SEMSWA is proposing the construction of a water quality pond and channel improvements along approximately 1,970 linear feet of the Green Acres Tributary (Tributary) to Happy Canyon Creek in Centennial Colorado. The project team has designed improvement and stabilization measures along a reach of the Tributary to maintain ecological integrity of the channel with future development. Project components include a 6.5-acre-foot offline water quality pond, channel realignment, and grade-control structures. The project has been designed to meet the local needs by providing semi-regional water quality for the drainage basin and formalizing a floodplain corridor that provides for a healthy system and long-term benefits.
PUBLIC NOTICE
US Army Corps
of Engineers
Omaha District
REPLY TO:
U.S. Army Corps of Engineers
Denver Regulatory Office
9307 South Wadsworth Blvd
Littleton, CO 80128-6901
Application No: NWO-2018-02041-DEN
Project: Green Acres Tributary Channel
Improvement Project
Applicant: Southeast Metro Stormwater Authority
Waterway: Green Acres Tributary
Issue Date: December 26, 2018
Expiration Date: January 25, 2019
30 DAY NOTICE
PUBLIC NOTICE
FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department
of the Army permit application from Southeast Metro Stormwater Authority (SEMSWA), c/o
ERO Resources Corporation, Attn: Esa Crumb, 1842 Clarkson Street, Denver, CO 80218.
Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the
placement of dredged or fill material in the nation's waters.
Summary
SEMSWA is proposing the construction of a water quality pond and channel improvements along
approximately 1,970 linear feet of the Green Acres Tributary (Tributary) to Happy Canyon Creek
in Centennial Colorado. The project team has designed improvement and stabilization measures
along a reach of the Tributary to maintain ecological integrity of the channel with future
development. Project components include a 6.5-acre-foot offline water quality pond, channel
realignment, and grade-control structures. The project has been designed to meet the local needs
by providing semi-regional water quality for the drainage basin and formalizing a floodplain
corridor that provides for a healthy system and long-term benefits.
Location
The project area is located at approximately 39.569286, -104.808433oW, in Sections 7,
Township 5 South, Range 66 West, of the 6th Principal Meridian in Arapahoe County, Colorado.
1
Project: Green Acres Tributary Channel Improvement Project
Waterway: Green Acres Tributary
Corps File No: NWO-2018-02041-DEN
Applicant: Southeast Metro Stormwater Authority
Description of work
The proposed project has three primary components: channel realignment, channel stabilization,
and construction of a water quality pond.
Channel Realignment and Stabilization
Under current conditions, the Tributary channel is a low-functioning drainage that lacks elements
of a healthy stream system. Historically, the Tributary was likely an ephemeral system that
received flows during storm events within a wide floodplain. Overtime as urbanization and
development has increased adjacent to the drainage, storm flow inputs have increased in volume
and frequency. As a result, the downstream portion of the Tributary has become an unstable
feature within a constrained floodplain. The upstream section of the Tributary generally lacks a
defined channel to convey flows, which poses a significant flood risk due to a lack of channel
features to convey flows. Wetlands are contained within sheet flow areas and contain mostly
emergent species that are typical of a volatile stream system. The downstream section of the
Tributary contains head cuts and an increasingly incised channel that lacks wetland or riparian
vegetation. The Tributary has been formalized in Douglas County and there is a need to
formalize and stabilize the Tributary from the Arapahoe and Douglas County line to the
confluence with Happy Canyon Creek.
The proposed project would include realignment of the channel within the project area to create a
continuous channel with the capacity to convey current flows and anticipated increased water
volumes. The realigned channel would allow restoration of the remaining floodplain and provide
flood protection.
In addition to channel realignment, 10 channel stabilization structures are proposed within the
Tributary channel to provide grade control and stabilization (see Sheets C-3, C-4, & C-5). The
structures would include three grouted boulder or sculpted concrete structures and seven voidfilled riprap riffle structures. Two of the grouted boulder drop structures would be constructed
on the downstream end of the Tributary (drop #1 & #2), and the third would be situated on the
upstream end of the Tributary (drop #10).
Seven void-filled riprap structures would be constructed along the channel. Each void-filled
riprap structure would be constructed below grade and would consists of 24-inch Type M riprap
combined with smaller material to fill the voids. Three inches of topsoil would be placed over
the void-filled structure and then covered with overlaying coir mats. The riprap structures would
be approximately 30 feet wide and 55 to 75 feet long with 6-foot-wide channel bottom.
Grading
The proposed project would involve grading within the existing floodplain and in areas currently
supporting wetlands and channel features. The grading would establish surface grades and
elevations to create a connecting floodplain adjacent to the realigned channel.
Dove Valley Water Quality Pond
As part of the proposed project, SEMSWA is proposing to construct a 6.5-acre-foot regional
water quality pond southwest of the Tributary and adjacent to the Dove Valley Business Park.
2
Project: Green Acres Tributary Channel Improvement Project
Waterway: Green Acres Tributary
Corps File No: NWO-2018-02041-DEN
Applicant: Southeast Metro Stormwater Authority
The water quality pond would provide stormwater runoff detention from current and proposed
future development in the vicinity of the Tributary. The pond is designed to capture flows from
southwest of the project area through a tributary boulder cascade channel. The basin floor would
contain a 4-foot-wide low-flow trickle channel. The water quality pond would provide
stormwater treatment and flood protection from storm flows anticipated from increases in
impervious surfaces in the project area vicinity.
Other Project Elements
Other project-related activities may result in temporary impacts on the Tributary channel. These
activities include erosion-and sediment-control measures, diverting water around work sites, and
construction access.
Purpose
For purposes of definition under Section 404, the basic project purpose is channel stabilization.
The overall project purpose is to improved stormwater management along the reach of Green
Acres Tributary upstream of the confluence with Happy Canyon Creek, between South Jordan
Road, South Chambers Road, and south of East Miner Avenue in Arapahoe County, Colorado.
Impacts and Mitigation
The project would result in permanent impacts along approximately 2,500 linear feet of Green
Acres Tributary. Additionally, total permanent impacts will occur within 1.18 acres of abutting
wetlands. The Applicant has proposed compensatory mitigation for permanent wetland impacts at
a 1:1 ratio through permittee responsible on-site, in-kind mitigation.
*********************
The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry
Creek Drive South, Denver, Colorado 80222-1530, would review the proposed project for state
certification in accordance with the provisions of Section 401 of the Clean Water Act. The
certification, if issued, would express the State's opinion that the operations undertaken by the
applicant would not result in a violation of applicable water quality standards. For further
information, please contact the Colorado Water Quality Control Division, (303) 692-3500.
In compliance with the Endangered Species Act, a preliminary determination has been made that
the described work would not adversely affect species designated as threatened or endangered or
adversely affect critical habitat. In order to complete our evaluation of this activity, comments are
solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals.
The Corps of Engineers, Omaha District would comply with the National Historic Preservation Act
of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We would
evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this
public notice, and we may conduct or require a survey of the permit area to check for unknown
historic or prehistoric properties, if warranted.
The decision whether to issue a permit would be based on an evaluation of the probable impacts
including cumulative impacts of the proposed activity on the public interest. That decision would
3
Project: Green Acres Tributary Channel Improvement Project
Waterway: Green Acres Tributary
Corps File No: NWO-2018-02041-DEN
Applicant: Southeast Metro Stormwater Authority
reflect the national concern for both protection and utilization of important resources. The benefits
which reasonably may be expected to accrue from the proposal must be balanced against the
reasonably foreseeable detriments. All factors which may be relevant to the proposal would be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, wetlands, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people. In addition, the evaluation of the impact of the
work on the public interest would include application of the guidelines promulgated by the
Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean
Water Act (40 C.F.R. Part 230).
The Corps of Engineers is soliciting written comments from the public; Federal, state and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received would be considered by the Corps
of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal.
To make this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the overall public interest
of the proposed activity.
Comments, both favorable and unfavorable, would be accepted, made a part of the record and
would receive full consideration in subsequent actions on this application. Any agency or
individual having an objection to the work should identify it as an objection with clear and specific
reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers,
Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901.
For additional information please contact Ellison Koonce at (303) 979-4120 or by email at
ellison.a.koonce@usace.army.mil or visit the Denver Regulatory Office web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx
The District Engineer would consider requests for holding a public hearing, for the purpose of
gathering additional information. Before the expiration date of this notice, anyone may request, in
writing, that a public hearing be held. Requests for a public hearing should state specifically the
reasons for holding a public hearing, and what additional information would be obtained. Should
the District Engineer decide that additional information is required and a public hearing should be
held, interested parties would be notified of the date, time and location.
Comments received after the close of business on the expiration date of this public notice
would not be considered.
4
Project: Green Acres Tributary Channel Improvement Project
Waterway: Green Acres Tributary
Corps File No: NWO-2018-02041-DEN
Applicant: Southeast Metro Stormwater Authority
11
-
0
z
I
I
E O:t'll·' Av·
..
"'
L 0,111 I
:>
<
1'
e
..
;<;
i
l 1 ll!fYIClll fil
i:,...,.'o
.-:;.
'"
I
1r L·
.-1 1 cJ .
ill
::!
0.
r
i
n·· ·r. ·
0
.
t
"'
"'
;;:
..
"
I
l
l
:
;;,
"fi'h.u1rn<''
>
'ii
1!
"'
I:
Cl
ii
8
::!
;;;
.
I
, .1
·
,I
&:1
d "'
Oo·n1VV1r_i
.,.
;
'1
".z
.,
C.reF.Jc
·;;;
'S
·
0
"'
""''
E tJ:sle1 Au:
"
"'
..
"E
.5
µ
"
l
''I r111I
1,4
EL 11 111-ff
..
"'
E llichol Plv:
'-1.
'."h
'f....,
17
I
'""
I
I 1· of
_,q...4
"";
·
iii
if
a
';>"}
cottonwood
"
.
u
,,.
!
a
'
Uut.h
n
'"
I
I
81111"-
' '
Catle>Rock
·
ll
'!-
0Eliz11beth
.
!?
./
Green Acres Tributary
"'
u
·'"l"lt>U I
Vilf>IJI
"'/
i
!:?
·.h
"
,.
P1111:: l
n
Figure 1
Vicinity Map
Sections 31 and 32, TSS, R66W; 6th PM
UTM NAO 83: Zone 13N; 5 16417mE, 4379870mN
longitud e 104.808433'W, latitud e 39.5 69286'N
N
USGS Parker, CO Quad rangle
Arapahoe County, Colorado
o
1,000
2,000
iF
iii· eet
Portions of this document Include Intellectual property of ESRI and Its licensors and are used herein under license. Copyright Cl
A
2017 ESRI and its lie.ensors. All rights reserved.
Prepared for: Muller Engineering Co.
File: 6888 Figure 1.mxd (WH)
November 20, 2018
ERO
ERO Resources Corp.
Green Acres Tributary
c:J Limits of Construction
-
Wetland Impact (1.18 ac)
Impact
l;ssJ
EZ2l
Figure 3
Proposed Impacts
Ordinary High Water Mark Impact (0.21 ac)
Channel Realignment
Proposed Channel Center
Grading
Water Quality Design Water Surface
Pond
Image Source: Google© Earth, October 2015
0
150
N
300
"""""'""""'iiiil/eet
A
Prepared for: Muller Engineering Co.
File: 6888 Figure 3.mxd (WH)
November 20, 2018
Dr\
E fiW
ERO Resources Corp.
111261:2018
/
/
'
--
--
\\
I
____,,
\\
\
·---
.....
\.
/
-- ,
Jordan Road
Properties
---
GREEN ACRES TRIBUTARY CHANNEL IMPROVEMENTS
·
ANODOVEVALLEYWATI:ROUAUTYPONO
11126/2018