You can copy from here when filling out the rest of the page.
PROPOSED WELL PAD AND WELL INSTALLATION IN TERREBONNE PARISH
NAME OF APPLICANT: Hilcorp Energy Company, c/o TRC Environmental, 8550 United Plaza Boulevard, Suite 502, Baton Rouge, Louisiana 70809
LOCATION OF WORK: In tidal wetlands (Latitude: 29.442439, Longitude: -90.463539) near Montegut, Louisiana, in Terrebonne Parish, within the West Central Louisiana Coastal basin in hydrological unit (HUC 08090302), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to place approximately 13,983 cubic yards of material in wetlands for the construction of a 3.16 acre well pad, access road and appurtenant structures for the installation and maintenance of a proposed drill rig in the Cartwright Production Prospect. If the well is successful, two 4-inch flow lines will be installed to connect the well to two existing adjacent pipelines. The project will require the dredging and filling of 3.19 acres of tidal marsh habitat.
A Geologic Review meeting was held on August 28, 2018 and the proposed plan was determined to be the least environmental damaging practical alternative and the applicant has stated that the project has been designed to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for the unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
January 7, 2019
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1577
Project Manager
Patricia Clune
Patricia.R.Clune@usace.army.mil
MVN 2018-01461-CE
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC #190103-01
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Water Permits Division, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of
the Clean Water Act (P.L.95-17).
PROPOSED WELL PAD AND WELL INSTALLATION IN TERREBONNE
PARISH
NAME OF APPLICANT: Hilcorp Energy Company, c/o TRC Environmental, 8550
United Plaza Boulevard, Suite 502, Baton Rouge, Louisiana 70809.
LOCATION OF WORK: In tidal wetlands (Latitude: 29.442439, Longitude: -90.463539)
near Montegut, Louisiana, in Terrebonne Parish, within the West Central Louisiana
Coastal basin in hydrological unit (HUC 08090302), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army
authorization to place approximately 13,983 cubic yards of material in wetlands for the
construction of a 3.16 acre well pad, access road and appurtenant structures for the
installation and maintenance of a proposed drill rig in the Cartwright Production
Prospect. If the well is successful, two 4-inch flow lines will be installed to connect the
well to two existing adjacent pipelines. The project will require the dredging and filling of
3.19 acres of tidal marsh habitat.
A Geologic Review meeting was held on August 28, 2018 and the proposed plan
was determined to be the least environmental damaging practical alternative and the
applicant has stated that the project has been designed to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable. As compensation
2
for the unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland
credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of the Army Permit modification and the
Louisiana Department of Environmental Quality WQC will close 20 days from the date
of this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from
anyone having interest in this permit and/or this WQC request and must be mailed so as
to be received before or by the last day of the comment period. Letters concerning the
Corps of Engineers permit modification application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the
address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning
the Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of
Engineers Project Manager listed above. Any request must be specific and
substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If
granted, the time extension will be continuous to the initial comment period and,
inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department
of Environmental Quality and may be examined during weekdays between 8:00 a.m.
and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public,
federal, state, and local agencies and officials, Indian Tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
3
comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest
factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of this notice are being sent to the State Archeologist
and the State Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor
affect any habitat designated as critical to the survival and recovery of such species,
listed as endangered by the U.S. Department of Interior. The New Orleans District has
determined that the proposed project is located in waters known to be utilized by the
West Indian Manatee (Trichechus manatus). Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife
Service, Ecological Services Office, the Corps has determined that with the inclusion of
the Standard Manatee Conditions for In-Water Activities, proposed work is not likely to
adversely affect the West Indian Manatee.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of up to 0 acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
has been issued from the Department of Environmental Quality, Water Permits Division
under permit number WQC-190103-01.
4
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program (Louisiana Coastal Zone Application P20181177). The
Department of the Army permit will not be issued unless the applicant received approval
or a waiver of the Coastal Use Permit by the Department of Natural Resources.
For John M Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
AREA OF
PROPOSED WORK
As-built drawings and/or plats shall have written on them the date of completion of said
activities and shall be submitted to the Louisiana Department of Natural Resources, Office
of Coastal Management, P.O. Box 44487, Baton Rouge, LA 70804-4487 within 30 days
following project completion.
All structures built under the authorization and conditions of this permit shall be removed
from the site within 120 days of abandonment of the facilities for the herein permitted use,
or when these structures fall into a state of disrepair such that they can no longer function
as intended. This condition does not preclude the necessity for revising the current permit
or obtaining a separate Coastal Use Permit, should one be required, for such removal
activities.
S68°07'E
6.0 MILES
Structures must also be marked / lighted in accordance with U.S Coast Guard regulations.
5
REPRODUCED FROM STATE HIGHWAY MAP
0
5
10
In order to ensure the safety of all parties, the permittee shall contact Louisiana One Call
System (1-800-272-3020) a minimum of 48 hours prior to the commencement of any
excavation (digging, dredging, jetting, etc.) or demolition activity.
15
MILES
THESE PLANS WERE PREPARED FOR THE EXCLUSIVE
USE OF OBTAINING REGULATORY PERMIT(S) AND ARE
NOT TO BE USED TO ACQUIRE RIGHT-OF-WAY,
SERVITUDE OR EASEMENT FROM PROPERTY OWNERS,
NOR DO THEY PURPORT TO SHOW ALL PIPELINE
CROSSINGS OR OTHER ENCUMBRANCES.
16
4
5
6
27
T19S-R19E
T19S-R20E
PROP. DRILL SITE, LOCATION, & F/L'S
SEE PLANS 1 - 3 SHEETS 2 - 4 OF 5
7
8
9
18
17
16
NAD27
LA SOUTH ZONE
LAMBERT GRID NORTH
28
2,000
0
REPRODUCED FROM USGS LAKE BULLY CAMP QUADRANGLE
2,000
4,000
U.S. SURVEY FEET (1"=2,000')
PROPOSED DRILL SITE, LOCATION, & F/L'S
CARTWRIGHT PROSPECT
Lirette Field
Terrebonne Parish, Louisiana
PREPARED
BY:
OCEANEERING INTERNATIONAL, INC.
730 E. KALISTE SALOOM RD.
LAFAYETTE, LA 70508
(337) 210-0000
LA Reg. No. 747
JOB: 186433
DRW: REP
DATE: OCTOBER 18, 2018
CKD: AO
APP: REP
SHEET 1 of 5
DOC: 186433-OII-DRW-COE-001-01
REV.
0
APPROX. 15,092 CU. YDS. OF MATERIAL TO BE HAULED IN
TO CONSTRUCT DRILL SITE & RING LEVEES.
PROP. CULVERT
24" X 100'
'
80
Proposed Access
90'
174'
Proposed Fill (+3.0')
Average Fill = 3.0'
483 cu.yds.
0.10 acres
PP
P
Proposed Fill (+3.0')
Average Fill = 3.0'
13,500 cu.yds.
3.06 acres
'
P
AREA TO BE BOARDED
(122,500 SQ. FT.)
ER
X
V
LE
AIL
TR
G
FH
ER
A
N
RI
DRILL PAD
35
P
AIL
TR
Ring Levees 1,109 cu.yds.
EE
FIRE
HYDRANT
X
30
0'
Sec. 7
X
A CLOSED LOOP SYSTEM WILL BE
UTILIZED DURING DRILLING OPERATIONS.
T19S-R20E
h.
eP
h.
ch
ur
eP
fo
nn
La
bo
rre
Te
UPON ABANDONMENT OF LOCATION WETLANDS WILL
BE RESTORED AS NEAR TO PREPROJECT CONDITIONS
AS PRACTICABLE.
PP
MP
'
10
PU
ND
BE SE
U
HO
5
66
NIT
GU
LIN
0'
20
"
E
GIN
EN INE
G
EN INE
G
EN NK
TA
36
E
SC
A'
OV
ER
Y
VE
LE
DI
NK
TA
0'
E E '
NC LIN 17
FE ER CE ±
W N
PO ARA
E
CL
OO
&C
PP
Y.
G,
GIN
SE
D
0'
35
37
X=
Y=
3,557,688' (83)
343,785'
29°26'32.78"N
90°27'48.74"W
2,276,887' (27)
283,079'
HW
OG
U
HO
D&
NK
TA
MP
PU
NG
RI
X=
Y=
P
DL
MU
K
WR
ER
AIL
TR
S,
K
AC
W
DR
P
ER
B
SU
B
SU
E
OK R
CH AKE
SH
0'
10
ER
AIL
TR
ND
OU D
AR AN
RN NG
TU RKI
ER L PA
EL
HE NNE
N W RSO
EE
E
HT R P
EIG A FO
E
AR
'
PIP
0
15
DENOTES
SINGLE PILE
46 TOTAL
PLAN VIEW 1
100
0
100
U.S. SURVEY FEET (1"=100')
NAD27
LA SOUTH ZONE
LAMBERT GRID NORTH
PROPOSED DRILL SITE, LOCATION, & F/L'S
CARTWRIGHT PROSPECT
Lirette Field
Terrebonne Parish, Louisiana
PREPARED
BY:
OCEANEERING INTERNATIONAL, INC.
730 E. KALISTE SALOOM RD.
LAFAYETTE, LA 70508
(337) 210-0000
LA Reg. No. 747
JOB: 186433
DRW: REP
DATE: NOVEMBER 6, 2018
CKD: AO
APP: REP
SHEET 2 of 5
DOC: 186433-OII-DRW-COE-002-01
REV.
0
PROP. 4" F/L "A"
BEARING
DISTANCE
353'
S56°10'08"W
PROP. 4" F/L "B"
COURSE
2
3
4
5
BEARING
DISTANCE
90'
190'
330'
135'
S56°10'08"W
S33°49'52"E
N56°10'08"E
S33°49'52"E
T19S-R20E
h.
eP
h.
ch
ur
eP
fo
nn
La
bo
rre
Te
COURSE
1
Sec. 7
PP
P
X
3,558,068' (83)
343,648'
29°26'31.40"N
90°27'44.44"W
2,277,268' (27)
282,942'
AREA TO BE BOARDED
(122,500 SQ. FT.)
LE
X=
Y=
5
66
PP
Y.
HW
NG
RI
DRILL PAD
E
VE
X
X=
Y=
X=
Y=
FH
P
3,557,394' (83)
343,589'
29°26'30.86"N
90°27'52.07"W
2,276,594' (27)
282,882'
07+45'
PROP. TIE-IN
P
X=
Y=
FIRE
HYDRANT
X
03+53' E.O.L. "A"
PROP. TIE-IN
P
X=
Y=
PP
"
5
4
3
NG
4
E
VE
LE
DI
RI
"
"B
20
"
P.
O
PR
/L
"F
VE
RY
P
SC
O
"A
P
X=
Y=
2
/L
"F
.4
P
1
RO
3,557,688' (83)
343,785'
29°26'32.78"N
90°27'48.74"W
2,276,887' (27)
283,079'
"
T 12
VES
HAR
MARSH BUGGY R.O.W.
PLAN VIEW 2
NOT TO SCALE
100
0
100
U.S. SURVEY FEET (1"=100')
NAD27
LA SOUTH ZONE
LAMBERT GRID NORTH
PROPOSED DRILL SITE, LOCATION, & F/L'S
CARTWRIGHT PROSPECT
Lirette Field
Terrebonne Parish, Louisiana
PREPARED
BY:
OCEANEERING INTERNATIONAL, INC.
730 E. KALISTE SALOOM RD.
LAFAYETTE, LA 70508
(337) 210-0000
LA Reg. No. 747
JOB: 186433
DRW: REP
DATE: OCTOBER 18, 2018
CKD: AO
APP: REP
SHEET 3 of 5
DOC: 186433-OII-DRW-COE-003-01
REV.
0
0.5' LIMESTONE
B'
24" CULVERT
SECTION B - B'
B
90'
Pad/Ring Levees
fill left in place
11,506 cu.yds.
FIRE
HYDRANT
P
5'
FH
5'
18
X
17
P
0'
35
AREA OF PAD/RING LEVEES
TO BE REMOVED AFTER
DRILLING OPERATIONS
"TEMP. FILL"
3,103 CU.YDS. ±0.60 ACS
'
X
NG
RI
PP
25
EE
V
LE
X
117'
126'
od
Pr
n
tio
u
Eq
P
4
ip
0'
'
x1
EV
170
EE
u
od
Pr
'
0'
16
'
RIN
GL
n
o
cti
uip
Eq
'x
40
60
'
60
4'
12
1'
13
"
"A
PP
4'
21
9'
21
178
"
T 12
VES
HAR
DI
3,557,688' (83)
343,785'
29°26'32.78"N
90°27'48.74"W
2,276,887' (27)
283,079'
"
"B
20
"
F/L
4"
.
'
OP 141
PR
VE
RY
0'
37
'
SC
O
OP
PR
X=
Y=
P
uc
PRODUCTION PAD
60
5
66
PP
PROP. AREA TO BE LIMESTONE
(102,776 SQ. FT. 1,903 CU.YDS.)
X=
Y=
Y.
HW
'
5
12
/L
"F
.4
Sec. 7
P
X=
Y=
3,557,738' (83)
343,879'
29°26'33.71"N
90°27'48.16"W
2,276,938' (27)
283,173'
174'
Access fill left in place
483 cu.yds.
X=
Y=
'
80
NOT TO SCALE
T19S-R20E
h.
eP
h.
ch
ur
eP
fo
nn
La
bo
rre
Te
3.0' FILL
EXIST. ROAD
PLAN VIEW 3
100
0
100
U.S. SURVEY FEET (1"=100')
NAD27
LA SOUTH ZONE
LAMBERT GRID NORTH
PROPOSED DRILL SITE, LOCATION, & F/L'S
CARTWRIGHT PROSPECT
Lirette Field
Terrebonne Parish, Louisiana
PREPARED
BY:
OCEANEERING INTERNATIONAL, INC.
730 E. KALISTE SALOOM RD.
LAFAYETTE, LA 70508
(337) 210-0000
LA Reg. No. 747
JOB: 186433
DRW: REP
DATE: NOVEMBER 14, 2018
CKD: AO
APP: REP
SHEET 4 of 5
DOC: 186433-OII-DRW-COE-004-01
REV.
0
5'
2'
4'
3'
350'
BOARDED AREA
3'
FILL
2'
5'
FILL
4'
3.0'
SECTION A - A'
HORIZONTAL & VERTICAL
0
10
US SURVEY FEET (1"=10')
TIMBER PILE TO BE DRIVEN TO
REFUSAL. THEN CUT OFF FLUSH
WITH TOP OF FILL AREA.
TYPICAL PILE
NOT TO SCALE
BOARDED AREA
3.0'
FILL
TIMBER PILE
SPOIL TO BE TEMPORARILY STOCKPILED ON EITHER
SIDE OF DITCH AS NOT TO INTERFERE WITH THE FLOW
OF CANALS, SLOUGHS, & BAYOUS, ETC. DITCH IS TO BE
BACKFILLED TO THE MAXIMUM EXTENT PRACTICABLE
WITH AVAILABLE MATERIALS. APPROX. 212 CU. YDS. OF
EXCAVATION REQUIRED FOR PIPE DITCH.
TYPICAL PIPELINE DITCH
NOT TO SCALE
PROP. FLOWLINE
(358')
4'
3'
SPOIL
MIN.
3.2'
5'
4'
PROPOSED DRILL SITE, LOCATION, & F/L'S
CARTWRIGHT PROSPECT
Lirette Field
Terrebonne Parish, Louisiana
PREPARED
BY:
OCEANEERING INTERNATIONAL, INC.
730 E. KALISTE SALOOM RD.
LAFAYETTE, LA 70508
(337) 210-0000
LA Reg. No. 747
JOB: 186433
DRW: REP
DATE: NOVEMBER 6, 2018
CKD: AO
APP: REP
SHEET 5 of 5
DOC: 186433-OII-DRW-COE-002-01
REV.
0