Home

Charleston District

Run scraper

Henry Brown Boulevard Phase 2 Road Widening Berkeley County

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Henry Brown Boulevard Phase 2 Road Widening Berkeley County, South Carolina

The applicant is proposing that 3,412 cubic yards of fill material will be placed within the 1.14 acres of jurisdictional, freshwater wetlands and 271 cubic yards of clean rip rap will be placed below the Ordinary High Water Mark of tributaries that flow through these wetland areas in order to widen the existing road. The applicant has proposed to mitigate for impacts to wetlands and/or waters of the United States by purchasing 11.0 wetland mitigation credits from a wetland mitigation bank to be determined at a later date. The project purpose is widening an existing road corridor.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas