Bank stabilization along approximately 1,600 linear feet of the Yellowstone River bank at the Lewis and Clark coal-fired power plant near Sidney, MT.

Bank stabilization along approximately 1,600 linear feet of the Yellowstone River bank at the Lewis and Clark coal-fired power plant near Sidney, MT.

PUBLIC NOTICE

Omaha District

Application No: NWO-2011-01131-MTM Applicant: Montana-Dakota Utilities Co. ATTN: Alan Welte Waterway: Yellowstone River Issue Date: February 4, 2019 Expiration Date: March 6, 2019 30 DAY NOTICE

Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application for the placement of approximately 22,700 cubic yards of gravel and rock riprap below the ordinary high water mark, along 1,600 linear feet of the north (left) bank of the Yellowstone River. This work would result in permanent impacts to approximately 2.34 acres of perennial waters of the United States. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx

AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Alan Welte Montana-Dakota Utilities Co. 400 North Fourth Street Bismarck, North Dakota 58501 LOCATION: The approximately 4-acre project site is located at the Lewis and Clark Station (L&C) coal-fired power plant at Latitude 47.68130°, Longitude -104.14723° on the Yellowstone River, within Section 9, Township 22 N, Range 59 E, Richland County, Montana. There is approximately 2,000 linear feet of the Yellowstone River within the project area. PROJECT DESCRIPTION: The project is designed to protect the facility uplands by addressing ongoing riverbank erosion adjacent to the L&C facilities and stabilizing U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

-2-

Action ID: NWO-2011-01131-MTM

approximately 1,600 linear feet of shoreline. Activities include removing approximately 800 linear feet of existing deteriorated riprap and slope material and backfilling portions of the riverbank with compacted clean backfill. Once an even subgrade is established at approximately 3 horizontal: 1 vertical (3H:1V), a geotextile layer will be placed, followed by riprap to enhance long-term stability of the riverbank and adjacent upland area. The applicant's preferred alternative would result in permanent impacts to approximately 1,600 linear feet (2.34 acres) of perennial stream bed and bank. The applicant's stated project purpose is to ensure long-term protection and retention of the upland property adjacent to the L&C facilities along the Yellowstone River. The attached drawings provide additional project details. ADDITIONAL INFORMATION: Alternatives. The applicant has provided information concerning the following project alternatives: Alternative 1: No action. The applicant's proposed no action alternative involves no work being done at the site. The applicant states that this would result in continued erosion of the river bank and would threaten the upland facilities such as the access road, pH pond, and reclaimed bottom ash pond. The applicant asserts that this alternative would not meet the project purpose. Alternative 2: Bank Slope Re-Grading and Setback Option The existing toe of the riverbank is steep and scarped in some locations with failed armor protection. The steep slopes of the riverbank are a contributing factor to the historical erosion and contribute to the toe failures (another factor is the lack of riprap toe protection). Flatter slopes tend to be more stable in highly erosive environments. Therefore, to reduce the erosion of the riverbank, one option the applicant considered was to excavate and re-grade the existing riverbanks to a slope flatter than 10H:1V. The existing riverbank slope and toe are approximately 3.5H:1V. The intent of regrading the riverbank slope would be to significantly increase the width of the slope and extend the slope back into the L&C property (approximately three to six times wider than the current riverbank slope), providing a gentler slope and reducing the expected rate of erosion during high shear stress and ice impact events. This option would require a significant area to construct and would encroach upon property setbacks, including setbacks required for protection of the pH pond and reclaimed bottom ash pond. Cutting back the slope to a 10H:1V grade would also increase the vulnerability of this infrastructure during high flow events, especially in winter months when more erosive ice flows are also present. This option would result in the loss of upland property, would impact the pH pond and reclaimed bottom ash pond that the slope is intended to protect, and is not consistent

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

-3-

Action ID: NWO-2011-01131-MTM

with the project purpose and need. Therefore, this option was not carried forward for consideration by the applicant at this time. Alternative 3: Vegetated Shoreline Option Shoreline plantings and large woody debris are commonly used in riverine environments to provide riverbank stabilization and to improve riparian habitat. Shoreline vegetation (grass plantings) at the site has been stable on the upper elevations of the riverbank where erosive forces from high flows are less frequent. At the lower elevations of the riverbank, shoreline plantings and even the existing armor rock are unstable and subject to erosion. Due to the severity of the high flows in the channel and the ice impact forces (i.e., scarping), riverbank plantings and soft armoring alternatives are not likely to provide long-term stability of the riverbank. When the lower elevation of the planted/living shoreline riverbank are eroded, the upper elevations of the riverbank would then be subject to scarping and geotechnical bank failure. Living shorelines would be difficult to establish in the lower elevations of the riverbank due to the limited time for roots to establish themselves before high flow events occur and over time after high shear stress or ice impact events occur. There is evidence of damage to large trees due to ice impacts at locations adjacent to the riverbank. Shoreline plantings were installed above the ordinary high water mark (OHWM) as part of the 2002 riverbank repair activities to provide soft shoreline stabilization measures. High-flow and ice scour forces removed the vegetation from the riverbank as a result of these events. Therefore, this option was not carried forward for consideration by the applicant at this time. Alternative 4: Sheet Pile Wall or Bulkhead Structure Option Another option considered was installing sheet pile wall or concrete bulkhead structure spanning the length of the riverbank to prevent upland erosion. While hardening the shoreline would provide upland stability, it would be significantly more expensive and impactful to the aquatic environment than the riprap revetment alternative because it would place a vertical shoreline structure in the water and potentially increase scour at the face and downstream of the wall. Additionally, the hardened shoreline would not provide potential opportunities for riparian vegetation recruitment benefits. The cost of installing a structure of this magnitude would also be significant, with high short-term capital costs and potentially high costs associated with long-term repair or maintenance of this structure. Therefore, this option was not carried forward for consideration by the applicant. Mitigation: The applicant has not proposed any compensatory stream mitigation at this point. OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

-4-

Action ID: NWO-2011-01131-MTM

in a violation of applicable water quality standards. The Montana Department of Environmental Quality hereby incorporates this public notice as its own public notice and procedures by reference thereto. HISTORIC PROPERTIES: The Corps is lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and has completed a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Omaha District's initial review, based on currently available information, indicates there are no recorded properties within the permit area. The Corps has not determined effects to properties eligible for listing on the National Register of Historic Properties. ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or threatened species or their critical habitat. Potential species occurring within the project area are: pallid sturgeon, piping plover, least tern, and whooping crane. The Corps will initiate consultation with the U.S. Fish and Wildlife Service, pursuant to Section 7 of the Endangered Species Act. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

-5-

Action ID: NWO-2011-01131-MTM

the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Nathan Green at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801, by email at Nathan.J.Green@usace.army.mil, or telephone at (406) 541-4845 X 323. Please refer to identification number NWO-2011-01131-MTM in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: 4 drawings

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

Sidney

il1 $ Y R·hbtt1 h,111111C;i;tl A111otl

MONTANA ·Helena

0

N ot

o Sca l e t

w "' .

c

l

Lewis

and Clari< Station

b

\

Project Location Yellowstone

i

PURPOSE: PREVENT ONGOING EROSION Of T H E RIVERBANK

_, DATUM: NAVD88

USACE REFERENC E NO.: NW0 -2011--0 1131 NAME: RIVERBANK REPAIR AND STABILIZATION PROJ ECT

E LATITU DE: 47°40'50.SO"N LONQTUDE : 104'09'03.SO"W S.T -R: 09-22N-59E

<><

S

"! ;:!

jg

lilt YELLOWSTON E RIVER NEAR/AT: SIDNEY COU NTY OF: RICHLAND STATE: MONTANA

SITE LOCATION ADDRESS: LEWI S AND CLARK STATION

EAST

3502 3 HIGHWAY 23 S IDNEY, MONTANA 59270

PROPOSED: RIV ERBANK REPAIR AND STABILIZATION

... '/.ANCHOR \.L,, QIA 54 N.. Last Chance Gulch Suite4 Hefena. MT 59601

406-422-2400

ADJ ACENT PROPfRTY OWNERS: ( SEE J OI NT APP LICATI ON FORM)

DATE: DEC EMBE R 2 018

SHEET: 1 OF 5

Lewis and Clari< Station

\ '

- Reclaimed Bottom Ash Pond

\

Existing

pHPond

2002Armor Placement Area

SOURCE: ©2018 Microsoft C orporation ©2018 DigitalGlobe ©CNES (2018) Distribution Airbus OS HORIZONTAL DATUM: Montana StatePlane Zone, North American Datum of 1983 (NAD83), US Feet VERTICAL DATUM: North American Vertical Datum of 1988 (NAVD88), Feet

NOTE:

URPOS E: PREVENT ONGOI NG £ROSIO N OF THE RIVERBANK P

NAVD88

-

Total Vol ume ( Cubic Yards)

Excavate riprap and existing slope materials

17 ,000

23,500

Place comp acted clea n fill n1at erial

2,000

2,400

Pla ce riprap (40 to 2,000 pounds)'

20,700

26,000

mo

--

A'

2017 Survey Elevations (1' & 5' Intervals) Cross Section Location and ldentrfkation Riverbank Stabilization Area (Riprap Slope)

SITE PLAN

USACE REFERENC E NO.: NW0-2011-01131 NAME: RIVERBANK REPAIRAND STABI LIZATION PROJECT

IN: YE LLOWSfONE RIVER

COUNTY OF: RICHLAND STATE: MONTANA

SITE LOCATION ADDRESS: LEWI S AND CLARK STATION

- Ordinary High Water Marl< (OWHM)at Elevation 1895'

n

PROPOSED: RIVERBANK REPAIR AND STABILIZATION

NEAR/AT: SIDNEY

S-T-R: 09-22N-S9E

EAST

A

t j fiili!i'.l!lj@

LATITUDE: 47°40' 50.SO"N LONGITUDE: 104·09'03.SO"W

3S023 HIGHWAY 23 SIDNEY, MONTANA 59270

Volume Placed Below OHWM (Cubic Yards)

LEGEND:

The tot a l riprap volun1e is conservative and m ay include e xisting riprap n1at erial ex cava ted fron1 the riverbank that is suitable for reuse.

DATUM:

Excavation/Fill Activity

0

2 00 Feet

._'/.,ANCHOR './..,, QEA S4N.. Last Chance Gulch Suite4 He6ena, MT 59601

406-422-2400

ADJACENT PROPERTY OWNERS: (SEE J OINT APPLICATIONfORM)

DATE: DECEMBER201B

SHEE T: 3 OF S

A'

A

1920 1920

-----

1860

w

-+-+-+-+-+-l----+--+- 1860 0

20

40

60

80

100

120

140

160

Horizontal Distance in

200

180

220

240

260

280

I

I

I

I

300

Feet

No Vertical Exagge

19 20

B -1-----

c;

---.... " ..

6

017 Suivey 2

.,__ I

--,...--.....

.1'1900

I

(50" Min .)

- -

. ;--....._ ' --

Geotexble

B'

MDT Oass Ill Riprap

..._ --=

-

1920

Maximum !\Ko Flood Stage (1907.0j -

-

- - -I . -

......_

I

- I

,__ 1900

Ordinary High Water Mark (1895.o;- 1..., -

Low Wat er Stage (1885.0')

_ i-. ---· -- --

I_ -. -

1880

-

1860

1860 0

20

40

60

80

100

140

180 Horizontal Di stance in Feet

120

160

200

220

240

260

280

300

No Vertical Exaggeration SOURCE: 2017 Survey surface based on ·uivey by lnter.:tate Engineering on

LEGEND:

4/27/2017.

NOTES: 1.

Maximum recorded flood stage is based

2.

Low river stage

Exi sting

on measuremtnts at the NOAA Yellowstone

MDT Class Ill Riprap

river gauge near Sidney (SIDM8). is based on th historical

2017 Survey Elevation

low water n1tasuren1ents at the NOAA gauge

Compacted Clean Fill Material

(SIDM 8).

Geotextile

CROSS SECTIONS (1 OF 2) PURPOSE:

PREV E NT ONGOING EROSION Of THE RMRBANK

DATUM: NAV068 LATITUDE: 47"40'50.SO"N

USAC E RE FE RENC E t.O : NW0-2011-01131 NAME: RMRBANK REPAIR STABILIZATI ON PROJECT

AND

LCli'GTUOE: 104'09'03.SOW

S-T-R: 09-22N-59E

SITT LOCATIONAOORESS; LfWlSAND CLARK STATION 35023 HGHWAY 23 EAST

ADW:ENTPR

SIDNEY, MJNTANA NT 5927

CA _ AP

0 (S 'E E-.IOl PU -TION FalM) -

PROPOSlO: RMRSANK REPAIR ANDSTABI U ZA TION IN: YELLOWSTONE RMR NEAR/AT: SIONfY COUNTY RICH.AND STATE: MONTANA

·..,_ANCHOR \/..,,, QIA 54N.lastChanaiGulch Suite4 Helena. MT59601 -UOO

c

C'

1920 ---------------------1920 MDT Class Ill Riprap (50" Min .) Maximum Recorded Flood Stage (1907;0') -

-r- r-- 1 -

19 20

D'

D

-------

1920

-

0rdinary High Water Mark (1895.0')-l---+---+--f--+-1900

Geotextife

2017 Survey

1860-+----+----__,>-->-1 860 0

20

40

60

80

100

120

1860-+----+----__,>-->-1 860

140

0

20

40

Hori zontal Distance in Feet No Vertical Exaggeration

60

80

100

120

140

Horizontal Distance in Feet No Vertical Exaggeration

SOURCE: 2017 Survey surface based on survey by Inte rstate Engi neering on 4/27/2017. NOTES : 1 . Maximum Recorded Flood Stage i s Based on Measurements at the N O AAYellowstone River Gauge Near Sidney (SIDM 8) . low River Stage is 8,ased on the Historical low Water Meas urements at the NOAA 2. Gauge (SIDM8).

LEGEND:

Existing 2017 Survey Elevation MDT Class Ill Riprap Geotextile

CROSS SECTIONS (2 OF 2) PURPOSE: PREVElllT ONGOING EROSION OF THE RIV ERBANK DATUM NAVDBB

US ACE RE F ERENCE NO .: NW0 .2 0 11- 0 1131 NAME: RIVERBANK REPAIR AND STABIL IZATION PROJECT

PROPOSED: RIVERBANK REPAIR AND STABILIZATION

LATITUDE: 47"4()'50.SO'N LONGITUDE: 104'09'03.50"W S-T-R: 09-22N- 59E

lilt

SITE LOCATION ADDRESS: LEWlS AND ClARK STATION

T S A TE : MONTANA

23 EAST

3 50 23 HIGHWAY SIDNEY, MONTAJllA 59270

YEL LOWSTONE RIVER

NEAR/AT: SIDNEY COUNTY OF: RICHLAND

ADJACENT PROPERTY OWN ERS: (SEE JOINT APPUCATION FORM)

DATE: DECEMBER 20 18

·ANCHOR '\/..., QEA 54 N. Last Chance Gulch Suite4 Helena, MT 59601 406·422-2.400

SHEET: 5 OF S

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas