Home

Galveston District

Run scraper

Richard Agee

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to conduct clearing, excavation, and earthwork.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to conduct clearing, excavation, and earthwork to construct a 500-foot-long and 8-foot-wide boardwalk, a boardwalk/dock that is 120-foot-long and ranges from 8- to 20-foot-wide, a 25-foot-long by 25-foot-wide boathouse, and an 800-foot-long bulkhead. Approximately 0.131-acre of wetlands will be filled by approximately 810 cubic yards of fill material to construct the bulkhead structure. The pilings for the boathouse and pier will be installed via a barge and a water jet. The boardwalk will be installed with an auger.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas