The Laurel County Water District No. 2, London, Kentucky (Laurel County) is proposing to construct a 500,000 gallon elevated water storage tank within the 123 acre Greer Industrial Park that is currently being developed by the LondonLaurel County Industrial Development Authority. The industrial park is located in the Fariston community of Laurel County just south of the London corporate limits and near the London-Corbin Airport. Laurel County is located in southcentral Kentucky and has a population of 60,174 as estimated by the U.S. Census Bureau as of July 1, 2017. The county’s 2012-2016 median household income (MHI) was $36,139 compared to a Kentucky statewide MHI of $44,811. The percentage of the population below the poverty level in Laurel County in the period 2012-2016 was 23.2% which is somewhat higher than the Kentucky average of 17.2%.

The U. S. Army Corps of Engineers, Nashville District (Corps) has received a Draft Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) for the proposed design and construction of 500,000 gallon Water Storage Tank in the Fariston Community in Laurel County, KY.

U.S. Army Corps of Engineers, Project Planning Branch, Nashville District

Coordinates: North 37.04.47.67, West 84.03.43.23 Community: Fariston County, State: Laurel County, Kentucky

River Mile: N/A

FINDING OF NO SIGNIFICANT IMPACT Section 531 ­ Laurel County Water District No. 2 Fariston Water Storage Tank London, Laurel County, Kentucky 1. Under authority of Section 531 of the Water Resources Development Act of 1996, the Laurel County Water District No. 2 and the U.S. Army Corps of Engineers, Nashville District (USACE), have performed an evaluation of the construction of a 500,000-gallon elevated water storage tank. The USACE Federal action is to provide 75% funding of the project construction under the Section 531 program. The local sponsor, Laurel County Water District No. 2 would provide the remaining 25% funding. The proposed Selected Action Alternative is to construct the 500,000-gallon elevated water storage tank in the Greer Industrial Park currently being developed by the London-Laurel County Industrial Development Authority. The industrial park is located in the Fariston community of Laurel County just south of the London corporate limits and near the London-Corbin Airport 2. The purpose of the proposed Selected Action Alternative (500,000-gallon elevated water storage tank) is to provide adequate water supply by doubling the water storage capacity within the project area. Steady residential and commercial growth in the area has resulted in inadequate water storage capacity. The need for the proposed project is to protect the health and safety of the public by providing a reliable water supply and improving the level of fire protection to both current and future residential and industrial customers. The possible consequences of the proposed Selected Action Alternative have been studied for environmental, cultural, and social well-being effects. 3. The proposed Selected Action and the No Action Alternatives were the only alternatives carried forward for detailed evaluation. A third alternative considered construction of a 250,000-gallon storage tank. This alternative was eliminated from detailed consideration because this volume is inadequate for keeping pace with area growth for the life of the project. A fourth alternative considered construction of a new 1,000,000-gallon storage tank to replace an existing 500,000-gallon storage tank located further south of the Greer Industrial Park. This alternative was eliminated from detailed consideration because it would not facilitate redundant storage options for safety (two water storage tanks), provide efficient and immediate access to stored water in the project area, increased impacts to the human and natural environment, and greater cost. 4. The No Action Alternative would deny Federal funding for the project through the Section 531 program. The result would be continued inadequate water storage capacity for the northern portion of the Laurel County Water District No. 2's service area in the

Greer Industrial Park and Fariston community. 5. The short term impacts from the proposed Selected Action Alternative are the effects of construction (noise, dust, and erosion control). These impacts are considered minor and temporary, due to site size (less than two acres) location (open field in a rural area) and the limited construction design with utilization of best management practices. The long term impacts include reliable water supply and storage volume, increased fire protection and safety, and continued economic growth. The proposed Selected Action Alternative would protect the land and water resources, and the human and social environment. 6. An evaluation of the proposed Selected Action Alternative produced the following pertinent conclusions: a. Environmental Considerations. USACE has taken reasonable measures to evaluate known and foreseeable impacts of the No Action and proposed Selected Action Alternatives to the human and natural environment in the Environmental Assessment. A Phase I Environmental Site Assessment to identify hazardous, toxic, radioactive waste (HTRW) was completed by an engineering firm, MSE of Kentucky, Inc. in August 2017 and considered adequate after USACE review. The Phase I assessment did not identify a recognizable environmental condition that could pose a liability to the government as a result of acquisition, easement or cost share. No wetlands or water resources would be negatively impacted by the proposed Selected Action Alternative. Potential adverse impacts of the proposed Selected Action Alternative are insignificant and short-term in duration. b. Social and Economic Considerations. No significant social or economic impacts that are both adverse and/or unavoidable are foreseen as a result of the proposed Selected Action Alternative. No minority, low-income populations, or children's health would be negatively impacted by the proposed Selected Action Alternative. The human community and natural environment would benefit from having a reliable water supply and adequate water storage capacity. c. Coordination with Natural Resources Agencies. Pursuant to Section 7 of the Endangered Species Act of 1970, as amended (ESA) and the Fish and Wildlife Coordination Act of 1958 as amended (FWCA), coordination was completed with the Kentucky U.S. Fish and Wildlife Service (USFWS) and the Kentucky Department of Fish and Wildlife Resources (KDFWR). The USFWS responded on November 1, 2018 stating that significant impacts to federally listed species are not likely to result from this project as currently proposed. The KDFWR responded on September 17, 2018 noting the agency had no comments on the project. ESA and FWCA requirements have been fulfilled for this project.

d. Coordination with Cultural Resources Agencies. Pursuant to Section 106 of the National Historic Preservation Act of 1966 as implemented by regulations at 36 CFR 800, USACE initiated consultation in letters dated October 23, 2018, with the Kentucky Heritage Council (KHC) and federally recognized tribes. In a letter dated November 7, 2018, the KHC concurred with a "no historic properties determination." In a letter dated November 15, 2018 the Cherokee Nation responded with the statement that "the Nation does not foresee this project imparting impacts to Cherokee cultural resources at this time." In addition, they requested USACE to "halt all project activities immediately and re-contact our Offices for further consultation if items of cultural significance are discovered during the course of this project." No other consulting party provided a response. Pursuant to 36 CFR 800.3(c)(4) the failure to respond allows USACE to proceed to the next step. USACE concludes the Section 106 process with a "no historic properties affected" determination. e. Coordination with State and Regional Agencies: The Laurel County Water District No. 2 submitted an application for, and received funding from the Kentucky Infrastructure Authority loan program for this project. 7. In light of the general public interest, I have determined that the work would not constitute a major Federal action significantly affecting the quality of the human or natural environments within the meaning of the National Environmental Policy Act of 1969. Accordingly, I have concluded that an Environmental Impact Statement covering the proposed work is not required. Further, having weighed the potential benefits that may be accrued as a result of implementing the proposed Selected Action Alternative against the reasonably-foreseeable detrimental effects, I conclude that the construction of a 500,000-gallon water storage tank, Section 531 project in the Fariston community, Laurel County, Kentucky, would be in the public interest.

__________________________ Date

_____________________________ Cullen A. Jones, P.E., PMP Lieutenant Colonel, U.S. Army District Commander

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 gm AVENUE SOUTH, ROOM A 405 NASHVILLE TN 37203

DEC 3 1 2018 Project Planning Branch

To All Interested Parties: The U.S. Army Corps of Engineers, Nashville District (USACE), has prepared a Draft Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) to assess the impacts of a proposed project to construct a 500,000-gallon elevated water storage tank (Proposed Action Alternative No. 1) in the Greer Industrial Park located in Fariston, Laurel County, Kentucky (Figu"re 1). The purpose of the proposed project is to double the water storage capacity within the project area and provide a reliable water supply and improved level of fire protection to both current and future residential and industrial customers. The draft EA considered four proposed action alternatives. The Proposed Action Alternative No. 1 - 500,000-gallon elevated water storage tank (selected), and the No Action Alternative were the only alternatives evaluated in detail. The No Action Alternative would deny Federal funding for the proposed project through the Section 531 program. Proposed Action Alternative No. 2 considered constructing a 250,000-gallon storage tank. Proposed Action Alternative No. 3 considered constructing a 1,000,000-gallon storage tank. Proposed · Action Alternatives 2 and 3 were eliminated from detailed consideration as described in the draft EA. This letter serves as Notice of Availability of the EA and the unsigned FONSI. Interested parties may rev\iew electronic copies of these documents at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. A copy of the EA, unsigned FONSI, and project plans are also available for review at the Laurel County Water District No.2, 3910 South Laurel Road, London Kentucky 40744. Please provide comments no later than February 1, 2019 to ensure consideration in · the EA. Email responses to: CorpsLRNPlanningPublicCom@usace.army.mil ; or mail responses to the address listed in the letter head, attention Joy Broach, Aquatic Biologist. If you have questions, please contact Joy Broach at (615) 736-7956. Your participation is appreciated.

Sincerely,

~ O. ~ Timothy A. Higgs Environmental Section Chief Project Planning Branch Enclosure

2

Kentucky ~ Laurel County '

'

Figure 1.

Fa~iston,

Kentucky Vicinity Map and Project Location

DRAFT

ENVIRONMENTAL ASSESSMENT

LAUREL COUNTY WATER DISTRICT NO. 2 FARISTON WATER STORAGE TANK LONDON, KENTUCKY

DECEMBER 2018

For Further Information, Contact: Joy Broach US Army Corps of Engineers Nashville District th 110 9 Avenue South, RM A405 Nashville, TN 37203-3817 Telephone: (615) 736-7956

TABLE OF CONTENTS SECTION 1 - PURPOSE AND NEED 1.01 Introduction................................................................................................. 1 1.02 Purpose, Need & Authority ........................................................................ 1 1.03 Project Location & Description ................................................................. 2 SECTION 2 - ALTERNATIVES 2.01 Evaluation of Alternatives ......................................................................... 2 2.02 Proposed Action Alternative No. 1 ............................................................ 2 2.03 Proposed Action Alternative No. 2....................................................2 2.04 Proposed Action Alternative No. 3...................................................3 2.05 No Federal Action Alternative ................................................................... 3 SECTION 3 - ENVIRONMENTAL REQUIREMENTS 3.01 General ........................................................................................................ 3 Protection Statute Summary Table ................................................................... 5 SECTION 4 - AFFECTED ENVIRONMENT 4.01 Natural Environment .................................................................................. 5 4.02 Cultural Environment ........................................................................ 7 SECTION 5 ­ ENVIRONMENTAL IMPACTS 5.01 Environmental Consequences .................................................................. 7 5.02 Cumulative Effects ..................................................................................... 9 5.03 Recommended Mitigation Measures......................................................... 9 SECTION 6 - PUBLIC INVOLVEMENT AND COORDINATION 6.01 Coordination ............................................................................................... 9 6.02 Public & Agency Involvement ................................................................. 10 SECTION 7- CONCLUSIONS..........................................................................11 SECTION 8- REFERENCES............................................................................12

i

APPENDICES Appendix 1. ...................................................................... Project Location Map Appendix 2..............................................Preliminary Engineering Report Appendix 3..............................................Letter - KY State Clearinghouse Appendix 4..........................................Letter ­ U.S. Fish & Wildlife Service Appendix 5............Letter ­ USDA Natural Resources Conservation Service Appendix 6.................................Letter ­ Kentucky Heritage Council/THPO Appendix 7.....................................Letter ­ U.S. Army Corp of Engineers Appendix 8...........................................................FEMA Floodplain Map Appendix 9.........................................IPaC Regulatory Review (Wetlands) Appendix 10......Phase 1 Environmental Site Assessment (Exec. Summary) Appendix 11.....................................................................EA Mailing List Appendix 12.....................................Agency Comment Letters on Draft EA

ii

SECTION 1--PURPOSE AND NEED 1.01 Introduction The Laurel County Water District No. 2, London, Kentucky (Laurel County) is proposing to construct a 500,000 gallon elevated water storage tank within the 123 acre Greer Industrial Park that is currently being developed by the LondonLaurel County Industrial Development Authority. The industrial park is located in the Fariston community of Laurel County just south of the London corporate limits and near the London-Corbin Airport. Laurel County is located in southcentral Kentucky and has a population of 60,174 as estimated by the U.S. Census Bureau as of July 1, 2017. The county's 2012-2016 median household income (MHI) was $36,139 compared to a Kentucky statewide MHI of $44,811. The percentage of the population below the poverty level in Laurel County in the period 2012-2016 was 23.2% which is somewhat higher than the Kentucky average of 17.2%. 1.02 Purpose, Need, and Authority The Laurel County Water District No. 2 owns and operates a water system which serves the rural population of southern Laurel and northwestern Knox Counties. The water system consists of a treatment plant along with a series of distribution and transmission water lines, booster pump stations and storage tanks that are strategically located throughout the system. The District operates and maintains the water system through a Board of Commissioners, a General Manager, office staff, and field service personnel. The Board of Commissioners consists of a chairperson and four commissioners that are appointed by the Laurel County Fiscal Court. Currently, the northern portion of the District's service area is supplied by the Aisin Storage Tank in the Lily community with a 500,000 gallon capacity. Steady residential and commercial growth in the area over the past few years has resulted in inadequate water storage capacity for the area. Construction of the proposed new 500,000 gallon water storage tank within the Greer Industrial Park will not only double the volume of stored water available in the District's northern service area but will provide capacity for future growth as well as greatly improving the level of fire protection to both residential and industrial customers. The proposed project is a cooperative agreement between the Laurel County Water District No. 2 and the US Army Corps of Engineers (Corps), established by authority of Section 531 of the Water Resources Development Act of 1996. No other cooperating Federal agencies are involved on this project. Funding, as established under Section 531, shall be shared 75% Federal (Corps) and 25% Non-Federal (State and Local). This Environmental Assessment (EA) is prepared pursuant to the National Environmental Policy Act (NEPA), Council on Environmental Quality (CEQ) Regulations (40 CFR 1500-1517), and Corps implementing regulation, ER 200-2-2, 1988.

1.03 Project Location and Description The proposed 500,000 elevated water storage tank and access road will be constructed on a 150'x150' site within the 123 acre Greer Industrial Park which is located just south of the London corporate limits on US 25 and Old Whitley Roads (see Appendix 1). This is a growth area near the London-Corbin Airport that has convenient access to Interstate 75. The construction of the 200-foot tank will consist of a concrete foundation and welded steel reservoir with a steel support structure. An access road will be constructed from Court Road to the water storage tank site. The access road will utilize an existing culvert for the crossing of an intermittent stream within the industrial park. A 12-inch water transmission main is already available to the proposed tank site and no additional water line will be required. The land use of the surrounding area is largely mixed, consisting of primarily medium density residential and light commercial and industrial development. SECTION 2--ALTERNATIVES 2.01 Evaluation of Alternatives. Based on the continued need for potable water service and to accommodate projected grown within the District's most northern service area, the District has to initiate action to provide sustainable water service as required by the Kentucky Division of Water and the Kentucky Public Service Commission. Final determination of the project scope was dependent on the District's ability to meet existing and future customer demands without having a significant impact of the ability to meet current and future financial obligations. Therefore, viable project alternatives were limited with focus largely on determining the most economical capacity, style, and location of a proposed water storage tank. These alternatives were considered in a preliminary engineering report completed in September 2018 and provided in Appendix 2. 2.02 Proposed Action Alternative No. 1 (Selected). Construction of a 500,000 gallon elevated multi-column style structure at the highest point available within the Greer Industrial Park. The proposed tank would be constructed with the same overflow elevation as the existing Aisin Storage Tank and the two tanks would work in tandem to serve the northern supply zone. Accordingly, the new tank would need to be constructed to an overflow height of approximately 200 feet. Selection of this alternative would double the available storage capacity within the northern supply zone while allowing suitable operational control.

2

2.03 Proposed Action Alternative No. 2 Construction of a 250,000 gallon elevated multi-column style tank with all other considerations remaining consistent with those described for Alternative No. 1. Similarly, all immediate project needs would be addressed with a 250,000 gallon tank. With the substantially smaller tank, the total project cost would be decreased by an estimated $450,000. However, the storage capacity gained with this alternative is not expected to keep pace with area growth for the life of the structure. 2.04 Proposed Action Alternative No. 3 Construction of a new 1,000,000 gallon elevated composite style tank to replace the existing 500,000 gallon Aisin Storage Tank which is currently in need of rehabilitation. The new tank would be constructed on a site within the Fariston Industrial Park which is centrally located between the existing Aisin Storage Tank and Greer Industrial park. This alternative would eliminate the need to rehabilitate the existing tank, but would not facilitate redundant storage options within the northern portion of the system. In addition, the total project cost would exceed that of the proposed project by an estimated $1million. 2.05 No Federal Action Alternative. The no action alternative would be to deny Federal funding for the project through the Section 531 program. The result would be continued inadequate water storage capacity for the northern portion of the Laurel County Water District No. 2's service area. The District selected Alternative No. 1 over Alternative 2 and 3. Alternative No. 1 will double the available storage capacity in the northern portion of the service area and will have the least impact on the District's ability to meet current and future financial obligations (see Appendix 2).

SECTION 3--ENVIRONMENTAL REQUIREMENTS 3.01 General Endangered Species Act. The proposed project would not significantly impact any federally-listed endangered or threatened species or adversely modify critical habitat (See Appendix 4). Historic Conservation. The proposed project would not affect religious sites or ceremonial rites of Native Americans, any property listed or eligible for listing on the National Register of Historic Places, any property listed as a National Historic 3

Landmark, or any archeological resource. An archaeological survey was conducted on the entire 123 acre Greer Industrial Park by the University of Kentucky, Department of Anthropology, and issued report entitled "Phase I Archaeological Survey of a Proposed 132-Acre Industrial Park In London, Laurel County, Kentucky" and dated January 2018. In letters dated October 23, 2018, the Corps initiated consultation with the Kentucky Heritage Council (KHC), Absentee Shawnee Tribe of Oklahoma, Cherokee Nation, Eastern Band of Cherokee Indians, Eastern Shawnee Tribe of Oklahoma, Shawnee Tribe, and United Keetoowah Band of Cherokee Indians. In a letter dated November 7, 2018, the KHC concurred with a "no historic properties determination." In a letter dated November 15, 2018 the Cherokee Nation responded with the statement that "the Nation does not foresee this project imparting impacts to Cherokee cultural resources at this time." In addition, they requested the Corps to "halt all project activities immediately and re-contact our Offices for further consultation if items of cultural significance are discovered during the course of this project." The other consulting parties did not provide a response. Pursuant to 36 CFR 800.3(c)(4) the failure to respond the agency may proceed to the next step. The Corps concludes the Section 106 process with a "no historic properties affected" determination. (See Appendix 12). Clean Water Act. The U.S. Army Corp of Engineers (Nashville District) reviewed the proposed water storage tank project and determined that proposed activities would not involve work in waters of the United States (streams and/or wetlands); therefore, a Department of the Army (DA) permit would not be required (See Appendix 7). The amount of area that would be disturbed during construction would appear to exceed one acre; therefore coverage under the Kentucky Pollutant Discharge Elimination System (KPDES) general permit for storm water runoff from construction sites would be required. Other State and Local Program Consistency. The project conforms to existing land use patterns, zoning, and local plans and the water storage tank plans will be approved by the Kentucky Division of Water (DOW). The Kentucky State Clearinghouse Letter indicates no unresolved issues other than regulatory and compliance issues which will be resolved prior to start of construction. The DOW, Water Infrastructure Branch, does not oppose the project; however, project plans and specifications must be approved by DOW prior to start of construction (See Appendix 3). Flood Plain/Wetlands. Neither the proposed tank site nor the proposed access road are within, nor will they affect, a designated floodplain per FEMA Flood Hazard Map (See Appendix 8). The U.S. Fish & Wildlife IPaC regulatory review states that "there are no known wetlands at this location" (See Appendix 9).

4

Recreation. No federal lands are involved with this project. The project would not adversely affect wild and scenic rivers and would not affect any parks, parklands, ecologically critical areas, wildlife management areas, wildlife refuges or other areas of ecological, recreational, scenic or aesthetic importance. Important Farmland. The U.S. Department of Agriculture, Natural Resources Conservation Service, reviewed the proposed project and determined that "no significant conversion of agricultural lands (prime, unique, or farmland of local or statewide importance) will occur or be negatively impacted by the proposed undertaking" (See appendix 5). Fish and Wildlife Coordination Act. The US Fish & Wildlife Service has reviewed the proposal and has determined that no significant impact to federally listed endangered or threatened species are anticipated (See Appendix 4). In addition, the Kentucky Department of Fish & Wildlife commented to the KY State Clearinghouse that "Based on the information provided, the Kentucky Department of Fish & Wildlife Resources has no comments concerning the proposed project" (See Appendix 3).

ENVIRONMENTAL REQUIREMENTS Clean Air Act - 42 USC 469, et seq. Clean Water Act - 336 USC 1251, et seq. Endangered Species Act - 16 USC 1531, et seq. Fish & Wildlife Coordination Act - 16 USC 661, et seq. National Environmental Policy Act - 42 USC 4321, et seq. National Historic Preservation Act - 16 USC 470a, et seq. Rivers & Harbors Act - 33 USC 401, et seq. Rivers & Harbors Act - 91 USC 122 Watershed Protection & Flood Preventions Act - 16 USC 1001, et seq. Wild & Scenic Rivers Act - 16 USC 1271, et seq. Flood Plain Management - Executive Order 11988 Protection of Wetlands - Executive Order 11990 Farmland Policy Protection Act - PL 97-98, 7 CFR 658 Environmental Justice - Executive Order 12898

FC FC FC FC FC FC NA NA FC FC FC FC FC FC

FC-FULL COMPLIANCE, PC-PARTIAL COMPLIANCE, NA-NOT APPLICABLE

SECTION 4--AFFECTED ENVIRONMENT 4.01 Natural Environment Physiography. Laurel County is located in the southeastern Kentucky coalfield region. The area is characterized by mountainous terrain, rapid surface runoff, and moderate rates of groundwater drainage. Elevations in the county range from 723 to 1,760 feet above sea level. Laurel County was the 80th county 5

to be organized in Kentucky by an act of the general assembly in 1825 from parts of Rockcastle, Clay, Knox and Whitley Counties. The early days of the county were heavily influenced by the coal and lumber industries. Climate. The climate of Laurel County is moderate but variable. The average annual temperature is 55.98o F which is about the same as the Kentucky average temperature of 55.62 degrees and is higher than the national temperature of 54.45 degrees. The normal precipitation is 48 inches per year. Geology/Soils. All of Laurel County lies within the Mountain and Eastern Coal Field Region which is a part of the Cumberland Plateau. The soils in this area are underlain by siltstone, sandstone, and shale. The underlain soils of the project area are part of the Whitley-Latham-Lily association. These soils are gently sloping to steep, moderately deep soils that have a loamy or clayey subsoil. They are found on ridgetops and side slopes. Lily and Bonnie silt loams make up the majority of the project area with slopes of 6% to 12%. Terrestrial Resources. The project area is a rolling-mountainous region consisting primarily of residential and light commercial/industrial properties. Air Quality. Laurel County is located within the Appalachian Region for the State's Air Quality Control Monitoring Program. The proposed project area is located in an air quality attainment area. The nearest monitoring station is Lexington. A review of the Kentucky Division for Air Quality's website revealed an Air Quality Index of 51 for the Lexington area on November 21, 2018 which is classified as "Good-Moderate" indicating that air quality is acceptable; however, for some pollutants there may be a moderate health concern for a very small number of people who are unusually sensitive to air pollution. Aquatic Resources/Water Quality. The Rockcastle River forms the western boundary and part of the northern boundary of Laurel County. The Laurel River, which forms part of the southern boundary of the county, joins the Cumberland River (Lake Cumberland) just east of the mouth of the Rockcastle River. Wetlands/Flooding. The proposed project will not impact a floodplain as determined by the Flood Hazard Boundary Map - Community Panel Number 21125C0230 D (See Appendix 8). There are no known wetlands at the project site location as determined by the U.S. Fish & Wildlife IPaC report (See Appendix 9). Solid/Hazardous Waste. A Phase I Environmental Site Assessment (ESA) for HTRW contamination was completed by the engineering firm, MSE of 6

Kentucky, Inc., in August 2017. Included in this assessment are interviews with local residents, field inspections, and environmental database review for potential contamination sources. No known contamination is present in the project area and no follow up investigation is recommended. The executive summary of the Phase I report is in Appendix 10. Historic/Cultural Resources. An archaeological survey of the entire 123 acre Greer Industrial Park was conducted in January 2018 by the University of Kentucky, Department of Anthropology. The archaeological report was submitted to the Kentucky State Historic Preservation Officer (SHPO) who responded in a letter dated February 14, 2018 stating "We would recommend that the project will result in No Effect to Historic properties" (See Appendix 6). The Corps consulted with the KHC and Indian Tribes with a historical relationship to the area. Section 106 consultation concluded with a "no historic properties affected" determination. 4.02 Cultural Environment Socioeconomics. The July 2017 population estimate for Laurel County is 60,174. Laurel County had a population change of +2.3% from April 1, 2010 to July 1, 2017. Persons over 65 years of age comprise 15.9% of the total population of the county. Minorities comprise 3% of the county population. The 2012-2016 median household income of the county is $36,139 compared to a Kentucky median household income of $44,811 for the same period. Persons residing in the county below the poverty level is 23.2% compared to 17.2% statewide. Transportation. London is approximately 76 miles southeast of Lexington via Interstate 75. Housing. The 2012-2016 preliminary data indicates 69.2% of Laurel County's population are homeowners with a median home value of $99,900. SECTION 5--ENVIRONMENTAL IMPACTS 5.01 Environmental Consequences Terrestrial Resources. The proposed water storage tank and access road will be constructed within the 123-acre Greer Industrial Park which has been committed to industrial development. The access road will utilize an existing culvert over an intermittent stream; therefore potential construction impacts would be minimal and temporary. The construction areas would be stabilized and reseeded with grasses as soon as possible upon project completion. Only short-term impacts during construction with no long-term adverse impacts would occur. 7

Air Quality. Temporary construction impacts could include fugitive dust emissions. Best management practices and housekeeping steps, such as wetting or spraying, would be incorporated as necessary. Sites would be reseeded/stabilized as sections of construction are completed. Water Quality/Aquatic Resources. Potential localized and short-term impacts to water quality could occur with project construction. However, with the implementation of Best Management Practices (BMP's), such as erosion control and timely reseeding of disturbed area, impacts would be minimal. Compliance with the storm water general permit would ensure minimal impacts on water quality. Long-term and cumulative effects of this project are beneficial for customers of the Laurel County Water District No. 2. Wetlands/Flooding. There would be no impact to wetlands as determined by the U.S. Fish & Wildlife Service IPaC report (See Appendix 9) or any designated floodplain area per FEMA Flood Hazard Map (See Appendix 8). . Historic/Cultural Resources. There would be no affect on historic properties or cultural resources. (See Appendix 6). Hazardous/Solid Waste. The project should not result in solid waste concerns with proper collection and disposal of construction and related waste. Hazardous waste generation is not anticipated. Noise. There could be an increase in noise levels during the construction period. However, the impact would be localized, temporary and should not approach nuisance levels. Socioeconomics. The most immediate environmental impact would be a sustained volume of water storage to serve the northern most section of the District's service area. Over time, the positive effects of the project would spread into surrounding communities. No homes or buildings would be adversely impacted by the proposed project. Project cost via user rates would be spread evenly to all customers of the water system. Housing. A sustained volume of stored potable water will be an asset to all households within the District's service area. Environmental Justice. Effects on the quality of the human environment are not likely to be controversial. The proposed water storage tank construction will not adversely or disproportionately effect human health or environmental conditions in minority populations or low-income populations and is in compliance with guidance set forth by Executive Order 12898. 8

Transportation. There is an inherent risk to the public any time construction takes place in an area where vehicular traffic is significant. Proper steps would be taken to insure the safety of the public. Prior to construction, the public would be informed of the schedule of construction and scope of work. During construction, if necessary, periodic press releases would be issued with information about areas under construction and possible road closures or traffic delays. The contractor would not be given authority to close or limit traffic without the permission of Kentucky Department of Transportation (KDOT) or the owner. During construction, the contractor would furnish, erect and maintain barricades, warning signs, and flaggers in such a manner that all local and through traffic would be adequately accommodated. Emergency vehicle access would be maintained. These steps would limit any impacts associated with construction. 5.02 Cumulative Effects. Effects would be the sustained volume of potable water available to community residents and businesses/industries. 5.03 Recommended Mitigation Measures. Potential adverse impacts would be minimized with proper construction techniques and implementation of Best Management Practices (BMP's) as previously discussed. The construction contractor will be required to obtain coverage for storm water discharges under the Kentucky Division of Water general permit for construction activities.

SECTION 6--PUBLIC INVOLVEMENT AND COORDINATION 6.01 Coordination This EA was prepared by the US Army Corps of Engineers in coordination with Monarch Engineering, Inc., consultant for the Laurel County Water District No. 2. Copies of this report are available for review at the following locations: Laurel County Water District No. 2, 3910 South Laurel Road, London, KY 40744 US Army Corps of Engineers, Section 531 Environmental Infrastructure Program, 110 9th Avenue South, RM A405, Nashville, TN 37203-3817.

9

The following is a list of persons and agencies consulted or involved in preparation of this EA to date: Lisa Morris U.S. Army Corp of Engineers Regulatory Branch-Nashville District 3701 Bell Road Nashville, TN 37214 PH: (615) 369-7504

Lee Mudd, P.E. Monarch Engineering, Inc. 556 Carlton Drive Lawrenceburg, KY 40342 PH: (502) 583-7020

Joy Broach U.S. Army Corp of Engineers Nashville District 110 9th Avenue South, RM A405 Nashville, TN 37203-3817 PH: (615) 736-7956

Craig A. Potts Kentucky Heritage Council and State Historic Preservation Officer 410 High Street Frankfort, KY 40601 PH: (502) 564-7005

Perri Pedley U.S. Department of Agriculture Natural Resources Conservation Service 100 Commonwealth Drive Mayfield, KY 42066 PH: (270) 247-9529

Lee Andrews US Fish and Wildlife Service JC Watts Federal Building, Room 226 330 West Broadway Frankfort, KY 40601 PH: (502) 695-0468

Lee Nalley Kentucky State Clearinghouse, D.L.G. 1024 Capital Center Drive, Suite 340 Frankfort, KY 40601 PH: (502) 573-2382

William C. Norris Environmental Assessment Services, LLC 2220 Celina Road Burkesville, KY 42717 PH: (270) 433-7256

Russell Townsend Tribal Historic Preservation Specialist Eastern Band of Cherokee Indians P.O. Box 455 Cherokee, NC 28719

Governor Edwina Butler-Wolfe Absentee-Shawnee Tribe of Oklahoma 2025 S. Gordon Cooper Dr. Shawnee, OK 74801-9381

Principal Chief Bill John Baker Tribal Historic Preservation Officer Cherokee Nation P.O. Box 948 Tahlequah, OK 74465-0948

Principal Chief Richard Sneed Eastern Band of Cherokee Indians Qualla Boundary P.O. Box 445 Cherokee, NC 28719

Chief Glenna J. Wallace Eastern Shawnee Tribe of Oklahoma P.O. Box 350 Seneca, MO 64865

Chairperson Ron Sparkman Shawnee Tribe P.O. Box 189 Miami, OK 74355

Chief Joe Bunch United Keetoowah Band of Cherokee Indians in OK P.O. Box 746 Tahlequah, OK 74464-0746 10

6.02 Public & Agency Involvement A Notice of Availability of the Draft Environmental Assessment and unsigned Finding of No Significant Impact will be circulated in draft form to the local community and local, state and federal governmental agencies with jurisdiction by law or special expertise for a 30-day review/comment period. Public comments will be incorporated into the final draft.

SECTION 7--Conclusion The US Army Corps of Engineers Section 531 program funding offers funds to communities, counties and other public entities for water system treatment and storage facilities. Such is the case in the Laurel County Water District No. 2's `Fariston Water Storage Tank' project The objective of the proposed project is to increase the level of water storage in the District's northern supply zone. The additional water storage capacity will ensure that the system will be able to meet the demand of its existing and future customers in a safe and efficient manner. The combined efforts of the local community, the Laurel County Water District No. 2, the Kentucky Infrastructure Authority, and the US Army Corps of Engineers would provide for adequate potable water storage for the District's current customers and would allow for future growth of the system. No significant adverse impacts have been identified. No significant scientific resources such as threatened or endangered species, threatened or endangered species habitat, water quality, forestation, or air quality would be adversely affected by the project. The project construction would take place within the 123acre Greer Industrial Park. Short-term impacts associated with construction would be localized and minor with the use of Best Management Practices. The Corps will verify during the pre-construction meeting that the District or its construction contractor has obtained coverage under the Kentucky Division of Water (KDW) general storm water permit for construction activities related to this project and that plans have been approved by KDW. Some possible temporary negative impacts on the human environment could include noise abatement, temporary road closure and aesthetic problems. However, these impacts would be temporary and insignificant when compared to the positive permanent impact the project would have in providing adequate and sustainable water storage to the customers of Laurel County Water District No.2.

11

SECTION 8--REFERENCES US Census Bureau. State and County QuickFacts. Census information on website http://www.census.gov/quickfacts/fact/laurelcountykentucky USDA, Soil Conservation Service. 1976. Soil Survey of Laurel and Rockcastle Counties, Kentucky. USGS, Lily Quadrangle, Kentucky 7.5-minute Topographic Quadrangle Map. Kentucky Ambient Air Monitoring Network, Air Quality Index http://eppcapp.ky.gov/dag/D Kentucky Atlas & Gazetteer www.kyatlas.com Kentucky Cabinet for Economic Development. http://www.thinkkentucky.com USA.com http://www.usa.com/laurel-county-ky-weather.htm Groundwater Resources in Kentucky http://www.uky.edu/kgs/water/library/gwatlas/laurel/topography

12

Appendix 1 Project Location Map

PROPOSED 500,000 GALLON FARISTON WATER STORAGE TA

Greer l Tndustrial "t .) .)k · Par

0 (j

I

·

~

Appendix 2 Preliminary Engineering Report

PRELIMINARY ENGINEERING REPORT FOR THE LAUREL COUNTY WATER DISTRICT #2

FARISTON WATER STORAGE TANK

SEPTEMBER 2018

A

Monarch Engineering, Inc. \;OJ

2 5

PRELIMINARY ENGINEERING REPORT FARISTON WATER STORAGE TANK LAUREL COUNTY WATER DISTRICT #2 LAUREL COUNTY, KENTUCKY

I.

GENERAL

This Preliminary Engineering Report is intended to detail and analyze the proposed water system improvements project which is being planned by the Laurel County Water District No. 2. The project includes the construction of a new 500,000 gallon elevated water storage tank struchll"e to be located in the Fariston community of central Laurel County, Kentucky. II.

PROJECT PLANNING AREA

The proposed water storage tank site lies within the boundaries of the planned Greer Industrial Park which is currently under development by the London-Laurel County Industrial Development Authority (LLCIDA). The 123 acre industrial park lies just south of London, Kentucky, being situated in the far northern p01iion of the District's service area. The land use of the smTounding area is largely mixed, comprised primarily medium density residential and light commercial/indush·ial development. Some intermittent areas of agricultural land are also present as well. The London-Corbin Airport is also nearby, lying approximately 4,500 feet north of the proposed tank site. The project area and the water distribution system as a whole have experienced significant growth since the system was first developed over fifty years ago. Due to its close proximity to the I-65 c01Tidor, lying between the cities of London and Corbin, it is anticipated that sustained residential and commercial growth will continue within the system going fo1ward. The development of the proposed Greer Industrial Park, and also the newly established Fariston Industrial Park to the south, are expected to greatly increase demands on the existing distribution system. New jobs created by businesses locating within these industrial parks are expected to spur additional residential and commercial development throughout the service area. III.

EXISTING FACILITIES

The Laurel County Water District No. 2 owns and operates a water h·eatment and distribution system which serves the rural population of south central Laurel and no1ih western Knox Counties. The Dish·ict operates and maintains the water system through a Board of Commissioners, a General Manager, as well as office and field personnel. The Board of Commissioners consists of a chairperson and four commissioners, all of which are appointed by the Laurel County Fiscal Court.

The District produces the vast majority of the systems potable water at its own tTeatment facility, however it does intermittently purchase a small amount of wholesale water for resale from the London Utility Commission. The combination of which has sufficient capacity to serve the Company's approximately 6,000 existing residential, commercial and industrial customers. The District's water treatment plant is located in the approximate center of the distribution system, near the community of Hopewell. The facility has a rated treatment capacity of 2.88 MGD and is currently operating at approxinmtely 50% of that capacity producing 1.46 MGD on average. The treatment plant is a conventional surface water filtration facility, consisting of a raw water intake & pumping sh11cture, flash mix, settling basins, multi-media filters, chemical disinfection, clearwell storage, and finished water pumping facilities. The primaiy water source is the Laurel River Lake, which generally yields high quality raw water and is of abundant capacity. The water distribution system consists of a network of water transmission and distribution mains along with a series of water tanks and booster pump stations. This includes vai-ious sized water lines ranging from 2-inch to 16-inch, three pumps stations, and three water storage tanks with a rated capacity of 1,700,000 gallons. The majority of the system has been in place for less than 50 years. Pipe material within the system consists of cast iron and asbestos cement for the older lines along with ductile iron and plastic for the newer ones. Water loss within the system is generally maintained at acceptable levels, with an average amrnal loss of about 15%. The District is currently in compliance with all Federal and State Regulations regarding the sanitary features of the potable water treatment and distribution system. In addition, the utility is governed by the Public Service Commission, and they have no cunent violations of PSC regulations. IV.

NEED FOR THE PROJECT

The projects primaiy objective is to increase the level of water storage in Dish·ict's n011hern supply zone. The additional water storage capacity will ensure that the system can meet the demands of existing and future customers in safe and efficient manner. In addition to correcting the existing capacity issues, the additional storage will al low the District to provide substantial fire protection coverage in the area. Currently, the northern pot1ion of the District's service area is supplied via one existing storage tank in the Lilly community (Aisin Storage Tank - 500,000 gallon capacity). Demand growth in this area has been steadily increasing over the past few decades, largely as a result of gains in residential development. However, in recent years, the London - Laurel County Industrial Development Authority (LLCIDA) has purchased two large tracts of farmland and is cmrently developing these parcels into industrial parks. As a result of this sustained growth, the District's water storage capacity is no longer adequate and must be increased.

Considering that this vital area of the system is cunently supplied by only one storage tank, the system lacks redundancy. Accordingly, should a failure or other major issue arise with the existing Aisin Storage Tank, customers in the area would face a lengthy period with a very limited or non-existent supply of potable water. Moreover, the construction of an additional tank in the Fariston community will allow the District to maintain normal service when future tank maintenance and rehabilitation activities are required at regular intervals. V.

ALTERNATIVES CONSIDERED

Based on the continued need for potable water service and also need to accommodate growth within the project area, the District must take the necessaiy steps to continue providing service as required by the Kentucky Division of Water and the Kentucky Public Service Commission. Determination of the final project scope was centered on meeting existing and future customer demands without significantly burdening the District's ability to meet its cmTent and future financial obligations. Accordingly, viable project alternatives were limited and focused largely on determining the most economical capacity, style, and location of the proposed water storage tank. Alternative No. 1 (Selected): Construction of a 500,000 gallon elevated multi-column style strncture at the highest point available within the proposed Greer Industrial Park. The proposed tank would be constrncted to the same overflow elevation as the existing Aisin Storage Tank such the two tanks would work in tandem to serve the northern supply zone. Accordingly, the proposed tank would need to be constrncted to an overflow height of approximately 200 feet. Selection of this alternative would double the available storage capacity within the supply zone while also permitting suitable operational control. Alternative No. 2: Consh·uction of a 250,000 gallon elevated multi-column style shllcture with all other considerations remaining consistent with those described for Alternative No. 1. Similarly, all immediate project needs would be addressed with a 250,000 gallon strncture. Considering the substantially smaller tank size, the total project cost would be decreased by an estimated $450,000. However, the modest gain in storage capacity is not expected to keep pace with demand growth for the life cycle of the strncture. Alternative No. 3: Conshllction of a new 1,000,000 gallon elevated composite style structure to replace the existing 500,000 gallon Aisin Storage Tank which is currently due for rehabilitation. The new tank would be constructed on a site within the Fariston Industrial Park, which is cenh'ally located between the existing Aisin Storage Tank and the Greer Indush·ial Park. This alternative would eliminate the need to rehabilitate the existing tank, but would not facilitate redundant storage options within the n011hern portion of the system. In addition, the total project cost would exceed that of the proposed project by an estimated $1,000,000.

Aside from the major alternatives presented above, slight variations of those alternatives were also considered. Discussion and analysis of the primary alternatives and variants centered on the final location and style of the proposed storage tank. Considerations included: the long te1m needs of the service area; the location of existing transmission mains and tank sites; the availability of transmission main rights-of-way; the future cost of maintaining the improvements; and the total project costs. VI.

PROPOSED PROJECT

In order to correct the cunent water storage inadequacies within the Dish·ict's n011hern supply zone, the project proposes to construct a new 500,000 gallon water storage tank within the Greer Industrial Park. The proposed water storage tank will be an elevated welded carbon steel water storage tank supported by a series of cylindrical steel columns and cross bracing. The tank shall be a Toro Ellipsoidal (Torus Bottom) style Multi Column structure constructed to an overflow elevation of 1359' MSL, that being equal to that of the existing Aisin Storage Tank. The final tank design shall incorporate operating parameters as follows: · The minimum operating capacity of the storage tank will be 500,000 US gallons · The capacity of the tank, low to high water level, shall be contained within a maximum operating range of the 37' · The storage tank overflow/ top capacity level elevation shall be 1359' · The height of the tank, top of foundation to overflow shall be 200' · Top of foundation elevation shall be 1159.00' · The existing ground elevation varies from 1155.50' to 1161 .00' · The finished ground elevation shall be 1158.00' +/ The structural design of the elevated water storage tank shall conform to the following design standards except as modified or clarified in the final design documents. · ·

· ·

Reinforced Concrete Foundations: AWWA DlOO & ACI 318 Welded Steel Water Tank: AWWA DlOO Steel Water Storage Tank Coatings: AWWA Dl02 Environmental Loading: A WWA D 100 & ASCE 7

The LLCIDA has verbally agreed to donate a roughly half acre parcel within the Greer Park to the District. The selected site is located on the western boundary of the park and is of a suitable elevation to facilitate construction of the proposed tank. Prior to the start of the final design, a geotechnical investigation will be undertaken to determine the site specific foundation requirements. Attached as a part of this report is a topographic map which depicts the location of the proposed water storage tank, tank site access road and the proposed connection points to existing system mains.

VII.

ENVIRONMENTAL IMPACTS

Considering the project location, limited footprint and scope of the project, no significant adverse environmental impacts are expected as a result of the project. Fm1hermore, no significant scientific resources such as threatened or endangered species, threatened or endangered species habitat, water quality, or air quality are expected be adversely affected by the project. Short-term impacts associated with the project would be localized and minor with the use of Best Management Practices. Some possible tempora1y negative impacts on the human environment could include construction noise and aesthetic problems. However, these impacts would be temporary and insignificant when compared to the positive permanent impact the project would have on the local community in the form of a continued safe and reliable supply of potable water. The staff of the University of Kentucky Program for Archaeological Research recently conducted a Phase I archaeological survey of the entire 132-acre Greer Industrial Park at the request of the LLCIDA. The findings of the survey have been reviewed by the Kentucky Heritage Council/State Historic Preservation Officer (SHPO). SHPO issued a letter dated February 14, 2018 stating that " We would recommend that the project will result in No Effect to Historic Properties." Although the survey and rep01i were prepared relative to development of the industrial park as a whole, it is anticipated that construction of the proposed water storage tank will attain similar concuITence from SHPO. The project has been submitted to the Kentucky State e-Clearinghouse, which is the official designated Single Point of Contact (SPOC) for the Commonwealth pursuant to Presidential Executive Order 123 72. The clearinghouse letter relative to this project (SAi# KY201808311020) is included as an attachment to this rep011. VIII.

LAND REQUIREMENTS

As previously noted, the new water storage tank will be constmcted on a site within the Greer Industrial Park. In order to facilitate future painting and maintenance of the tank, a minimum permanent tank site of no less than 150 feet square (0.52 acres) shall be acquired by the Dish"ict in fee simple title. To allow adequate space for material staging and equipment storage during construction, and an additional area of no less than 0.92 acres shall be made available adjacent to the site. This temporary consttuction easement will revert back to the adjoining landowner (LLCIDA) once constluction is complete. The proposed site is currently landlocked and a suitable access easement of no less than 20 feet in width shall be conveyed with the tank site. Access to the site shall be from Court Road and will parallel the LLCIDA property line adjacent to an existing residential subdivision. An existing 12-inch water tt·ansrnission main is already present on the existing site and no additional water line easements will be required. The proposed tank will need an electt·ical service, so an electt"ic easement to the site will need to be granted to the local power company for this purpose.

IX.

CONSTRUCTION CONCERNS

Considering the substantial overall height of the proposed tank and the close proximity of the tank site to the London-Corbin Airport, the location of the structure must be approved by the FAA and the KY Airpmt Zoning Commission. Siting applications were filed with both entities in July 2017. Correspondence from both entities was received by the District in September 2017 granting clearance with only red aviation marking lights being required. The FAA and KAZC determination does permit temporary construction equipment such as cranes which may be used during construction of the storage tank. However, this equipment shall not exceed the overall height of the proposed structure. If equipment which has a height greater than the proposed tank is needed, it will require a separate notice to the FAA. This information will be included in the bid documents and prospective contractors will be required to inform the District if their construction methods will require such additional clearances. No other major construction concerns are anticipated with the project. X.

PROJECT SCHEDULE Land & Easement Acquisition: Finalize Project Funding: Kentucky Division of Water Submittal: Advertise for Construction Bids: Contract Award/Begin Construction: Substantial Completion: Final Completion:

XI.

November 2018 December 2018 December 2018 January 2019 March 2019 March2020 May 2020

PROJECT COST & FUNDING

An itemized preliminary cost estimate is included in this repo1t and outlines all of the individual construction items along with their estimated unit costs. A summary cost estimate is incorporated therein and recaps all of the project costs and outlines the funding scheme for the project. The total construction cost has been estimated to be $1 ,400,000, with a corresponding total project cost of $1 ,850,000. Full project funding has been secured through a combination of grant and low-interest loan funds. Specifically, the funding package includes a $1,300,000 grant which was awarded through the Section 531 - Southern and Eastern Kentucky Environmental Infrastructure Program, a $445,000 low interest loan from the Kentucky Infrastructure Authority, and $105,000 in local funds from Laurel County Water District No. 2.

VII.

CONCLUSIONS AND RECOMMENDATIONS

Based on the need to provide existing and future customers with a sufficient and dependable potable water supply, it is recommended that the Lamel County Water District No. 2 pursue the financial assistance as outlined herein so that the proposed project can be implemented as soon as possible. Once complete, the proposed storage tank will double the volume of stored water available in Districts northern service area. As a result, the Dish·ict will have the excess capacity required to meet the area's surging demand. In addition, the proposed storage tank will greatly improve the level of fire protection which the District can provide to potential occupants in both new industrial parks and also to those residential customers in the surrounding areas.

\

\.

PROPOSED 500,000 GALLON FARISTON WATER STORAGE TA I

0

I

,./

I./

)

·

/, I I I \

( ,

.~

l ,, ~

/

I"

\ \

·

0 {l

'

)

l 8

.'

I

PRELIMINARY COST ESTIMATE FARISTON WATER STORAGE TANK LAUREL COUNTY WATER DISTRICT #2 SEPTEMBER 2018

ITEM NO. DESCRIPTION 1 Erosion & Sedimentation Controls 2 Site Preparation, Grading & Excavation 3 500,000 Gallon Steel Multi-Column Elevated Tank 3A Foundation 38 Welded Steel Reservoir & Support Structure (200' Tall) 3C Appurtenances & Accessories 3D Coatings & Disinfection 4 Yard Piping & Appurtenances Miscellaneous Site Improvements 5 (Access Road, Parking , Ditches) Final Site Restoration & Cleanup 6

UNIT COST $10,000.00 25,000.00

TOTAL COST $10,000.00 25,000.00

LS LS LS LS LS

200,000.00 850,000.00 20,000.00 200,000.00 50,000.00

200,000.00 850,000.00 20,000.00 200,000.00 50,000.00

1 LS

25,000.00

25,000.00

1 LS

20,000.00

20,000.00

Subtotal Contingencies ( 10%)

$1,400,000.00 140,000.00

TOTAL CONSTRUCTION

$1,540,000.00

QUANTITY 1 LS 1 LS 1 1 1 1 1

Preliminary Engineering Report Environmental Assessment Geotechnical Investigation Legal & Administration Engineering Design Construction Inspection US Army Corps of Engineers Review & Administration

$10,000.00 5,000.00 10,000.00 20,000.00 117,000.00 73,000.00 75 000.00

TOTAL NON-CONSTRUCTION

$310,000.00

TOTAL PROJECT COST

$1,850,000.00

USACE Section 531 Grant

$1 ,300,000.00

KIA Fund B Loan Laurel County Water District No. 2

$445,000.00 105,000.00

TOTAL PROJECT FUNDING

$1,850,000.00

Appendix 3 Letter - KY State Clearinghouse

MATIHE W G. BEVl N

DEPARTMENT FOR LOCAL GOVERNMENT

SANDRA K. DUNAHOO

GOVERNOR

OFFI C E OF T llE GOVERNOR 1024 CA PITAL CENTER DRIVE. SUITE 340 FRA NKFORT, KENTUC KY 4060 1-8204 PH ONE (502) 573-2382 FAX (502) 573-2939 T OL L FREE (800) 346-5606/ T DD:7 1I WWW.kydlgweb.ky.gov

COMM ISS IONER

September 17, 2018 Mr. Kenneth Fisher Laurel County Water District #2 P 0 Box 2598 London, KY 40744 RE:

Fariston Water Storage Tank WX.2 11 25020 SAT# KY201808311020 CFDA# I 0.760

Dear Mr. Fisher: The Kentucky State e-Clearinghouse is the official designated Single Point of Contact (SPOC) for the Commonwealth pursuant to Presidential Executive Order 12372, and suppo1ted by Kentucky Statutes KRS 45 .03. The primary function of the SPOC is to streamline the review aforementioned process for the applicant and the funding agency. This process helps in vocalizing the statutory and regulatory requirements. information in the form of comments, if any, will be attached to this correspondence. This proposal has been reviewed by the appropriate state agencies in the e-Clearinghouse for conflicts with state or local plans, goals and objectives. After receiving this letter, you should make it available to the funding agency and continue with the funding agencies application process. This e-clearinghouse SPOC letter signifies only that the project has followed the state reviewing requirements, and is neither a commitment of funds from this agency or any other state or federal agency. Please remember ifany federal reviews are required the applicant must follow through with those federal agencies. The results of this review are valid for one year from the date of this letter. If the project is not submitted to the funding agency or not approved within one year after the completion of this review, the applicant can request an extension by email to Lee.Nalley@ky.gov. If the project changes in any way after the review, the applicant must reapply through the eclearinghouse for a new review. There are no exceptions. If you have any questions regarding this Jetter or the review process please contact the e-Clearinghouse office at 502-573-2382, ext. 274. Sincerely,

~\\oJlSho· Lee Nalley, SPOC Kentucky State Clearinghouse Attachment

An Equal Opportunity Employer M/ F/D

\

Department of Housing, Buildings and Construction Kevin Carli n

The Department of Housing Buildings and Construction, Division of Building Code Enforcement, has no comments concerning the proposed project.

Division of Enforcement Tim Harrod

The Division of Enforcement does not object to the project proposed by the applicant. Tim Harrod, Enforcement Specialist, Division ofEnforcement, Timothy.Harrod@ky.gov

Division of Water Andrea Fredenburg

Best management practices should be utilized to reduce runoff from project construction activities into nearby waters.

Division of Water Julia Harrod

A Water Withdrawal Application is not required for this proposed project. This proposed project is within the Corbin Utilities Commission designated Source Water Protection Area: Zone 3. Questions should be directed to Chloe Brantley at 502-782-6898 or Chloe.Brantley@ky.gov The proposed Fariston Water Storage Tank project will tie into the newly constructed 12" transmission line. The new line that wi ll co1111ect to the tank needs to be mapped in the WRIS to satisfy Water Management Plaru1ing. Questions should be directed to Julia Harrod, 502-782-6967 or julia.harrod@ky.gov This proposed project does not require a Kentucky Division of Water Application for Permit to Construct Across or Along a Stream. Questions should be directed to Ron Dutta at 502-782-6941 or Ramendra.Dutta@ky.gov

Division of Water Abba Pourghasemi

No objections to the proposed project. Plans and specifications along with hydraulic analysis of the proposed project (including fill/drain cycles of the tank to justify adequate tank turn over) must be submitted to the Division of Water's Water Infrastructure Branch by a registered professional engineer in Kentucky. Must receive a written approval from the Division of Water prior to the beginning of the construction.

Division of Water Ryan Reed

System should continue efforts to implement the Division of Water's recommendation from the most recent Sanitary Survey (April 20 I7).

DOW

Daniel Fraley Endorse

DOW

Wei Ji The proposed work is endorsed by the Groundwater Section of the Watershed Management Branch. However, the proposed work is located in an area with a high potential for karst development where groundwater is susceptible to direct contamination from surface activities. It is our recommendation that proposed work be made aware of the requirements of 40 I KAR 5:037 and the need to develop a Groundwater Protection Plan (GPP) for the protection of groundwater resources within that area. Questions should be directed to Wei Ji (502-782-6934) or Section Supervisor David Jackson (502-782-6986).

Fish and Wildlife

Dan Stoelb Based on the information provided, the Kentucky Department of Fish & Wildlife Resources has no comments concerning the proposed project. Please contact Dan Stoelb@ 502-892-4453 or Daniel.Stoelb@ky.gov ifyou have further questions or require additional information.

Kentucky Department for Environmental Protection

Larry Taylor Joel Murphy - Endorse with Comments The proposed project is subject to Division of Water (DOW) jurisdiction because the following are or appear to be involved: water storage tank construction. Prior approval must be obtained from the DOW before construction can begin. The applicant must cite the State Application Identifier (SAl #KY20180831 I020) when submitting plans and specifications. A Water Withdrawal Application is not required for this proposed project. This proposed project is within the Corbin Utilities Commission designated Source Water Protection Area: Zone 3. Questions should be directed to Chloe Brantley at 502-782-6898 or CWoe.Brantley@ky.gov. The proposed Fariston Water Storage Tank project will tie into the newly constructed 12" transmission line. The new line that will connect to the tank needs to be mapped in the WRIS to satisfy Water Management Planning. Questions should be directed to Julia Harrod, 502 782-6967 or Julia.Harrod@ky.gov. This proposed project does not require a DOW Application for Permit to Construct Across or Along a Stream. Questions should be directed to Ron Dutta at 502-782-6941 or Ramendra.Dutta@ky.gov. The proposed project consists of the construction of a new 500,000 gallon elevated water storage tank to be constructed in Fariston community. The structure will be a multi-column type storage tank and will be built on a site within the Fariston Industrial Park. There are no objections to the proposed project. Plans and specifications along with hydraulic analysis of the proposed project (including fill/drain cycles of the tank to justify adequate tank turn over) must be submitted to the DOW's Water Infrastructure Branch by a registered professional engineer in Kentucky. The applicant must receive a written approval from the DOW prior to the beginning of the construction. Abbas Pourghasemi, Water IJ1frastructure Branch, (502) 782-7041 , Abbas.Pourghaserni@ky.gov.

System should continue efforts to implement the DOW's recommendation from the most recent Sanitary Survey (April 2017). Ryan Reed, Water Infrastructure Branch, (502) 782-7045, Ryan.Reed@ky.gov. Best management practices should be utilized to reduce runoff from project construction activities into nearby waters. Andrea Fredenburg, Water Quality Branch, (502) 782-6950, Andrea.Fredenburg@ky.gov. No comment. Daniel Daniel.Fraley@ky.gov.

Fraley,

Compliance

and

Technical

Assistance

Branch,

(606)

783-8655,

The Division of Enforcement does not object to the project proposed by the applicant. Tim Harrod, Division of Enforcement, (502) 782-6858, Timothy.Harrod@ky.gov. The proposed work is endorsed by the Groundwater Section of the Watershed Management Branch. However, the proposed work is located in an area with a high potential for karst development where groundwater is susceptible to direct contamination from surface activities. It is our recommendation that proposed work be made aware of the requirements of 401 KAR 5:037 and the need to develop a Groundwater Protection Plan (GPP) for the protection of groundwater resources within that area. Wei Ji, Watershed Management Branch, (502) 782-6934, Wei.Ji@ky.gov.

If the construction area disturbed is equal to or greater than I acre, the applicant will need to apply for a Kentucky Pollutant Discharge Elimination System (KPDES) storm water discharge permit. Utility line projects that cross a stream will require a Section 404 permit from the US Army Corps of Engineers and a 401 Water Quality Certification from DOW. The Kentucky Division of Water suppo1ts the goals of EPA's Sustainable Infrastructure Initiative. This initiative seeks to promote sustainable practices that will help to reduce the potential gap between funding needs and spending at the local and national level. The Sustainable Infrastructure Initiative will guide our effo1ts in changing how Kentucky views, values, manages, and invests in its water infrastructure. This website, www.epa.gov/waterinfrastructure/, contains infonnation that will help you ensure your facility and operations are consistent with and can benefit from the aims of the Sustainable Infrastructure Initiative.

Kentucky Division of Water Chloe Brantley reviewed.

Kentucky Infrastructure Authority Dustin Horn This project was reviewed in the WRlS Po1tal by KIA staff.

Kentucky Transportation Cabinet (D-11) Quentin Smith Contact KYTC District 11 permits prior to any work on or near KYTC Right of Way. (606)598-2145.

KY Heritage Council Yvonne Sherrick To receive a review from the KY Heritage Council/State Historical Preservation Office (SHPO) you must follow the instructions located on their website at http://www. heritage.ky.gov/siteprotect/ . There you will find the required documents for tbe Section I 06 Review and Compliance for 36 CFRPat1800. Th.is Section 106 submission process to SHPO will assist applicants and agencies in providing the appropriate level of information to receive comments from SHPO. If you have any questions please contact Yvonne Sherrick, Administrative Specialist m, (502) 564-7005, Ext. 113, yvonne.sherrick@ky.gov. Please note: If your project is funded through Transportation AJternative (TAP), Transportation En hancements (TE), Congestion, Mitigation, Air Quality (CMAQ), or Safe Routes to School (SRTS) you will need to send this information to Michael Jones, Historic Preservation Program Administrator with the Kentucky Transpo11ation Cabinet via email MichaelR.Jones2@ky.gov or hard copy to Michael Jones, Office of Local Programs, KY Transportation Cabinet, 200 Mero Street Frankfo11, KY 40622. Do not send materials directly to SHPO if your project involves funding from these four sources as it will cause delays in the review process. Michael Jones will consult directly with the SHPO on projects with these funding sources to complete the Section 106 review.

Appendix 4 Letter - U.S. Fish & wildlife Service

RECi~lVED

NOV O1 2018 t.MM!ftJelllESIMEITIEIVlllS. llC

mo cclinB Rnad Burli!SVille, l

Pl1onc (270) 433·7256 Fax (270) 433-6313 email bnorris@doo-c:clJTTly.C(Jln

October 3 1, 2018 Significant Impacts to federally·ll.sted species a~e not likely to result from this p~oiect as cdu~~tt~Y osed Project re-coordlnat1on Is nee e 1 e 0 P~lect ch'anges or If new species or critical hab!tats ~~at could be Impacted by

Mr. Lee Andrews U.S. Fish & Wildlife Service Kentucky Ecological Services Field Office 330 West Broadway, Suite 265 Frankfort, KY 40601

L'

L~&/-3

Kentucky Field Supervls u.s. Fish end Wildlife

:M

II

D e Ice

Re: Laurel County Water District No. 2 - 500,000 Gallon Elevated Water Tank Project IPaC Consultation Code: 04EK I 000·20 l 9-E-00325 Dear Mr. Andrews: The Laurel County Water District No. 2, London, KY (Laurel County) is proposing to use funding from the U.S. Army Corp of Engineers and the Kentucky Infrastructure Authority to construct a 500,000 gallon elevated water storage tank within the Greer Industrial Park just outside the London corporate limits. The Greer Industrial Park is a 132 acre park in close proximity to the London-Corbin Airport. A 150' x 150' tract will be deeded to the Laurel County Water District No. 2 for the tank site along with a proposed 2, 100' x 30' property access road through the industrial park. The District's consulting engineer has retained our services to assist with the environmental review of the proposed project. The 150' x 150' proposed tank site will not require any tree removal. The 2, I00 LF of access road could possibly require the removal ofone large tree (which appears to be a Yellow poplar). The access road will utilize an existing culvert for an intermittent stream crossing and there should be no disturbance to the stream itself. There are no known caves, abandoned mines, or rockshelters in the immediate project area. A USGS map showing the industrial park and the proposed location of both the water storage tank site and the access road is enclosed. In addition, pictures of the proposed tank site and the access road route are enclosed, including a picture ofthe large tree that may require removal. Should the Service determine that the one subject tree is potential summer bat habitat, tree removal would be accomplished during the recommended timeframe of November 15111 through March 31 51 ·

i

It does not appear that the project would result in direct, indirect, or cumulative adverse effects to listed species or habitat: Direct Effects: By observing the recommended tree removal timeframe, there should be minimal, if any, direct effect on listed species or critical habitat by the proposed project.

Indirect Effects: Periodic maintenance to the elevated water tank and the access road would be limited to those sites. Cumulative Effects: Potable water service to rural areas historically has resulted in some build-up. The proposed project, however, is for water storage and there will be no new customers other than potential industries which locate in the existing industrial park. A "not likely to adversely to affect'' determination is hereby requested. Ifadditional information is needed, please contact me at (270) 433-7256. Sincerely,

Enclosures

Appendix 5 Letter - USDA Natural Resources Conservation Service

-

USDA United States Department of Agriculture

Natural Resources Conservation Service USDA Service Center

1000 Commonwealth Drive Mayfield, KY 42066

November I, 2018

William C. Norris Environmental Assessment Services, LLC 2220 Celina Road Burkesville, KY 42717 RE: LAUREL COUNTY WATER DISTRICT NO. 2 WATER STORAGE PROJECT

Dear Mr. Norris: In response to your request from I 0/30/20 18 regarding the Laurel County Water District No. 2 proposed water storage tank site and access road project within the Greer Industrial Park in London, Kentucky, the Natural Resources Conservation Service (NRCS) has no congressional authority for conducting Environmental Assessments (EA). NRCS is mandated to provide information on the soils and/or impact to farmland according to the Farmland Protection Policy Act (P.L. 97-98) for projects that will be utilizing federal monies. Based on a review of your cover letter and accompanying maps, only a small acreage (±0.5 acres for the tank and ± 1.4 acres for the road) within the previously developed Greer Industrial Park will be involved with this project, therefore no significant conversion of agricultural lands (prime, 1111iq11e, orfan11/a11d oflocal or stateivide importance) will occur or be negatively impacted by the proposed undertaking. This office has no additional concerns at this time. If we may be of additional assistance, please do not hesitate to contact us. Best Wishes with the success of your

project.

Sincerely,

C?=GJArsSoil Scientist Perri. Pedley@ky. usda.gov

CC:

Scott Aldridge, USDA-NRCS, Frankfort, KY Jamie Ponder, USDA-NRCS, London, KY The Natural Resources Conservation Service provides l eadership in a partnership effort to help people conserve, maintain, and Improve our natural re sources and environment. An Equal Opportunity Provider and Employer

Appendix 6 Letter - Kentucky Heritage Council/SHPO

-

p#

0 I

-~

MATTHEW

G.

BEVIN

GOVERNOR

DON PARKINSON SECRETARY

TOURISM, ARTS AND HERITAGE CABINET KENTUCKY HERITAGE COUNCIL T HE STATE H ISTORIC PRESERVATION OFFICE 4 10 HIGH STREET FRANKFORT, KENTUCKY 40601 P HONE (502) 564qoos FAX(5 0 2 )564-5820

www. heritaqe.ky.qov

R EGINA STIVERS DEPUTY SECRETARY

CRAIG A. Pons E XECUTIVE DIRECTOR & STATE HISTORIC PRESERVATION OFFICER

f ebruary 14, 20 18 Dr. Steven Ahler Director, UK-PAR I020A Export Street Lexington, KY 40506-9854 RE:

Phase I Arch aeological Survey of a Proposed 132-Ac re l1Hl11strial Park in Lo11do11, La urel Co uuty, Ken tucky prepared by Milaina fl oyd of UK-PAR. Report dated Jamrnry 26, 20 18

Dear Dr. Ahler: Thank you fo r the letter conceming the above-mcnl ioned report, received January 26, 20 18. The report describes the intensive pedestrian survey ofa 132 acre parcel in the community of London, Laurel County, Kentuck"Y, that will be developed u1to an industrial p;i rk. Survey methods consisted primarily of visual inspection ofsystematic plow strips, supplemented by limited shovel testing and augering iD the floodplain of the Little Laurel River. T he investiga tors defined two new archaeo logic;il sites, l 5Ll392 and l 5Ll393, as well as several non-site isolated frnd locations. Site I5:ll392 consists of a light scalier of historic period artifacts and disa rticul ated bricks. Shovel testing indicated no evidence of intact subsurface features, and evidence ofdisl11rbi1nce was observed in plow strips. The investigators reconunended th<1t 1he si te is not eligible for the Na tional Register, and recommended no additional work. Site l5Ll393 consisted ofa light scatter or prel1istory material, consisting ofstone tool manufacturing debris and a scraper fragment. No evidence for intact subsurface feat ures were encountered, and all arti facts were recovered from plowzone contexts. The investigators recommended that the site is not eligible fo r lhe Nat ional Register, and recommended no additional work. Non-site isolated finds consisted of a mix of prehistoric and historic artifacts. None were recommended as eligible for the National Register. After review oflhc report, we agree with the investigators findings and recon11ucndations. \Ve accept this report as final and acknowledge receipt of four archiva l copies. \Ve would recommend that the project will resu lt in No Effect to Historic Properties. Despite our accrpl1111cc of the report, we would like to note that it does lack a mnp of field methods as stipulated in lhe KHC report Specifications ... section Vl. F. I.a. Please be sun:: io include such maps in future submissions. If the projec t design or boundllries change, this office should be consulted to cletennine the nature and ex tent ofadditional documentation that may be needed. In the event of the unanticipated discovery ofan ;irchaeological site or object of antiquity, the discovery should be reported lo tl1e Kentucky IJeritage Council and to the Kentucky Office of State Archaeo logy in the Anthropology Department at the University of Kentucky in accordance with KRS 164.730. Ill the event that hunrnn remau1s are encountered duriJ1g project activities, all work should be immediately stopped in the area and the area cordoned off, and in accordance with KRS 72.020 the county coroner and local law enfo rcement must be contacted unrncdiately. Upon confirma tion that the human remains are not of forensic interest, the unanticipated discovery n ~us t be reported to the Kentucky Heritage Council.

l

An Equal Opportunity Employer M/F/D

S. AJ1ler UK-PAR Phase j for London Industrial Park February 14, 20 18 page 2

Should you have a11y questions concerning archaeological properties, feel free to contact Chris Gunn of my staff at 502.564.7005, extension 4450 or chns.gu nn@kv.!!ov.

Sincerely,

Execu 1ve Director and State Historic Preservation Officer

CP: cmg KHC fl 50798 cc: George Crothers (OSA); Paula Thompson (London lnduslrial Dev. J\uth.)

Appendix 7 Letter - U.S. Army Corp of Engineers

Page 1of1

Bill Norris From:

Date:

To: Attach: Subject:

"Bill Nonis" Tuesday, October 30, 2018 3: 16 PM "Lisa R LRN Morris" Scan0433.pdf Laurel County Water District No. 2 (Laurel County, Kentucky)

Lisa, The Laurel County Water District No. 2, London, KY is proposing to construct a new 500,000 gallon elevated water storage tank and an access road to the tank in the newly developed Greer Industrial Park near London, KY. Attached is a letter, USGS Map, and a picture of a culvert that will be utilized with the construction of the access road. Please contact me if you should have questions. Thanks.

William C. Norris EAS1 LLC 2220 Celina Road Burkesville1 KY 42717 Ph: (270} 433-7256 Cell: (270} 433-1525

There has been no response to the attached letter as of December 3, 2 018 (more than 30 days).

10/30/2018

EllVIRllllllllll.ASSESUIEllT SEIVIOES. UC

2220 Celina Road Burkesville, Kentucky 42117

Phone (270) 433-7256 Fax(270)433-6313 Email bnorris@doo-colJITty.ccm

October 30, 2018

Ms. Lisa Morris U.S. Army Corp of Engineers Eastern Regulatory Section Operations Division 3701 Bell Road Nashville, TN 37214 Dear Ms. Morris: The Laurel County Water District No. 2, London, KY is proposing to construct a new 500,000 gallon elevated water storage tank within the Greer Industrial Park located just outside the London corporate limits. The Greer Industrial Park is a 132 acre park in close proximity to the London-Corbin Airport. A 150'x 150' tract will be deeded to the Laurel County Water District No. 2 for the tank site along with a 2, 100' x 30' property access road through the industrial park. The entire industrial park received environmental clearance prior to development. The District's consulting engineer has retained our services to assist with an environmental review of the proposed project. The proposed access road to the tank site will utilize an existing cu Ivett to cross what appears to be an intermittent stream. There will be no disturbance to the stream itself. A USGS map showing the coordinates for the stream and culvert is enclosed along with a picture of the culve1t and stream. Since there will be no placement of dredged or fill material, permanently or temporarily, into "waters of the United States" including wetlands, and since there are no actual stream crossings required, it would appear that a DA permit should not be required. Therefore, an early coordination response or a no permit required determintition is requested for the proposed project If you should have questions, please contact me at (270) 433-7256. Sincerely,

~~= ~r Enclosures

j (

(

\

)

,... I

I

\\

SCALE: 1· =6'00)

I

I

PROPOSED YATER Ullll

J EXISTING 4 · YATER UNE IOOSTING 6" YATER UNE

LAURAL COUNTY ll'ATER DISTRICr #2 WATER SYSTEll lllPROVEllEHTS FARISTON ll'ATER S'roRAGE TANK

OCTOBER 2016

~ch

Engineering, Inc.

Appendix 8 FEMA Floodplain Map

Appendix 9 IPaC Regulatory Review (Wetlands)

IPaC

U.S. Fish & Wildlife Service

Laurel County Water District No. 2 - Water Storage Tank The Laurel County Water District No.2, Laurel County, KY, is proposing use U.S. Army Corp

{;' ,,, ,. \ '

LOCATION Laurel County, Kentucky CREATED

October 31, 2018

What's next? ENDANGERED SPECIES REVIEW

Review this project's effect on listed species pursuant to the Endangered Species Act, as part of the overall regulatory review.

1

1. Species listed under the Endangered Species Act are threatened or endangered; IPaC also shows species that are candidates, or proposed, for listing. See the listing status ~formore

information.

SPECIES LIST

Resources

An official species list was generated 20 days ago

IPaC

U.S. Fish & Wildlife Service

Regulatory review The IPaC regulatory review process helps evaluate the potential impacts of your project on resources managed by the U.S. Fish and Wildlife Service. It walks through regulations covering each protected resource, and offers suggestions and assistance in designing your project.

·::. Endangered species Endangered species are protected under the Endangered Species Act 1.

8 endangered species are known to occur or may be affected by activities in this location. ~

Request an official species list An official species list was generated .?.Q..9..~Y?...~8'?...P.9/?.1/?.0~..~...9.:.51 .:?..6 ~t0.).

2

Evaluate determination keys Determination keys are up-front analysis from the U.S. Fish and Wildlife Service that streamline the consultation process for common project types. Each determination key starts with a qualification interview to see if the key is appropriate for your project.

3

i·'

Make effect determinations

Migratory birds Certain birds are protected under the Migratory Bird Treaty Act J

and the Bald and Golden Eagle Protection

Act~.

1 and the Bald and Golden Eagle Protection Act1.

3 migratory birds of conservation concern are expected to occur or may be affected by activities in this location. \. Contact the local U.S. Fish and Wildlife Service field office There is currently no regulatory review process in IPaC for migratory bird s. Please contact the local U.S. Fish and Wildlife Service field office to evaluate effects and authorize take.

Q Facilities U.S. Fish and Wildlife Service facilities are protected under the National Wildlife Refuge System Administration Act a and the National Fish Hatchery System2. Refuge and fish hatchery information is not available at this time

...

a

-i

Wetlands Wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act 1.Q,

or other State/Federal statutes.

4

THERE ARE NO KNOWN WETLANDS AT THIS LOCATION.

" '

1. The Endangered Species Act (ESA) of 1973. 2. The Migratory Birds Treaty Act of 1918. 3. The Bald and Golden Eagle Protection Act of 1940.

...'

~:

1.

'1

Appendix 10 Phase 1 Environmental Site Assessment (Executive Summary)

Phase I - Environmental Site Assessment

Greer Property London, Laurel County, Kentucky Prepared for: London-Laurel County Industrial Development Authority

By

1151

OF KENTUCKY, INC .

624 Wellington Way Lexington KY 40503 Phone: (859) 223-5694 C Fax: 223-2607 Email: m seinc@mselex.com

August 2017

1.0 Executive Summary Executi ve MSE of Kentucky, Inc. (MSE) has been retai ned by, the London-Laurel County Industrial Development Authority (Client) to conduct a Phase I Environmental S ite Assessment (ESA) in conformance with ASTM Practice E 1527-13, Standard Practice for Environme ntal Site Assessments. The subject property is located in Laurel County, London, Kentucky 40744. The objecti ve of this assessment is to determine the presence o r absence of Recognized Environmental Conditions (RECs), as de lined in ASTM 1527- 13. There are no exceptions or deletions from the ASTM Prac1ice E 1527-13. 1.1 Summary of Findings Assessmcnl Section

Acceplable

Acceplablc Requires 0 &

i\l's Historic Review

Y

Regulatory

Y

ACM

Y

USTs

Y

ASTs

Y

PC Us

Y

Was1c Siles

Y

RECs on

Y

Addilional Research o r Receipt of FOIA n eq uesl Rto'd

Phase II Req

Adjacent Properties On-Si te Operation s

Y

Chemical/Hazard Material

Y

Wetlands

Y

Dry Cleaner

Y

Mold

y

Other

Y

Table I: Summary of l'ind ings

Abalement Required

Eslimalcd

Cos1

1.2 Data Gaps Based on the information obtained during this ESA, it is the professional opinion of MSE that a hi storical data failure. as defined in the ASTM guidelines, has occurred in attempting to document the history of the s ubject property back to the earlier of 1940 or the fi rst developed usage of the property in five year increments. However, based on the information obtained, the lack of documentation is not dee med critical and did not affect the ability to identify potential REC(s) associated with the s ubject property.

1.3 Findings and Opinions MSE has performed thi s Phase I Environmental Site Assessment of the Subject Property in conformance with the scope and limitations of ASTM S tandard E 1527- 13 which became mandato ry October 6, 20 15. Any exception to, o r deletions from, this practice are described in Sectio n 2.4 of this report. T his assessment has identified no evidence of recognized en vironmental conditio ns ( RECs) in connectio n with the Subject P roperty.

1.4 Recommendations MSE has performed a Phase I Environmental Site Assessment in conformance w ith the scope and limitations of ASTM Practice E 1527- 13 of the property located in on US 25 S and Old Whi tley Road in, London, KY ( Laurel Cou nty) the subject property. Any exceptions to, o r de letio ns fro m, thi s practice is described in Section 2.4 of th is report . T his assessment has revealed

110

evidence of recognized e nv ironmental conditions in connection with the subject

property. It is recommended that federal, state and local asbestos regulations (O&M Plan) be reviewed for compliance p rior to any renovation or demolition activities. National Emission Standards for Hazardous Air Pollutants (NESHAP) regu lat io ns require sampling potential AC BM prior to demolition or extensive renovation, regard less of the date of construction; therefore, if such activities arc planned, it may be requi red to conduct a survey of the entire fac ility, or that portion slated for renovation o r demo lition, before ini tiating such destructi ve activities. That su rvey should include an assessment of all s ubject building materials, including those in areas which are nomiall y inaccess ible. Under the All Appropriate Inquiry Rule, fulllrc and continuing obligati ons are required to maintain landowner liability protections under CERCLA. S pecificall y, ( I) complying with land use restrictions and institutional controls; (2)

2

tak ing reasonable steps with respect to hazardous substance releases; (3) providing full cooperation, assistance and access lo persons that are authorized to conduct response actions or natural resource restoration; (4) complying with information requests and admini strative subpoenas; and (5) providing legally required notices.

3

Appendix 11 EA Mailing List

Appendix 12 Agency Comment Letters on Draft EA

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 gTM AVENUE SOUTH, ROOM A-405 NASHVILLE, TN ,37203

OCT 2 3 2018

Mr. Craig A. Potts, Director State Historic Preservation Officer Kentucky Heritage Council 41 O High Street Frankfort, Kentucky 40601

Dear Mr. Potts: The U.S. Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCVVD#2) for the cohstruction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of ah industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 meter radius from the water tower. Figure 1 presents the APEs on a portion of the Lily, KY USGS topographic map. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. UK-PAR identified two new archaeological sites and eight cultural isolated finds . No cultural material was recovered from the proposed water tower APE. The archaeological survey ''Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky" is enclosed for your reference . KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introduction of the water tower, Corps

archaeologist Va lerie McCormack reviewed the National Register of Historic Places, and historic U.S.G.S . topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. Figure 2 includes portions of U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgsQ. There are no buildings recorded on the 1897 map. By 1951, several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images (Figure 3) indicate that the area is undergoing continued development. While the proposed water tower would introduce a new vertical element on the landscape, it would not alter the existing setting, which indudes a variety of residential buildings, commercial and industrial buildings, and an airport. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic properties affected" and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847orvalerie.Lmccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

Area of Potential Effects

800 m line radius from the water tower

Figure 1. The direct and indirect Areas of Potential Effects ona portion of the Lily, KY, U.S.G.S. topographic quadrangle map (7.5' series). (Figure 1.2 from Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky .)

A portion of the 1897 London, Kentucky U.S.G.S. topographic map 1:250,000 . Note there are no buildings within 800 meters of the proposed water tower location.

A portion of the 1951 Lily, Kentucky U.S.G.S. topographic map 1:24000. Note the residential street to the southwest of the proposed water tower is under development.

A portion of the 1970 Lily, Kentucky U.S.G.S. topographic map 1:24000. Note the increased number of buildings in residential neighborhood to the southwest of the proposed and some of the buildings on the 1951 topographic map are no longer extant.

Figure 2. Comparison of historic topographic maps from the U.S.G.S. Historical map explorer (http://historicalmaps.arcgis.com/usgs/ accessed October 12, 2018).

Figure 3. Google Earth image (June 2018) of the proposed water location displaying an 800 m radius within the surrounding area.

PHASE I ARCHAEOLOGICAL SURVEY OF A PROPOSED 132-ACRE INDUSTRIAL PARK IN LONDON, LAUREL COUNTY, KENTUCKY KENTUCKY OSA PROJECT REGISTRATION NO. FY18-9430 UK-PAR PROJECT 17-26

University of Kentucky Program for Archaeological Research Department of Anthropology Technical Report No. 833 26 January 2018

MATTHEW G. BEVIN GOVERNOR

TOURISM, ARTS AND HERITAGE CABINET KENTUCKY HERITAGE COUNCIL

REGINA STIVERS DEPUTY SECRETARY

THE STATE HISTORIC PRESERVATION OFFICE DON PARKINSON SECRETARY

410 HIGH STREET FRANKFORT, KENTUCKY 40601 PHONE (502) 564-7005 FAX(502)564-5820 www.heritage.ky.gov

CRAIG

A. POTTS

EXECUTIVE DIRECTOR & STATE HISTORIC PRESERVATION OFFICER

November 7, 2018

Ms. Angela Dunn Department of the Army · Corps of Engineers, Nashville District 110 9111 Avenue South, Room A-405 Nashville, Tennessee 37203

Re:

construction of a 500,000 gallon elevated water storage tank within an industrial park London, Laurel County, Kentucky

Dear Ms. Dunn: We are in receipt of the information you submitted pertaining to the above-referenced project, including a cover letter, maps of the Area of Potential Effect (APE), and a report, Phase I Archaeological Survey ofa Proposed 132-Acre Industrial Park in London, Laurel County, Kentucky from January of 2018. We ·understand that the current undertaking involves the construction of an elevated water tank within an industrial park in London, Kentucky. Previously we have reviewed two projects that overlap with the current undertaking. On February 14, 2018, this office reviewed and commented on the archaeological report you resubmitted with the information pertaining to the current undertaking. In that letter, this office accepted the report and concurred with the recommendation of No Effect to Historic Properties. That investigation pertained to the development of the industrial park. On January 25, 2018, this office completed a Section 106 review for replacement of water supply lines and construction of a 500,000-gallon water storage tank. This office did not recommend an above or below ground survey for this project. Our recommendation for that proposed project was No Effect to Historic Properties. The letter from this office was written in response to a submission by William C. Norris of Environmental Assessment Services, LLC, who was acting on behalf of Laurel County Water District No. 2. · Based on previous reviews, for the current undertaking, we can now concur with the determination of No Effect to Historic Properties for above and below ground resources for the construction of a 500,000 gallon elevated water storage tank within the industrial park in London, Laurel County, Kentucky.

KentuckyUnbridledSpirit.com

An Equal Opportunity Employer M/F/D

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 9 TH AVENUE SOUTH, ROOM A-405 NASHVILLE, TN. 37203

OCT 2 3 2018

Governor Edwina Butler-Wolfe Absentee-Shawnee Tribe of Oklahoma 2025 S. Gordon Cooper Dr. Shawnee, Oklahoma 74801-9381

Dear Governor Butler-Wolfe; The U.S. Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrast~ucture to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with Absentee-Shawnee Tribe of Oklahoma under Section 106 of the National Historic Preservation Act. The proposed project involves constructing· a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR identified two new archaeological sites and eight cultural isolated finds. No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introduction of the water tower, Corps archaeologist Valerie McCormack reviewed the National Register of Historic Places,

-2

and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued development. While the proposed water tower would introduce a new vertical element on the landscape, it would not alter the existing setting, which includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Ms. Devon Frazier of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic 1 properties affected ' and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847or valerie.j.mccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 g TH AVENUE SOUTH, ROOM A-405 NASHVILLE, TN 37203

OCT 2 3 2018

Principal Chief Bill John Baker Cherokee Nation P.O. Box 948 Tahlequah, Oklahoma 74465-0948

Dear Principal Chief Baker: The U.S. Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with Cherokee Nation under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess CC\pacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps Involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR identified two new archaeological sites and eight cultural isolated finds. No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introduction of the water tower, Corps archaeologist Valerie McCormack reviewed the National Register of Historic Places,

-2

and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgsD indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued ·development. While the proposed water tower would introduce a new vertical element on the landscape, it would not alter the existing setting, which includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Ms. Elizabeth Toombs of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic properties affected'' and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

November 15, 2018 Valerie McCormack United States Army Corps of Engineers, Nashville District 110 9th Avenue South, Room A-405 Nashville, TN 37203 Re:

Water Storage Tank Construction, Laurel County Water District No.2

Dr. Valerie McCormack: The Cherokee Nation (Nation) is in receipt of your correspondence about and related report for Water Storage Tank Construction, Laurel County Water District No.2, and appreciates the opportunity to provide comment upon this project. Please allow this letter to serve as the Nation's interest in acting as a consulting party to this proposed undertaking. The Nation maintains databases and records of cultural, historic, and pre-historic resources in this area. Our Historic Preservation Office reviewed this project, cross referenced the project's legal description against our information, and found no instances where this project intersects or adjoins such resources. Thus, the Nation does not foresee this project imparting impacts to Cherokee cultural resources at this time. However, the Nation requests that the United States Army Corps of Engineers (USACE) halt all project activities immediately and re-contact our Offices for further consultation if items of cultural significance are discovered during the course of this project. Additionally, the Nation requests that USACE conduct appropriate inquiries with other pertinent Tribal and Historic Preservation Offices regarding historic and prehistoric resources not included in the Nation's databases or records. If you require additional information or have any questions, please contact me at your convenience. Thank you for your time and attention to this matter. Wado,

Elizabeth Toombs, Tribal Historic Preservation Officer Cherokee Nation Tribal Historic Preservation Office elizabeth-toombs@cherokee.org 918.453.5389

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 g TH AVENUE SOUTH, ROOM A-405 NASHVILLE, TN 37203

OCT 23 2018

Principal Chief Richard Sneed Eastern Band of Cherokee Indians Qualia Boundary P.O. Box 445 Cherokee, North Carolina 28719

Dear Principal Chief Sneed: The U.S . Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with Eastern Band of Cherokee Indians under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research {UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky" presents the results . UK-PAR identified two new archaeological sites and eight cultural isolated finds. No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introduction of the water tower, Corps

-2

archaeologist Valerie McCormack reviewed the National Register of Historic Places, and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued development. While. the proposed water towe r would introduce a new vertical element on the landscape, it would not alter the existing setting, which includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Mr. Stephen Yerka of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic properties affected" and requests your comments on the proposed project Please contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 9T11 AVENUE SOUTH, ROOM A-405 NASHVILLE, TN 37203

OCT 23 2018

Chief Glenna Wallace Eastern Shawnee Tribe of Oklahoma P.O. Box 350 Seneca, Missouri 64865

Dear Chief Wallace: The U.S, Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construct{on of a 500,000-gallon elevated water storage tank within the Fariston Community 1 Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to .rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with Eastern Shawnee Tribe of Oklahoma under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps involvement. Therefore; the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the Industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky'' presents the results. UK-PAR identified two new archaeological sites and eight cultural isolated finds . No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introduction of the water tower, Corps archaeologist Valerie McCormack reviewed the National Register of Historic Places,

-2

and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued development. While the proposed water tower would Introduce a new vertical element on the landscape, it would not alter the existing setting, which includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Mr. Brett Barnes of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic properties affected'' and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847orvalerie.Lmccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 gm AVENUE SOUTH, ROOM A-405 NASHVILLE, TN 37203

Chairperson Ron Sparkman Shawnee Tribe P.O. Box 189 Miami, Oklahoma 74355

Dear Chairperson Sparkman: The U.S. Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with Shawnee Tribe under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial parks would occur without the Corps involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC 's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky' presents the results . UK-PAR identified two new archaeological sites and eight cultural isolated finds. No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indirect effects created through the introd uction of the water tower, Corps archaeologist Valerie McCormack reviewed the National Register of Historic Places,

-2

and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued development. While the proposed water tower would introduce a new vertical element on the landscape, it would not alter the existing setting, wh ich includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Ms. Tonya Tipton of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and indirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of ilno historic properties affected" and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Planning Branch Enclosures

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT 110 9TM AVENUE SOUTH, ROOM A-405 NASHVILLE, TN 37203

OCT ·23 2018

Chief Joe Bunch United Keetoowah Band of Cherokee Indians in Oklahoma P.O. Box 746 Tahlequah, Oklahoma 74464-0746

Dear Chief Bunch: The U.S. Army Corps of Engineers, Nashville District is providing financial assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a 500,000-gallon elevated water storage tank within the Fariston Community, Laurel County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA) of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and construction assistance for water related environmental infrastructure to rural counties in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an undertaking with the potential to cause effects to historic properties and initiates consultation with United Keetoowah Band of Cherokee Indians in Oklahoma under Section 106 of the National Historic Preservation Act. The proposed project involves constructing a 500,000 gallon elevated water storage tank within the boundaries of an industrial park in London, Laurel County, Kentucky. The proposed water tank would provide excess capacity to supply the demand growth and fire protection needs for an industrial park. The development of the industrial park would occur without the Corps involvement. Therefore, the Corps defines the area of potential effects (APE) as the footprint of the proposed water tower and an 800 m radius from the water tower. The location of the proposed water tower falls within the boundaries of the industrial park. LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments, LCWD#2 contracted with the University of Kentucky, Program for Archaeological Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR identified two new archaeological sites and eight cultural isolated finds. No cultural material was recovered from the proposed water tower APE. KHC did not request an assessment of indirect visual introductions. In order to address indireot effects created through the introduction of the water tower, Corps archaeologist Valerie McCormack reviewed the National Register of Historic Places,

-2

and historic U.S.G.S. topographic maps. The National Register of Historic Places lists nine properties for Laurel County; none of the properties is located within a half mile of the water tower. U.S.G.S. topographic maps available on the USGS historic map explorer (http://historicalmaps.arcgis.com/usgsQ indicate a lack of buildings on the 1897 map. By 1951 , several residential developments within the 800 m indirect APE are present. The 1970 map and recent aerial images indicate that the area is undergoing continued development. While the proposed water tower would introduce a new vertical element on the landscape, it would not alter the existing setting, which includes a variety of residential buildings, commercial and industrial buildings, and an airport. A copy of this letter and supporting documentation is being forwarded to Ms. Sheila Bird of your staff. Given the results of the archaeological survey and the consideration of buildings and structures within the direct and i·ndirect APE, the Corps believes the proposed water tower would not affect historic properties. The Corps proposes concluding Section 106 consultation with a determination of "no historic properties affected" and requests your comments on the proposed project. Please contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil if you require additional information. Sincerely,

Angela E. Dunn Chief, Project Plc:mning Branch Enclosures

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas