The Laurel County Water District No. 2, London, Kentucky (Laurel County) is
proposing to construct a 500,000 gallon elevated water storage tank within the
123 acre Greer Industrial Park that is currently being developed by the LondonLaurel
County Industrial Development Authority. The industrial park is located in
the Fariston community of Laurel County just south of the London corporate
limits and near the London-Corbin Airport. Laurel County is located in
southcentral Kentucky and has a population of 60,174 as estimated by the U.S.
Census Bureau as of July 1, 2017. The county’s 2012-2016 median household
income (MHI) was $36,139 compared to a Kentucky statewide MHI of $44,811.
The percentage of the population below the poverty level in Laurel County in the
period 2012-2016 was 23.2% which is somewhat higher than the Kentucky
average of 17.2%.
The U. S. Army Corps of Engineers, Nashville District (Corps) has received a Draft Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) for the proposed design and construction of 500,000 gallon Water Storage Tank in the Fariston Community in Laurel County, KY.
U.S. Army Corps of Engineers, Project Planning Branch, Nashville District
Coordinates: North 37.04.47.67, West 84.03.43.23
Community: Fariston
County, State: Laurel County, Kentucky
River Mile: N/A
FINDING OF NO SIGNIFICANT IMPACT
Section 531 Laurel County Water District No. 2
Fariston Water Storage Tank
London, Laurel County, Kentucky
1. Under authority of Section 531 of the Water Resources Development Act of 1996,
the Laurel County Water District No. 2 and the U.S. Army Corps of Engineers,
Nashville District (USACE), have performed an evaluation of the construction of a
500,000-gallon elevated water storage tank. The USACE Federal action is to provide
75% funding of the project construction under the Section 531 program. The local
sponsor, Laurel County Water District No. 2 would provide the remaining 25% funding.
The proposed Selected Action Alternative is to construct the 500,000-gallon elevated
water storage tank in the Greer Industrial Park currently being developed by the
London-Laurel County Industrial Development Authority. The industrial park is located
in the Fariston community of Laurel County just south of the London corporate limits
and near the London-Corbin Airport
2. The purpose of the proposed Selected Action Alternative (500,000-gallon elevated
water storage tank) is to provide adequate water supply by doubling the water storage
capacity within the project area. Steady residential and commercial growth in the area
has resulted in inadequate water storage capacity. The need for the proposed project
is to protect the health and safety of the public by providing a reliable water supply and
improving the level of fire protection to both current and future residential and industrial
customers. The possible consequences of the proposed Selected Action Alternative
have been studied for environmental, cultural, and social well-being effects.
3. The proposed Selected Action and the No Action Alternatives were the only
alternatives carried forward for detailed evaluation. A third alternative considered
construction of a 250,000-gallon storage tank. This alternative was eliminated from
detailed consideration because this volume is inadequate for keeping pace with area
growth for the life of the project. A fourth alternative considered construction of a new
1,000,000-gallon storage tank to replace an existing 500,000-gallon storage tank
located further south of the Greer Industrial Park. This alternative was eliminated from
detailed consideration because it would not facilitate redundant storage options for
safety (two water storage tanks), provide efficient and immediate access to stored water
in the project area, increased impacts to the human and natural environment, and
greater cost.
4. The No Action Alternative would deny Federal funding for the project through the
Section 531 program. The result would be continued inadequate water storage capacity
for the northern portion of the Laurel County Water District No. 2's service area in the
Greer Industrial Park and Fariston community.
5. The short term impacts from the proposed Selected Action Alternative are the
effects of construction (noise, dust, and erosion control). These impacts are considered
minor and temporary, due to site size (less than two acres) location (open field in a rural
area) and the limited construction design with utilization of best management practices.
The long term impacts include reliable water supply and storage volume, increased fire
protection and safety, and continued economic growth. The proposed Selected Action
Alternative would protect the land and water resources, and the human and social
environment.
6. An evaluation of the proposed Selected Action Alternative produced the following
pertinent conclusions:
a. Environmental Considerations. USACE has taken reasonable measures to
evaluate known and foreseeable impacts of the No Action and proposed
Selected Action Alternatives to the human and natural environment in the
Environmental Assessment. A Phase I Environmental Site Assessment to
identify hazardous, toxic, radioactive waste (HTRW) was completed by an
engineering firm, MSE of Kentucky, Inc. in August 2017 and considered
adequate after USACE review. The Phase I assessment did not identify a
recognizable environmental condition that could pose a liability to the
government as a result of acquisition, easement or cost share. No wetlands or
water resources would be negatively impacted by the proposed Selected Action
Alternative. Potential adverse impacts of the proposed Selected Action
Alternative are insignificant and short-term in duration.
b. Social and Economic Considerations. No significant social or economic impacts
that are both adverse and/or unavoidable are foreseen as a result of the
proposed Selected Action Alternative. No minority, low-income populations, or
children's health would be negatively impacted by the proposed Selected Action
Alternative. The human community and natural environment would benefit from
having a reliable water supply and adequate water storage capacity.
c. Coordination with Natural Resources Agencies. Pursuant to Section 7 of the
Endangered Species Act of 1970, as amended (ESA) and the Fish and Wildlife
Coordination Act of 1958 as amended (FWCA), coordination was completed with
the Kentucky U.S. Fish and Wildlife Service (USFWS) and the Kentucky
Department of Fish and Wildlife Resources (KDFWR). The USFWS responded
on November 1, 2018 stating that significant impacts to federally listed species
are not likely to result from this project as currently proposed. The KDFWR
responded on September 17, 2018 noting the agency had no comments on the
project. ESA and FWCA requirements have been fulfilled for this project.
d. Coordination with Cultural Resources Agencies. Pursuant to Section 106 of the
National Historic Preservation Act of 1966 as implemented by regulations at 36
CFR 800, USACE initiated consultation in letters dated October 23, 2018, with
the Kentucky Heritage Council (KHC) and federally recognized tribes. In a letter
dated November 7, 2018, the KHC concurred with a "no historic properties
determination." In a letter dated November 15, 2018 the Cherokee Nation
responded with the statement that "the Nation does not foresee this project
imparting impacts to Cherokee cultural resources at this time." In addition, they
requested USACE to "halt all project activities immediately and re-contact our
Offices for further consultation if items of cultural significance are discovered
during the course of this project." No other consulting party provided a response.
Pursuant to 36 CFR 800.3(c)(4) the failure to respond allows USACE to proceed
to the next step. USACE concludes the Section 106 process with a "no historic
properties affected" determination.
e. Coordination with State and Regional Agencies: The Laurel County Water
District No. 2 submitted an application for, and received funding from the
Kentucky Infrastructure Authority loan program for this project.
7. In light of the general public interest, I have determined that the work would not
constitute a major Federal action significantly affecting the quality of the human or
natural environments within the meaning of the National Environmental Policy Act of
1969. Accordingly, I have concluded that an Environmental Impact Statement covering
the proposed work is not required. Further, having weighed the potential benefits that
may be accrued as a result of implementing the proposed Selected Action Alternative
against the reasonably-foreseeable detrimental effects, I conclude that the construction
of a 500,000-gallon water storage tank, Section 531 project in the Fariston community,
Laurel County, Kentucky, would be in the public interest.
__________________________
Date
_____________________________
Cullen A. Jones, P.E., PMP
Lieutenant Colonel, U.S. Army
District Commander
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 gm AVENUE SOUTH, ROOM A 405
NASHVILLE TN 37203
DEC 3 1 2018
Project Planning Branch
To All Interested Parties:
The U.S. Army Corps of Engineers, Nashville District (USACE), has prepared a Draft
Environmental Assessment (EA) and unsigned Finding of No Significant Impact (FONSI) to
assess the impacts of a proposed project to construct a 500,000-gallon elevated water
storage tank (Proposed Action Alternative No. 1) in the Greer Industrial Park located in
Fariston, Laurel County, Kentucky (Figu"re 1). The purpose of the proposed project is to
double the water storage capacity within the project area and provide a reliable water
supply and improved level of fire protection to both current and future residential and
industrial customers.
The draft EA considered four proposed action alternatives. The Proposed Action
Alternative No. 1 - 500,000-gallon elevated water storage tank (selected), and the No Action
Alternative were the only alternatives evaluated in detail. The No Action Alternative would
deny Federal funding for the proposed project through the Section 531 program. Proposed
Action Alternative No. 2 considered constructing a 250,000-gallon storage tank. Proposed
Action Alternative No. 3 considered constructing a 1,000,000-gallon storage tank. Proposed
· Action Alternatives 2 and 3 were eliminated from detailed consideration as described in the
draft EA.
This letter serves as Notice of Availability of the EA and the unsigned FONSI. Interested
parties may rev\iew electronic copies of these documents at:
http://www.lrn.usace.army.mil/Media/PublicNotices.aspx. A copy of the EA, unsigned
FONSI, and project plans are also available for review at the Laurel County Water District
No.2, 3910 South Laurel Road, London Kentucky 40744.
Please provide comments no later than February 1, 2019 to ensure consideration in ·
the EA. Email responses to: CorpsLRNPlanningPublicCom@usace.army.mil ; or mail
responses to the address listed in the letter head, attention Joy Broach, Aquatic Biologist. If
you have questions, please contact Joy Broach at (615) 736-7956. Your participation is
appreciated.
Sincerely,
~ O. ~
Timothy A. Higgs
Environmental Section Chief
Project Planning Branch
Enclosure
2
Kentucky ~
Laurel County '
'
Figure 1.
Fa~iston,
Kentucky Vicinity Map and Project Location
DRAFT
ENVIRONMENTAL ASSESSMENT
LAUREL COUNTY WATER DISTRICT NO. 2
FARISTON WATER STORAGE TANK
LONDON, KENTUCKY
DECEMBER 2018
For Further Information, Contact:
Joy Broach
US Army Corps of Engineers
Nashville District
th
110 9 Avenue South, RM A405
Nashville, TN 37203-3817
Telephone: (615) 736-7956
TABLE OF CONTENTS
SECTION 1 - PURPOSE AND NEED
1.01 Introduction................................................................................................. 1
1.02 Purpose, Need & Authority ........................................................................ 1
1.03 Project Location & Description ................................................................. 2
SECTION 2 - ALTERNATIVES
2.01 Evaluation of Alternatives ......................................................................... 2
2.02 Proposed Action Alternative No. 1 ............................................................ 2
2.03 Proposed Action Alternative No. 2....................................................2
2.04 Proposed Action Alternative No. 3...................................................3
2.05 No Federal Action Alternative ................................................................... 3
SECTION 3 - ENVIRONMENTAL REQUIREMENTS
3.01 General ........................................................................................................ 3
Protection Statute Summary Table ................................................................... 5
SECTION 4 - AFFECTED ENVIRONMENT
4.01 Natural Environment .................................................................................. 5
4.02 Cultural Environment
........................................................................ 7
SECTION 5 ENVIRONMENTAL IMPACTS
5.01 Environmental Consequences .................................................................. 7
5.02 Cumulative Effects ..................................................................................... 9
5.03 Recommended Mitigation Measures......................................................... 9
SECTION 6 - PUBLIC INVOLVEMENT AND COORDINATION
6.01 Coordination ............................................................................................... 9
6.02 Public & Agency Involvement ................................................................. 10
SECTION 7- CONCLUSIONS..........................................................................11
SECTION 8- REFERENCES............................................................................12
i
APPENDICES
Appendix 1. ...................................................................... Project Location Map
Appendix 2..............................................Preliminary Engineering Report
Appendix 3..............................................Letter - KY State Clearinghouse
Appendix 4..........................................Letter U.S. Fish & Wildlife Service
Appendix 5............Letter USDA Natural Resources Conservation Service
Appendix 6.................................Letter Kentucky Heritage Council/THPO
Appendix 7.....................................Letter U.S. Army Corp of Engineers
Appendix 8...........................................................FEMA Floodplain Map
Appendix 9.........................................IPaC Regulatory Review (Wetlands)
Appendix 10......Phase 1 Environmental Site Assessment (Exec. Summary)
Appendix 11.....................................................................EA Mailing List
Appendix 12.....................................Agency Comment Letters on Draft EA
ii
SECTION 1--PURPOSE AND NEED
1.01 Introduction
The Laurel County Water District No. 2, London, Kentucky (Laurel County) is
proposing to construct a 500,000 gallon elevated water storage tank within the
123 acre Greer Industrial Park that is currently being developed by the LondonLaurel County Industrial Development Authority. The industrial park is located in
the Fariston community of Laurel County just south of the London corporate
limits and near the London-Corbin Airport. Laurel County is located in
southcentral Kentucky and has a population of 60,174 as estimated by the U.S.
Census Bureau as of July 1, 2017. The county's 2012-2016 median household
income (MHI) was $36,139 compared to a Kentucky statewide MHI of $44,811.
The percentage of the population below the poverty level in Laurel County in the
period 2012-2016 was 23.2% which is somewhat higher than the Kentucky
average of 17.2%.
1.02 Purpose, Need, and Authority
The Laurel County Water District No. 2 owns and operates a water system which
serves the rural population of southern Laurel and northwestern Knox Counties.
The water system consists of a treatment plant along with a series of distribution
and transmission water lines, booster pump stations and storage tanks that are
strategically located throughout the system. The District operates and maintains
the water system through a Board of Commissioners, a General Manager, office
staff, and field service personnel. The Board of Commissioners consists of a
chairperson and four commissioners that are appointed by the Laurel County
Fiscal Court. Currently, the northern portion of the District's service area is
supplied by the Aisin Storage Tank in the Lily community with a 500,000 gallon
capacity. Steady residential and commercial growth in the area over the past few
years has resulted in inadequate water storage capacity for the area.
Construction of the proposed new 500,000 gallon water storage tank within the
Greer Industrial Park will not only double the volume of stored water available in
the District's northern service area but will provide capacity for future growth as
well as greatly improving the level of fire protection to both residential and
industrial customers. The proposed project is a cooperative agreement between
the Laurel County Water District No. 2 and the US Army Corps of Engineers
(Corps), established by authority of Section 531 of the Water Resources
Development Act of 1996. No other cooperating Federal agencies are involved
on this project. Funding, as established under Section 531, shall be shared 75%
Federal (Corps) and 25% Non-Federal (State and Local).
This Environmental Assessment (EA) is prepared pursuant to the National
Environmental Policy Act (NEPA), Council on Environmental Quality (CEQ)
Regulations (40 CFR 1500-1517), and Corps implementing regulation,
ER 200-2-2, 1988.
1.03 Project Location and Description
The proposed 500,000 elevated water storage tank and access road will be
constructed on a 150'x150' site within the 123 acre Greer Industrial Park which is
located just south of the London corporate limits on US 25 and Old Whitley
Roads (see Appendix 1). This is a growth area near the London-Corbin Airport
that has convenient access to Interstate 75. The construction of the 200-foot
tank will consist of a concrete foundation and welded steel reservoir with a steel
support structure. An access road will be constructed from Court Road to the
water storage tank site. The access road will utilize an existing culvert for the
crossing of an intermittent stream within the industrial park. A 12-inch water
transmission main is already available to the proposed tank site and no additional
water line will be required. The land use of the surrounding area is largely mixed,
consisting of primarily medium density residential and light commercial and
industrial development.
SECTION 2--ALTERNATIVES
2.01 Evaluation of Alternatives.
Based on the continued need for potable water service and to accommodate
projected grown within the District's most northern service area, the District has
to initiate action to provide sustainable water service as required by the Kentucky
Division of Water and the Kentucky Public Service Commission. Final
determination of the project scope was dependent on the District's ability to meet
existing and future customer demands without having a significant impact of the
ability to meet current and future financial obligations. Therefore, viable project
alternatives were limited with focus largely on determining the most economical
capacity, style, and location of a proposed water storage tank. These alternatives
were considered in a preliminary engineering report completed in September
2018 and provided in Appendix 2.
2.02 Proposed Action Alternative No. 1 (Selected).
Construction of a 500,000 gallon elevated multi-column style structure at the
highest point available within the Greer Industrial Park. The proposed tank would
be constructed with the same overflow elevation as the existing Aisin Storage
Tank and the two tanks would work in tandem to serve the northern supply zone.
Accordingly, the new tank would need to be constructed to an overflow height of
approximately 200 feet. Selection of this alternative would double the available
storage capacity within the northern supply zone while allowing suitable
operational control.
2
2.03 Proposed Action Alternative No. 2
Construction of a 250,000 gallon elevated multi-column style tank with all other
considerations remaining consistent with those described for Alternative No. 1.
Similarly, all immediate project needs would be addressed with a 250,000 gallon
tank. With the substantially smaller tank, the total project cost would be
decreased by an estimated $450,000. However, the storage capacity gained
with this alternative is not expected to keep pace with area growth for the life of
the structure.
2.04 Proposed Action Alternative No. 3
Construction of a new 1,000,000 gallon elevated composite style tank to replace
the existing 500,000 gallon Aisin Storage Tank which is currently in need of
rehabilitation. The new tank would be constructed on a site within the Fariston
Industrial Park which is centrally located between the existing Aisin Storage Tank
and Greer Industrial park. This alternative would eliminate the need to
rehabilitate the existing tank, but would not facilitate redundant storage options
within the northern portion of the system. In addition, the total project cost would
exceed that of the proposed project by an estimated $1million.
2.05 No Federal Action Alternative.
The no action alternative would be to deny Federal funding for the project
through the Section 531 program. The result would be continued inadequate
water storage capacity for the northern portion of the Laurel County Water
District No. 2's service area.
The District selected Alternative No. 1 over Alternative 2 and 3. Alternative No. 1
will double the available storage capacity in the northern portion of the service
area and will have the least impact on the District's ability to meet current and
future financial obligations (see Appendix 2).
SECTION 3--ENVIRONMENTAL REQUIREMENTS
3.01 General
Endangered Species Act. The proposed project would not significantly impact
any federally-listed endangered or threatened species or adversely modify critical
habitat (See Appendix 4).
Historic Conservation. The proposed project would not affect religious sites or
ceremonial rites of Native Americans, any property listed or eligible for listing on
the National Register of Historic Places, any property listed as a National Historic
3
Landmark, or any archeological resource. An archaeological survey was
conducted on the entire 123 acre Greer Industrial Park by the University of
Kentucky, Department of Anthropology, and issued report entitled "Phase I
Archaeological Survey of a Proposed 132-Acre Industrial Park In London, Laurel
County, Kentucky" and dated January 2018.
In letters dated October 23, 2018, the Corps initiated consultation with the
Kentucky Heritage Council (KHC), Absentee Shawnee Tribe of Oklahoma,
Cherokee Nation, Eastern Band of Cherokee Indians, Eastern Shawnee Tribe of
Oklahoma, Shawnee Tribe, and United Keetoowah Band of Cherokee Indians.
In a letter dated November 7, 2018, the KHC concurred with a "no historic
properties determination." In a letter dated November 15, 2018 the Cherokee
Nation responded with the statement that "the Nation does not foresee this
project imparting impacts to Cherokee cultural resources at this time." In
addition, they requested the Corps to "halt all project activities immediately and
re-contact our Offices for further consultation if items of cultural significance are
discovered during the course of this project." The other consulting parties did not
provide a response. Pursuant to 36 CFR 800.3(c)(4) the failure to respond the
agency may proceed to the next step. The Corps concludes the Section 106
process with a "no historic properties affected" determination. (See Appendix 12).
Clean Water Act. The U.S. Army Corp of Engineers (Nashville District)
reviewed the proposed water storage tank project and determined that proposed
activities would not involve work in waters of the United States (streams and/or
wetlands); therefore, a Department of the Army (DA) permit would not be
required (See Appendix 7). The amount of area that would be disturbed during
construction would appear to exceed one acre; therefore coverage under the
Kentucky Pollutant Discharge Elimination System (KPDES) general permit for
storm water runoff from construction sites would be required.
Other State and Local Program Consistency. The project conforms to
existing land use patterns, zoning, and local plans and the water storage tank
plans will be approved by the Kentucky Division of Water (DOW). The Kentucky
State Clearinghouse Letter indicates no unresolved issues other than regulatory
and compliance issues which will be resolved prior to start of construction. The
DOW, Water Infrastructure Branch, does not oppose the project; however,
project plans and specifications must be approved by DOW prior to start of
construction (See Appendix 3).
Flood Plain/Wetlands. Neither the proposed tank site nor the proposed access
road are within, nor will they affect, a designated floodplain per FEMA Flood
Hazard Map (See Appendix 8). The U.S. Fish & Wildlife IPaC regulatory review
states that "there are no known wetlands at this location" (See Appendix 9).
4
Recreation. No federal lands are involved with this project. The project would
not adversely affect wild and scenic rivers and would not affect any parks,
parklands, ecologically critical areas, wildlife management areas, wildlife refuges
or other areas of ecological, recreational, scenic or aesthetic importance.
Important Farmland. The U.S. Department of Agriculture, Natural Resources
Conservation Service, reviewed the proposed project and determined that "no
significant conversion of agricultural lands (prime, unique, or farmland of local or
statewide importance) will occur or be negatively impacted by the proposed
undertaking" (See appendix 5).
Fish and Wildlife Coordination Act. The US Fish & Wildlife Service has
reviewed the proposal and has determined that no significant impact to federally
listed endangered or threatened species are anticipated (See Appendix 4). In
addition, the Kentucky Department of Fish & Wildlife commented to the KY State
Clearinghouse that "Based on the information provided, the Kentucky
Department of Fish & Wildlife Resources has no comments concerning the
proposed project" (See Appendix 3).
ENVIRONMENTAL REQUIREMENTS
Clean Air Act - 42 USC 469, et seq.
Clean Water Act - 336 USC 1251, et seq.
Endangered Species Act - 16 USC 1531, et seq.
Fish & Wildlife Coordination Act - 16 USC 661, et seq.
National Environmental Policy Act - 42 USC 4321, et seq.
National Historic Preservation Act - 16 USC 470a, et seq.
Rivers & Harbors Act - 33 USC 401, et seq.
Rivers & Harbors Act - 91 USC 122
Watershed Protection & Flood Preventions Act - 16 USC 1001, et seq.
Wild & Scenic Rivers Act - 16 USC 1271, et seq.
Flood Plain Management - Executive Order 11988
Protection of Wetlands - Executive Order 11990
Farmland Policy Protection Act - PL 97-98, 7 CFR 658
Environmental Justice - Executive Order 12898
FC
FC
FC
FC
FC
FC
NA
NA
FC
FC
FC
FC
FC
FC
FC-FULL COMPLIANCE, PC-PARTIAL COMPLIANCE, NA-NOT APPLICABLE
SECTION 4--AFFECTED ENVIRONMENT
4.01 Natural Environment
Physiography. Laurel County is located in the southeastern Kentucky
coalfield region. The area is characterized by mountainous terrain, rapid surface
runoff, and moderate rates of groundwater drainage. Elevations in the county
range from 723 to 1,760 feet above sea level. Laurel County was the 80th county
5
to be organized in Kentucky by an act of the general assembly in 1825 from parts
of Rockcastle, Clay, Knox and Whitley Counties. The early days of the county
were heavily influenced by the coal and lumber industries.
Climate. The climate of Laurel County is moderate but variable. The
average annual temperature is 55.98o F which is about the same as the Kentucky
average temperature of 55.62 degrees and is higher than the national
temperature of 54.45 degrees. The normal precipitation is 48 inches per year.
Geology/Soils. All of Laurel County lies within the Mountain and Eastern
Coal Field Region which is a part of the Cumberland Plateau. The soils in this
area are underlain by siltstone, sandstone, and shale.
The underlain soils of the project area are part of the Whitley-Latham-Lily
association. These soils are gently sloping to steep, moderately deep soils that
have a loamy or clayey subsoil. They are found on ridgetops and side slopes.
Lily and Bonnie silt loams make up the majority of the project area with slopes of
6% to 12%.
Terrestrial Resources. The project area is a rolling-mountainous region
consisting primarily of residential and light commercial/industrial properties.
Air Quality. Laurel County is located within the Appalachian Region for
the State's Air Quality Control Monitoring Program. The proposed project area is
located in an air quality attainment area. The nearest monitoring station is
Lexington. A review of the Kentucky Division for Air Quality's website revealed
an Air Quality Index of 51 for the Lexington area on November 21, 2018 which is
classified as "Good-Moderate" indicating that air quality is acceptable; however,
for some pollutants there may be a moderate health concern for a very small
number of people who are unusually sensitive to air pollution.
Aquatic Resources/Water Quality. The Rockcastle River forms the
western boundary and part of the northern boundary of Laurel County. The
Laurel River, which forms part of the southern boundary of the county, joins the
Cumberland River (Lake Cumberland) just east of the mouth of the Rockcastle
River.
Wetlands/Flooding. The proposed project will not impact a floodplain as
determined by the Flood Hazard Boundary Map - Community Panel Number
21125C0230 D (See Appendix 8). There are no known wetlands at the project
site location as determined by the U.S. Fish & Wildlife IPaC report (See Appendix
9).
Solid/Hazardous Waste. A Phase I Environmental Site Assessment (ESA)
for HTRW contamination was completed by the engineering firm, MSE of
6
Kentucky, Inc., in August 2017. Included in this assessment are interviews with
local residents, field inspections, and environmental database review for potential
contamination sources. No known contamination is present in the project area
and no follow up investigation is recommended. The executive summary of the
Phase I report is in Appendix 10.
Historic/Cultural Resources. An archaeological survey of the entire 123
acre Greer Industrial Park was conducted in January 2018 by the University of
Kentucky, Department of Anthropology. The archaeological report was
submitted to the Kentucky State Historic Preservation Officer (SHPO) who
responded in a letter dated February 14, 2018 stating "We would recommend
that the project will result in No Effect to Historic properties" (See Appendix 6).
The Corps consulted with the KHC and Indian Tribes with a historical relationship
to the area. Section 106 consultation concluded with a "no historic properties
affected" determination.
4.02 Cultural Environment
Socioeconomics. The July 2017 population estimate for Laurel County is
60,174. Laurel County had a population change of +2.3% from April 1, 2010 to
July 1, 2017. Persons over 65 years of age comprise 15.9% of the total
population of the county. Minorities comprise 3% of the county population. The
2012-2016 median household income of the county is $36,139 compared to a
Kentucky median household income of $44,811 for the same period. Persons
residing in the county below the poverty level is 23.2% compared to 17.2%
statewide.
Transportation. London is approximately 76 miles southeast of Lexington
via Interstate 75.
Housing. The 2012-2016 preliminary data indicates 69.2% of Laurel
County's population are homeowners with a median home value of $99,900.
SECTION 5--ENVIRONMENTAL IMPACTS
5.01 Environmental Consequences
Terrestrial Resources. The proposed water storage tank and access road
will be constructed within the 123-acre Greer Industrial Park which has been
committed to industrial development. The access road will utilize an existing
culvert over an intermittent stream; therefore potential construction impacts
would be minimal and temporary. The construction areas would be stabilized
and reseeded with grasses as soon as possible upon project completion. Only
short-term impacts during construction with no long-term adverse impacts would
occur.
7
Air Quality. Temporary construction impacts could include fugitive dust
emissions. Best management practices and housekeeping steps, such as
wetting or spraying, would be incorporated as necessary. Sites would be
reseeded/stabilized as sections of construction are completed.
Water Quality/Aquatic Resources. Potential localized and short-term
impacts to water quality could occur with project construction. However, with the
implementation of Best Management Practices (BMP's), such as erosion control
and timely reseeding of disturbed area, impacts would be minimal. Compliance
with the storm water general permit would ensure minimal impacts on water
quality. Long-term and cumulative effects of this project are beneficial for
customers of the Laurel County Water District No. 2.
Wetlands/Flooding. There would be no impact to wetlands as determined
by the U.S. Fish & Wildlife Service IPaC report (See Appendix 9) or any
designated floodplain area per FEMA Flood Hazard Map (See Appendix 8).
.
Historic/Cultural Resources. There would be no affect on historic
properties or cultural resources. (See Appendix 6).
Hazardous/Solid Waste. The project should not result in solid waste
concerns with proper collection and disposal of construction and related waste.
Hazardous waste generation is not anticipated.
Noise. There could be an increase in noise levels during the construction
period. However, the impact would be localized, temporary and should not
approach nuisance levels.
Socioeconomics. The most immediate environmental impact would be a
sustained volume of water storage to serve the northern most section of the
District's service area. Over time, the positive effects of the project would spread
into surrounding communities. No homes or buildings would be adversely
impacted by the proposed project. Project cost via user rates would be spread
evenly to all customers of the water system.
Housing. A sustained volume of stored potable water will be an asset to
all households within the District's service area.
Environmental Justice. Effects on the quality of the human environment
are not likely to be controversial. The proposed water storage tank construction
will not adversely or disproportionately effect human health or environmental
conditions in minority populations or low-income populations and is in compliance
with guidance set forth by Executive Order 12898.
8
Transportation. There is an inherent risk to the public any time
construction takes place in an area where vehicular traffic is significant. Proper
steps would be taken to insure the safety of the public. Prior to construction, the
public would be informed of the schedule of construction and scope of work.
During construction, if necessary, periodic press releases would be issued with
information about areas under construction and possible road closures or traffic
delays. The contractor would not be given authority to close or limit traffic
without the permission of Kentucky Department of Transportation (KDOT) or the
owner. During construction, the contractor would furnish, erect and maintain
barricades, warning signs, and flaggers in such a manner that all local and
through traffic would be adequately accommodated. Emergency vehicle access
would be maintained. These steps would limit any impacts associated with
construction.
5.02 Cumulative Effects. Effects would be the sustained volume of potable water
available to community residents and businesses/industries.
5.03 Recommended Mitigation Measures. Potential adverse impacts would be
minimized with proper construction techniques and implementation of Best
Management Practices (BMP's) as previously discussed. The construction
contractor will be required to obtain coverage for storm water discharges under
the Kentucky Division of Water general permit for construction activities.
SECTION 6--PUBLIC INVOLVEMENT AND COORDINATION
6.01 Coordination
This EA was prepared by the US Army Corps of Engineers in coordination with
Monarch Engineering, Inc., consultant for the Laurel County Water District No. 2.
Copies of this report are available for review at the following locations:
Laurel County Water District No. 2, 3910 South Laurel Road, London, KY
40744
US Army Corps of Engineers, Section 531 Environmental Infrastructure
Program, 110 9th Avenue South, RM A405, Nashville, TN 37203-3817.
9
The following is a list of persons and agencies consulted or involved in
preparation of this EA to date:
Lisa Morris
U.S. Army Corp of Engineers
Regulatory Branch-Nashville District
3701 Bell Road
Nashville, TN 37214
PH: (615) 369-7504
Lee Mudd, P.E.
Monarch Engineering, Inc.
556 Carlton Drive
Lawrenceburg, KY 40342
PH: (502) 583-7020
Joy Broach
U.S. Army Corp of Engineers
Nashville District
110 9th Avenue South, RM A405
Nashville, TN 37203-3817
PH: (615) 736-7956
Craig A. Potts
Kentucky Heritage Council and
State Historic Preservation Officer
410 High Street
Frankfort, KY 40601
PH: (502) 564-7005
Perri Pedley
U.S. Department of Agriculture
Natural Resources Conservation Service
100 Commonwealth Drive
Mayfield, KY 42066
PH: (270) 247-9529
Lee Andrews
US Fish and Wildlife Service
JC Watts Federal Building, Room 226
330 West Broadway
Frankfort, KY 40601
PH: (502) 695-0468
Lee Nalley
Kentucky State Clearinghouse, D.L.G.
1024 Capital Center Drive, Suite 340
Frankfort, KY 40601
PH: (502) 573-2382
William C. Norris
Environmental Assessment Services, LLC
2220 Celina Road
Burkesville, KY 42717
PH: (270) 433-7256
Russell Townsend
Tribal Historic Preservation Specialist
Eastern Band of Cherokee Indians
P.O. Box 455
Cherokee, NC 28719
Governor Edwina Butler-Wolfe
Absentee-Shawnee Tribe of Oklahoma
2025 S. Gordon Cooper Dr.
Shawnee, OK 74801-9381
Principal Chief Bill John Baker
Tribal Historic Preservation Officer
Cherokee Nation
P.O. Box 948
Tahlequah, OK 74465-0948
Principal Chief Richard Sneed
Eastern Band of Cherokee Indians
Qualla Boundary
P.O. Box 445
Cherokee, NC 28719
Chief Glenna J. Wallace
Eastern Shawnee Tribe of Oklahoma
P.O. Box 350
Seneca, MO 64865
Chairperson Ron Sparkman
Shawnee Tribe
P.O. Box 189
Miami, OK 74355
Chief Joe Bunch
United Keetoowah Band of Cherokee Indians in OK
P.O. Box 746
Tahlequah, OK 74464-0746
10
6.02 Public & Agency Involvement
A Notice of Availability of the Draft Environmental Assessment and unsigned
Finding of No Significant Impact will be circulated in draft form to the local
community and local, state and federal governmental agencies with jurisdiction
by law or special expertise for a 30-day review/comment period. Public
comments will be incorporated into the final draft.
SECTION 7--Conclusion
The US Army Corps of Engineers Section 531 program funding offers funds to
communities, counties and other public entities for water system treatment and
storage facilities. Such is the case in the Laurel County Water District No. 2's
`Fariston Water Storage Tank' project The objective of the proposed project is to
increase the level of water storage in the District's northern supply zone. The
additional water storage capacity will ensure that the system will be able to meet
the demand of its existing and future customers in a safe and efficient manner.
The combined efforts of the local community, the Laurel County Water District
No. 2, the Kentucky Infrastructure Authority, and the US Army Corps of
Engineers would provide for adequate potable water storage for the District's
current customers and would allow for future growth of the system.
No significant adverse impacts have been identified. No significant scientific
resources such as threatened or endangered species, threatened or endangered
species habitat, water quality, forestation, or air quality would be adversely
affected by the project. The project construction would take place within the 123acre Greer Industrial Park. Short-term impacts associated with construction
would be localized and minor with the use of Best Management Practices. The
Corps will verify during the pre-construction meeting that the District or its
construction contractor has obtained coverage under the Kentucky Division of
Water (KDW) general storm water permit for construction activities related to this
project and that plans have been approved by KDW.
Some possible temporary negative impacts on the human environment could
include noise abatement, temporary road closure and aesthetic problems.
However, these impacts would be temporary and insignificant when compared to
the positive permanent impact the project would have in providing adequate and
sustainable water storage to the customers of Laurel County Water District No.2.
11
SECTION 8--REFERENCES
US Census Bureau. State and County QuickFacts. Census information on
website http://www.census.gov/quickfacts/fact/laurelcountykentucky
USDA, Soil Conservation Service. 1976. Soil Survey of Laurel and Rockcastle
Counties, Kentucky.
USGS, Lily Quadrangle, Kentucky 7.5-minute Topographic Quadrangle Map.
Kentucky Ambient Air Monitoring Network, Air Quality Index
http://eppcapp.ky.gov/dag/D
Kentucky Atlas & Gazetteer www.kyatlas.com
Kentucky Cabinet for Economic Development. http://www.thinkkentucky.com
USA.com http://www.usa.com/laurel-county-ky-weather.htm
Groundwater Resources in Kentucky
http://www.uky.edu/kgs/water/library/gwatlas/laurel/topography
12
Appendix 1
Project Location Map
PROPOSED 500,000 GALLON
FARISTON WATER STORAGE TA
Greer
l Tndustrial
"t .) .)k
· Par
0
(j
I
·
~
Appendix 2
Preliminary Engineering Report
PRELIMINARY ENGINEERING REPORT
FOR THE
LAUREL COUNTY WATER DISTRICT #2
FARISTON WATER STORAGE TANK
SEPTEMBER 2018
A
Monarch Engineering, Inc.
\;OJ
2 5
PRELIMINARY ENGINEERING REPORT
FARISTON WATER STORAGE TANK
LAUREL COUNTY WATER DISTRICT #2
LAUREL COUNTY, KENTUCKY
I.
GENERAL
This Preliminary Engineering Report is intended to detail and analyze the proposed water
system improvements project which is being planned by the Laurel County Water
District No. 2. The project includes the construction of a new 500,000 gallon elevated
water storage tank struchll"e to be located in the Fariston community of central Laurel
County, Kentucky.
II.
PROJECT PLANNING AREA
The proposed water storage tank site lies within the boundaries of the planned Greer
Industrial Park which is currently under development by the London-Laurel County
Industrial Development Authority (LLCIDA). The 123 acre industrial park lies just south
of London, Kentucky, being situated in the far northern p01iion of the District's service
area. The land use of the smTounding area is largely mixed, comprised primarily medium
density residential and light commercial/indush·ial development. Some intermittent areas
of agricultural land are also present as well. The London-Corbin Airport is also nearby,
lying approximately 4,500 feet north of the proposed tank site.
The project area and the water distribution system as a whole have experienced
significant growth since the system was first developed over fifty years ago. Due to its
close proximity to the I-65 c01Tidor, lying between the cities of London and Corbin, it is
anticipated that sustained residential and commercial growth will continue within the
system going fo1ward. The development of the proposed Greer Industrial Park, and also
the newly established Fariston Industrial Park to the south, are expected to greatly
increase demands on the existing distribution system. New jobs created by businesses
locating within these industrial parks are expected to spur additional residential and
commercial development throughout the service area.
III.
EXISTING FACILITIES
The Laurel County Water District No. 2 owns and operates a water h·eatment and
distribution system which serves the rural population of south central Laurel and no1ih
western Knox Counties. The Dish·ict operates and maintains the water system through a
Board of Commissioners, a General Manager, as well as office and field personnel. The
Board of Commissioners consists of a chairperson and four commissioners, all of which
are appointed by the Laurel County Fiscal Court.
The District produces the vast majority of the systems potable water at its own tTeatment
facility, however it does intermittently purchase a small amount of wholesale water for
resale from the London Utility Commission. The combination of which has sufficient
capacity to serve the Company's approximately 6,000 existing residential, commercial
and industrial customers.
The District's water treatment plant is located in the approximate center of the
distribution system, near the community of Hopewell. The facility has a rated treatment
capacity of 2.88 MGD and is currently operating at approxinmtely 50% of that capacity
producing 1.46 MGD on average. The treatment plant is a conventional surface water
filtration facility, consisting of a raw water intake & pumping sh11cture, flash mix,
settling basins, multi-media filters, chemical disinfection, clearwell storage, and finished
water pumping facilities. The primaiy water source is the Laurel River Lake, which
generally yields high quality raw water and is of abundant capacity.
The water distribution system consists of a network of water transmission and
distribution mains along with a series of water tanks and booster pump stations. This
includes vai-ious sized water lines ranging from 2-inch to 16-inch, three pumps stations,
and three water storage tanks with a rated capacity of 1,700,000 gallons. The majority of
the system has been in place for less than 50 years. Pipe material within the system
consists of cast iron and asbestos cement for the older lines along with ductile iron and
plastic for the newer ones. Water loss within the system is generally maintained at
acceptable levels, with an average amrnal loss of about 15%.
The District is currently in compliance with all Federal and State Regulations regarding
the sanitary features of the potable water treatment and distribution system. In addition,
the utility is governed by the Public Service Commission, and they have no cunent
violations of PSC regulations.
IV.
NEED FOR THE PROJECT
The projects primaiy objective is to increase the level of water storage in Dish·ict's
n011hern supply zone. The additional water storage capacity will ensure that the system
can meet the demands of existing and future customers in safe and efficient manner. In
addition to correcting the existing capacity issues, the additional storage will al low the
District to provide substantial fire protection coverage in the area.
Currently, the northern pot1ion of the District's service area is supplied via one existing
storage tank in the Lilly community (Aisin Storage Tank - 500,000 gallon capacity).
Demand growth in this area has been steadily increasing over the past few decades,
largely as a result of gains in residential development. However, in recent years, the
London - Laurel County Industrial Development Authority (LLCIDA) has purchased two
large tracts of farmland and is cmrently developing these parcels into industrial parks. As
a result of this sustained growth, the District's water storage capacity is no longer
adequate and must be increased.
Considering that this vital area of the system is cunently supplied by only one storage
tank, the system lacks redundancy. Accordingly, should a failure or other major issue
arise with the existing Aisin Storage Tank, customers in the area would face a lengthy
period with a very limited or non-existent supply of potable water. Moreover, the
construction of an additional tank in the Fariston community will allow the District to
maintain normal service when future tank maintenance and rehabilitation activities are
required at regular intervals.
V.
ALTERNATIVES CONSIDERED
Based on the continued need for potable water service and also need to accommodate
growth within the project area, the District must take the necessaiy steps to continue
providing service as required by the Kentucky Division of Water and the Kentucky
Public Service Commission. Determination of the final project scope was centered on
meeting existing and future customer demands without significantly burdening the
District's ability to meet its cmTent and future financial obligations. Accordingly, viable
project alternatives were limited and focused largely on determining the most economical
capacity, style, and location of the proposed water storage tank.
Alternative No. 1 (Selected): Construction of a 500,000 gallon elevated multi-column
style strncture at the highest point available within the proposed Greer Industrial Park.
The proposed tank would be constrncted to the same overflow elevation as the existing
Aisin Storage Tank such the two tanks would work in tandem to serve the northern
supply zone. Accordingly, the proposed tank would need to be constrncted to an
overflow height of approximately 200 feet. Selection of this alternative would double the
available storage capacity within the supply zone while also permitting suitable
operational control.
Alternative No. 2: Consh·uction of a 250,000 gallon elevated multi-column style shllcture
with all other considerations remaining consistent with those described for Alternative
No. 1. Similarly, all immediate project needs would be addressed with a 250,000 gallon
strncture. Considering the substantially smaller tank size, the total project cost would be
decreased by an estimated $450,000. However, the modest gain in storage capacity is not
expected to keep pace with demand growth for the life cycle of the strncture.
Alternative No. 3: Conshllction of a new 1,000,000 gallon elevated composite style
structure to replace the existing 500,000 gallon Aisin Storage Tank which is currently
due for rehabilitation. The new tank would be constructed on a site within the Fariston
Industrial Park, which is cenh'ally located between the existing Aisin Storage Tank and
the Greer Indush·ial Park. This alternative would eliminate the need to rehabilitate the
existing tank, but would not facilitate redundant storage options within the n011hern
portion of the system. In addition, the total project cost would exceed that of the
proposed project by an estimated $1,000,000.
Aside from the major alternatives presented above, slight variations of those alternatives
were also considered. Discussion and analysis of the primary alternatives and variants
centered on the final location and style of the proposed storage tank. Considerations
included: the long te1m needs of the service area; the location of existing transmission
mains and tank sites; the availability of transmission main rights-of-way; the future cost
of maintaining the improvements; and the total project costs.
VI.
PROPOSED PROJECT
In order to correct the cunent water storage inadequacies within the Dish·ict's n011hern
supply zone, the project proposes to construct a new 500,000 gallon water storage tank
within the Greer Industrial Park. The proposed water storage tank will be an elevated
welded carbon steel water storage tank supported by a series of cylindrical steel columns
and cross bracing. The tank shall be a Toro Ellipsoidal (Torus Bottom) style Multi
Column structure constructed to an overflow elevation of 1359' MSL, that being equal to
that of the existing Aisin Storage Tank. The final tank design shall incorporate operating
parameters as follows:
· The minimum operating capacity of the storage tank will be 500,000 US gallons
· The capacity of the tank, low to high water level, shall be contained within a
maximum operating range of the 37'
· The storage tank overflow/ top capacity level elevation shall be 1359'
· The height of the tank, top of foundation to overflow shall be 200'
· Top of foundation elevation shall be 1159.00'
· The existing ground elevation varies from 1155.50' to 1161 .00'
· The finished ground elevation shall be 1158.00' +/
The structural design of the elevated water storage tank shall conform to the
following design standards except as modified or clarified in the final design
documents.
·
·
·
·
Reinforced Concrete Foundations: AWWA DlOO & ACI 318
Welded Steel Water Tank: AWWA DlOO
Steel Water Storage Tank Coatings: AWWA Dl02
Environmental Loading: A WWA D 100 & ASCE 7
The LLCIDA has verbally agreed to donate a roughly half acre parcel within the Greer
Park to the District. The selected site is located on the western boundary of the park and
is of a suitable elevation to facilitate construction of the proposed tank. Prior to the start
of the final design, a geotechnical investigation will be undertaken to determine the site
specific foundation requirements.
Attached as a part of this report is a topographic map which depicts the location of the
proposed water storage tank, tank site access road and the proposed connection points to
existing system mains.
VII.
ENVIRONMENTAL IMPACTS
Considering the project location, limited footprint and scope of the project, no significant
adverse environmental impacts are expected as a result of the project. Fm1hermore, no
significant scientific resources such as threatened or endangered species, threatened or
endangered species habitat, water quality, or air quality are expected be adversely
affected by the project. Short-term impacts associated with the project would be localized
and minor with the use of Best Management Practices.
Some possible tempora1y negative impacts on the human environment could include
construction noise and aesthetic problems. However, these impacts would be temporary
and insignificant when compared to the positive permanent impact the project would
have on the local community in the form of a continued safe and reliable supply of
potable water.
The staff of the University of Kentucky Program for Archaeological Research recently
conducted a Phase I archaeological survey of the entire 132-acre Greer Industrial Park at
the request of the LLCIDA. The findings of the survey have been reviewed by the
Kentucky Heritage Council/State Historic Preservation Officer (SHPO). SHPO issued a
letter dated February 14, 2018 stating that " We would recommend that the project will
result in No Effect to Historic Properties." Although the survey and rep01i were prepared
relative to development of the industrial park as a whole, it is anticipated that
construction of the proposed water storage tank will attain similar concuITence from
SHPO.
The project has been submitted to the Kentucky State e-Clearinghouse, which is the
official designated Single Point of Contact (SPOC) for the Commonwealth pursuant to
Presidential Executive Order 123 72. The clearinghouse letter relative to this project
(SAi# KY201808311020) is included as an attachment to this rep011.
VIII.
LAND REQUIREMENTS
As previously noted, the new water storage tank will be constmcted on a site within the
Greer Industrial Park. In order to facilitate future painting and maintenance of the tank, a
minimum permanent tank site of no less than 150 feet square (0.52 acres) shall be
acquired by the Dish"ict in fee simple title. To allow adequate space for material staging
and equipment storage during construction, and an additional area of no less than 0.92
acres shall be made available adjacent to the site. This temporary consttuction easement
will revert back to the adjoining landowner (LLCIDA) once constluction is complete.
The proposed site is currently landlocked and a suitable access easement of no less than
20 feet in width shall be conveyed with the tank site. Access to the site shall be from
Court Road and will parallel the LLCIDA property line adjacent to an existing residential
subdivision. An existing 12-inch water tt·ansrnission main is already present on the
existing site and no additional water line easements will be required. The proposed tank
will need an electt·ical service, so an electt"ic easement to the site will need to be granted
to the local power company for this purpose.
IX.
CONSTRUCTION CONCERNS
Considering the substantial overall height of the proposed tank and the close proximity of
the tank site to the London-Corbin Airport, the location of the structure must be approved
by the FAA and the KY Airpmt Zoning Commission. Siting applications were filed with
both entities in July 2017. Correspondence from both entities was received by the District
in September 2017 granting clearance with only red aviation marking lights being
required.
The FAA and KAZC determination does permit temporary construction equipment such
as cranes which may be used during construction of the storage tank. However, this
equipment shall not exceed the overall height of the proposed structure. If equipment
which has a height greater than the proposed tank is needed, it will require a separate
notice to the FAA. This information will be included in the bid documents and
prospective contractors will be required to inform the District if their construction
methods will require such additional clearances.
No other major construction concerns are anticipated with the project.
X.
PROJECT SCHEDULE
Land & Easement Acquisition:
Finalize Project Funding:
Kentucky Division of Water Submittal:
Advertise for Construction Bids:
Contract Award/Begin Construction:
Substantial Completion:
Final Completion:
XI.
November 2018
December 2018
December 2018
January 2019
March 2019
March2020
May 2020
PROJECT COST & FUNDING
An itemized preliminary cost estimate is included in this repo1t and outlines all of the
individual construction items along with their estimated unit costs. A summary cost
estimate is incorporated therein and recaps all of the project costs and outlines the
funding scheme for the project.
The total construction cost has been estimated to be $1 ,400,000, with a corresponding
total project cost of $1 ,850,000. Full project funding has been secured through a
combination of grant and low-interest loan funds. Specifically, the funding package
includes a $1,300,000 grant which was awarded through the Section 531 - Southern and
Eastern Kentucky Environmental Infrastructure Program, a $445,000 low interest loan
from the Kentucky Infrastructure Authority, and $105,000 in local funds from Laurel
County Water District No. 2.
VII.
CONCLUSIONS AND RECOMMENDATIONS
Based on the need to provide existing and future customers with a sufficient and
dependable potable water supply, it is recommended that the Lamel County Water
District No. 2 pursue the financial assistance as outlined herein so that the proposed
project can be implemented as soon as possible.
Once complete, the proposed storage tank will double the volume of stored water
available in Districts northern service area. As a result, the Dish·ict will have the excess
capacity required to meet the area's surging demand. In addition, the proposed storage
tank will greatly improve the level of fire protection which the District can provide to
potential occupants in both new industrial parks and also to those residential customers in
the surrounding areas.
\
\.
PROPOSED 500,000 GALLON
FARISTON WATER STORAGE TA
I
0
I
,./
I./
)
·
/,
I
I
I
\
(
,
.~
l ,,
~
/
I"
\
\
·
0
{l
'
)
l
8
.'
I
PRELIMINARY COST ESTIMATE
FARISTON WATER STORAGE TANK
LAUREL COUNTY WATER DISTRICT #2
SEPTEMBER 2018
ITEM
NO.
DESCRIPTION
1
Erosion & Sedimentation Controls
2
Site Preparation, Grading & Excavation
3
500,000 Gallon Steel Multi-Column Elevated Tank
3A Foundation
38 Welded Steel Reservoir & Support Structure (200' Tall)
3C Appurtenances & Accessories
3D Coatings & Disinfection
4
Yard Piping & Appurtenances
Miscellaneous Site Improvements
5
(Access Road, Parking , Ditches)
Final Site Restoration & Cleanup
6
UNIT
COST
$10,000.00
25,000.00
TOTAL
COST
$10,000.00
25,000.00
LS
LS
LS
LS
LS
200,000.00
850,000.00
20,000.00
200,000.00
50,000.00
200,000.00
850,000.00
20,000.00
200,000.00
50,000.00
1 LS
25,000.00
25,000.00
1 LS
20,000.00
20,000.00
Subtotal
Contingencies ( 10%)
$1,400,000.00
140,000.00
TOTAL CONSTRUCTION
$1,540,000.00
QUANTITY
1 LS
1 LS
1
1
1
1
1
Preliminary Engineering Report
Environmental Assessment
Geotechnical Investigation
Legal & Administration
Engineering Design
Construction Inspection
US Army Corps of Engineers Review & Administration
$10,000.00
5,000.00
10,000.00
20,000.00
117,000.00
73,000.00
75 000.00
TOTAL NON-CONSTRUCTION
$310,000.00
TOTAL PROJECT COST
$1,850,000.00
USACE Section 531 Grant
$1 ,300,000.00
KIA Fund B Loan
Laurel County Water District No. 2
$445,000.00
105,000.00
TOTAL PROJECT FUNDING
$1,850,000.00
Appendix 3
Letter - KY State Clearinghouse
MATIHE W G. BEVl N
DEPARTMENT FOR LOCAL GOVERNMENT
SANDRA K. DUNAHOO
GOVERNOR
OFFI C E OF T llE GOVERNOR
1024 CA PITAL CENTER DRIVE. SUITE 340
FRA NKFORT, KENTUC KY 4060 1-8204
PH ONE (502) 573-2382 FAX (502) 573-2939
T OL L FREE (800) 346-5606/ T DD:7 1I
WWW.kydlgweb.ky.gov
COMM ISS IONER
September 17, 2018
Mr. Kenneth Fisher
Laurel County Water District #2
P 0 Box 2598
London, KY 40744
RE:
Fariston Water Storage Tank
WX.2 11 25020
SAT# KY201808311020
CFDA# I 0.760
Dear Mr. Fisher:
The Kentucky State e-Clearinghouse is the official designated Single Point of Contact (SPOC) for the
Commonwealth pursuant to Presidential Executive Order 12372, and suppo1ted by Kentucky Statutes KRS 45 .03.
The primary function of the SPOC is to streamline the review aforementioned process for the applicant and the
funding agency. This process helps in vocalizing the statutory and regulatory requirements. information in the
form of comments, if any, will be attached to this correspondence.
This proposal has been reviewed by the appropriate state agencies in the e-Clearinghouse for conflicts with state
or local plans, goals and objectives. After receiving this letter, you should make it available to the funding agency
and continue with the funding agencies application process. This e-clearinghouse SPOC letter signifies only that
the project has followed the state reviewing requirements, and is neither a commitment of funds from this agency
or any other state or federal agency. Please remember ifany federal reviews are required the applicant must follow
through with those federal agencies.
The results of this review are valid for one year from the date of this letter. If the project is not submitted to the
funding agency or not approved within one year after the completion of this review, the applicant can request an
extension by email to Lee.Nalley@ky.gov. If the project changes in any way after the review, the applicant must
reapply through the eclearinghouse for a new review. There are no exceptions.
If you have any questions regarding this Jetter or the review process please contact the e-Clearinghouse office at
502-573-2382, ext. 274.
Sincerely,
~\\oJlSho·
Lee Nalley, SPOC
Kentucky State Clearinghouse
Attachment
An Equal Opportunity Employer M/ F/D
\
Department of Housing, Buildings and Construction
Kevin Carli n
The Department of Housing Buildings and Construction, Division of Building Code Enforcement, has no
comments concerning the proposed project.
Division of Enforcement
Tim Harrod
The Division of Enforcement does not object to the project proposed by the applicant.
Tim Harrod, Enforcement Specialist, Division ofEnforcement, Timothy.Harrod@ky.gov
Division of Water
Andrea Fredenburg
Best management practices should be utilized to reduce runoff from project construction activities into nearby
waters.
Division of Water
Julia Harrod
A Water Withdrawal Application is not required for this proposed project. This proposed project is within the
Corbin Utilities Commission designated Source Water Protection Area: Zone 3. Questions should be directed to
Chloe Brantley at 502-782-6898 or Chloe.Brantley@ky.gov
The proposed Fariston Water Storage Tank project will tie into the newly constructed 12" transmission line. The
new line that wi ll co1111ect to the tank needs to be mapped in the WRIS to satisfy Water Management Plaru1ing.
Questions should be directed to Julia Harrod, 502-782-6967 or julia.harrod@ky.gov
This proposed project does not require a Kentucky Division of Water Application for Permit to Construct Across
or Along a Stream. Questions should be directed to Ron Dutta at 502-782-6941 or Ramendra.Dutta@ky.gov
Division of Water
Abba Pourghasemi
No objections to the proposed project. Plans and specifications along with hydraulic analysis of the proposed
project (including fill/drain cycles of the tank to justify adequate tank turn over) must be submitted to the Division
of Water's Water Infrastructure Branch by a registered professional engineer in Kentucky. Must receive a written
approval from the Division of Water prior to the beginning of the construction.
Division of Water
Ryan Reed
System should continue efforts to implement the Division of Water's recommendation from the most recent
Sanitary Survey (April 20 I7).
DOW
Daniel Fraley
Endorse
DOW
Wei Ji
The proposed work is endorsed by the Groundwater Section of the Watershed Management Branch. However, the
proposed work is located in an area with a high potential for karst development where groundwater is susceptible
to direct contamination from surface activities. It is our recommendation that proposed work be made aware of the
requirements of 40 I KAR 5:037 and the need to develop a Groundwater Protection Plan (GPP) for the protection
of groundwater resources within that area. Questions should be directed to Wei Ji (502-782-6934) or Section
Supervisor David Jackson (502-782-6986).
Fish and Wildlife
Dan Stoelb
Based on the information provided, the Kentucky Department of Fish & Wildlife Resources has no comments
concerning the proposed project. Please contact Dan Stoelb@ 502-892-4453 or Daniel.Stoelb@ky.gov ifyou have
further questions or require additional information.
Kentucky Department for Environmental Protection
Larry Taylor
Joel Murphy - Endorse with Comments The proposed project is subject to Division of Water (DOW) jurisdiction
because the following are or appear to be involved: water storage tank construction. Prior approval must be
obtained from the DOW before construction can begin. The applicant must cite the State Application Identifier
(SAl #KY20180831 I020) when submitting plans and specifications.
A Water Withdrawal Application is not required for this proposed project. This proposed project is within the
Corbin Utilities Commission designated Source Water Protection Area: Zone 3. Questions should be directed to
Chloe Brantley at 502-782-6898 or CWoe.Brantley@ky.gov. The proposed Fariston Water Storage Tank project
will tie into the newly constructed 12" transmission line. The new line that will connect to the tank needs to be
mapped in the WRIS to satisfy Water Management Planning. Questions should be directed to Julia Harrod, 502
782-6967 or Julia.Harrod@ky.gov. This proposed project does not require a DOW Application for Permit to
Construct Across or Along a Stream. Questions should be directed to Ron Dutta at 502-782-6941 or
Ramendra.Dutta@ky.gov.
The proposed project consists of the construction of a new 500,000 gallon elevated water storage tank to be
constructed in Fariston community. The structure will be a multi-column type storage tank and will be built on a
site within the Fariston Industrial Park.
There are no objections to the proposed project. Plans and specifications along with hydraulic analysis of the
proposed project (including fill/drain cycles of the tank to justify adequate tank turn over) must be submitted to
the DOW's Water Infrastructure Branch by a registered professional engineer in Kentucky. The applicant must
receive a written approval from the DOW prior to the beginning of the construction. Abbas Pourghasemi, Water
IJ1frastructure Branch, (502) 782-7041 , Abbas.Pourghaserni@ky.gov.
System should continue efforts to implement the DOW's recommendation from the most recent Sanitary Survey
(April 2017). Ryan Reed, Water Infrastructure Branch, (502) 782-7045, Ryan.Reed@ky.gov.
Best management practices should be utilized to reduce runoff from project construction activities into nearby
waters. Andrea Fredenburg, Water Quality Branch, (502) 782-6950, Andrea.Fredenburg@ky.gov.
No comment. Daniel
Daniel.Fraley@ky.gov.
Fraley,
Compliance
and
Technical
Assistance
Branch,
(606)
783-8655,
The Division of Enforcement does not object to the project proposed by the applicant. Tim Harrod, Division of
Enforcement, (502) 782-6858, Timothy.Harrod@ky.gov.
The proposed work is endorsed by the Groundwater Section of the Watershed Management Branch. However, the
proposed work is located in an area with a high potential for karst development where groundwater is susceptible
to direct contamination from surface activities. It is our recommendation that proposed work be made aware of the
requirements of 401 KAR 5:037 and the need to develop a Groundwater Protection Plan (GPP) for the protection
of groundwater resources within that area. Wei Ji, Watershed Management Branch, (502) 782-6934,
Wei.Ji@ky.gov.
If the construction area disturbed is equal to or greater than I acre, the applicant will need to apply for a Kentucky
Pollutant Discharge Elimination System (KPDES) storm water discharge permit.
Utility line projects that cross a stream will require a Section 404 permit from the US Army Corps of Engineers
and a 401 Water Quality Certification from DOW.
The Kentucky Division of Water suppo1ts the goals of EPA's Sustainable Infrastructure Initiative. This initiative
seeks to promote sustainable practices that will help to reduce the potential gap between funding needs and
spending at the local and national level. The Sustainable Infrastructure Initiative will guide our effo1ts in changing
how Kentucky views, values, manages, and invests in its water infrastructure. This website,
www.epa.gov/waterinfrastructure/, contains infonnation that will help you ensure your facility and operations are
consistent with and can benefit from the aims of the Sustainable Infrastructure Initiative.
Kentucky Division of Water
Chloe Brantley
reviewed.
Kentucky Infrastructure Authority
Dustin Horn
This project was reviewed in the WRlS Po1tal by KIA staff.
Kentucky Transportation Cabinet (D-11)
Quentin Smith
Contact KYTC District 11 permits prior to any work on or near KYTC Right of Way. (606)598-2145.
KY Heritage Council
Yvonne Sherrick
To receive a review from the KY Heritage Council/State Historical Preservation Office (SHPO) you must follow
the instructions located on their website at http://www. heritage.ky.gov/siteprotect/ . There you will find the
required documents for tbe Section I 06 Review and Compliance for 36 CFRPat1800. Th.is Section 106 submission
process to SHPO will assist applicants and agencies in providing the appropriate level of information to receive
comments from SHPO. If you have any questions please contact Yvonne Sherrick, Administrative Specialist m,
(502) 564-7005, Ext. 113, yvonne.sherrick@ky.gov.
Please note: If your project is funded through Transportation AJternative (TAP), Transportation En hancements
(TE), Congestion, Mitigation, Air Quality (CMAQ), or Safe Routes to School (SRTS) you will need to send this
information to Michael Jones, Historic Preservation Program Administrator with the Kentucky Transpo11ation
Cabinet via email MichaelR.Jones2@ky.gov or hard copy to Michael Jones, Office of Local Programs, KY
Transportation Cabinet, 200 Mero Street Frankfo11, KY 40622. Do not send materials directly to SHPO if your
project involves funding from these four sources as it will cause delays in the review process. Michael Jones will
consult directly with the SHPO on projects with these funding sources to complete the Section 106 review.
Appendix 4
Letter - U.S. Fish & wildlife Service
RECi~lVED
NOV O1 2018
t.MM!ftJelllESIMEITIEIVlllS. llC
mo cclinB Rnad
Burli!SVille, lPl1onc (270) 433·7256
Fax (270) 433-6313
email bnorris@doo-c:clJTTly.C(Jln
October 3 1, 2018
Significant Impacts to federally·ll.sted species a~e
not likely to result from this p~oiect as cdu~~tt~Y
osed Project re-coordlnat1on Is nee e 1 e
0
P~lect ch'anges or If new species or critical hab!tats
~~at could be Impacted by
Mr. Lee Andrews
U.S. Fish & Wildlife Service
Kentucky Ecological Services Field Office
330 West Broadway, Suite 265
Frankfort, KY 40601
L'
L~&/-3
Kentucky Field Supervls
u.s. Fish end Wildlife
:M
II
D e
Ice
Re: Laurel County Water District No. 2 - 500,000 Gallon Elevated Water Tank Project
IPaC Consultation Code: 04EK I 000·20 l 9-E-00325
Dear Mr. Andrews:
The Laurel County Water District No. 2, London, KY (Laurel County) is proposing to use
funding from the U.S. Army Corp of Engineers and the Kentucky Infrastructure Authority to
construct a 500,000 gallon elevated water storage tank within the Greer Industrial Park just
outside the London corporate limits. The Greer Industrial Park is a 132 acre park in close
proximity to the London-Corbin Airport. A 150' x 150' tract will be deeded to the Laurel County
Water District No. 2 for the tank site along with a proposed 2, 100' x 30' property access road
through the industrial park.
The District's consulting engineer has retained our services to assist with the environmental
review of the proposed project.
The 150' x 150' proposed tank site will not require any tree removal. The 2, I00 LF of access
road could possibly require the removal ofone large tree (which appears to be a Yellow poplar).
The access road will utilize an existing culvert for an intermittent stream crossing and there
should be no disturbance to the stream itself. There are no known caves, abandoned mines, or
rockshelters in the immediate project area.
A USGS map showing the industrial park and the proposed location of both the water storage
tank site and the access road is enclosed. In addition, pictures of the proposed tank site and the
access road route are enclosed, including a picture ofthe large tree that may require removal.
Should the Service determine that the one subject tree is potential summer bat habitat, tree
removal would be accomplished during the recommended timeframe of November 15111 through
March 31 51 ·
i
It does not appear that the project would result in direct, indirect, or cumulative adverse effects to
listed species or habitat:
Direct Effects: By observing the recommended tree removal timeframe, there should be
minimal, if any, direct effect on listed species or critical habitat by the proposed project.
Indirect Effects: Periodic maintenance to the elevated water tank and the access road would be
limited to those sites.
Cumulative Effects: Potable water service to rural areas historically has resulted in some
build-up. The proposed project, however, is for water storage and there will be no new
customers other than potential industries which locate in the existing industrial park.
A "not likely to adversely to affect'' determination is hereby requested.
Ifadditional information is needed, please contact me at (270) 433-7256.
Sincerely,
Enclosures
Appendix 5
Letter - USDA Natural Resources Conservation
Service
-
USDA
United States Department of Agriculture
Natural Resources Conservation Service
USDA Service Center
1000 Commonwealth Drive
Mayfield, KY 42066
November I, 2018
William C. Norris
Environmental Assessment Services, LLC
2220 Celina Road
Burkesville, KY 42717
RE: LAUREL COUNTY WATER DISTRICT NO. 2 WATER STORAGE PROJECT
Dear Mr. Norris:
In response to your request from I 0/30/20 18 regarding the Laurel County Water District No. 2 proposed water
storage tank site and access road project within the Greer Industrial Park in London, Kentucky, the Natural
Resources Conservation Service (NRCS) has no congressional authority for conducting Environmental
Assessments (EA).
NRCS is mandated to provide information on the soils and/or impact to farmland according to the Farmland
Protection Policy Act (P.L. 97-98) for projects that will be utilizing federal monies.
Based on a review of your cover letter and accompanying maps, only a small acreage (±0.5 acres for the tank
and ± 1.4 acres for the road) within the previously developed Greer Industrial Park will be involved with this
project, therefore no significant conversion of agricultural lands (prime, 1111iq11e, orfan11/a11d oflocal or stateivide
importance) will occur or be negatively impacted by the proposed undertaking. This office has no additional
concerns at this time.
If we may be of additional assistance, please do not hesitate to contact us. Best Wishes with the success of your
project.
Sincerely,
C?=GJArsSoil Scientist
Perri. Pedley@ky. usda.gov
CC:
Scott Aldridge, USDA-NRCS, Frankfort, KY
Jamie Ponder, USDA-NRCS, London, KY
The Natural Resources Conservation Service provides l eadership in a partnership effort to help people
conserve, maintain, and Improve our natural re sources and environment.
An Equal Opportunity Provider and Employer
Appendix 6
Letter - Kentucky Heritage Council/SHPO
-
p#
0
I
-~
MATTHEW
G.
BEVIN
GOVERNOR
DON PARKINSON
SECRETARY
TOURISM, ARTS AND HERITAGE CABINET
KENTUCKY HERITAGE COUNCIL
T HE STATE H ISTORIC PRESERVATION OFFICE
4 10 HIGH STREET
FRANKFORT, KENTUCKY 40601
P HONE (502) 564qoos
FAX(5 0 2 )564-5820
www. heritaqe.ky.qov
R EGINA STIVERS
DEPUTY SECRETARY
CRAIG A. Pons
E XECUTIVE DIRECTOR
& STATE HISTORIC
PRESERVATION OFFICER
f ebruary 14, 20 18
Dr. Steven Ahler
Director, UK-PAR
I020A Export Street
Lexington, KY 40506-9854
RE:
Phase I Arch aeological Survey of a Proposed 132-Ac re l1Hl11strial Park in Lo11do11, La urel Co uuty, Ken tucky prepared
by Milaina fl oyd of UK-PAR. Report dated Jamrnry 26, 20 18
Dear Dr. Ahler:
Thank you fo r the letter conceming the above-mcnl ioned report, received January 26, 20 18. The report describes the intensive
pedestrian survey ofa 132 acre parcel in the community of London, Laurel County, Kentuck"Y, that will be developed u1to an industrial
p;i rk. Survey methods consisted primarily of visual inspection ofsystematic plow strips, supplemented by limited shovel testing and
augering iD the floodplain of the Little Laurel River. T he investiga tors defined two new archaeo logic;il sites, l 5Ll392 and l 5Ll393, as
well as several non-site isolated frnd locations.
Site I5:ll392 consists of a light scalier of historic period artifacts and disa rticul ated bricks. Shovel testing indicated no evidence of
intact subsurface features, and evidence ofdisl11rbi1nce was observed in plow strips. The investigators reconunended th<1t 1he si te is
not eligible for the Na tional Register, and recommended no additional work. Site l5Ll393 consisted ofa light scatter or prel1istory
material, consisting ofstone tool manufacturing debris and a scraper fragment. No evidence for intact subsurface feat ures were
encountered, and all arti facts were recovered from plowzone contexts. The investigators recommended that the site is not eligible fo r
lhe Nat ional Register, and recommended no additional work. Non-site isolated finds consisted of a mix of prehistoric and historic
artifacts. None were recommended as eligible for the National Register.
After review oflhc report, we agree with the investigators findings and recon11ucndations. \Ve accept this report as final and
acknowledge receipt of four archiva l copies. \Ve would recommend that the project will resu lt in No Effect to Historic Properties.
Despite our accrpl1111cc of the report, we would like to note that it does lack a mnp of field methods as stipulated in lhe KHC report
Specifications ... section Vl. F. I.a. Please be sun:: io include such maps in future submissions.
If the projec t design or boundllries change, this office should be consulted to cletennine the nature and ex tent ofadditional documentation
that may be needed. In the event of the unanticipated discovery ofan ;irchaeological site or object of antiquity, the discovery should be
reported lo tl1e Kentucky IJeritage Council and to the Kentucky Office of State Archaeo logy in the Anthropology Department at the
University of Kentucky in accordance with KRS 164.730. Ill the event that hunrnn remau1s are encountered duriJ1g project activities, all
work should be immediately stopped in the area and the area cordoned off, and in accordance with KRS 72.020 the county coroner and
local law enfo rcement must be contacted unrncdiately. Upon confirma tion that the human remains are not of forensic interest, the
unanticipated discovery n ~us t be reported to the Kentucky Heritage Council.
lAn Equal Opportunity Employer M/F/D
S. AJ1ler
UK-PAR
Phase j for London Industrial Park
February 14, 20 18
page 2
Should you have a11y questions concerning archaeological properties, feel free to contact Chris Gunn of my staff at 502.564.7005,
extension 4450 or chns.gu nn@kv.!!ov.
Sincerely,
Execu 1ve Director and
State Historic Preservation Officer
CP: cmg KHC fl 50798
cc: George Crothers (OSA); Paula Thompson (London lnduslrial Dev. J\uth.)
Appendix 7
Letter - U.S. Army Corp of Engineers
Page 1of1
Bill Norris
From:
Date:
To:
Attach:
Subject:
"Bill Nonis"
Tuesday, October 30, 2018 3: 16 PM
"Lisa R LRN Morris"
Scan0433.pdf
Laurel County Water District No. 2 (Laurel County, Kentucky)
Lisa,
The Laurel County Water District No. 2, London, KY is proposing to construct a new 500,000 gallon
elevated water storage tank and an access road to the tank in the newly developed Greer Industrial
Park near London, KY. Attached is a letter, USGS Map, and a picture of a culvert that will be utilized
with the construction of the access road.
Please contact me if you should have questions.
Thanks.
William C. Norris
EAS1 LLC
2220 Celina Road
Burkesville1 KY 42717
Ph: (270} 433-7256
Cell: (270} 433-1525
There has been no response to the attached letter as of
December 3, 2 018 (more than 30 days).
10/30/2018
EllVIRllllllllll.ASSESUIEllT SEIVIOES. UC
2220 Celina Road
Burkesville, Kentucky 42117
Phone (270) 433-7256
Fax(270)433-6313
Email bnorris@doo-colJITty.ccm
October 30, 2018
Ms. Lisa Morris
U.S. Army Corp of Engineers
Eastern Regulatory Section
Operations Division
3701 Bell Road
Nashville, TN 37214
Dear Ms. Morris:
The Laurel County Water District No. 2, London, KY is proposing to construct a new 500,000
gallon elevated water storage tank within the Greer Industrial Park located just outside the
London corporate limits. The Greer Industrial Park is a 132 acre park in close proximity to the
London-Corbin Airport. A 150'x 150' tract will be deeded to the Laurel County Water District
No. 2 for the tank site along with a 2, 100' x 30' property access road through the industrial park.
The entire industrial park received environmental clearance prior to development.
The District's consulting engineer has retained our services to assist with an environmental
review of the proposed project.
The proposed access road to the tank site will utilize an existing cu Ivett to cross what appears to
be an intermittent stream. There will be no disturbance to the stream itself.
A USGS map showing the coordinates for the stream and culvert is enclosed along with a picture
of the culve1t and stream. Since there will be no placement of dredged or fill material,
permanently or temporarily, into "waters of the United States" including wetlands, and since
there are no actual stream crossings required, it would appear that a DA permit should not be
required. Therefore, an early coordination response or a no permit required determintition is
requested for the proposed project
If you should have questions, please contact me at (270) 433-7256.
Sincerely,
~~= ~r
Enclosures
j
(
(
\
)
,...
I
I
\\
SCALE: 1· =6'00)
I
I
PROPOSED YATER Ullll
J
EXISTING 4 · YATER UNE
IOOSTING 6" YATER UNE
LAURAL COUNTY ll'ATER DISTRICr #2
WATER SYSTEll lllPROVEllEHTS
FARISTON ll'ATER S'roRAGE TANK
OCTOBER 2016
~ch
Engineering, Inc.
Appendix 8
FEMA Floodplain Map
Appendix 9
IPaC Regulatory Review (Wetlands)
IPaC
U.S. Fish & Wildlife Service
Laurel County
Water District No. 2
- Water Storage
Tank
The Laurel
County Water District No.2, Laurel
County, KY, is proposing use U.S. Army
Corp
{;'
,,, ,. \ '
LOCATION Laurel County, Kentucky
CREATED
October 31, 2018
What's
next?
ENDANGERED SPECIES
REVIEW
Review this project's
effect on listed
species
pursuant to the
Endangered Species
Act, as part of the
overall regulatory
review.
1
1. Species listed
under the
Endangered
Species Act are
threatened or
endangered;
IPaC also shows
species that are
candidates, or
proposed, for
listing. See the
listing status
~formore
information.
SPECIES LIST
Resources
An official species
list was generated
20 days ago
IPaC
U.S. Fish & Wildlife Service
Regulatory review
The IPaC regulatory review process helps evaluate the potential impacts of your
project on resources managed by the U.S. Fish and Wildlife Service. It walks through
regulations covering each protected resource, and offers suggestions and assistance
in designing your project.
·::. Endangered species
Endangered species are protected under the Endangered Species Act
1.
8 endangered species are known to occur or may be affected by
activities in this location.
~
Request an official species list
An official species list was generated .?.Q..9..~Y?...~8'?...P.9/?.1/?.0~..~...9.:.51 .:?..6 ~t0.).
2
Evaluate determination keys
Determination keys are up-front analysis from the U.S. Fish and Wildlife
Service that streamline the consultation process for common project types.
Each determination key starts with a qualification interview to see if the key is
appropriate for your project.
3
i·'
Make effect determinations
Migratory birds
Certain birds are protected under the Migratory Bird Treaty Act
J
and the Bald and Golden Eagle Protection
Act~.
1 and the Bald and Golden Eagle Protection Act1.
3 migratory birds of conservation concern are expected to occur or
may be affected by activities in this location.
\. Contact the local U.S. Fish and Wildlife Service field office
There is currently no regulatory review process in IPaC for migratory bird s.
Please contact the local U.S. Fish and Wildlife Service field office to evaluate
effects and authorize take.
Q Facilities
U.S. Fish and Wildlife Service facilities are protected under the National
Wildlife Refuge System Administration Act
a and the National Fish Hatchery System2.
Refuge and fish hatchery information is not available at this time
...
a
-i
Wetlands
Wetlands and other aquatic habitats may be subject to regulation under
Section 404 of the Clean Water Act
1.Q,
or other State/Federal statutes.
4
THERE ARE NO KNOWN WETLANDS AT THIS LOCATION.
"
'
1. The Endangered Species Act (ESA) of 1973.
2. The Migratory Birds Treaty Act of 1918.
3. The Bald and Golden Eagle Protection Act of 1940.
...'
~:
1.
'1
Appendix 10
Phase 1 Environmental Site Assessment
(Executive Summary)
Phase I - Environmental Site Assessment
Greer Property
London, Laurel County, Kentucky
Prepared for:
London-Laurel County Industrial Development Authority
By
1151
OF KENTUCKY, INC .
624 Wellington Way
Lexington KY 40503
Phone: (859) 223-5694 C Fax: 223-2607
Email: m seinc@mselex.com
August 2017
1.0 Executive Summary
Executi ve MSE of Kentucky, Inc. (MSE) has been retai ned by, the London-Laurel County
Industrial Development Authority (Client) to conduct a Phase I Environmental S ite Assessment
(ESA) in conformance with ASTM Practice E 1527-13, Standard Practice for Environme ntal Site
Assessments. The subject property is located in Laurel County, London, Kentucky 40744. The
objecti ve of this assessment is to determine the presence o r absence of Recognized
Environmental Conditions (RECs), as de lined in ASTM 1527- 13. There are no exceptions or
deletions from the ASTM Prac1ice E 1527-13.
1.1 Summary of Findings
Assessmcnl
Section
Acceplable
Acceplablc
Requires 0 &
i\l's
Historic Review
Y
Regulatory
Y
ACM
Y
USTs
Y
ASTs
Y
PC Us
Y
Was1c Siles
Y
RECs on
Y
Addilional
Research o r
Receipt of
FOIA n eq uesl
Rto'd
Phase II Req
Adjacent
Properties
On-Si te
Operation s
Y
Chemical/Hazard
Material
Y
Wetlands
Y
Dry Cleaner
Y
Mold
y
Other
Y
Table I: Summary of l'ind ings
Abalement
Required
Eslimalcd
Cos1
1.2 Data Gaps
Based on the information obtained during this ESA, it is the professional opinion of MSE that a
hi storical data failure. as defined in the ASTM guidelines, has occurred in attempting to
document the history of the s ubject property back to the earlier of 1940 or the fi rst developed
usage of the property in five year increments. However, based on the information obtained, the
lack of documentation is not dee med critical and did not affect the ability to identify potential
REC(s) associated with the s ubject property.
1.3 Findings and Opinions
MSE has performed thi s Phase I Environmental Site Assessment of the Subject Property in
conformance with the scope and limitations of ASTM S tandard E 1527- 13 which became
mandato ry October 6, 20 15. Any exception to, o r deletions from, this practice are described in
Sectio n 2.4 of this report. T his assessment has identified no evidence of recognized
en vironmental conditio ns ( RECs) in connectio n with the Subject P roperty.
1.4 Recommendations
MSE has performed a Phase I Environmental Site Assessment in conformance w ith the scope
and limitations of ASTM Practice E 1527- 13 of the property located in on US 25 S and Old
Whi tley Road in, London, KY ( Laurel Cou nty) the subject property. Any exceptions to, o r
de letio ns fro m, thi s practice is described in Section 2.4 of th is report . T his assessment has
revealed
110
evidence of recognized e nv ironmental conditions in connection with the subject
property. It is recommended that federal, state and local asbestos regulations (O&M Plan) be
reviewed for compliance p rior to any renovation or demolition activities. National Emission
Standards for Hazardous Air Pollutants (NESHAP) regu lat io ns require sampling potential
AC BM prior to demolition or extensive renovation, regard less of the date of construction;
therefore, if such activities arc planned, it may be requi red to conduct a survey of the entire
fac ility, or that portion slated for renovation o r demo lition, before ini tiating such destructi ve
activities. That su rvey should include an assessment of all s ubject building materials, including
those in areas which are nomiall y inaccess ible. Under the All Appropriate Inquiry Rule, fulllrc
and continuing obligati ons are required to maintain landowner liability protections under
CERCLA. S pecificall y, ( I) complying with land use restrictions and institutional controls; (2)
2
tak ing reasonable steps with respect to hazardous substance releases; (3) providing full
cooperation, assistance and access lo persons that are authorized to conduct response actions or
natural resource restoration; (4) complying with information requests and admini strative
subpoenas; and (5) providing legally required notices.
3
Appendix 11
EA Mailing List
Appendix 12
Agency Comment Letters on Draft EA
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 gTM AVENUE SOUTH, ROOM A-405
NASHVILLE, TN ,37203
OCT 2 3 2018
Mr. Craig A. Potts, Director
State Historic Preservation Officer
Kentucky Heritage Council
41 O High Street
Frankfort, Kentucky 40601
Dear Mr. Potts:
The U.S. Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCVVD#2) for the cohstruction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation under Section 106 of the National Historic Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of ah industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 meter
radius from the water tower. Figure 1 presents the APEs on a portion of the Lily, KY
USGS topographic map. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. UK-PAR identified two new archaeological sites and eight cultural
isolated finds . No cultural material was recovered from the proposed water tower APE.
The archaeological survey ''Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky" is enclosed for your reference .
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introduction of the water tower, Corps
archaeologist Va lerie McCormack reviewed the National Register of Historic Places,
and historic U.S.G.S . topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
Figure 2 includes portions of U.S.G.S. topographic maps available on the USGS
historic map explorer (http://historicalmaps.arcgis.com/usgsQ. There are no buildings
recorded on the 1897 map. By 1951, several residential developments within the 800 m
indirect APE are present. The 1970 map and recent aerial images (Figure 3) indicate
that the area is undergoing continued development. While the proposed water tower
would introduce a new vertical element on the landscape, it would not alter the existing
setting, which indudes a variety of residential buildings, commercial and industrial
buildings, and an airport.
Given the results of the archaeological survey and the consideration of buildings and
structures within the direct and indirect APE, the Corps believes the proposed water
tower would not affect historic properties. The Corps proposes concluding Section 106
consultation with a determination of "no historic properties affected" and requests your
comments on the proposed project. Please contact Valerie McCormack at
(615) 736-7847orvalerie.Lmccormack@usace.army.mil if you require additional
information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
Area of Potential Effects
800 m line radius
from the water tower
Figure 1. The direct and indirect Areas of Potential Effects ona portion of the Lily, KY, U.S.G.S. topographic
quadrangle map (7.5' series). (Figure 1.2 from Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky .)
A portion of the 1897 London, Kentucky U.S.G.S. topographic map 1:250,000 . Note there are no buildings within 800 meters of the proposed water tower location.
A portion of the 1951 Lily, Kentucky U.S.G.S. topographic map 1:24000. Note the residential street to
the southwest of the proposed water tower is under development.
A portion of the 1970 Lily, Kentucky U.S.G.S. topographic map 1:24000. Note the increased number of
buildings in residential neighborhood to the southwest of the proposed and some of the buildings on the
1951 topographic map are no longer extant.
Figure 2. Comparison of historic topographic maps from the U.S.G.S. Historical map
explorer (http://historicalmaps.arcgis.com/usgs/ accessed October 12, 2018).
Figure 3. Google Earth image (June 2018) of the proposed water location displaying an 800 m radius within the surrounding area.
PHASE I ARCHAEOLOGICAL SURVEY OF A
PROPOSED 132-ACRE INDUSTRIAL PARK IN
LONDON, LAUREL COUNTY, KENTUCKY
KENTUCKY OSA PROJECT REGISTRATION NO. FY18-9430
UK-PAR PROJECT 17-26
University of Kentucky
Program for Archaeological Research
Department of Anthropology
Technical Report No. 833
26 January 2018
MATTHEW G. BEVIN
GOVERNOR
TOURISM, ARTS AND HERITAGE CABINET
KENTUCKY HERITAGE COUNCIL
REGINA STIVERS
DEPUTY SECRETARY
THE STATE HISTORIC PRESERVATION OFFICE
DON PARKINSON
SECRETARY
410 HIGH STREET
FRANKFORT, KENTUCKY 40601
PHONE (502) 564-7005
FAX(502)564-5820
www.heritage.ky.gov
CRAIG
A. POTTS
EXECUTIVE DIRECTOR
& STATE HISTORIC
PRESERVATION OFFICER
November 7, 2018
Ms. Angela Dunn
Department of the Army ·
Corps of Engineers, Nashville District
110 9111 Avenue South, Room A-405
Nashville, Tennessee 37203
Re:
construction of a 500,000 gallon elevated water storage tank within an industrial park
London, Laurel County, Kentucky
Dear Ms. Dunn:
We are in receipt of the information you submitted pertaining to the above-referenced project, including a
cover letter, maps of the Area of Potential Effect (APE), and a report, Phase I Archaeological Survey ofa
Proposed 132-Acre Industrial Park in London, Laurel County, Kentucky from January of 2018. We
·understand that the current undertaking involves the construction of an elevated water tank within an
industrial park in London, Kentucky.
Previously we have reviewed two projects that overlap with the current undertaking. On February 14,
2018, this office reviewed and commented on the archaeological report you resubmitted with the
information pertaining to the current undertaking. In that letter, this office accepted the report and
concurred with the recommendation of No Effect to Historic Properties. That investigation pertained to
the development of the industrial park.
On January 25, 2018, this office completed a Section 106 review for replacement of water supply lines
and construction of a 500,000-gallon water storage tank. This office did not recommend an above or
below ground survey for this project. Our recommendation for that proposed project was No Effect to
Historic Properties. The letter from this office was written in response to a submission by William C.
Norris of Environmental Assessment Services, LLC, who was acting on behalf of Laurel County Water
District No. 2.
·
Based on previous reviews, for the current undertaking, we can now concur with the determination of No
Effect to Historic Properties for above and below ground resources for the construction of a 500,000
gallon elevated water storage tank within the industrial park in London, Laurel County, Kentucky.
KentuckyUnbridledSpirit.com
An Equal Opportunity Employer M/F/D
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 9 TH AVENUE SOUTH, ROOM A-405
NASHVILLE, TN. 37203
OCT 2 3 2018
Governor Edwina Butler-Wolfe
Absentee-Shawnee Tribe of Oklahoma
2025 S. Gordon Cooper Dr.
Shawnee, Oklahoma 74801-9381
Dear Governor Butler-Wolfe;
The U.S. Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrast~ucture to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with Absentee-Shawnee Tribe of Oklahoma under Section 106 of the
National Historic Preservation Act.
The proposed project involves constructing· a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR
identified two new archaeological sites and eight cultural isolated finds. No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introduction of the water tower, Corps
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
-2
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
development. While the proposed water tower would introduce a new vertical element
on the landscape, it would not alter the existing setting, which includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Ms. Devon Frazier of your staff. Given the results of the archaeological survey and the
consideration of buildings and structures within the direct and indirect APE, the Corps
believes the proposed water tower would not affect historic properties. The Corps
proposes concluding Section 106 consultation with a determination of "no historic
1
properties affected ' and requests your comments on the proposed project. Please
contact Valerie McCormack at (615) 736-7847or valerie.j.mccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 g TH AVENUE SOUTH, ROOM A-405
NASHVILLE, TN 37203
OCT 2 3 2018
Principal Chief Bill John Baker
Cherokee Nation
P.O. Box 948
Tahlequah, Oklahoma 74465-0948
Dear Principal Chief Baker:
The U.S. Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with Cherokee Nation under Section 106 of the National Historic
Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess CC\pacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps Involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR
identified two new archaeological sites and eight cultural isolated finds. No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introduction of the water tower, Corps
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
-2
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgsD indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
·development. While the proposed water tower would introduce a new vertical element
on the landscape, it would not alter the existing setting, which includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Ms. Elizabeth Toombs of your staff. Given the results of the archaeological survey and
the consideration of buildings and structures within the direct and indirect APE, the
Corps believes the proposed water tower would not affect historic properties. The
Corps proposes concluding Section 106 consultation with a determination of "no historic
properties affected'' and requests your comments on the proposed project. Please
contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
November 15, 2018
Valerie McCormack
United States Army Corps of Engineers, Nashville District
110 9th Avenue South, Room A-405
Nashville, TN 37203
Re:
Water Storage Tank Construction, Laurel County Water District No.2
Dr. Valerie McCormack:
The Cherokee Nation (Nation) is in receipt of your correspondence about and related report for
Water Storage Tank Construction, Laurel County Water District No.2, and appreciates the
opportunity to provide comment upon this project. Please allow this letter to serve as the Nation's
interest in acting as a consulting party to this proposed undertaking.
The Nation maintains databases and records of cultural, historic, and pre-historic resources in this
area. Our Historic Preservation Office reviewed this project, cross referenced the project's legal
description against our information, and found no instances where this project intersects or adjoins
such resources. Thus, the Nation does not foresee this project imparting impacts to Cherokee
cultural resources at this time.
However, the Nation requests that the United States Army Corps of Engineers (USACE) halt all
project activities immediately and re-contact our Offices for further consultation if items of cultural
significance are discovered during the course of this project.
Additionally, the Nation requests that USACE conduct appropriate inquiries with other pertinent
Tribal and Historic Preservation Offices regarding historic and prehistoric resources not included
in the Nation's databases or records.
If you require additional information or have any questions, please contact me at your convenience.
Thank you for your time and attention to this matter.
Wado,
Elizabeth Toombs, Tribal Historic Preservation Officer
Cherokee Nation Tribal Historic Preservation Office
elizabeth-toombs@cherokee.org
918.453.5389
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 g TH AVENUE SOUTH, ROOM A-405
NASHVILLE, TN 37203
OCT 23 2018
Principal Chief Richard Sneed
Eastern Band of Cherokee Indians
Qualia Boundary
P.O. Box 445
Cherokee, North Carolina 28719
Dear Principal Chief Sneed:
The U.S . Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with Eastern Band of Cherokee Indians under Section 106 of the National
Historic Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research {UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky" presents the results . UK-PAR
identified two new archaeological sites and eight cultural isolated finds. No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introduction of the water tower, Corps
-2
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
development. While. the proposed water towe r would introduce a new vertical element
on the landscape, it would not alter the existing setting, which includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Mr. Stephen Yerka of your staff. Given the results of the archaeological survey and the
consideration of buildings and structures within the direct and indirect APE, the Corps
believes the proposed water tower would not affect historic properties. The Corps
proposes concluding Section 106 consultation with a determination of "no historic
properties affected" and requests your comments on the proposed project Please
contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 9T11 AVENUE SOUTH, ROOM A-405
NASHVILLE, TN 37203
OCT 23 2018
Chief Glenna Wallace
Eastern Shawnee Tribe of Oklahoma
P.O. Box 350
Seneca, Missouri 64865
Dear Chief Wallace:
The U.S, Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construct{on of a
500,000-gallon elevated water storage tank within the Fariston Community 1 Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to .rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with Eastern Shawnee Tribe of Oklahoma under Section 106 of the
National Historic Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps involvement. Therefore; the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the Industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky'' presents the results. UK-PAR
identified two new archaeological sites and eight cultural isolated finds . No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introduction of the water tower, Corps
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
-2
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
development. While the proposed water tower would Introduce a new vertical element
on the landscape, it would not alter the existing setting, which includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Mr. Brett Barnes of your staff. Given the results of the archaeological survey and the
consideration of buildings and structures within the direct and indirect APE, the Corps
believes the proposed water tower would not affect historic properties. The Corps
proposes concluding Section 106 consultation with a determination of "no historic
properties affected'' and requests your comments on the proposed project. Please
contact Valerie McCormack at (615) 736-7847orvalerie.Lmccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 gm AVENUE SOUTH, ROOM A-405
NASHVILLE, TN 37203
Chairperson Ron Sparkman
Shawnee Tribe
P.O. Box 189
Miami, Oklahoma 74355
Dear Chairperson Sparkman:
The U.S. Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with Shawnee Tribe under Section 106 of the National Historic
Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial parks
would occur without the Corps involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC 's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky' presents the results . UK-PAR
identified two new archaeological sites and eight cultural isolated finds. No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indirect effects created through the introd uction of the water tower, Corps
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
-2
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgs/) indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
development. While the proposed water tower would introduce a new vertical element
on the landscape, it would not alter the existing setting, wh ich includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Ms. Tonya Tipton of your staff. Given the results of the archaeological survey and the
consideration of buildings and structures within the direct and indirect APE, the Corps
believes the proposed water tower would not affect historic properties. The Corps
proposes concluding Section 106 consultation with a determination of ilno historic
properties affected" and requests your comments on the proposed project. Please
contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Planning Branch
Enclosures
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NASHVILLE DISTRICT
110 9TM AVENUE SOUTH, ROOM A-405
NASHVILLE, TN 37203
OCT ·23 2018
Chief Joe Bunch
United Keetoowah Band of Cherokee Indians in Oklahoma
P.O. Box 746
Tahlequah, Oklahoma 74464-0746
Dear Chief Bunch:
The U.S. Army Corps of Engineers, Nashville District is providing financial
assistance to the Laurel County Water District No. 2 (LCWD#2) for the construction of a
500,000-gallon elevated water storage tank within the Fariston Community, Laurel
County, Kentucky. Section 531 of the Water Resources and Development Act (WRDA)
of 1996 (Public Law 104-303), as amended authorizes the Corps to provide design and
construction assistance for water related environmental infrastructure to rural counties
in southern and eastern Kentucky. The Corps defines the assistance to LCWD#2 as an
undertaking with the potential to cause effects to historic properties and initiates
consultation with United Keetoowah Band of Cherokee Indians in Oklahoma under
Section 106 of the National Historic Preservation Act.
The proposed project involves constructing a 500,000 gallon elevated water storage
tank within the boundaries of an industrial park in London, Laurel County, Kentucky.
The proposed water tank would provide excess capacity to supply the demand growth
and fire protection needs for an industrial park. The development of the industrial park
would occur without the Corps involvement. Therefore, the Corps defines the area of
potential effects (APE) as the footprint of the proposed water tower and an 800 m radius
from the water tower. The location of the proposed water tower falls within the
boundaries of the industrial park.
LCWD#2 coordinated the 132-acre industrial park project with the Kentucky Heritage
Council (KHC) through the Kentucky Clearinghouse. In response to KHC's comments,
LCWD#2 contracted with the University of Kentucky, Program for Archaeological
Research (UK-PAR) to complete an archaeological survey of the proposed 132-acre
industrial park. The report Phase I Archaeological Survey of a Proposed 132-acre
Industrial Park in London, Laurel County, Kentucky" presents the results. UK-PAR
identified two new archaeological sites and eight cultural isolated finds. No cultural
material was recovered from the proposed water tower APE.
KHC did not request an assessment of indirect visual introductions. In order to
address indireot effects created through the introduction of the water tower, Corps
archaeologist Valerie McCormack reviewed the National Register of Historic Places,
-2
and historic U.S.G.S. topographic maps. The National Register of Historic Places lists
nine properties for Laurel County; none of the properties is located within a half mile of
the water tower.
U.S.G.S. topographic maps available on the USGS historic map explorer
(http://historicalmaps.arcgis.com/usgsQ indicate a lack of buildings on the 1897 map.
By 1951 , several residential developments within the 800 m indirect APE are present.
The 1970 map and recent aerial images indicate that the area is undergoing continued
development. While the proposed water tower would introduce a new vertical element
on the landscape, it would not alter the existing setting, which includes a variety of
residential buildings, commercial and industrial buildings, and an airport.
A copy of this letter and supporting documentation is being forwarded to
Ms. Sheila Bird of your staff. Given the results of the archaeological survey and the
consideration of buildings and structures within the direct and i·ndirect APE, the Corps
believes the proposed water tower would not affect historic properties. The Corps
proposes concluding Section 106 consultation with a determination of "no historic
properties affected" and requests your comments on the proposed project. Please
contact Valerie McCormack at (615) 736-7847orvalerie.j.mccormack@usace.army.mil
if you require additional information.
Sincerely,
Angela E. Dunn
Chief, Project Plc:mning Branch
Enclosures