Bank stabilization along two sections (548 LF and 243 LF) of the Clark Fork River using approximately 1,460 cubic yards (CY) of MDT Class 3+ Rock, interspersed with approximately 5,000 willow pole plantings. The work is designed to protect an existing road containing three utility lines (two fiber optic lines and one 16-inch natural gas pipeline).

Bank stabilization along two sections (548 LF and 243 LF) of the Clark Fork River using approximately 1,460 cubic yards (CY) of MDT Class 3+ Rock, interspersed with approximately 5,000 willow pole plantings. The work is designed to protect an existing road containing three utility lines (two fiber optic lines and one 16-inch natural gas pipeline).

PUBLIC NOTICE Omaha District

Application No: NWO-2018-01778-MTM Applicant: Blackfoot Communication Waterway: Clark Fork River Issue Date: January 25, 2019 Expiration Date: February 25, 2019 30 DAY NOTICE

Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for a bank stabilization project, which would result in permanent and temporary impacts to approximately 791 linear feet (0.21 acre) of the Clark Fork River, a waters of the United States. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: https://www.nwo.usace.army.mil/Missions/Regulatory-Program/Montana/PublicNotices/ AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Blackfoot Telecommunications ATTN: Jared Jarrett 1221 North Russell Street Missoula, Montana 59808 LOCATION: The approximately 2.5-acre project site is located near Latitude 46.839454°, Longitude -113.849875° on the Clark Fork River, within Section 34, Township 13, Range 18 W, Missoula County, Montana. There are approximately 2,000 linear feet (LF) of the Clark Fork River within the project area, the proposed work will not impact wetlands. PROJECT DESCRIPTION: Bank stabilization along two sections (548 LF and 243 LF) of the Clark Fork River using approximately 1,460 cubic yards (CY) of MDT Class 3+ Rock, interspersed with approximately 5,000 willow pole plantings. The work is U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT https://www.nwo.usace.army.mil/Missions/Regulatory -Program/Montana/Public-Notices/

CENWO-ODR-MT

Page 2

Action ID: NWO-2018-01778-MTM

designed to protect an existing road containing three utility lines (two fiber optic lines and one 16-inch natural gas pipeline). The closest line (Blackfoot Communications fiber optic including the public 911 system) is 30 inches from the river's edge at one location. The river has aggressively migrated southward during recent annual runoff events. A new mid-channel gravel bar has formed, and it is causing high velocities and significant shear stress on the south stream bank during runoff events. The applicant's preferred alternative would result in permanent impacts to 791 LF of perennial stream bank. This alternative would result in temporary impacts to approximately 2,800 square feet of perennial stream bed from excavation and discharge of stream bed materials for the construction of three temporary diversion berms for construction area dewatering. The applicant's stated project purpose is to perform stream bank stabilization on a portion of rapidly eroding stream bank to protect three critical buried utility lines, including two fiber optic lines and a 16-inch natural gas line. The attached drawings provide additional project details. ADDITIONAL INFORMATION: Alternatives. The applicant has provided the following information concerning project alternatives: Alternative 1: No action. Relocation of existing roads and utility lines to an upland location. This alternative would require a lengthy planning and coordination process among multiple parties, easement negotiation, and significant construction expense. This option may be feasible given a planning time span of many multiple years. The applicant believes that the current utilities are expected to experience irreparable damage from erosion in the time it would take to complete the planning, design, and installation of relocated utilities. Further, the applicant does not know if a viable alternative utility route exists (or could be negotiated) that would avoid other stream crossings and impacts. Alternative 2: Soft Bank Stabilization Methods. Soft stabilization methods were considered instead of riprap, but ultimately not selected because the applicant believes these methods do not have the long-term reliability needed to protect critical utility and road infrastructure. Further, the applicant does not believe there is enough physical space between the utilities and the active river channel to properly install woody debris or soil lifts. Mitigation: Since the work covers more than 300 LF of bank stabilization, compensatory stream mitigation will be required. The applicant will submit a mitigation plan including credit/debit calculations and a final mitigation proffer. At this time, the applicant plans to purchase stream mitigation credits from the Upper Clark Fork Stream and Wetland Mitigation Bank.

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT https://www.nwo.usace.army.mil/Missions/Regulatory -Program/Montana/Public-Notices/

CENWO-ODR-MT

Page 3

Action ID: NWO-2018-01778-MTM

OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The Montana Department of Environmental Quality hereby incorporates this public notice as its own public notice and procedures by reference thereto. HISTORIC PROPERTIES: The Corps is lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and will complete a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Corps has not yet determined effects to properties eligible for listing on the National Register of Historic Properties. ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or threatened species and their critical habitat. The Corps will initiate consultation with the U.S. Fish and Wildlife Service, pursuant to Section 7 of the Endangered Species Act. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT https://www.nwo.usace.army.mil/Missions/Regulatory -Program/Montana/Public-Notices/

CENWO-ODR-MT

Page 4

Action ID: NWO-2018-01778-MTM

used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or federal agency; Indian Tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Nathan Green at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801, by email at Nathan.J.Green@usace.army.mil, or telephone at (406) 541-4845 extension 323. Please refer to identification number NWO-2018-01778-MTM in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: 6 drawings

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT https://www.nwo.usace.army.mil/Missions/Regulatory -Program/Montana/Public-Notices/

EXHIBIT B ­ Historic Aerial Photos Legend for all Historic Aerial Photos New Streambank Stabilization Extents Previous Streambank Stabilization Extents (2011) Potential Repair Areas on Previous Streambank Stabilization GB 12-18 = Gravel Bar Extents Observed in December 2018

Photo 1. Aerial Photo, Google Earth 7/7/2014, shows how much the inner channel and gravel bar layout has varied in just four years. Photo Exhibit B Page 1 of 5

Photo 5. Aerial Photo, Google Earth/USDA 8/18/1995, showing variation of channel and gravel deposits. Photo Exhibit B Page 5 of 5

30" proximity from eroding bank to Blackfoot fiber optic

New mid-channel gravel bar

Century Link fiber optic line.

Blackfoot Telecommunications fiber optic line. NorthWestern Energy natural gas line.

Photo 12. Milwaukee Railroad Grade with utility locations, November 2018.

Photo Exhibit A Page 12 of 12

M IL AU W KE E

WGM GROUP

IL

RA RO

WWW.WGMGROUP.COM

AD

PERMITTING

RA G

OA D

MISSOULA COUNTY, MONTANA

LC RE EK R

EXISTING CONDITIONS

R VE RI EL) RK NN FO A K CH AR IN CL (MA

CR YS TA

CLARK FORK RIVER STREAMBANK STABILIZATION

DE

PLOTTED: 1/11/19 SAVED: 1/11/19

LEGEND-EXISTING

DECEMBER 2018

2 OF 4

M IL AU W KE E

WGM GROUP

IL

RA RO

WWW.WGMGROUP.COM

AD

PERMITTING

RA G

OA D

SHEET LEGEND - PROPOSED

MISSOULA COUNTY, MONTANA

LC RE EK R

BANK STABLIZATION PLAN

R VE RI EL) RK NN FO A K CH AR IN CL (MA

CR YS TA

UPSTREAM OF THE PROJECT

CLARK FORK RIVER STREAMBANK STABILIZATION

DE

PLOTTED: 1/11/19 SAVED: 1/11/19

SHEET NOTES

DECEMBER 2018

3 OF 4

WGM GROUP WWW.WGMGROUP.COM

PERMITTING

TYPICAL SECTION RIPRAP AND WILLOW STABILIZATION

CROSS SECTIONS

MATERIAL SPECIFICATIONS

MISSOULA COUNTY, MONTANA

OLD MILWAUKEE RAILROAD GRADE

CLARK FORK RIVER STREAMBANK STABILIZATION

PLOTTED: 1/11/19 SAVED: 1/11/19

TEMPORARY DIVERSION BERMS AND DEWATERING NOTES

DECEMBER 2018

4 OF 4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas