SUBJECT: The U.S. Army Corps of Engineers (“Corps”) requested an opinion from the Advisory Council on Historic Preservation (“Council”) regarding the determination of no adverse effect to historic properties from the proposed Sonoita Creek Ranch Compensatory Mitigation Site. The Council’s opinion was provided to the Corps in a letter dated December 11, 2018, which is attached to this public notice. After reviewing the Council’s opinion, the Corps affirms its finding of no adverse effect.
SPECIAL PUBLIC NOTICE
December 27, 2018
Permit Application Number: 2008-0816-MB
SUBJECT: The U.S. Army Corps of Engineers (“Corps”) requested an opinion from the Advisory Council on Historic Preservation (“Council”) regarding the determination of no adverse effect to historic properties from the proposed Sonoita Creek Ranch Compensatory Mitigation Site. The Council’s opinion was provided to the Corps in a letter dated December 11, 2018, which is attached to this public notice. After reviewing the Council’s opinion, the Corps affirms its finding of no adverse effect.
AUTHORITIES: This Department of the Army (DA) permit application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. The request from the Council is in accordance with 36 CFR 800.5(c)(3) and the Corps’ Revised Interim Guidance for Implementing Appendix C of 33 CFR Part 325 with the Revised Advisory Council on Historic Preservation Regulations at 36 CFR Part 800.
APPLICANT:Rosemont Copper Company
5255 East Williams Circle Suite 1065
Tucson, Arizona 85711
LOCATION: The Sonoita Creek Ranch Compensatory Mitigation property is located along State Route 82 northeast of Patagonia and southwest of Sonoita in Santa Cruz County, Arizona.
PREVIOUS PUBLIC NOTICE: The Corps published a public notice to the South Pacific Division website on December 3, 2018 regarding the Corps request to the Council for an opinion regarding its determination of effect to historic properties from the compensatory mitigation at Sonoita Creek Ranch. It includes a description of the larger undertaking and proposed compensatory mitigation activities at Sonoita Creek, results of the cultural resource investigations and corresponding determinations under Section 106 of the National Historic Preservation Act and other applicable regulations, and consulting party correspondence regarding the action. It is located at the following link: https://www.spd.usace.army.mil/Missions/Regulatory/Public-Notices-and-References/Article/1702742/2008-0816-mb/
ATTACHMENT: Council’s letter to the Corps dated December 11, 2018
Preserving Hrnerlca's Heritage
December 1l,20 18
D. Peter Helrnlinger
Brigadier General
U.S. Army Corps of Engineers
Northwestern Division
PO Box 2870
Portland, Oregon 97208-2870
Ref
Proposed Sonoita Creek Ranch CompensatoryMitigation Site Project
United States Army Corps of Engineers, Santa Cruz County, Arizona
ACEtPConnect Log Number: 013453
Dear General Helrnlinger:
On November 20,2018, the Advisory Council on Historic Preservation (ACHP) received U.S. Army Corps of
Engineers' (Corps) request to review its finding of no adverse effect (NAE) for the referenced undertaking.
This request was made by the Corps in accordance with 36 CFR 8 800.5(c)(2)(i) of the regulations
implementing Section 106 of the National Historic Preservation Act (54 U.S.C. 8 306108; 36 CFR part 800).
On November 30,2018, the ACHP notified the Corps that it was extending its review period for an additional
15 days pursuant to 36 CFR 8 800.5(c)(3)(i).
The Corps provided notification of its fmding of NAE to the Arizona State Historic Preservation Officer
(SHPO), Indian tribes, the ACHP, and other identified consulting parties in a letter dated September 27,2018.
Following this, the SHPO concurred with the Corps' fmding on October 23,2018, as did several other
consulting parties. On October 24,2018, the Corps received notice from the Tohono O'odham Nation's
(Nation) Tribal Historic Preservation Officer (THPO) that they did not concur with the Corps' finding.
Through subsequent communications, the Corps attempted to resolve the dispute; however, the Nation's
THPO reaffirmed their position via email on November 9,2018. The Corps subsequently forwarded the
dispute to the ACHP.
Based on our review of the documentation the Corps has provided, and discussions with Corps staff and the
Nation's THPO, it is the ACHP's advisory opinion that USACE has correctly applied the criteria of adverse
effect to this undertaking.
The undertaking consists of mitigation actions that will be required for issuance of the Corps' Clean Water Act
Section 404 permit. The permit and associated mitigation are proposed in conjunction with the Rosemont
Copper Mine Undertaking. The Rosemont Copper Company (Rosemont) proposes to develop a mine on
private lands and within the U.S. Forest Service's (USFS) Coronado National Forest (CNF). The USFS was
designated lead federal agency and conducted Section 106 compliance for the proposed mine project, with the
Corps participating in the consultation as a Cooperating Agency and as a Signatory to the Memorandum of
Agreement (MOA) that was executed in 2013 to set forth the resolution of adverse effects to historic
properties from the development of the mine. The proposed Sonoita Creek Ranch mitigation actions were not
developed at that time and therefore were not evaluated in that Section 106 review for the Rosemont Mine
undertaking or referenced in the 20 13 MOA, and the Corps subsequently initiated a new Section 106 review
ADVISORY COUNCIL ON HISTORIC PRESERVATION
401 F Street NW, Suite 308 Washington, DC 20001-2637
Phone: 202-517-0200 Fax: 202-517-6381 achp@achp.gov www.achp.gov
for those actions.
As part of the mitigation, Rosemont has acquired four parcels of private land within the Santa Cruz River
Watershed for mitigation activities that are to include stream, floodplain, and upland restoration activities
within the Rail X Ranch and Sonoita Creek Ranch. The proposed work includes rehabilitation of Sonoita
Creek and tributary channels within both parcels, reestablishment of floodplain benches and uplands that
buffer the channel, and pond enhancement for native species. The Corps decided to conduct a new Section 106
review for this undertaking for several reasons, including its determination that the proposed site for the
mitigation was outside of the area of potential effects (APE) considered in the 2013 MOA and additional
efforts would be necessary to identify historic properties that may be located within the mitigation parcels.
Finding of No Adverse Effect
In reviewing how the criteria of adverse effect have been applied, the ACHP was guided by the regulations.
which state (at 36 CFR 3 800.5(a)(l)):
An adverse effect is found when an undertaking may alter, directly or indirectly, any of the
characteristics of a historic property that qualify the property for inclusion in the National Register in
a manner that would diminish the integrity of the property's location, design, setting, materials,
workmanship, feeling, or association. Consideration shall be given to all qualifying characteristics of a
historic property, including those that may have been identified subsequent to the original evaluation
of the property's eligibility for the National Register. Adverse effects may include reasonably
foreseeable effects caused by the undertaking that may occur later in time, be farther removed in
distance or be cumulative.
A finding of NAE by the agency official is appropriate when the undertaking's effects do not meet the criteria
of adverse effect or the undertaking is modified or conditioned to avoid adverse effects.
It is the ACHP's advisory opinion that the Corps has correctly applied the critka of adverse effect to this
undertaking. The Corps appears to have made a reasonable and good faith effort to cany out appropriate
historic property identification efforts and through consultation with the SHPO, Indian tribes, and other
consulting parties, determined that the proposed undertaking could avoid adverse effects to identified historic
properties. Based on the documentation provided, the Corps received initial SHPO concurrence with its
identification efforts and determination of NAE for the undertaking in September of 2017. It also received
concurrence from several other consulting parties (including the Arizona State Land Department, the CNF, the
White Mountain Apache Tribe, and the San Carlos Apache Tribe); no objections were forthcoming at that
time. The Corps did receive requests for additional information from the Nation and Pirna County, and the
requested documents, which included the revised Habitat Mitigation and Monitoring Plan, were provided for
their review. The Corps did not receive any subsequent objections from the Nation or Pima County or any
other consulting party to its determination of no adverse effect.
After this initial review and consultation, the Corps identified locations of two proposed fence lines that did
not fall entirely within the original APE and therefore were not surveyed as part of the Corps' earlier
identification efforts. The Corps undertook further identification efforts resulting in an addendum to its survey
efforts and provided this update to consulting parties on September 27,2018. The Corps identification efforts
in the addendum did not present any substantively new information concerning identified historic properties.
The document also discussed the indirect effects of the proposed action. The Corps then reaffirmed its NAE
finding, to which the SHPO again concurred along with other consulting parties except for the Nation, which
objected on October 24,2018.
In its objection, the Nation's THPO stated that they did not concur with the Corps' determination of no adverse
effect and that a cultural landscape study would be necessary to further evaluate the,impacts from the proposed
undertaking. In communication between the Nation and the Corps attempting to resolve the dispute, a second
correspondence from the THPO indicated that ". ..while there will be no adverse effect on individual cultural
sites, there will be an adverse effect on the cultural and natural landscape of the Sonoita Creek project area."
The Corps disagreed that any further identification effort would be necessary in the project area. Relying on
guidance found in the National Park Service Preservation Brief 36: Protecting Cultural Landscapes:
Planning, Treatment and Management of Historic Landscapes, the Corps determined it lacked sufficient
information to identify an additional historic landscape in the project area. The Corps asked the Nation to
clarify its suggestion that a cultural landscape or another historic property may be present in the area or how
the proposed mitigation actions might affect such a property but the Nation provided no further information.
The Section 106 regulations do not specify to what extent a federal agency is required to engage in prospective
studies in areas where a tribe indicates there may be historic properties of concern that may be affected by an
undertaking. In this instance, the ACHP notes that the Corps made significant outreach efforts to the Nation
and other consulting parties, and there had been no such indication, either now or previously, that any
additional identification efforts would be warranted. To the contrary, the Corps did not receive any prior
objections from the Nation to its original 2017 NAE finding or identification efforts, nor from any other
consulting party. The only new information provided in the addendum in 2018 concerned revisions APE
caused by changes in two proposed fence lines. The Nation's response to the addendum in October 2018 was
the only statement expressed throughout the review of the mitigation actions that suggested any additional
historic resources might be affected. Having attempted to consult further with the Nation and lacking any
additional clarifying information to support further identification work, the ACHP believes the Corps took
into account the available input from consulting parties to ensure its efforts were both reasonable in terms of
intensity and scale and carried out in good faith through its development and execution.
In a related manner, while it appears the Corps has adequately taken into account the potential effects of the
Sonoita Creek Ranch Compensatory Mitigation Site Project on historic properties via this additional Section
106 review process, the ACHP would recommend for future undertakings that involve multiple required parts,
such as offsite mitigation associated .with Corps permits, the Corps address all the related parts of the larger
undertaking through a single review process, resulting in a Section 106 agreement document that provides
clear directions for ongoing review and consultation as needed.
Based on the above information, it is the ACHP's advisory opinion that the Corps has adequately taken
reasonable steps to identify historic properties, assessed and consulted on the potential effects of the
undertaking, and that these steps support its finding of NAE. In accordance with 36 C.F.R. 3
800.5(c)(3)(ii)(B),the Corps is now required to take into account this advisory opinion in reaching a fhal
decision on its finding of effect, and provide to the ACHP, SHPO, and other consulting parties a summary of
how these advisory comments were considered by the Corps. Once the summary of the decision has been sent
to the ACHP and other parties, the agency official's responsibilities are fulfilled for this step in the Section 106
process.
If you or your staff have any questions or require further clarification, please contact me directly at 202-5 170206 or rnelson@achp.gov, or Mr. Christopher Daniel, Program Analyst, at 202-517-0223 or via e-mail at
cdaniel@achp.gov.
Director
Office of Federal Agency Programs