The District Commander, U.S. Army Corps of Engineers, Omaha District, 1616 Capitol Avenue, Suite 9000, Omaha, Nebraska 68102-9000 proposes to issue Version 6 of Regional General Permit 199222002 (RGP 9202-06). The permit would authorize construction of boat ramps and attendant features in waters of the United States located in Wyoming pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 (U.S.C. 1344).

The District Commander, U.S. Army Corps of Engineers, Omaha District, 1616 Capitol Avenue, Suite 9000, Omaha, Nebraska 68102-9000 proposes to issue Version6 of Regional General Permit 199222002 (RGP 9202-06). The permit would authorize construction of boat ramps and attendant features in waters of the United States located in Wyoming pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 (U.S.C. 1344).

PUBLIC NOTICE Permit No: Regional General Permit 199222002, Version 6 Permittee: General Public Waterway: Waters of the U.S. in Wyoming Effective Date: January 14, 2019 Expiration Date: February 13, 2019

30 Day Notice Wyoming Regulatory Office

2232 Dell Range Blvd., Suite 210

Cheyenne, Wyoming 82009

JOINT NOTICE OF PERMIT PENDING U.S. ARMY CORPS OF ENGINEERS AND WYOMING DEPARTMENT OF ENVIRONMENTAL QUALITY The District Commander, U.S. Army Corps of Engineers, Omaha District, 1616 Capitol Avenue, Suite 9000, Omaha, Nebraska 68102-9000 proposes to issue Version 6 of Regional General Permit 199222002 (RGP 9202-06). The permit would authorize construction of boat ramps and attendant features in waters of the United States located in Wyoming pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 (U.S.C. 1344). RGP 9202-06 would be issued in accordance with the "Regulatory Programs of the Corps; Final Rule," as published in the Federal Register, Volume 51, Number 219, dated November 13, 1986. A consolidated version of the regulations updated through April 2008 is available from the Corps Headquarters web site at: http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/FederalRegulation.aspx Section 322.2(f) of the regulations defines "general permit" as a Department of the Army authorization that is issued on a nationwide or regional basis for a category or categories of activities when those activities are substantially similar in nature and cause only minimal individual and cumulative environmental impacts. Section 325.2(e)(2) of the regulations defines regional permits as a type of general permit issued by a division or district engineer after compliance with the other procedures of the regulations. After a regional permit has been issued, individual activities falling within those categories that are authorized by such regional permits do not have to be further authorized by the procedures of the regulations. The issuing authority will determine and add appropriate conditions to protect the public interest. When the issuing authority determines on a case-by-case basis that the concerns for the aquatic environment so indicate, he may exercise discretionary authority to override the regional permit and require an individual application and review. No regional permit shall be issued for a period of more than five years. The Corps began development of a regional general permit for construction of boat ramps in January 1992 after receiving a request from the Wyoming Game and Fish Department. The first version of RGP 92-02 was issued in June 1992. The Corps revised RGP 92-02 and issued it in 1997, 2002, 2008, and 2013, after each previous version expired. The most recent version of RGP 92-02 (RGP 9202-05) expired on December 31, 2018. That permit has authorized 11 projects during the last five year term.

The Corps is now considering issuance of RGP 92-02 version 6 (RGP 9202-06). The permit would authorize the construction of new boat ramps, the expansion, extension and modification of existing boat ramps, construction of transfer walls and docks to service boat ramps, and protective fills immediately adjacent to proposed and existing ramps. See Appendix A attached to this notice for a list of proposed authorized activities, general conditions and typical drawings of a single lane concrete boat ramp, double lane concrete boat ramp, and single lane gabion boat ramp. The Corps is soliciting comments from the public; federal, state, and local agencies; Indian tribes; and other interested parties in order to consider and evaluate impacts of the proposed action. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny RGP 9202-06. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental affects, and other public interest factors. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the project. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and shall identify what additional information would be obtained. The request must be submitted to the Corps at the following address: U.S. Army Corps of Engineers Wyoming Regulatory Office 2232 Dell Range Boulevard, Suite 210 Cheyenne, Wyoming 82009 Any interested party (particularly officials of any town, county, state, federal agency, or local association whose interests may be affected by the project) is invited to submit to this office written facts, arguments, or objections on or before the expiration date of this notice. Any agency or individual having an objection to the project should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be mailed to the address listed above. Mr. John Derbish may be contacted for additional information by telephone at (402) 996-3778 or by electronic mail at: john.derbish@usace.army.mil The Wyoming Department of Environmental Quality (WDEQ), Water Quality Division, 200 W. 17th St. Cheyenne, Wyoming 82002, will review the application and comments with intent to certify in accordance with provisions of Section 401 of the Clean Water Act of 1972, as amended. The certification, if issued, will express the state's opinion that authorized activities will not result in a violation of applicable water quality standards. The WDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. Authorized activities that would occur in areas where the Corps is the lead federal agency will be evaluated to ensure compliance with the National Historic Preservation Act of 1966. The Corps may require surveys within the permit area to check for unknown historic properties and consult with the State Historic Preservation Officer if warranted. Authorized activities that would occur in areas where the Corps is the lead federal agency will be evaluated to ensure compliance with the Endangered Species Act of 1973. The Corps will evaluate potential affects on listed species and consult with the U.S. Fish and Wildlife Service if an authorized activity may affect threatened or endangered species, or critical habitat.

The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the project on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife, flood plains, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and considerations of property ownership. In addition, the evaluation will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under the authority of Section 404 (b) of the Clean Water Act of 1972, as amended (40 C.F.R.; Part 230). Comments received after the close of business on the expiration date of this public notice will not be considered.

This and other public notices issued by the Wyoming Regulatory Office can also be obtained by visiting its web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Wyoming.aspx

Appendix A AUTHORIZED ACTIVITIES This general permit would authorize the construction of new boat ramps, the expansion, extension and modification of existing boat ramps, construction of transfer walls and docks to service boat ramps, and protective fills immediately adjacent to proposed and existing ramps. Permanent and temporary activities allowed in jurisdictional areas would include, but are not limited to: Boat Ramps. Placement of dredge and fill material into rivers, lakes, and reservoirs for the purpose of providing access to the waterbody by watercraft. Material may include soil, gravel, concrete, and rock, including wire baskets filled with rock (gabions). Excavation activities such as redistribution of bed material necessary to prepare the substrate prior to placement of other fill materials. Erosion Protection. Placement of fill material to protect boat ramps and attendant features from damage due to wind and wave action. Erosion protection also includes stabilization of shorelines and stream banks within 100 feet on either side of boat ramps. Walkways, Transfer Walls, and Docks. Walkways and other permanent features parallel to ramps that provide access to boat docks and other attendant features for pedestrians. Also includes boat docks and other attendant features in navigable waters subject to regulation under Section 10 of the Rivers and Harbors Act. Temporary Cofferdams. Construction of temporary cofferdams formed by redistribution of bed material or use of imported suitable fill materials. Temporary is defined as six weeks or less with restoration of substrate contours and removal of all imported fill material. The general conditions listed below and the Special Conditions attached as Appendix B to this notice would apply to the use of this general permit: Equipment for handling, conveying and discharging materials during construction shall be operated to prevent dumping or spilling the materials into waters of the U.S. except as approved herein. Only those materials identified in the Project Description are authorized to be discharged. All dredged or excavated materials, with the exception of that authorized herein, will be placed on an upland site above the ordinary high water line in a confined area, not classified as a wetland, to prevent the return of such materials to the waterway. All construction debris (which includes excess dredge and/or fill materials, wood, cleared vegetation, concrete, and all other materials not specifically addressed in the permit) will be disposed of on land in such a manner that it cannot enter a waterway or wetland. All work in the waterway is performed in such a manner so as to minimize increases in suspended solids and turbidity, which may degrade water quality and damage aquatic life outside the immediate area of operation. Clearing of vegetation will be limited to that which is absolutely necessary for construction of the project.

Areas along the bank disturbed or newly created by the construction activity which will not be riprapped, will be seeded with vegetation both in kind and quantity (this will include herbaceous and woody species) that are indigenous to the area for protection against subsequent erosion and to minimize adverse impacts to fish and wildlife resources. This may require maintenance such as reseeding, watering, implementation of grazing restrictions, fencing, etc., to ensure the survival of the replacement vegetation. Discharges will consist of suitable material free from toxic pollutants in toxic amounts. Only clean rock material from a non-streambed source will be utilized for riprap or associated with the placement of riprap in order to avoid the percolation of fines which would result in excessive local turbidity. When the District Engineer has been notified that a dredging or filling activity is adversely affecting fish or wildlife resources or the harvest thereof and the District Engineer subsequently directs remedial measures, the permittee will comply with such directions as may be received to suspend or modify the activity to the extent necessary to mitigate or eliminate the adverse effect as required. Attached are drawings of a typical single lane concrete boat ramp, double lane concrete boat ramp, and single lane gabion boat ramp as the types of structures and fills that would be authorized.

PREVAILING WIND DIRECTION

I I I

I

50' M.11

VARIES

I

I

8

I

\._

N.H.W.I.. ----------

-

--------- - --------------....... , -

-

8'

A 6"

WALK FOR FLOATING DOCK

A

stAB

CONCRill

cm

CONCRaE PLANK OR SW

N.H.W.L. r __ _

I I I I

8

-

--

------- --

-

-

--- -----

--

-

--------'

---

WYOMING GAME AND FISH DEPT. DRAWING NO. 1 TYPICAL SINGLE BOAT RAMP PLAN VIEW N.T.S.

6"

-- -- \ oosm«: GROtMD

oo_\

N.H.W.I..

COll'ACltD PIT RUN

YElyo':U

-

U:: SE:O;:A N.T.S.

£AR1H fUJ.

---

- ......,. '

r-

INl...'j....... \J

SECTION B::B N.T.S.

12· or 2" TO I" SP

EXCAVAllON

STATE WIDE

I I I

I

50'

VARIES

I

I

B

RIPRAP 050 =I 2"

I \.....

llAX

N.H.W.l.

-- ---------

---------

----- - ---------

A

A

N.H.W.L

,-- - - -------- -------------------- --

I

B

WYOMING GAME AND FISH DEPT. DRAWING NO. 2 TYPICAL DOUBLE BOAT RAMP PLAN VIEW

I

I I

N.T.S.

6"

&' COHCR£I[ SUB

RIPRAP SlfOUUlEJI 2· IJ!A. llOCK

.. -

-

N.H.W.l.

- ....__ -- _ mAD SURf'Aa: CRAVD. -- -_

CIHIPACltll PIT RUN GRAVO.. 1· DIA. MAX.

j- ::.: N.T.S.

£Milt ru

i5 "'

--

--

'-. -

12° or 2° TO f" SP

SECTION B-B N.T.S. ·.

w..'J'-. \J

-

EXCAYATIOH

STATE WIDE

-

-

--

-

-

-

B

A

9 -

-

WYOMING GAME AND FISH DEPT. TYPICAL GEOWEB OR GABION BOAl' RAMP DRAWING NO. 3 PLAN VIEW N.T.S.

SEC'DON B-E N.T.S.

SECJJON A-A N.T.S.

STATE WIDE

Appendix B Special Conditions All activities authorized under this permit must comply with the following special conditions: 1. Notification: All prospective permittees must submit a Notice of Intent (NOI) to the U.S. Army Corps of Engineers in accordance with the notification procedure described in Appendix C prior to initiating any authorized activities in waters of the United States. The permittee shall not undertake any authorized activities until the Corps provides written verification that proposed activities are authorized by RGP 9202-05. The Corps may withhold verification by exercising discretionary authority and require application for a standard (individual) Department of the Army permit in accordance with 33 CFR 325.2(e)(2) 2. Length, Width, Area, and Volume Limits: Maximum length of erosion protection structures along the shoreline or stream bank is 200 feet. Maximum length of boat ramps is 600 feet. Maximum width of boat ramps is 72 feet for all lanes combined which includes the travel surface only and does not include other features adjacent to the ramp. Maximum volume of permanent discharges of dredge and fill material into waters of the U.S. for a single and complete project is 4,000 cubic yards. Maximum filled area in waters of the U.S. for a single and complete project is 1.0 acre and loss of wetland cannot exceed 0.1 acre. A single and complete project includes all activities authorized at a single boat ramp location during the five year term of RGP 9202-05. 3. Suitable Fill Material: No discharge may consist of unsuitable material (e.g., trash, debris, car bodies, asphalt, organic material, etc.) and material discharged must be free from toxic pollutants in toxic amounts as required by Section 307 of the Clean Water Act. The Omaha District issued a Special Public Notice on October 20, 2011, prohibiting use of certain materials as fill in waters of the U.S. within the regulatory boundaries of the Omaha District, which includes the State of Wyoming. 4. Best Management Practices: Permittees are required to minimize adverse effects on the aquatic ecosystem by implementing the following measures whenever possible: (a) Store all construction debris in a manner that prevents it from entering a waterbody or wetland. (b) Operate equipment that conveys materials during construction to prevent dumping or spilling unauthorized materials into the waterbody or wetland. (c) Perform activities in a manner that minimizes suspended solids and turbidity to prevent degradation of water quality and damage to aquatic life outside the immediate area of operation. (d) Use only clean rock material from an upland source for erosion protection. Use of substrate materials for temporary cofferdams is allowed provided the material is returned to the source area and the bottom elevation is restored to near normal contours. (e) Limit clearing of vegetation to the minimum necessary during construction. (f) Coordinate with downstream water users advising them of any water quality changes that may occur during construction. (g) Conduct operations on shore in a manner that controls soil erosion and sediment transport. (h) Comply with remedial measures given by the District Engineer if notified that the authorized activity is adversely affecting fish or wildlife resources or the harvest thereof. This may include suspending or modifying the activity to the extent necessary to mitigate or eliminate adverse affects. (i) Seed areas along banks or shorelines which were disturbed or cleared with plant species indigenous to the area. (j) Ensure that petroleum products, chemicals, or other deleterious materials are not disposed of or allowed to enter the water by taking precautions to prevent accidental entry of such materials into the water. (k) Properly clean construction equipment to prevent the movement of invasive seeds or plant material to or

from the construction site. 5. Water Quality Certification: Permittees must comply with all conditions established by the Wyoming Department of Environmental Quality, Water Quality Division under Section 401 of the Clean Water Act as specified in its certification letter (copy attached). Project specific 401 certification must be obtained from the EPA for any activities proposed for authorization under the GP on Tribal lands within the boundaries of the Wind River Indian Reservation. Permittees must also comply with all Section 401 conditions established by the U.S. Environmental Protection Agency if it provides water quality certification for specific activities on the Wind River Indian Reservation. 6. Fens: This permit is not applicable to activities that involve impacts to fens. Fens are defined as wetlands that contain (all or in part) soils classified as histosols or mineral soils with a histic epipedon. 7. Springs: This permit is not applicable to activities that involve impacts within 100 feet of the water source of natural spring areas. A spring area is defined as any location where there is an artesian flow of water emanating from a distinct point. Springs do not include seeps and other groundwater discharge areas where there is no distinct point source. 8. Spawning Areas: Discharge in spawning areas during the spawning seasons must be avoided to the maximum extent possible. General spawning seasons for common fish species in Wyoming are: Rainbow and Cutthroat Trout - March 15 through July 31 Brown and Brook Trout - September 15 through November 30 Permittees are encouraged to obtain site specific information on spawning areas and seasons from Fisheries Supervisors in Wyoming Game and Fish Department Regional Offices. 9. Wild and Scenic Rivers: No discharge may occur in a component of the National Wild and Scenic River System; or in a river officially designated by Congress as a "study river" for possible inclusion in the system, while the river is in an official study status; unless the appropriate federal agency, with direct management responsibility for such river, has determined in writing that the proposed discharge will not adversely effect the Wild and Scenic River designation, or study status. 10. Historic Properties: No discharge is authorized that would adversely affect sites included in the most current listing of the National Register of Historic Places or sites known to be eligible for such listing, sites included in the National Register of Natural Landmarks, or any other known historic, cultural, or archaeological sites until the District Engineer has complied with the provisions of 33 CFR Part 325, Appendix C pursuant the National Historic Preservation Act of 1966. 11. Threatened and Endangered Species: No discharge is authorized that is likely to jeopardize the continued existence of threatened or endangered species or that will result in the destruction or adverse modification of designated or proposed critical habitat pursuant to the Endangered Species Act (ESA) of 1973, as amended. Permittees must comply with any special terms and conditions adopted by the Corps as a result of consultation with the U.S. Fish and Wildlife Service to avoid or reduce potential adverse affects on threatened and endangered species, or critical habitat.

12. Tribal Rights: No discharge is authorized that would impair reserved tribal rights; including, but not limited to, water, fishing, and hunting rights. 13. Proper Maintenance: Boat ramps and other authorized attendant features must be properly maintained, including maintenance necessary to ensure public safety. Maintenance does not include dredging activities that result in unauthorized discharges. 14. Stockpiling: Storage of excess soil or unwanted vegetation in wetland areas is allowed on a temporary basis only, not to exceed the duration of construction. Stockpiling of materials is not allowed in flowing or standing water.

APPENDIX C NOTICE OF INTENT (NOI) PROCEDURES Prospective permittees are required to submit a Notice of Intent (NOI) as specified in Special Condition 1. The NOI's must contain sufficient information as defined below for the Corps to determine if a project complies with the terms and conditions of RGP 9202-05. However, the Corps or EPA may require additional information if necessary to ensure compliance. The permittee is not allowed to proceed with authorized activities until after receipt of a letter of verification from the Corps. 1. Applicant: Name, address, and telephone number of the permittee (project proponent) and contact persons. 2. Project Location: A legal description of the project location, including borrow and disposal sites, by quarter, section, township, and range. An enlarged copy of the appropriate portion of the U.S. Geologic Survey topographic map for the area is the preferred method of specifying the location. 3. Project Description: A brief written description of all project features, including all dimensions; composition and volume (cubic yards) of all fill materials; filled area; and area of excavation. The NOI must include a wetland delineation map (see item 5 below) if wetlands would be filled. Also specify types and numbers of construction equipment to be used, total area of surface disturbance including upland; and any other relevant information that would facilitate processing the NOI. 4. Project Drawings: Drawings of all project features, preferably on 11" by 17" paper, in both plan view and cross section. Plan view drawings must identify the stream, lake, or reservoir boundary as defined by the ordinary high water elevation in relation to all other project features. A wetland delineation map must also be provided showing existing wetland boundaries in addition to other water features if wetlands exist in the project area. 5. Wetland Delineation: A wetland delineation must be completed in accordance with the U.S. Army Corps of Engineers Wetland Delineation Manual dated January 1987 and any current supplements for all wetland areas that could be affected by authorized activities. Information on delineations can be found at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/reg_supp/ Delineation maps must show boundaries of all areas that meet the definition of wetland and boundaries of all other water features in the project area such as ditches, streams, lakes, and reservoirs. 6. Photographs: Photographs of the project area showing typical wetland boundaries and ordinary high water elevations are necessary to document site conditions. The NOI must be mailed to the following address at least 30 days prior to the anticipated start of construction. U.S. Army Corps of Engineers Wyoming Regulatory Office 2232 Dell Range Boulevard, Suite 210 Cheyenne, Wyoming 82009-4142 Questions concerning the NOI procedure should be directed to Mr. Michael Happold by at (307) 772-2300 or Mike.T.Happold@usace.army.mil

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas