The application is to construct several bridges, culverts, reinforced concrete boxes (RCB), and stream realignment to facilitate the new Gilcrease Expressway. This includes constructing a span bridge over the Arkansas River, a span bridge over Berryhill Creek, and impacts to several other waterways.
The proposed project would result in a combined total of 8,188 linear feet (13,193 CYS and 3.239 acres) of perennial, intermittent, and ephemeral stream impacts and 0.583 acre (939 CYS) of jurisdictional palustrine emergent wetland impacts. The fill material would be placed in the Arkansas River, Berryhill Creek, and other streams and wetlands. The proposed project would result in a total of 14,132 cubic yards of fill material consisting of concrete fill, clean native earthen material or clay, in addition to 12- to 18-inch riprap. The placement of fill material would be placed utilizing large earth moving equipment, such as bulldozers, dump trucks, and other heavy operations equipment.