Home

Galveston District

Run scraper

Sunoco Partners Marketing & Terminals L.P.

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant requests to modify the previously authorized Permit SWG-2007-01401.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant requests to modify the previously authorized Permit SWG-2007-01401 (Formerly 09855) to construct a new 15- x 20-foot gangway tower foundation extending from the previously authorized platform and the associated new gangway tower, a new 12- x 42.5-foot-tall hose tower on the previously authorized platform, three new product loading arms on the previously authorized platform, one new 54-inch breasting dolphin with 5.5- x 12-foot fenders extending 8.5 feet into the Neches River, four new 5.5-foot breasting fenders on existing dolphins extending 8 feet into the Neches River, and a new piperack with nine 24-foot-wide rack bents spaced every 20 feet.

The proposed construction will increase the facility’s existing fenderline by 2 feet. The facility is located in a portion of the Neches River designated as a “yellow” setback zone.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas