Reissuance of Department of the Army (DA) Permit LRN-2006-02547, originally advertised on Public Notice 11-32, for Proposed Stream Encapsulation of Unnamed Tributary to Dry Creek, in Huntsville, Madison County, Alabama
Public Notice No. 18-53
Nashville District
Corps Application No. LRN-2006-02547
Date: December 28, 2018Expires: January 11, 2019
Please address all comments to:
Nashville District Corps of Engineers, Regulatory Division
(Attn: Amy Robinson), 3701 Bell Road, Nashville, TN 37221
JOINT PUBLIC NOTICE
US ARMY CORPS OF ENGINEERS AND
STATE OF ALABAMA
SUBJECT: Reissuance of Department of the Army (DA) Permit LRN-2006-02547, originally advertised onPublic Notice 11-32, for Proposed Stream Encapsulation of Unnamed Tributary to Dry Creek, in Huntsville, Madison County, Alabama
TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA).
APPLICANT: Ming Enterprises, LLC
P.O. Box 1084
Athens, Alabama 35612
LOCATION: Unnamed Tributary to Dry Creek, a tributary to Tennessee River Mile 321.0R, at intersection of Research Boulevard and SR-53, in Huntsville, Madison County, Alabama (Greenbrier Quadrangle; latitude 34.78912, longitude -86.66798)
BACKGROUND: Public Notice 11-32 was issued on August 31, 2011 for 0.88 acre of wetland fill and encapsulation of 690 linear feet of intermittent stream (6’ x 4’ box culvert) for commercial development. The project site is divided by Research Park Boulevard with 0.54 acre of wetland fillon the north portion and 0.34 acre of wetland fill and the stream encapsulation on the south side. Compensatory mitigation for the wetland fill was provided at a 2:1 ratio by purchasing 1.76 wetland credits at the Wheeler Pointe Wetlands Mitigation Bank. The applicant calculated compensatory mitigation for the stream encapsulation based on an assessment using the Unified Stream Methodology. The assessment result indicated the need for 649 stream credits. The applicant provided compensatory mitigation by purchasing 690 stream credits from the Robinson Mitigation Bank and provided a certificate of credit purchase to the USACE on November 21, 2011. The USACE issued a DA permit On January 30, 2012 for the proposed project with an expiration date of January 30, 2017.
DESCRIPTION OF PROPOSED WORK to be REISSUED: DA permit reissuance is requested for encapsulation of 690 linear feet of intermittent stream that was authorized but not constructed prior to DA permit expiration. Compensatory mitigation bank credits for stream and wetland impacts were purchased prior to fill in waters. However, encapsulation of the stream did not occur and the applicant is seeking reauthorization to complete the project. The project plans remain the same as those originally advertised on Public Notice 11-32 and as authorized by DA permit dated January 30, 2012.
Plans and a location map of the proposed project are provided in this notice.
ENVIRONMENTAL DOCUMENTATION: Pursuant to National Environmental Policy Act (NEPA), this office prepared an Environmental Assessment (EA), dated December 12, 2011, to address the environmental consequences of the proposed project. The proposed wetland and stream impacts were addressed in the EA along with an alternatives analysis, affected environment, and potentialenvironmental consequences. The EA also documents necessary consultations with the U.S. Fish and Wildlife Service, the State Historic Preservation Office, and other agencies.
PURPOSE AND NEED: The applicant stated the purpose of the proposed project is to finish the partially completed development to provide a retail development to meet demand in northwest Madison County, AL.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The applicant provided an Alternatives Analysis for the original authorized project. Offsite alternatives and onsite alternatives were considered and the authorized project was found to be the least
environmentally damaging practicable alternative.
COMPENSATORY MITIGATION: The original authorized project required compensatory mitigation for encapsulation of 690 linear feet of intermittent stream. The applicant completed a stream assessment using the Unified Stream Methodology to determine that 649 credits were needed to offsetimpacts. The applicant purchased the necessary credits from the Robinson Mitigation Bank in accordance with the DA permit conditions. The mitigation bank provided written confirmation on November 21, 2011 that 690 stream credits had been purchased (41 credits more than required, for a 1:1 ratio). No additional compensatory mitigation for the stream encapsulation has been proposed in the application for re- authorization.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to reissue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. These public interest factors and cumulative effects were considered and addressed within the EA prepared for the original proposal and will be considered in any supplemental documentation. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal,must be balanced against its reasonably foreseeable detriments. All factors which may be relevant
to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, theneeds and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. USACE is soliciting comments from the public;federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA), supplemental EA, and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
HISTORIC AND CULTURAL RESOURCES: Public Notice 11-32 was issued in August 2011 advertising the project. No properties listed or eligible for listing on the National Register of Historic Places (NRHP) are known to be affected by the proposed project. In December 2011, the Alabama Historical Commission (AHC) concurred with the USACE determination that the proposed activities will have no effect on properties listed or eligible for listing on the NRHP. The USACE determined that the completion of the project as originally authorized will have no effect on properties listed or eligible for listing on the NRHP. Copies of this notice are being sent to AHC and the State Historic Preservation Office for their comments. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic propertiesand cultural significance at or near the project area.
ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed under the ESA as threatened or endangered (T&E) or any designated critical habitat. The proposed activity was previously advertised by Public Notice 11- 32 in August 2011 stating no federally listed T&E species were known to occur within the project area. Since that time, new species have been added to the federal T&E species list:
Group
Common Name/
Scientific Name
Status
Mammal
Indiana bat /
Myotis sodalis
Endangered
Mammal
Gray bat /
Myotis grisescens
Endangered
Mammal
Northern Long-Eared Bat /
Myotis septentrionalis
Threatened
No T&E aquatic species have been identified in vicinity of the project area. The majority of the project site had been cleared after the original DA permit authorization. No trees of significant size remain within the permit area. Additionally, no designated critical habitat was identified in the permit area. No significant adverse effects to fish and wildlife, their habitats and human uses are expected to result from the proposed work. This public notice serves as coordination with the USFWS pursuant to Section 7 of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to T&E species. After receipt of comments, USACE will evaluate potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.
OTHER APPROVALS: In addition to the DA permit reissuance, other federal, state, and/or local approvals may be required for the proposed work, including but not limited to:
Water quality certification must be provided by the state of Alabama pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.
COMMENT PERIOD: Written statements received by January 11, 2019, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2006-02547, and be directed to the Regulatory Division, Attn: Amy Robinson, at the above address, or at amy.m.robinson@usace.army.mil.
If you received this notice by mail and wish to view all of the diagrams, visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Ms. Robinson at the above address, telephone number or email.
/s/
Timothy C. Wilder
Chief, West Branch
Regulatory Division
U.S. Army Corps of Engineers