving pedestrian circulation. Work being discussed is the proposal to construct a pile supported deck along the waterfront to enhance waterfront cruise ship visitor accessibility through the construction of a concrete retaining wall and pile supported deck with upland features including a passenger covered shelter, open space, passenger restrooms, and a transportation staging area. The proposed work would take place within tidal waters of Gastineau Channel below the High Tide Line (+20.8 feet above the 0.0 foot contour) and the Mean High Water (+15.4 feet above the 0.l0 foot contour). The project site is located within Section 23, T. 41 S.,R. 67 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.297498º N., Longitude -134.403391º W.; in Juneau, Alaska.Please contact Matthew Brody at (907) 790-4493, at the address shown above, or by email at Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.
http://www.poa.usace.army.mil//LinkClick.aspx?fileticket=0k71HDC7rFU%3d&portalid=34×tamp=1545437545729
US Army Corps
of Engineers
Alaska District
JUNEAU FIELD OFFICE
Regulatory Division (1145)
CEPOA-RD
Post Office Box 22270
Juneau, Alaska 99802-2270
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 21, 2018
EXPIRATION DATE:
January 7, 2018
REFERENCE NUMBER:
POA-2018-433
WATERWAY:
Gastineau Channel
Interested parties are hereby notified that a Department of the Army permit application has
been received for work in waters of the United States (U.S.) as described below and shown on
the enclosed project drawings.
All comments regarding this Public Notice (PN) should be sent to the address noted above. If
you desire to submit your comments by email, you should send it to the Project Manager's
email as listed below or to regpagemaster@usace.army.mil. All comments should include the
PN reference number listed above.
All comments should reach this office no later than the expiration date of this PN to become
part of the record and be considered in the decision. Please contact Matthew Brody at
(907) 790-4493, at the address shown above, or by email at:
Matthew.T.Brody@usace.army.mil if further information is desired concerning this notice.
APPLICANT: Mr. Carl Uchytil
The City and Borough of Juneau
155 South Seward Street
Juneau, Alaska 99801
Carl.Uchytil@juneau.org
AGENT:
Mr. Dick Somerville
PND Engineers Inc.
9630 Glacier Highway
Juneau, Alaska 99801
dsomerville@pndengineers.com
LOCATION: The project site is located within Section 23, T. 41 S., R. 67 E., Copper River
Meridian; USGS Quad Map Juneau B-2; Latitude 58.297498º N., Longitude -134.403391º W.;
in Juneau, Alaska.
PURPOSE: The applicant's stated purpose is to meet the needs of the expanding cruise ship
industry and its passengers by creating ample open space thereby decreasing congestion and
improving pedestrian circulation.
PROPOSED WORK: The applicant is proposing to construct a pile supported deck along the
waterfront to enhance waterfront cruise ship visitor accessibility through the construction of a
concrete retaining wall and pile supported deck with upland features including a passenger
covered shelter, open space, passenger restrooms, and a transportation staging area. The
proposed work would take place within tidal waters of Gastineau Channel below the High Tide
Line (+20.8 feet above the 0.0 foot contour) and the Mean High Water (+15.4 feet above the
0.l0 foot contour). Specifically the work includes:
1. The demolition of existing timber deck and approach structures consisting of
approximately 4,260 square feet and the removal of approximately 100 tapered
16-18 inch diameter creosote treated timber pilings,
2. Installation of (87) 18-inch diameter steel temporary template pilings,
3. Removal of (87) 18-inch diameter steel temporary template pilings,
4. Installation of (42) 16-inch diameter steel pipe pilings,
5. Installation of (45) 18-inch diameter steel pipe pilings,
6. Installation of (40) 24-inch diameter steel pipe pilings,
7. Construction of a 500 cubic yard concrete retaining wall measuring 2 feet wide x 390
feet long,
8. Construction of a new timber ramp and decking measuring 20,160 square feet,
9. Construction of a new concrete deck measuring 15,900 square feet,
10. The placement of 2,500 cubic yards of class A shot rock backfill and 700 cubic yards
of class II armor rock into 0.08 acres.
All work would be performed in accordance with the enclosed plan (sheets 1-9), dated October
2018.
ADDITIONAL INFORMATION: The applicant needs to acquire the following authorizations
from other Federal, State, and Local Agencies:
· Incidental Harassment Authorization National Marine Fisheries Service
-2-
·
·
·
Utilities and 401 Water Quality Certification Alaska Department of Environmental
Conservation
Flood Zone Variance Federal Emergency Management Administration
Conditional Use Permit City and Borough of Juneau
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the U.S. from activities
involving discharges of dredged or fill material.
a. Avoidance: See attached Mitigation Statement.
b. Minimization: See attached Mitigation Statement.
c. Compensatory Mitigation: The City and Borough of Juneau believes that
compensatory mitigation for the permanent loss of 0.08 acres of near shore aquatic habitat
should not be required and has proposed none.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a
certification or waiver of certification, as required under Section 401 of the Clean Water Act
(Public Law 95-217), has been received from the Alaska Department of Environmental
Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic properties,
including those listed in or eligible for inclusion in the National Register of Historic Places.
There are cultural resources within the vicinity of the permit area. The permit area has been
determined to be the footprint of the proposed work within waters of the U.S. consisting of
44,868-ft^2. Consultation of the AHRS constitutes the extent of cultural resource
investigations by the Corps of Engineers (Corps) at this time, and we are otherwise unaware
of the presence of such resources. While the proposed project is within the vicinity of identified
cultural resources, there are none located within the permit area. Due to the lack of historic
sites within the permit area the Corps has made a No Historic Properties Affected (No Effect)
determination for the proposed project. This application is being coordinated with the State
Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently
unknown archeological or historic data that may be lost or destroyed by work under the
requested permit will be considered in our final assessment of the described work. The Corps
is requesting the SHPO's concurrence with this determination.
ENDANGERED SPECIES: The project area is within the known or historic range of the
Humpback whale (Megaptera novaelangliae) and the Steller sea lion (Eumetopias jubatus).
We have determined the described activity may affect the threatened or endangered
Humpback whale and Steller sea lion. We will initiate the appropriate consultation procedures
under section 7 of the Endangered Species Act with the National Marine Fisheries Service
(NMFS). Any comments they may have concerning endangered or threatened wildlife or
-3-
plants or their critical habitat will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH).
We have determined the described activity may adversely affect EFH in the project area for the
following species Sockeye (Oncorhynchus nerka), Silver (Oncorhynchus kisutch), Chinook
(Oncorhynchus tshawytscha), Chum (Oncorhynchus keta), and Pink Salmon (Oncorhynchus
gorbuscha). The proposed project would involve pile driving, placement of fill material, and
construction of overwater structures, which may increase the potential for injury or mortality to
salmon from pressure waves generated from pile driving, elevation of suspended particulates
within the water column, and/or the loss of habitat. This PN initiates EFH consultation with
the NMFS. Any comments or recommendations they may have concerning EFH will be
considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the Federal
government. Tribes with protected rights or resources that could be significantly affected by a
proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska
District on a government-to-government basis. Views of each Tribe regarding protected
rights and resources will be accorded due consideration in this process. This PN serves as
notification to the Tribes within the area potentially affected by the proposed work and invites
their participation in the Federal decision-making process regarding the protected Tribal right
or resource. Consultation may be initiated by the affected Tribe upon written request to the
District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period specified
in this notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, reasons for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity and its intended use
on the public interest. Evaluation of the probable impacts, which the proposed activity may
have on the public interest, requires a careful weighing of all the factors that become relevant
in each particular case. The benefits, which reasonably may be expected to accrue from the
proposal, must be balanced against its reasonably foreseeable detriments. The outcome of
the general balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect the national
concern for both protection and utilization of important resources. All factors, which may be
relevant to the proposal, must be considered including the cumulative effects thereof. Among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water quality, energy
-4-
needs, safety, food and fiber production, mineral needs, considerations of property ownership,
and, in general, the needs and welfare of the people. For activities involving 404 discharges,
a permit will be denied if the discharge that would be authorized by such permit would not
comply with the Environmental Protection Agency's 404(b)(l) guidelines. Subject to the
preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and
320.3), a permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps is soliciting comments from the public; Federal, State, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
AUTHORITY: This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States Section 10 Rivers and
Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States Section 404 Clean
Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines
set forth under Section 404(b) of the Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification are enclosed
with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-5-
BILL WALKER, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
Wastewater Discharge Authorization Program (WDAP) / 401 Certification
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WDAP/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-6285 | EMAIL: dec-401cert@alaska.gov
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might result in a
discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of
1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of
Environmental Conservation that the discharge will comply with the Clean Water Act, the
Alaska Water Quality Standards, and other applicable State laws. By agreement between the
U.S. Army Corps of Engineers and the Department of Environmental Conservation, application
for a Department of the Army permit to discharge dredged or fill material into navigable waters
under Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit described in
the Corps of Engineers' Public Notice (PN) Reference Number POA-2018-433, Gastineau
Channel, serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable assurance the
activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska
Water Quality Standards, and other applicable State laws. The Department also may deny or
waive certification.
Any person desiring to comment on the project with respect to Water Quality Certification, may
submit written comments to the address above or via email to dec-401cert@alaska.gov by the
expiration date of the Corps of Engineer's Public Notice. All comments should include the PN
reference number listed above. Mailed comments must be postmarked on or before the
expiration date of the public notice.
Disability Reasonable Accommodation Notice
The State of Alaska, Department of Environmental Conservation complies with Title II of the
Americans with Disabilities Act of 1990. If you are a person with a disability who may need
special accommodation in order to participate in this public process, please contact Theresa
Zimmerman at 907-465-6171 or TDD Relay Service 1-800-770-8973/TTY or dial 711 within 5
days of the expiration date of this public notice to ensure that any necessary accommodations
can be provided.
ALASKA
JUNEAU
SOUTHEAST
ALASKA
LOCATION
MARINE
WA
Y
MARINE
PARK
CBJ
PARKING
GARAGE
ALASKA
STEAMSHIP
DOCK (AS)
BERTH
U
TH
SKAGWAY
HAINES
JUNEAU
HOONAH
THIS
PROJECT
A
N
TRAM
BLDG
K
LI
N
ST
TAKU
FISHERY
DOCK
CANADA
KAKE
FR
PORT/
CUSTOMS
BLDG
UNITED STATES
SITKA
SO
PETERSBURG
WRANGELL
SOUTH BERTH
CRUISE SHIP
TERMINAL (CT)
BERTH
GASTINEAU
CHANNEL
CRAIG
KETCHIKAN
AERIAL PHOTO MODIFIED FROM:
CITY AND BOROUGH OF JUNEAU, 2006
GRAHAM
ISLAND
SOUTHEAST
ALASKA
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
DATUM:
MLLW = 0.0'
HTL = 20.6'
MHW = 15.4'
LOCATION AND
VICINITY MAP
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
VICINITY MAP
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
1
of
9
BLDG
BLDG
BLDG
28
BLDG
BLDG
SOUTH FRANKLIN ST.
27
S
28
28
PAVED
ALLEY
28
PIER
49
28
30
29
GRAVEL SURFACED UPLAND AREA
BURIED
CONCRETE
FOUNDATIONS
29
CBJ
LIBRARY/
PARKING
GARAGE
PILE-SUPPORT
ED TIMBER
APPROACH DO
CK
28
PILE-SUPPORT
ED TIMBER
APPROACH DO
CK
HTL = 20.8'
MHW = 15.4'
-5
-10
-15
-20
-25
MLLW = 0.0'
AWALK
TED SE
PPOR
PILE-SU
ADA
RAMP
-50
-40
-45
-30
-35
-35
GASTINEAU
CHANNEL
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
DATUM:
MLLW = 0.0'
HTL = 20.6'
MHW = 15.4'
EXISTING CONDITIONS
PLAN
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
2
of
9
28
SOUTH FRANKLIN ST.
27
S
28
28
C
28
PIER
49
BUS STAGING AREA
28
30
29
COVERED CANOPY
NEW CONCRETE RETAINING WALL
A
29
B
28
CBJ
LIBRARY/
PARKING
GARAGE
HTL = 20.8'
-5
NEW CONCRETE DECK
MHW = 15.4'
-10
COVERED
SHELTER
&
-15
NEW TIMBER
RAMP
-20
NEW TIMBER DECK
RESTROOM
BUILDING
-25
MLLW = 0.0'
-35
A
-30
B
-35
PURPOSE:
DATUM:
-45
GASTINEAU
CHANNEL
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
MLLW = 0.0'
EXIST. TIMBER
SEAWALK
-50
C
-40
HTL = 20.6'
MHW = 15.4'
PROPOSED GENERAL
SITE PLAN
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
3
of
9
-25
-20
-15
-10
-5
PIER
49
27
EXISTING
GRAVEL SURFACED UPLAND AREA
RETAINING WALL
FOUNDATION PLAN
MLLW = 0.0'
NEW CONCRETE
RETAINING WALL
NEW CONCRETE
WALL FOOTING
SOUTH FRANKLIN ST.
24
28
MHW = 15.4'
HTL = 20.8'
29
28
40
388
HTL = 20.6'
MHW = 15.4'
RETAINING WALL
FOUNDATION PLAN
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
CBJ
LIBRARY/
PARKING
GARAGE
28
28
DATUM:
28
500
700
2,500
CONCRETE
QUANTITY (CY)
ARMOR ROCK
QUANTITY (CY)
BELOW HTL
PILE Ø (INCH)
# OF PILES
LINEAR FEET
(FT)
30
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
MLLW = 0.0'
29
CLASS A SHOT ROCK
QUANTITY (CY)
BELOW HTL
28
CONCRETE RETAINING WALL STRUCTURE SUMMARY
A
5
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
4
of
9
CONCRETE FOOTING
EXCAVATION
LIMITS
RETAINING WALL SECTION
CONCRETE STEM WALL
CLASS A
SHOT ROCK
FILL
A
4
5'
24"Ø
PIPE
PILE
2'
EXISTING
GRADE
CONCRETE SLAB
CL WALL
CL PILE
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
DATUM:
MLLW = 0.0'
HTL = 20.6'
MHW = 15.4'
RETAINING WALL
SECTION
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
HTL +15.4'
CLASS II
ARMOR
ROCK
HTL +20.8'
1
1.5
CONCRETE DECK
3'
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
5
of
9
HTL = 20.6'
MHW = 15.4'
TIMBER DECK
SECTION
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
TIMBER DECK SECTION
INTERPRETED
BEDROCK PROFILE
16"Ø
VERTICAL
STEEL
PIPE
PILE,
TYP.
EXISTING
GROUND,
TYP.
EXISTING
TIMBER PILE,
TYP.
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
EXISTING PILE-SUPPORTED
DOCK
30
13,600
HTL
ELEV. +20.6'
DATUM:
MLLW = 0.0'
A
AJ MINE ROCK TAILINGS PREVIOUSLY PLACED IN MINING ERA
24"Ø VERTICAL
STEEL PIPE
PILE
ARMOR ROCK SLOPE
PROTECTION
EXCAVATION LIMITS
STEEL PILE CAP
TIMBER DECKING
& STRINGERS
TIMBER DECK
16"Ø
STEEL
BATTER
PIPE
PILE,
TYP.
CLASS A SHOT
ROCK FILL
EXIST. DRAINAGE
CULVERT
HDPE CULVERT
EXTENSION
FINISH GRADE
NEW PILE-SUPPORTED
CONCRETE RETAINING
WALL
16
PILE Ø
(INCH)
# OF PILES
SURFACE
COVERAGE
(SF)
TIMBER DECK
STRUCTURE
SUMMARY
FACE OF DOCK
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
6
of
9
HTL = 20.6'
MHW = 15.4'
TIMBER RAMP
SECTION
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
EXISTING
GROUND,
TYP.
EXISTING
TIMBER PILE,
TYP.
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.6'
EXISTING PILE-SUPPORTED
DOCK
12
2,020
B
TIMBER RAMP SECTION
INTERPRETED
BEDROCK PROFILE
16"Ø
VERTICAL
STEEL
PIPE
PILE
16"Ø
STEEL
BATTER
PIPE
PILE,
TYP.
TIMBER DECKING
& STRINGERS
AJ MINE ROCK TAILINGS
PREVIOUSLY PLACED IN MINING ERA
24"Ø VERTICAL
STEEL PIPE
PILE
ARMOR ROCK
SLOPE
PROTECTION
CLASS A SHOT
ROCK FILL
EXIST. CONCRETE
RETAINING WALL w/
UTILITY CONDUITS
NEW PILESUPPORTED
CONCRETE
RETAINING
WALL
TIMBER RAMP
DATUM:
MLLW = 0.0'
16
PILE Ø
(INCH)
# OF PILES
SURFACE
COVERAGE
(SF)
TIMBER RAMP
STRUCTURE
SUMMARY
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
7
of
9
CONCRETE DECK SECTION
C
INTERPRETED
BEDROCK PROFILE
18"Ø
VERTICAL
STEEL
PIPE
PILE
STEEL PILE CAP
AJ MINE ROCK TAILINGS
PREVIOUSLY PLACED IN MINING ERA
24"Ø VERTICAL
STEEL PIPE PILE
18"Ø
STEEL
BATTER
PIPE
PILE,
TYP.
EXCAVATION
LIMITS
ARMOR ROCK
SLOPE
PROTECTION
CLASS A SHOT
ROCK FILL
NEW PILESUPPORTED
CONCRETE
RETAINING WALL
FINISH GRADE
HTL = 20.6'
MHW = 15.4'
TIMBER STRINGERS
6" THK CONCRETE DECK
CONCRETE DECK
DATUM:
MLLW = 0.0'
CONCRETE DECK
SECTION
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
EXISTING
GROUND,
TYP.
EXISTING
TIMBER PILE,
TYP.
MLLW
ELEV. +0.0'
MHW
ELEV. +15.4'
HTL
ELEV. +20.6'
EXISTING PILE-SUPPORTED
DOCK
18
45
27,000
PILE Ø
(INCH)
# OF PILES
SURFACE
COVERAGE
(SF)
CONCRETE DECK
STRUCTURE
SUMMARY
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
8
of
9
STEEL PIPE PILE,
TYP.
SEA FLOOR
PILE TIP AS REQ'D
BEDROCK PROFILE
PILE DETAILS
PURPOSE:
THE PROPOSED DOWNTOWN
WATERFRONT IMPROVEMENTS PROJECT
WILL MEET THE NEEDS OF AN
EXPANDING CRUISE SHIP INDUSTRY AND
ITS PASSENGERS BY CREATING AMPLE
OPEN SPACE THEREBY DECREASING
CONGESTION AND IMPROVING
PEDESTRIAN CIRCULATION.
DATUM:
MLLW = 0.0'
HTL = 20.6'
MHW = 15.4'
PILE DETAILS
APPLICANT ADRESS:
CITY AND BOROUGH OF JUNEAU
DOCKS AND HARBORS
155 S. SEWARD STREET
JUNEAU, AK 99801
PND PROJECT NO. 182045
CBJ DOWNTOWN WATERFRONT
IMPROVEMENTS
APPLICANT: CITY AND BOROUGH OF JUNEAU D&H
FILE NO.:
WATERWAY: GASTINEAU CHANNEL
PROPOSED ACTIVITY: WATERFRONT IMPROVEMENTS
SEC. 23 T. 41 S R. 67 E M CRM
LAT.: 58°17' 51" N LONG.: 134° 24' 13" W
DATE: OCTOBER 2018
SHEET
9
of
9
Applicant Proposed Mitigation Statements
Background:
The U.S. Army Corps of Engineers (Corps) and the Environmental Protection Agency issued regulations
that govern national compensatory mitigation policy for activities in waters of the U.S., including
wetlands, authorized by Corps permits. The final mitigation rule was published in the federal register on
April 10, 2008, and became effective on June 9, 2008. The final rule establishes standards and criteria for
the use of appropriate and practicable compensatory mitigation for unavoidable functional losses of
aquatic resources authorized by Corps permits (33 CFR Part 332). Additionally, the rule requires new
information to be included in Corps permit applications and public notices to enable meaningful
comments on applicant proposed mitigation. In accordance with 33 CFR Part 325.1(d)(7), "For activities
involving discharges of dredged or fill material into waters of the U.S., the application must include a
statement describing how impacts to waters of the United States are to be avoided and minimized. The
application must also include either a statement describing how impacts to waters of the United States are
to be compensated for or a statement explaining why compensatory mitigation should not be required for
the proposed impacts." For additional information, the final mitigation rule can be viewed at:
http://www.usace.army.mil/cw/cecwo/reg/news/final_mitig_rule.pdf
Mitigation is a sequential process of avoidance, minimization, and compensation. Compensatory
mitigation is not considered until after all appropriate and practicable steps have been taken to first avoid
and then minimize adverse impacts to the aquatic ecosystem. Please provide your proposed avoidance,
minimization, and compensatory mitigation below:
Applicant's Proposed Mitigation (attach additional sheets as necessary):
1. Avoidance of impacts to waters of the U.S., including wetlands:
Please describe how, in your project planning process, you avoided impacts to waters of the U.S.,
including wetlands, to the maximum extent practicable. Examples of avoidance measures include site
selection, routes, design configurations, etc...
Measures to avoid impact to jurisdictional wetlands and waters of the U.S. include the following actions:
·
Avoid migration barriers to salmonids. At no time will the construction activities result in a
migration barrier to salmonids.
·
Avoid introduction of contaminated material during construction. Contaminant-free, clean
shot rock embankment and surface materials will be used during all aspects of construction.
Material used for construction or discharge will not consist of unsuitable material (e.g., trash,
debris, car bodies, asphalt, etc.).
Avoid impacts to water quality. The contractor will comply with water quality standards as
required by law and implement corrective measures if water quality standards are exceeded.
Avoid potential water quality impacts to Gastineau Channel by controlling surface water runoff. Surface water runoff will be directed away from Gastineau Channel through a storm
drain conveyance and treatment system prior to discharge.
Avoid impacts from potential spills during construction. To prevent spills or leakage of
hazardous material during construction, standard spill-prevention measures including on-site
spill kits will be implemented. The contractor will be responsible for the preparation of a
Spill Prevention, Control, and Countermeasures (SPCC) plan to be used for the duration of
the project as required by permitting agencies.
·
·
·
1
Applicant Proposed Mitigation Statements
·
·
Prevent petroleum and hazardous materials from entering waters of the U.S. during
construction. Care will be taken to prevent any petroleum products or other toxic or
deleterious materials from entering the waters of the U.S. Fuel hoses, oil drums, oil or fuel
transfer valves and fittings, etc., will be checked regularly for drips or leaks, and shall be
maintained and stored properly on secondary containment pallets to prevent spills.
Avoid impacts to Endangered Species. Driving piles in-water can generate underwater sound
pressure waves that have the potential to disrupt migration and harass or injure species listed
under the Endangered Species Act (ESA). ESA listed species with the potential to be in the
action area include the Mexico distinct population segment (DPS) of humpback whales and
the western DPS of Steller sea lions. A marine wildlife monitor shall be assigned to the
project during in-water pile driving operations. The observer shall begin to observe 15
minutes (pinnipeds) and 30 minutes (cetaceans) prior to in-water pile driving activities, and
throughout the duration of each pile driving event. The following measures will be taken:
o All 24-inch piles are located at a +12 MLLW elevation or higher. All 24-inch piles
will be driven when the tide is below the pile elevation such that all of the largest
project piles are driven out of the water to reduce sound exposure.
o One or more protected species observers (PSOs), able to accurately identify and
distinguish species of Alaska marine mammals, will be present before and during all
inwater construction and demolition activities.
o Prior to inwater pile driving activities, an exclusion (i.e., shut-down) zone will be
established. For this project, the exclusion zone includes all marine waters within
1,815 meters of the sound source for humpback whales and Steller sea lions.
o In-water pile-driving will not be conducted unless all waters within and adjacent to
the exclusion zone are clearly visible.
o The PSO(s) will be positioned such that the entire exclusion zone is visible to them
(e.g., situated on a platform, elevated promontory, boat or aircraft).
o The PSO(s) will have the following to aid in determining the location of observed
listed species, to take action if listed species enter the exclusion zone, and to record
these events:
Binoculars
Range finder
GPS
Compass
Twoway radio communication with construction foreman/superintendent
A log book of all activities which will be made available to the Corps and
NMFS upon request
o The PSO(s) will have no other primary duty than to watch for and report on events
related to listed species.
o The PSO(s) will be in direct communication with on-site project lead and will have
shutdown authority.
2
Applicant Proposed Mitigation Statements
o The PSO(s) will work in shifts lasting no longer than four (4) hours with at least a
one (1) hour break between shifts, and will not perform duties as a PSO for more
than 12 hours in a 24 hour period (to reduce PSO fatigue).
o The PSO(s) will scan the exclusion zone for the presence of listed species for 30
minutes before any piledriving or removal activities take place.
o If any listed species are present within the exclusion zone, piledriving and removal
activities will not begin until the animal(s) has left the exclusion zone or no listed
species have been observed in the exclusion zone for 15 minutes (for pinnipeds) or
30 minutes (for cetaceans).
o Throughout all in-water piledriving activity, the PSO(s) will continuously scan the
exclusion zone to ensure that listed species do not enter it.
o If any listed species enter, or appear likely to enter, the exclusion zone during
piledriving or removal activities, all piledriving activity will cease immediately.
Pile-driving activities may resume when the animal(s) has been observed leaving
the area on its own accord. If the animal(s) is not observed leaving the area but is
no longer visible, piledriving activity may begin 15 minutes (for pinnipeds) or 30
minutes (for cetaceans) after the animal is last observed in the area. Note: If a listed
species is observed within the exclusion zone during construction operations, the
PSO will notify NMFS immediately after ordering a shut-down of operations.
o Rampup (soft start) procedures will be applied prior to beginning piledriving
activities each day and/or when piledriving hammers have been idle for more than
30 minutes:
For vibratory hammers, the contractor shall run the vibratory hammer for
no more than 30 seconds followed by a quiet period of at least 60 seconds
without vibratory removal of piles. The process shall be repeated twice
more within 10 minutes before beginning in-water pile driving operations.
For impact hammers, the soft start technique must initiate approximately
three strikes at a reduced energy level, followed by a 30-second waiting
period. This procedure would also be repeated two additional times.
o Monthly PSO report and a final PSO report will be provided to NMFS.
o The reporting period for each monthly PSO report will be the entire calendar
month, and reports will be submitted by close of business on the fifth day of the
month following the end of the reporting period (e.g., the monthly report covering
April 1 to 30, 2017, will be submitted to the NMFS by close of business on May 5,
2017).
o PSO report data will also include the following for each listed species observation or
"sighting event" if repeated sightings are made of the same animal(s):
Species, date, and time for each sighting event.
Number of animals per sighting event; and number of
adults/juveniles/calves per sighting event.
Primary, and, if observed, secondary behaviors of the marine mammals in
each sighting event.
Geographic coordinates for the observed animals, with the position
recorded by using the most precise coordinates practicable (coordinates
3
Applicant Proposed Mitigation Statements
·
must be recorded in decimal degrees, or similar standard, and defined
coordinate system).
Time of the most recent piledriving or other project activity prior to
marine mammal observation.
Environmental conditions as they existed during each sighting event,
including sea state, weather conditions, visibility (km/mi), lighting
conditions, and percent ice cover.
Though take is not authorized, if a listed species is taken (i.e., a listed
species is observed entering the exclusion zone before piledriving
operations can be shut down), reinitiation of consultation is required, and
the take must be reported to NMFS within one business day (contact listed
at item 14 below). PSO records for listed species taken by project activities
must include:
·
All the information that must be listed in the PSO report.
·
Number of listed species taken.
·
The date and time of each take.
·
The cause of the take (e.g., impact hammer operating at maximum
energy).
·
The time the animal(s) entered the exclusion zone, and, if known,
the time it exited the zone.
·
Mitigation measures implemented prior to and after the animal
entered the exclusion zone.
Monthly reports and reports of take will be submitted to:
NMFS Protected Resources Division, Juneau Office NMFS POC. The NMFS point of
contact and their information will be determined at time of the informal consultation
request, and will be provided to the applicant.
4
Applicant Proposed Mitigation Statements
2. Minimization of unavoidable impacts to waters of the U.S., including wetlands:
Please describe how your project design incorporates measures that minimize the unavoidable impacts to
waters of the U.S., including wetlands, by limiting fill discharges to the minimum amount/size necessary
to achieve the project purpose.
Impacts to wetlands and other waters of the U.S. have been avoided to the greatest extent possible.
However, due to fill placement, there would be unavoidable impacts. The following measures would
be implements to minimize unavoidable impacts associated with the proposed project.
·
Minimization of potential impacts to salmonids and EFH species during critical life stage.
Timing windows will be incorporated and strictly observed during construction activities for
all in-water work to minimize potential adverse effects to salmon during critical life stages.
In-water work will be timed to avoid those times when eggs are in the gravel and juvenile
salmon are out-migrating as stipulated in the permit special conditions. Once construction
has ceased, the proposed project is not expected to measurably impact EFH-listed fish
populations at the Downtown Waterfront Improvements project site.
·
Minimization of impacts to estuarine intertidal/subtidal habitat. The configuration of the
intertidal fill was reduced through the use of a retaining wall and pile supported structures to
minimize the amount of fill that would be placed in estuarine intertidal habitats. A pile
supported dock was chosen to minimize the project impact while still meeting the project
purpose.
·
Minimization of potential turbidity impacts during construction. Potential impacts to
Gastineau during construction, such as increased turbidity, would be avoided and minimized
through implementation of construction techniques and BMPs including placing all fill when
the tide is below work elevation such that fill is placed out of the water to avoid suspending
sediment.
·
Minimization of impacts to bald eagles and migratory birds. The USFWS bald eagle nest
atlas shows one nest within the vicinity of the project approximately 0.50 miles from the
closest portion of the project site at 58°17'34.30" north, 134°23'32.82"W. Due to this
distance from the project and development in the area the Proposed Action is not expected
to have impacts on bald eagles or migratory birds in the project area; however, the following
measures will be taken to minimize potential impacts.
o All vegetation between the project site and the nests will be maintained.
o If bald eagles nest is located closer to the project area during construction, agencies
will be contacted and a bald eagle permit will be obtained, if needed, in accordance
with 50 CFR Part 22.
Minimization of impacts from invasive species. Revegetation and planting activities are not
anticipated for this work. Should it be necessary, the prevention and establishment of
invasive plants during planting and revegetation activities will be accomplished by following
the Cooperative Extension Service's "DON'T plant in Alaska" list.
·
5
Applicant Proposed Mitigation Statements
3. Compensation for unavoidable impacts to waters of the U.S., including wetlands:
Please describe your proposed compensatory mitigation to offset unavoidable impacts to waters of the
U.S., or, alternatively, why compensatory mitigation is not appropriate or practicable for your project.
Compensatory mitigation involves actions taken to offset unavoidable adverse impacts to waters of the
U.S., including wetlands, streams and other aquatic resources (aquatic sites) authorized by Corps
permits. Compensatory mitigation may involve the restoration, enhancement, establishment (creation),
and/or the preservation of aquatic sites. The three mechanisms for providing compensatory mitigation
are mitigation banks, in-lieu fee of mitigation, and permittee-responsible mitigation. Please see the
attached definitions for additional information.
The City and Borough of Juneau recognizes that the fill for the retaining wall will result in a minor permanent
loss of habitat of 0.08 acres. The City and Borough of Juneau has minimized and avoided impacts to the
extent practicable. Water quality will be improved through the removal of creosote treated timber from the
marine environment. Due to the minor footprint and temporary nature of impacts of the project on
previously placed fill the applicant has determined additional mitigation is warranted.
6