Bank stabilization along approximately 1,600 linear feet of the Yellowstone River bank at the Lewis and Clark coal-fired power plant near Sidney, MT.
Bank stabilization along approximately 1,600 linear feet of the Yellowstone River bank at the Lewis and Clark coal-fired power plant near Sidney, MT.
PUBLIC NOTICE
Omaha District
Application No: NWO-2011-01131-MTM
Applicant: Montana-Dakota Utilities Co.
ATTN: Alan Welte
Waterway: Yellowstone River
Issue Date: February 4, 2019
Expiration Date: March 6, 2019
30 DAY NOTICE
Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula,
Montana 59801
JOINT PUBLIC NOTICE
FOR PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
AND
MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a
permit application for the placement of approximately 22,700 cubic yards of gravel and
rock riprap below the ordinary high water mark, along 1,600 linear feet of the north (left)
bank of the Yellowstone River. This work would result in permanent impacts to
approximately 2.34 acres of perennial waters of the United States. This notice is to
inform interested parties of the proposed activity and to solicit comments. This notice
may also be viewed at the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water
Act for the discharge of dredged or fill material in waters of the United States.
APPLICANT: Alan Welte
Montana-Dakota Utilities Co.
400 North Fourth Street
Bismarck, North Dakota 58501
LOCATION: The approximately 4-acre project site is located at the Lewis and Clark
Station (L&C) coal-fired power plant at Latitude 47.68130°, Longitude -104.14723° on the
Yellowstone River, within Section 9, Township 22 N, Range 59 E, Richland County,
Montana. There is approximately 2,000 linear feet of the Yellowstone River within the
project area.
PROJECT DESCRIPTION: The project is designed to protect the facility uplands by
addressing ongoing riverbank erosion adjacent to the L&C facilities and stabilizing
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
-2-
Action ID: NWO-2011-01131-MTM
approximately 1,600 linear feet of shoreline. Activities include removing approximately
800 linear feet of existing deteriorated riprap and slope material and backfilling portions
of the riverbank with compacted clean backfill. Once an even subgrade is established
at approximately 3 horizontal: 1 vertical (3H:1V), a geotextile layer will be placed,
followed by riprap to enhance long-term stability of the riverbank and adjacent upland
area.
The applicant's preferred alternative would result in permanent impacts to
approximately 1,600 linear feet (2.34 acres) of perennial stream bed and bank.
The applicant's stated project purpose is to ensure long-term protection and retention of
the upland property adjacent to the L&C facilities along the Yellowstone River. The
attached drawings provide additional project details.
ADDITIONAL INFORMATION:
Alternatives. The applicant has provided information concerning the following project
alternatives:
Alternative 1: No action. The applicant's proposed no action alternative involves no
work being done at the site. The applicant states that this would result in continued
erosion of the river bank and would threaten the upland facilities such as the access
road, pH pond, and reclaimed bottom ash pond. The applicant asserts that this
alternative would not meet the project purpose.
Alternative 2: Bank Slope Re-Grading and Setback Option
The existing toe of the riverbank is steep and scarped in some locations with failed
armor protection. The steep slopes of the riverbank are a contributing factor to the
historical erosion and contribute to the toe failures (another factor is the lack of riprap
toe protection). Flatter slopes tend to be more stable in highly erosive environments.
Therefore, to reduce the erosion of the riverbank, one option the applicant considered
was to excavate and re-grade the existing riverbanks to a slope flatter than 10H:1V.
The existing riverbank slope and toe are approximately 3.5H:1V. The intent of regrading the riverbank slope would be to significantly increase the width of the slope and
extend the slope back into the L&C property (approximately three to six times wider
than the current riverbank slope), providing a gentler slope and reducing the expected
rate of erosion during high shear stress and ice impact events. This option would
require a significant area to construct and would encroach upon property setbacks,
including setbacks required for protection of the pH pond and reclaimed bottom ash
pond. Cutting back the slope to a 10H:1V grade would also increase the vulnerability of
this infrastructure during high flow events, especially in winter months when more
erosive ice flows are also present.
This option would result in the loss of upland property, would impact the pH pond and
reclaimed bottom ash pond that the slope is intended to protect, and is not consistent
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
-3-
Action ID: NWO-2011-01131-MTM
with the project purpose and need. Therefore, this option was not carried forward for
consideration by the applicant at this time.
Alternative 3: Vegetated Shoreline Option
Shoreline plantings and large woody debris are commonly used in riverine
environments to provide riverbank stabilization and to improve riparian habitat.
Shoreline vegetation (grass plantings) at the site has been stable on the upper
elevations of the riverbank where erosive forces from high flows are less frequent. At
the lower elevations of the riverbank, shoreline plantings and even the existing armor
rock are unstable and subject to erosion. Due to the severity of the high flows in the
channel and the ice impact forces (i.e., scarping), riverbank plantings and soft armoring
alternatives are not likely to provide long-term stability of the riverbank. When the lower
elevation of the planted/living shoreline riverbank are eroded, the upper elevations of
the riverbank would then be subject to scarping and geotechnical bank failure. Living
shorelines would be difficult to establish in the lower elevations of the riverbank due to
the limited time for roots to establish themselves before high flow events occur and over
time after high shear stress or ice impact events occur. There is evidence of damage to
large trees due to ice impacts at locations adjacent to the riverbank.
Shoreline plantings were installed above the ordinary high water mark (OHWM) as part
of the 2002 riverbank repair activities to provide soft shoreline stabilization measures.
High-flow and ice scour forces removed the vegetation from the riverbank as a result of
these events. Therefore, this option was not carried forward for consideration by the
applicant at this time.
Alternative 4: Sheet Pile Wall or Bulkhead Structure Option
Another option considered was installing sheet pile wall or concrete bulkhead structure
spanning the length of the riverbank to prevent upland erosion. While hardening the
shoreline would provide upland stability, it would be significantly more expensive and
impactful to the aquatic environment than the riprap revetment alternative because it
would place a vertical shoreline structure in the water and potentially increase scour at
the face and downstream of the wall. Additionally, the hardened shoreline would not
provide potential opportunities for riparian vegetation recruitment benefits. The cost of
installing a structure of this magnitude would also be significant, with high short-term
capital costs and potentially high costs associated with long-term repair or maintenance
of this structure. Therefore, this option was not carried forward for consideration by the
applicant.
Mitigation: The applicant has not proposed any compensatory stream mitigation at this
point.
OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of
Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana
59620-0901 will review the proposed project with the intent to certify in accordance with
the provisions of Section 401 of the Clean Water Act. The certification, if issued, will
express the State's opinion that the operations undertaken by the applicant will not result
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
-4-
Action ID: NWO-2011-01131-MTM
in a violation of applicable water quality standards. The Montana Department of
Environmental Quality hereby incorporates this public notice as its own public notice and
procedures by reference thereto.
HISTORIC PROPERTIES: The Corps is lead federal agency for determining
compliance with Section 106 of the National Historic Preservation Act for this project
and has completed a cultural resource review of the project site in conjunction with their
obligations under Section 106 and the National Environmental Policy Act. The Omaha
District's initial review, based on currently available information, indicates there are no
recorded properties within the permit area. The Corps has not determined effects to
properties eligible for listing on the National Register of Historic Properties.
ENDANGERED SPECIES: The proposed activity may affect Federally-listed
endangered or threatened species or their critical habitat. Potential species occurring
within the project area are: pallid sturgeon, piping plover, least tern, and whooping
crane. The Corps will initiate consultation with the U.S. Fish and Wildlife Service,
pursuant to Section 7 of the Endangered Species Act.
The above determinations are based on information provided by the applicant and our
preliminary review.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts, of the described
activity on the public interest. That decision will reflect the national concern for both
protection and utilization of important resources. The benefit, which reasonably may be
expected to accrue from the described activity, must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the described activity will
be considered, including the cumulative effects thereof; among those are conservation,
economics, aesthetics, general environmental concerns, wetlands, historic properties,
fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, consideration of property
ownership and, in general, the needs and welfare of the people. The activity's impact
on the public interest will include application of the Section 404(b)(1) guidelines
promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230).
COMMENTS: The Corps of Engineers is soliciting comments from the public; federal,
state, and local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments received
will be considered by the Corps of Engineers to determine whether to issue, modify,
condition or deny a permit for this proposal. To make this decision, comments are used
to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used
to determine the need for a public hearing and to determine the overall public interest of
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
-5-
Action ID: NWO-2011-01131-MTM
the proposed activity. All public notice comments will be considered public information
and will be subject to review by the applicant.
The Corps is particularly interested in receiving comments related to the proposal's
probable impacts on the affected aquatic environment and the secondary and
cumulative effects. Any person may request, in writing and within the comment period
specified in this notice, that a public hearing be held for the purpose of gathering
additional information. Requests for public hearings must be identified as such and shall
state specifically the reasons for holding a public hearing and what additional information
would be obtained. The request must be submitted to the U.S. Army Corps of Engineers,
at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula,
Montana 59801. If it is decided that additional information is required and that a public
hearing should be held, interested parties will be notified of the date, time and location.
Any interested party (particularly officials of any town, city, county, state, or Federal
agency; Indian tribe; or local association whose interests may be affected by the work) is
invited to submit to this office written facts, arguments, or objections on or before the
expiration date listed on the front of this notice. Any agency or individual having an
objection to the work should specifically identify it as an objection with clear and specific
reasons. Comments, both favorable and unfavorable, will be accepted, made a part of
the record and will receive full consideration in subsequent actions on this application. All
replies to the public notice should be addressed to Nathan Green at the Missoula
Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801, by
email at Nathan.J.Green@usace.army.mil, or telephone at (406) 541-4845 X 323. Please
refer to identification number NWO-2011-01131-MTM in any correspondence concerning
this project.
Comments postmarked after the expiration date of this public notice, or received by fax or
e-mail after the expiration date, will not be considered. Comments left on our voicemail
system will not be considered.
Attachments: 4 drawings
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
Sidney
il1
$ Y R·hbtt1
h,111111C;i;tl
A111otl
MONTANA
·Helena
0
N ot
o Sca l e
t
w
"'
.
c
l
Lewis
and Clari< Station
b
\
Project Location
Yellowstone
i
PURPOSE: PREVENT ONGOING EROSION Of T H E RIVERBANK
_, DATUM: NAVD88
USACE REFERENC E NO.: NW0 -2011--0 1131
NAME: RIVERBANK REPAIR AND STABILIZATION PROJ ECT
E LATITU DE: 47°40'50.SO"N
LONQTUDE : 104'09'03.SO"W
S.T -R: 09-22N-59E
<><
S
"!
;:!
jg
lilt YELLOWSTON E RIVER
NEAR/AT: SIDNEY
COU NTY OF: RICHLAND
STATE: MONTANA
SITE LOCATION ADDRESS:
LEWI S AND CLARK STATION
EAST
3502 3 HIGHWAY 23
S IDNEY, MONTANA 59270
PROPOSED: RIV ERBANK REPAIR AND STABILIZATION
... '/.ANCHOR
\.L,, QIA
54 N.. Last Chance Gulch
Suite4
Hefena. MT 59601
406-422-2400
ADJ ACENT PROPfRTY OWNERS:
( SEE J OI NT APP LICATI ON FORM)
DATE: DEC EMBE R 2 018
SHEET: 1 OF 5
Lewis and Clari<
Station
\
'
- Reclaimed Bottom Ash Pond
\
Existing
pHPond
2002Armor
Placement Area
SOURCE: ©2018 Microsoft C orporation ©2018 DigitalGlobe ©CNES (2018)
Distribution Airbus OS
HORIZONTAL DATUM: Montana StatePlane Zone, North American Datum
of 1983 (NAD83), US Feet
VERTICAL DATUM: North American Vertical Datum of 1988 (NAVD88), Feet
NOTE:
URPOS E: PREVENT ONGOI NG £ROSIO N OF THE RIVERBANK
P
NAVD88
-
Total Vol ume
( Cubic Yards)
Excavate riprap and existing slope materials
17 ,000
23,500
Place comp acted clea n fill n1at
erial
2,000
2,400
Pla ce riprap (40 to 2,000 pounds)'
20,700
26,000
mo
--
A'
2017 Survey Elevations (1' & 5' Intervals)
Cross Section Location and ldentrfkation
Riverbank Stabilization Area (Riprap Slope)
SITE PLAN
USACE REFERENC E NO.: NW0-2011-01131
NAME: RIVERBANK REPAIRAND STABI LIZATION PROJECT
IN: YE LLOWSfONE RIVER
COUNTY OF: RICHLAND
STATE: MONTANA
SITE LOCATION ADDRESS:
LEWI S AND CLARK STATION
- Ordinary High Water Marl<
(OWHM)at Elevation 1895'
n
PROPOSED: RIVERBANK REPAIR AND STABILIZATION
NEAR/AT: SIDNEY
S-T-R: 09-22N-S9E
EAST
A
t j
fiili!i'.l!lj@
LATITUDE: 47°40' 50.SO"N
LONGITUDE: 104·09'03.SO"W
3S023 HIGHWAY 23
SIDNEY, MONTANA 59270
Volume Placed Below
OHWM (Cubic Yards)
LEGEND:
The tot
a l riprap volun1e is conservative and m ay include e xisting riprap
n1at
erial ex cava ted fron1 the riverbank that is suitable for reuse.
DATUM:
Excavation/Fill Activity
0
2 00
Feet
._'/.,ANCHOR
'./..,, QEA
S4N.. Last Chance Gulch
Suite4
He6ena, MT 59601
406-422-2400
ADJACENT PROPERTY OWNERS:
(SEE J OINT APPLICATIONfORM)
DATE: DECEMBER201B
SHEE T: 3 OF S
A'
A
1920 1920
-----
1860
w
-+-+-+-+-+-l----+--+- 1860
0
20
40
60
80
100
120
140
160
Horizontal Distance in
200
180
220
240
260
280
I
I
I
I
300
Feet
No Vertical Exagge19 20
B
-1-----
c;
---....
"
..
6
017
Suivey
2
.,__ I
--,...--.....
.1'1900
I
(50" Min .)
- -
. ;--....._
' --
Geotexble
B'
MDT Oass Ill Riprap
..._ --=
-
1920
Maximum !\Ko Flood Stage (1907.0j
-
-
- - -I .
-
......_
I
- I
,__ 1900
Ordinary High Water Mark (1895.o;- 1...,
-
Low Wat er Stage (1885.0')
_ i-. ---· -- --
I_
-. -
1880
-
1860
1860
0
20
40
60
80
100
140
180
Horizontal Di stance in Feet
120
160
200
220
240
260
280
300
No Vertical Exaggeration
SOURCE: 2017 Survey surface based on ·uivey by lnter.:tate Engineering on
LEGEND:
4/27/2017.
NOTES:
1.
Maximum recorded flood stage is based
2.
Low river stage
Exi sting
on measuremtnts at the NOAA Yellowstone
MDT Class Ill Riprap
river gauge near Sidney (SIDM8).
is based on th historical
2017 Survey Elevation
low water n1tasuren1ents at the NOAA gauge
Compacted Clean Fill Material
(SIDM 8).
Geotextile
CROSS SECTIONS (1 OF 2)
PURPOSE:
PREV
E NT ONGOING EROSION Of THE RMRBANK
DATUM: NAV068
LATITUDE: 47"40'50.SO"N
USAC E RE
FE
RENC
E t.O : NW0-2011-01131
NAME: RMRBANK REPAIR
STABILIZATI ON PROJECT
AND
LCli'GTUOE: 104'09'03.SOW
S-T-R: 09-22N-59E
SITT LOCATIONAOORESS;
LfWlSAND CLARK STATION
35023 HGHWAY 23 EAST
ADW:ENTPRSIDNEY, MJNTANA
NT
5927
CA
_
AP
0
(S
'E E-.IOl
PU
-TION
FalM) -
PROPOSlO: RMRSANK REPAIR ANDSTABI U ZA TION
IN: YELLOWSTONE RMR
NEAR/AT: SIONfY
COUNTY RICH.AND
STATE: MONTANA
·..,_ANCHOR
\/..,,, QIA
54N.lastChanaiGulch
Suite4
Helena. MT59601
-UOO
c
C'
1920 ---------------------1920
MDT Class Ill Riprap (50" Min .)
Maximum Recorded Flood Stage (1907;0')
-
-r- r-- 1
-
19 20
D'
D
-------
1920
-
0rdinary High Water Mark (1895.0')-l---+---+--f--+-1900
Geotextife
2017 Survey
1860-+----+----__,>-->-1 860
0
20
40
60
80
100
120
1860-+----+----__,>-->-1 860
140
0
20
40
Hori zontal Distance in Feet
No Vertical Exaggeration
60
80
100
120
140
Horizontal Distance in Feet
No Vertical Exaggeration
SOURCE: 2017 Survey surface based on survey by Inte rstate Engi neering on 4/27/2017.
NOTES :
1 . Maximum Recorded Flood Stage i s Based on Measurements at the N O AAYellowstone
River Gauge Near Sidney (SIDM 8) .
low River Stage is 8,ased on the Historical low Water Meas urements at the NOAA
2.
Gauge (SIDM8).
LEGEND:
Existing 2017 Survey Elevation
MDT Class Ill Riprap
Geotextile
CROSS SECTIONS (2 OF 2)
PURPOSE: PREVElllT ONGOING EROSION OF THE RIV ERBANK
DATUM NAVDBB
US ACE RE F ERENCE NO .: NW0 .2
0 11- 0 1131
NAME: RIVERBANK REPAIR AND STABIL IZATION PROJECT
PROPOSED: RIVERBANK REPAIR AND STABILIZATION
LATITUDE: 47"4()'50.SO'N
LONGITUDE: 104'09'03.50"W
S-T-R: 09-22N- 59E
lilt
SITE LOCATION ADDRESS:
LEWlS AND ClARK STATION
T
S
A
TE : MONTANA
23 EAST
3 50 23 HIGHWAY
SIDNEY, MONTAJllA 59270
YEL LOWSTONE RIVER
NEAR/AT: SIDNEY
COUNTY OF: RICHLAND
ADJACENT PROPERTY OWN ERS:
(SEE JOINT APPUCATION FORM)
DATE: DECEMBER 20 18
·ANCHOR
'\/..., QEA
54 N. Last Chance Gulch
Suite4
Helena, MT 59601
406·422-2.400
SHEET: 5 OF S