Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan
Please open the attachment to view the full Public Notice.
US Army Corps
of Engineers
Public Notice
Detroit District
Applicant: Enbridge Pipelines (Lakehead), LLC
In Reply Refer To: Corps File No. LRE-2010-00463-56-N18
Date: January
Expires: February
29, 2019
17, 2019
Proposed anchor structures, dredging, and discharge at the Enbridge Line 5
pipeline in the Straits of Mackinac, Michigan
Applicant: Enbridge Pipelines (Lakehead) LLC
26 East Superior Street, Suite 309, Duluth, MN 55802
Project Location: The site is located in the Straits of Mackinac between Point
LaBarbe and McGulpin Point, Emmet and Mackinac Counties, Michigan.
Federal Authority: The applicant has applied for a Department of the Army permit
under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean
Water Act.
State Authority: Section 401 of the Clean Water Act requires that all discharges of
dredged or fill material must be certified by the State as complying with applicable
effluent limitations and water quality standards. Coastal Zone Management Certification
(or waiver thereof) is required from the State of Michigan if this proposed activity would
occur within the designated coastal zone.
Project Description: As shown on the attached plans, the applicant proposes to install
51 helical anchor structures on the existing pipeline, including the 48 anchors described
in the USACE public notice of June 29, 2018, and 3 additional anchors proposed in
September 2018. Anchors would consist of a helical anchoring system with saddle
mounts. The anchors would be augured into the lakebed to a depth of approximately
10 feet. Work would be conducted from a barge with diver assistance. A total of up to
10 cubic yards of material would be dredged from an area approximately 4 feet long, 2
feet wide, and 1 foot deep, if needed to accommodate anchor saddle installation at
some proposed anchor locations. A total of up to 5 cubic yards of material would be
dredged from a similar sized area at 3 locations where anchors were authorized in 2017
but have not yet been installed. The dredged material would be discharged on the
lakebed adjacent to the dredge area.
The applicant further proposes to dredge and discharge lakebed sediment in
association with the inspection of 128 existing pipeline anchor structures. A total of up
to 300 cubic yards of sediment would be dredged from an area up to 40 feet long, 5
File No. LRE-2010-00463-56-N18
January 29, 2019
feet wide, and 2 feet deep at up to 128 anchor sites by pumping, water jetting, and
hand excavation to expose the pipeline for inspection, if needed. If coating repairs are
needed in close proximity to an anchor, approximately 4 cubic yards of sand bags
would be temporarily placed in a 6-foot by 6-foot area underneath the pipeline to
support it as the anchor saddle is removed and replaced following coating repair. A
total of 13 cubic yards would be dredged from areas approximately 5 feet wide and 3
feet deep, and discharged on the adjacent lakebed for pipeline coating inspection and
possible repair at 3 locations not associated with anchor structures. The purpose of the
proposed work is to maintain the existing pipeline in accordance with state and federal
requirements.
Avoidance & Minimization: The applicant has stated the following concerning
avoidance and minimization of impacts to Waters of the United States: "Enbridge has
sought to minimize impacts to waters of the United States by limiting the extent of
bottom disturbance to the minimal amount necessary to safely complete the proposed
work activities. The extent of bottom disturbance described in our application is the
maximum potential. The actual amount of bottom disturbance is anticipated to be
significantly less." The Corps has not verified the adequacy of the applicant's
avoidance and minimization statement at this time.
Compensatory Mitigation: The applicant has stated the following concerning
compensatory mitigation for unavoidable impacts to Waters of the United States:
"Enbridge believes compensatory mitigation should not be required for the work
activities described in our applications due to the minimal footprint of bottom
disturbance, all of which qualify under the nationwide permits." The Corps has not
verified the adequacy of this mitigation proposal at this time.
Other Authorizations: A permit is required from the Michigan Department of
Environmental Quality under applicable provisions of the Natural Resources and
Environmental Protection Act (NREPA), 1994 PA 451. The State file number is 24Enbridge Energy, LP - Straits of Mackinac
Comments: We are publishing this notice in compliance with Title 33 Code of Federal
Regulations Parts 320-332. Comments on the project should be submitted in writing
and postmarked or delivered by the expiration date of this public notice. Comments of
a positive or negative nature may be submitted. All responses must refer to file number
LRE-2010-00463-56-N18. We will interpret a lack of response as meaning that there is
no objection to the permit application. Comments should be filed with:
2
File No. LRE-2010-00463-56-N18
January 29, 2019
Kerrie E. Kuhne
Chief, Permit Evaluation Western Branch
Regulatory Office
Detroit District, Corps of Engineers
477 Michigan Avenue
Detroit, Michigan 48226-2550
Comments may be e-mailed to: Katie.L.Otanez@usace.army.mil but must include a
name and mailing address.
Public Hearing: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this application.
Requests for public hearings shall state, with particularity, the reasons for holding a
public hearing.
Evaluation: The decision whether to issue the Department of the Army permit will be
based on evaluation of the probable impacts of the proposed activity on the public
interest. That decision will reflect the national concerns for both protection and
utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property ownership,
and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian Tribes; and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps of Engineers to determine whether to issue, modify, condition
or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public
interest of the proposed activity.
This activity involves the discharge of dredged or fill material into waters of the United
States. Therefore, the U.S. Army Corps of Engineers' evaluation of the impact of the
activity on the public interest will include application of the guidelines promulgated by
3
File No. LRE-2010-00463-56-N18
January 29, 2019
the Administrator of the Federal Environmental Protection Agency, under the authority
of Section 404(b)(1) of the Clean Water Act.
Endangered Species: We will review this application for the potential impact on
threatened or endangered species pursuant to Section 7 of the Endangered Species
Act as amended. We are not aware of the presence of any listed species or critical
habitat at or in the vicinity of the proposed worksite. We invite information and/or
comments regarding the potential presence of, or impacts to, any listed species or
critical habitat.
Cultural Resources: The District Staff has reviewed existing information on historic
properties potentially affected by the proposed project, including the National Register
of Historic Places. There are no recorded historic properties within the permit area.
The proposed work is of such a limited nature and extent that little likelihood exists for
the project to impinge upon an unrecorded historic property. The District Engineer
invites responses to this public notice from federal, state and local agencies, historical
and archaeological societies, Indian tribes, and other parties likely to have knowledge of
or concerns with historic properties in the area.
Additional Information: This public notice and drawings are also available for
viewing/printing at:
http://www.lre.usace.army.mil/Missions/RegulatoryProgramandPermits/PublicNotices.as
px. Questions concerning this application may be directed to Katie Otanez at the Corps
of Engineers address listed above, or telephone number (313) 226-5479.
FOR THE DISTRICT ENGINEER:
Kerrie E. Kuhne
Chief, Permit Evaluation Western Branch
Regulatory Office
NOTICE TO POSTMASTERS:
We request that the above notice be conspicuously and continuously posted for the
time period of this notice.
4
Supplemental Information
Enbridge Pipelines (Lakehead) L.L.C.
2018 Line 5 Anchor Installation Project
Mackinac and Emmet Counties, Michigan
PROJECT SUMMARY
3 Proposed Activities and Construction Methods
Enbridge Pipelines (Lakehead) L.L.C. (Enbridge) is planning to conduct maintenance on
the existing dual 20-inch-diameter pipelines beneath the Straits of Mackinac. Enbridge is
proposing to install pipeline anchors at 48 locations to comply with federal consent decree
(Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68. These pipeline anchors are
in addition to the 22 anchors applied for in 2017 (submission number 2RD-DFDK-Y35G).
Enbridge, considering the history of previous pipeline anchor installation work, is seeking
authorization to complete this project from the Michigan DEQ under Act 451, Section 325
and from USACE under Nationwide Permit 12.
Project activities will involve the installation of pipeline anchors which consist of a helical
anchoring system with saddle mounts around the pipeline at each of the proposed
locations. The 48 anchors will be augured directly into the lake bed. Each anchor uses
two 10-inch-diameter by 10-foot long screws. The total lake bottom impact from the
anchors will be approximately 20 cubic yards with a total footprint of about 53 ft2. The
proposed locations for installation of the anchors are provided in Attachment A.
Attachment B contains typical drawings depicting the auguring apparatus, as well as
equipment that will be used for installation. Attachment C contains the anchor installation
procedure.
A marine infrastructure and utility contractor, Ballard Marine Construction, will work from
barges to complete the anchor installation. No new on-land staging, temporary
workspaces, or new access routes will be required for the Project. The Project is
scheduled to begin in July 2018.
Ballard Marine Construction will maintain a safety plan and an environmental protection
plan for this work activity (Attachment D). In the unlikely event of pipeline damage during
this project, Enbridge will implement a repair plan. If a release were to occur from the
pipeline during this project, Enbridge would respond following the company Integrated
Contingency Plan and Straits Tactical Response Plan.
4 Project Purpose, Use and Alternatives
The installation of 48 pipeline anchors is being proposed to comply with federal consent
decree (Case 1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68.
This Project is pipeline maintenance and is not associated with a new utility installation.
The proposed activities are for the sole purpose of maintaining the previously authorized
1
Supplemental Information
Enbridge Pipelines (Lakehead) L.L.C.
2018 Line 5 Anchor Installation Project
Mackinac and Emmet Counties, Michigan
pipelines, and are consistent with those activities authorized under Nationwide Permit 12.
The method of anchor installation is anticipated to incur no environmental impacts.
2
Canada
WI
Michigan
IL
IN
OH
WAP-1
WAP-2
WAP-6
WAP-7
WAP-8
WAP-9
WAP-10
WAP-11
WAP-12
WAP-13
WAP-14
WAP-15
WAP-16
WAP-17
WAP-18
WAP-19
WAP-20
EAP-6
EAP-7
EAP-8
EAP-9
EAP-10
EAP-11
EAP-12
EAP-13
EAP-14
EAP-15
EAP-16
EAP-17
EAP-18
EAP-19
EAP-20
EAP-21
EAP-22
EAP-23
EAP-24
EAP-25
EAP-26
EAP-27
EAP-28
Copyright:© 2013 National Geographic Society, i-cubed
0
0.5
1
Miles
1 inch = 1 miles
Figure 1a
Line 5 Straits of Mackinac
Enbridge Pipelines (Lakehead) L.L.C.
2018 Proposed Anchor Locations
For Environmental Review Purposes Only
2018 Proposed Anchor Locations
Line 5
Source: Z:\Clients\E_H\Enbridge\Line_5_Straits_of_Mackinac\Permitting\Maintenance\201802\L5_Straits_of_Mackinac_2018_Anchors_Overview_Topo.mxd
WAP-5
Date: (2/14/2018)
WAP-3
WAP-4
EAP-1
EAP-2
EAP-3
EAP-4
EAP-5
Supplemental Information
Enbridge Pipelines (Lakehead) L.L.C.
Line 5 Anchor Installation Project September 2018
Mackinac and Emmet Counties, Michigan
PROJECT SUMMARY
3 Proposed Activities and Construction Methods
Enbridge Pipelines (Lakehead) L.L.C. (Enbridge) is planning to conduct preventive
maintenance on its existing dual 20-inch-diameter pipelines beneath the Straits of
Mackinac following a visual survey. Enbridge is proposing to install three anchors along
the pipelines to comply with federal consent decree (Case 1:16-cv-00914, ECF No. 3 filed
7/20/16) condition 68 and its subsequent modifications.
Enbridge, considering the history of previous anchor installation work, is seeking
authorization to complete this project from the Michigan Department of Environmental
Quality (DEQ) under Act 451, Section 325 and from U.S. Army Corps of Engineers
(USACE) under Nationwide Permit 12.
These pipeline anchors are in addition to the application for the 48 anchors applied for
earlier in 2018 (DEQ submission number HNC-AR90-WAHM0; USACE File 2010-0046356-N18).
Project activities will involve the installation of a helical anchoring system with saddle
mounts around the pipeline in each of the proposed locations. Two of the three installation
locations will require minor excavations to properly install the anchors. Less than 1 cubic
yard of sediment will need to be excavated at each location. The three anchors will be
augured directly into the lake bed.
Each anchor uses two 10-inch-diameter by 10-foot-long screws. The proposed locations
for installation of the three anchors are provided in Attachment A. Attachment B contains
typical drawings depicting the plan and profile view, auguring apparatus, as well as
equipment that will be utilized for installation. Attachment C contains the anchor
installation methodology.
A marine infrastructure and utility contractor, Ballard Marine Construction, working from
barges, will be used to complete the anchor installation. No new on-land staging,
temporary workspaces, or new access routes will be required for the Project. The Project
is expected to take approximately one week to complete, depending on weather.
Ballard Marine Construction will maintain a safety plan and an environmental protection
plan for this work activity (Attachment D). In the unlikely event of pipeline damage during
this project, Enbridge will implement a repair plan. If a release were to occur from the
pipeline during this project, Enbridge would respond following the company Integrated
Contingency Plan and Straits Tactical Response Plan.
1
Supplemental Information
Enbridge Pipelines (Lakehead) L.L.C.
Line 5 Anchor Installation Project September 2018
Mackinac and Emmet Counties, Michigan
4 Project Purpose, Use and Alternatives
These three proposed anchors are for compliance with federal consent decree (Case
1:16-cv-00914, ECF No. 3 filed 7/20/16) condition 68 and its subsequent modifications.
This Project is not associated with a new utility installation. The proposed activities are
for the sole purpose of maintaining the previously authorized pipelines and are consistent
with those activities authorized under Nationwide Permit 12. The method of anchor
installation is anticipated to incur no environmental impacts.
2
Canada
WI
Michigan
WAP-21
OH
EAP-29
(
!
(
!
EAP-30
Copyright:© 2013 National Geographic Society, i-cubed
0
0.5
1 inch = 1 miles
1
Miles
For Environmental Review Purposes Only
4
Figure 1a
Line 5 Straits of Mackinac
Enbridge Pipelines (Lakehead) L.L.C.
Proposed Anchor Locations
(
!
Proposed Anchor Locations
Line 5
Source: Z:\Clients\E_H\Enbridge\Line_5_Straits_of_Mackinac\Permitting\Maintenance\201802\L5_Straits_of_Mackinac_2018_Anchors_Overview_Topo.mxd
(
!
IN
Date: (9/17/2018)
IL
Supplemental Information
Enbridge Pipelines (Lakehead) L.L.C.
2018 Line 5 Anchor Installation Project
Mackinac and Emmet Counties, Michigan
3