PUBLIC NOTICE: The sponsor is proposing to develop the Benz Wetland Bank. The proposed bank site is approximately 155.7 acres in size, including upland buffer areas.
PROJECT DESCRIPTION AND PURPOSE: The sponsor is proposing to develop the Benz Wetland Bank. The proposed bank site is approximately 155.7 acres in size, including upland buffer areas.
Public Notice
SPONSOR:
Loren Benz
REFER TO: MVP-2018-01893-MJB
ISSUED: February 4, 2019
EXPIRES: March 6, 2019
SECTION: 404 - Clean Water Act
1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL
2. SPECIFIC INFORMATION
SPONSOR'S ADDRESS:
302 Oak Knoll Court
Blue Earth, Minnesota 56013
SPONSOR'S AGENT
I&S Group (ISG)
Nick McCabe, Senior Environmental Scientist
115 E. Hickory St., Suite 300
Mankato, Minnesota 56001
PROJECT LOCATION: The project site is located in Section 3, Township 101 North, Range 28 West,
Faribault County, Minnesota. The approximate coordinates are Latitude (NAD83) 43.581709 North,
Longitude -94.174068 West.
BANK SERVICE AREA (BSA): The proposed bank service area is the Minnesota River Basin in
Minnesota (BSA 9)
DESCRIPTION OF PROJECT: The sponsor is proposing to develop Benz Wetland Bank.
The proposed bank site is approximately 155.7 acres in size, including upland buffer areas. The bank
site is shown on the enclosed figures labeled MVP-2018-01893-MJB (Public Notice) Page 1-16 of 16.
NEED AND OBJECTIVE OF PROJECT (per applicant): The bank is proposed to restore via reestablishment 31.4 acres of Type 4, deep marsh, 43.5 acres of Type 3, shallow marsh, and 16.5
acres of Type 2, fresh (wet) meadow wetlands. In addition, 64.3 acres of upland buffer are proposed
to be created surrounding the restored wetlands. Per the Sponsor's agent the bank site is in an area
of need for wetland credits to offset impacts associated with agricultural practices and residential,
commercial, and industrial development. Fresh (wet) meadow wetlands are the most common type of
wetland impacted in the area and credits are needed for potential impacts to them in the BSA.
Shallow and deep marsh wetlands provide flood water and peak storage and attenuation benefits to
the BSA.
ESTABLISHMENT, OPERATION AND MANAGEMENT: The Sponsor proposes to restore a farmed
agricultural field via re-establishment into 31.4 acres of deep marsh, 43.5 acres of shallow marsh,
16.5 acres of fresh (wet) meadow, and 64.3 acres of upland buffer. The following steps are
anticipated to occur to establish the wetland bank: removing reed canary grass along an existing berm
adjacent to Badger Creek (County Ditch 514); using herbicide and mechanical treatments to remove
the invasive species and their rhizomes; plant seed via plow and disk, harrow or roll, or broadcasting;
dismantle tile; construct an outlet structure; and stabilize and seed areas disturbed by the breaking of
tile. The proposed performance standard and credit release schedule is provided in the enclosed
figures labeled MVP-2018-01893-MJB (Public Notice) Page 13-14 of 16.
Regulatory Branch (File No. MVP-2018-01893-MJB)
OWNERSHIP AND LONG-TERM MANAGEMENT: The bank site would be managed long-term by
Loren Benz, the Bank Sponsor. Per the Sponsor's agent, long term management will include signage
to protect the bank site from encroachment and periodic inspections of the outlet structure. For the
purpose of managing detritus and controlling invasive species a combination of the following practices
will be implemented: periodic burning, mowing, haying, herbicide application, and reseeding and interseeding. The established bank site would be managed by the sponsor or their successors in property
ownership. The site would be adaptively managed for development of herbaceous communities
dominated by native species common to the bank area. Credit sales would be tracked by sponsor and
reported to the state as required by state law. The reported credit releases and sales would be
tracked on both Corps and state databases using ledger data supplied by the state. By state law,
long-term management of the property would be the responsibility of the landowner and the sponsor
until all released credits have been debited. After all credits are debited, long-term management
obligations would fall to the landowner under state law. Additional protections and management
limitations would be spelled out in both a conservation easement and in an approved bank plan.
TECHNICAL FEASIBILITY AND QUALIFICATIONS: The majority of the hydrology restoration will
occur from dismantling the tile system. As ISG (agent) has been widely involved in seeing banks
through the Corps mitigation banking process and have completed this type of hydrology restoration
previously, they bring experience and expertise to the project.
ECOLOGICAL SUITABILITY: The historical public ditch records identify the site as Badger Lake,
suggesting a large waterbody may have been historically present on-site. Extensive tiling exists today
to allow for crop production. The site has been in crop production since prior to 1938, as evidenced
by the historical aerial photographs and cropping history. The area naturally floods in response to
large water events and as the current tile system is malfunctioning. Considering the majority of the
site was historically wet, topographically low, and has extensive tile that can be dismantled to bring it
back to wet conditions, the Sponsor expects the site to provide an ecologically suitable wetland basin.
HYDROLOGY: Hydrology would be restored to the site as a result of dismantling the extensive
drainage tiles throughout the bank site. The subsurface drain tile, surface tile intakes, tile system
outlet, and adjacent ditch maintain the water table to be below the ground surface in the project site.
As the site has extensive tile, breaking and daylighting the tile is expected to provide significant
hydrology to the site from a drainage area measuring approximately 1,104 acres.
CURRENT LAND USES: Currently, the site is comprised of row crop agricultural land that is farmed.
Surrounding land use is comprised of agricultural fields, a public ditch, and a U.S. Fish and Wildlife
Service (USFWS) wetland to the southwest.
COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the
following members of the Interagency Review Team (IRT) and other resource agencies: U.S.
Environmental Protection Agency, U.S. Fish and Wildlife Service (USFWS), Minnesota Department of
Natural Resources, Board of Water and Soil Resources
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR
CRITICAL HABITAT
The USFWS website Information for Planning and Consultation (IPaC) was used to generate an
Official Species List, which identified the following Federally-listed species as having the potential to
be in the action area:
Northern Long-Eared Bat
Hibernates in caves and mines swarming in surrounding
wooded areas in autumn. Roosts and forages in upland forests
during spring and summer.
Page 2 of 3
Regulatory Branch (File No. MVP-2018-01893-MJB)
This notice is being coordinated with the USFWS. Any comments it may have concerning Federallylisted threatened or endangered wildlife or plants or their critical habitat will be considered in our final
assessment of the described work.
4. JURISDICTION
This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction
under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act
identified in Regulatory Guidance Letter 16-01.
5. HISTORICAL/ARCHAEOLOGICAL
The Corps will review information on known cultural resources and/or historic properties within and
adjacent to the project area. The Corps will also consider the potential effects of the project on any
properties that have yet to be identified. The results of this review and the Corps' determination of
effect will be coordinated with the State Historic Preservation Officer independent of this public notice.
Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work
in connection with this project.
6.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, in detail, the
reasons for holding a public hearing. A request may be denied if substantive reasons for holding a
hearing are not provided or if there is otherwise no valid interest to be served.
7.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within 30
days of the date of this notice. These statements should bear upon the suitability of the location and
the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable.
Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by the
Sponsor is available to the public for review upon request.
Replies may be addressed to:
Regulatory Branch
St. Paul District Corps of Engineers
c/o Meghan Brown
1114 South Oak Street
La Crescent, MN 55947-1560
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, contact Meghan Brown at the La Crescent
office of the Corps, 651-290-5688 or Meghan.J.Brown@usace.army.mil
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in
the New Registration Box.
Enclosure
Page 3 of 3
35
36
31
MVP-2018-01893-MJB (Public Notice) Page 1 of 16
32
33
34
35
36
31
31
6
5
4
3
2
1
6
5
4
3
2
Site Location
1
32
T102N
R28W
6
U
V
33
246
34
ß
9
10
11
12
7
8
9
10
11
17
16
15
14
13
18
17
16
15
14
T103N
R29W
20
21
22
23
24
19
12
340th Ave
8
13
T103N
R28W
20
21
22
23
24
V
U
299
29
28
27
26
25
30
29
28
27
26
25
35
36
5
4
3
2
1
6
7
Martin
34
2
1
11
12
T101N
14
R28W
13
6
7
8
9
10
18
17
16
15
22
U
V
T103N
R27W
19
20
32
33
34
35
36
31
6
5
4
3
2
1
6
32
33
5
4
§
¦£
¨
¤
90
1
23
24
Faribault
V County5
U
6
27
26
4
34
35
36
3
2
1
10
11
12
7
8
9
10
11
12
7
8
9
10
11
12
17
16
15
14
13
18
17
16
15
14
13
18
17
16
15
14
13
21
29
1
T102N
R29W
T102N
R28W
T102N
R27W
1
22
23
24
19
20
21
22
23
24
19
20
21
22
23
24
28
27
26
25
30
29
28
27
26
25
30
29
28
27
26
25
32
33
34
35
36
31
32
33
34
35
36
31
32
33
34
35
36
5
4
8
17
30
31
Site Location
6
3
2
1
6
5
4
3
2
1
6
5
4
3
2
1
9
10
11
12
7
8
9
10
11
12
7
8
9
10
11
12
16
15
14
13
18
17
16
15
14
13
18
17
16
15
14
13
7
20
21
29
32
7
T101N
R29W
18
T101N
ÞYµYs R28W
19
20
21
22
YÌÞ
22
23
24
28
27
26
25
30
29
28
33
34
35
36
31
32
33
T101N
R27W
24
19
20
21
22
23
24
27
26
25
30
29
28
27
26
25
34
35
36
31
32
33
34
35
36
30
31
Friday, December 28, 2018
12,000
Feet
1 in = 12,000 ft
19
23
IOWA
6,000
3
6
7
169
9
20
3
25
8
6
0
1
2
60th St
31
7
350th A v
22
21
Faribault
County
30
29
28
101
33
3
109
5
"
)
32
36
4
70th St
7
35
M I NNESO T A
S:\Projects\21000 PROJ\21700-21799\21756 Benz Wetland Bank-Pilot Grove Township MN\21756 GIS\21756 MapDocs\21756 Prospectus Maps\21756 Figure 1 - Location Map.mxd
34
e
33
ª
32
Project Number 18-21756
¯
Figure 1
Project Location Map
Benz Wetland Bank
Source(s):
Municipalities (MN DOT, 6/24/2016)
Lakes (MN DNR, July, 2008)
Counties (MN DNR, July 2013)
PLSS (MnGeo/USGS)
Pilot Grove Twp, Faribault County, Minnesota
MVP-2018-01893-MJB (Public Notice) Page 2 of 16
Legend
347th Ave
Hydric Soil
ÌYsYY_ÞO
Predominantly Hydric Soil
YYsOs
Partially Hydric Soil
YssY_s_
22
U
V
Predominantly Non-Hydric Soil
Non-Hydric Soil
_Y¯ÞO
YY
sOsYs
YEYÞÞ
OYY
sOsYs
µOssÞ
OY
YsOsYs
ÌYsYY_Þ
OYY
sOsYs
246
ÞsY
ÞO
Y
ÌYsYY_ÞO
YYsOs
YssY_s_
ÞOsÞO
YY
sOsYs
V
U
70th St
ÌYsYY_Þ
OYY
sOsYs
YEYÞÞ
OYY
sOsYs
_Y¯Þ
OYY
sOsYs
^s¯OY
YsOs
Ys
NYÞYY_Þ
OYY
sOsYs
ÌYsYY_Þ
OYY
sOsYs
s¶Y
YÞY
sOsYs
µOssÞ
OYY
sOsYs
NÞY°Y_sOYs
YsOsYs
Y_sssY_s_
ÞsY
Þ
OY
ÌYsYY_Þ
OYY
sOsYs
NÞsYO
YY
sOsYs
Y_s°NÞY
OYsY
sOsYssY_s_
ÌYsYY_Þ
OYY
sOsYs
2
V
U
ÞsY
NYÞYY_Þ
ÞO
OYY
Y
sOsYs YEYÞÞO
ÞOYsO
Y Y
Thursday, October 11, 2018
0
250
500
Feet
1 in = 500 ft
ÌYsYY_Þ
OYY
sOsYs
ÌYsYY_Þ
OYY
sOsYs
®Þs_Y°NÞsYOYs
ÌYsYY_Þ
OYY
sOsYs
µOssÞ
¯
ÌYsYY_Þ
OYY
sOsY
350th Ave
YY
sOsYs
NÞY
YY
sOsYs
NÞY
YY
sOsYs
ÌYsYY_Þ
OYY
sOsYs
_Y¯Þ
OYY
sOsYs
S:\Projects\21000 PROJ\21700-21799\21756 Benz Wetland Bank-Pilot Grove Township MN\21756 GIS\21756 MapDocs\21756 Prospectus Maps\21756 Figure 4 - Soil Map.mxd
Easement Boundary
Faribault County Soil Survey
Project Number 18-21756
Figure 4
Faribault County
Soil Survey
Benz Wetland Bank
Pilot Grove Twp, Faribault County, Minnesota
Source(s):
Orthophoto (MnGeo WMS, 2017)
Soil Survey (USDA NRCS, 2015)
ß
0 , 1 1( 6 27 $
Earth
Martin
6
5
ª
6
5
6
5
ß
0 , 1 1( 6 27 $
"
)
£
¤
§
¦ §
¨
¦
¨
6
5
6
5
5
5 6
6
6
5
5
6
6
5
Martin
6
5
"
)
6
5
)
6"
5
6
5
Badger Cr
minor
watershed
Faribault
County
"
)
5
6
"
)
ß
0 , 1 1( 6 27 $
6
5
6
5
"
)
"
)
6
5
"
)
"
)
)
6 "
5
6
5
6
5
"
)
6
5
"
)
0RQGD\-DQXDU\
)HHW
LQ IW
"
)
"
)
I O W A
6
5
£
¤
"
)
6
5
ª
)
"
) "
6
5
6
5
6
5
6
5
%OXH(DUWK5LYHU
PDMRUZDWHUVKHG
5
6
/H6XHXU5LYHU
PDMRU
ZDWHUVKHG 6
5
"
)
5
6
"
)
Bank Service
Area 9
Blue Earth
"
)
"
)
ª
"
)
6/HJHQG
5
"
)
Project Area
"
) Major
"
) Watershed
)
5 "
6
Minor
"
)Watershed
Bank Service
5 Areas
6
6
5
0 , 1 1( 6 27 $
"
)
"
)
6
5
6
5
6
5
ß
"
)
"
)
6
6 5
5
"
)
6
5
"
)
"
)
Blue
6
5
Watonwan
Martin
"
) "
)
ß
0 , 1 1( 6 27 $
ª
"
)
£
¤
6?3URMHFWV?352-??%HQ]:HWODQG%DQN3LORW*URYH7RZQVKLS01?*,6?0DS'RFV?3URVSHFWXV0DSV?)LJXUH:DWHUVKHG0DSP[G
6
"
) 5
ª
:DWRQZDQ
5LYHU
PDMRU
ZDWHUVKHG
MVP-2018-01893-MJB (Public Notice) Page 3 of 16
3URMHFW1XPEHU
¯
Figure 5
Watershed Map
Benz Wetland Bank
Source(s):
&RQWRXUV+LOOVKDGH 0Q*HR/L'$5
Pilot Grove Twp,Faribault County, Minnesota
MVP-2018-01893-MJB (Public Notice) Page 4 of 16
347th Ave
Legend
Ba
USGS Streams
V
U
70th St
k
re e
C
r
dge
0 th Ave
35
V
U
Project Number 18-21756
Monday, January 7, 2019
0
250
500
Feet
1 in = 500 ft
¯
Figure 6
Existing Wetlands Map
Benz Wetland Bank
Pilot Grove Twp, Faribault County, Minnesota
Source(s):
Orthophoto (MnGeo WMS, 2015)
S:\Projects\21000 PROJ\21700-21799\21756 Benz Wetland Bank-Pilot Grove Township MN\21756 GIS\21756 MapDocs\21756 Prospectus Maps\21756 Figure 6 - Existing Wetlands Map.mxd
V
U
Project Area
WK6W
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
!
(
)HHW
LQ IW
V
U
!
(
0RQGD\-DQXDU\
WK $ YH
6?3URMHFWV?352-??%HQ]:HWODQG%DQN3LORW*URYH7RZQVKLS01?*,6?0DS'RFV?3URVSHFWXV0DSV?)LJXUH3URSRVHG(DVHPHQW%RXQGDU\0DSP[G
2' Contour
10' Contour
!
(
Monument Points
Boundary
Easement
WK$YH
V
U
/HJHQG
V
U
MVP-2018-01893-MJB (Public Notice) Page 5 of 16
3URMHFW1XPEHU
¯
Figure 8
Proposed Easement
Boundary Map
Benz Wetland Bank
Source(s):
2UWKRSKRWR 0Q*HR:06
&RQWRXUV 0Q/L'$5
Pilot Grove Twp, Faribault County, Minnesota
1102
1100
1101
03
11
1092
1091
1095
1090
1089
1096
109
3
1099
1094
5
109
1092
1094
0
109
1091
MVP-2018-01893-MJB (Public Notice) Page 6 of 16
8
1086
1087
Benz Wetland
Bank
1081
1091
Note: Existing Tile Elevations
To Be Verified Prior to Construction
Concept Plan
04
11
01
11
1086
2
110
1089
Figure 10:
1103
1093
1083
1106
Wetland Outlet
Elevation=1087.50
109
9
7
108
8
10
109
6
1097
110
5
1084
1098
1088
Faribault County, MN
9
10
8
1085
109
7
110
7
7
10
8
1089
Proposed Perforated Tile
Proposed Non-Perforated Tile
Proposed Wetland Outlet
1106
1081
4
109
1084
1' Contour
5' Contour
Maintained Water Level
04
11
1082
Easement Boundary
1099
110
2
1105
1092
6
108
1
109
1083
1082
0
109
08
11
1086
1083
11
03
1090
1086
Legend
109
8
1106
109
2
8
1080
10
8
Friday, August 3, 2018
Proposed Tile Block
Proposed Branch S Reroute
Fill Areas
Existing Private Tile Lines
Existing Branch S
JCD 514 Open Ditch
1101
8
10
8
Fill Area
11
00
1086
1087
10
9
Parcels
02
11
9
PN: 18-21756
5
Source:
9
10
4
110
1103
1086
8
10
108
7
7
Orthophotograph (MnGeo WMS, 2017)
9
10
Tile/Ditch (Blue Earth County, 12/16/2016)
5
Major Stream (MN DNR, July 2008)
1107
1108
1114
1101
1102
5
6
9
10
8
9
1103
6
5
63
16
Blue
Blue
Earth
Earth
6
5
6
5
6
5
4
6
5
9
8
110
1106
1109
10
9
90
18
11
10
County
1097
169
£
¤
§
¦
¨
6
5
6
5
2
1102
8
1
110
7
1101
4
109
280
Feet
6
1112
3
111
1089
1111
1099
1113
26
4
110
1106
110
9
1115
11
14
111
2
6
5
1109
2
1100
03
11
9
10
1105
50-yr
100-yr
1104
1087.42 1087.81
1088.75 1089.11
1090
25-yr
1087.05
1088.43
1100
10-yr
1086.58
1088.08
5
2
V
U
Proposed Private Tile
Outlet Elevation=1088.50
140
66
5
5
1111
16
11
1107
1104
5-yr
1086.29
1087.86
3
1098
6
110
1110
1108
Storm Event
2-yr
Existing Peak Elevation (ft) 1085.93
Proposed Peak Elevation (ft) 1087.66
10
9
110
6
1094
1102
1097
70
1 inch = 300 feet
1104
1096
1088
1091
1
1105
1101
11
02
Proposed10Branch
S
95
1103
4
Outlet
Elevation=1088.50
110
10
0
0
Elmore
Elmore
Iowa
S:\Projects\21000 PRO J\21700-21799\21756 Benz Wetland Bank-Pilot G rove Township MN\21756 G IS\21756 MapDocs\21756 Prospectus Maps\21756 F igure 10 - Concept Plan.mxd
350th Ave
1090
1092
q
1087
1088
1089
MVP-2018-01893-MJB (Public Notice) Page 7 of 16
0
10
9
4
109
109
6
1098
02
11
00
11
4
110
1102
1100
G
10
9
109 2
4
1092
)
!
0
1102
!
!
.
Outlet Structure Observation
)
08
8
Faribault County, MN
11
00
1
Friday, August 3, 2018
06
11
1086
09
8
110
4
Legend
Ditches
)
G
Type 4 - Deep Marsh
Type 3- Shallow Marsh
Type 2- Fresh (wet) Meadow
Upland Buffer
1094
1106
1088
1100
1098
10' Contour
2' Contour
1088
109
0
109
6
1092
1102
88
10
1102
1086
! Well Location
Tile Inspection
G
2
109
! Photo Location
)
)
04
11 6
110
1108
1092
Monitoring Plan Map
Benz Wetland
Bank
!1
Staff Gauge
Figure 11:
11
06
1094
10
9
Staff Gauge
!
. Outlet Structure Observation
Well & Vegetation Transect
108
6
10
92
PN: 18-21756
Source:
1088
94
10
Orthophotograph (MnGeo WMS, 2017)
Tile/Ditch (Blue Earth County, 12/16/2016)
Major Stream (MN DNR, July 2008)
Contours (MnLiDAR, 2010)
1100
)
G
1102
11
)
G
10
11
08
00
11
6
111
1114
1112
1110
1108
1106
1104
70
2
V
U
!
280
Feet
66
5
5
5
1106
!
140
1 inch = 300 feet
350th Ave
11
06
!
110
6
0
1088
11
06
11
08
!
!
6
5
26
1108
8
169
£
¤
§
¦
¨
90
6
5
6
5
63
16
Blue
Blue
Earth
Earth
6
5
6
1110
6
5
1
5
6
1094
1110
4
110
1102
1096
1114
18
110
6
6
5
4
4
110
6
5
110
2
96
10
1102
County
11
04
1104
6
5
2
1108
1106
1106
11
04
9
1108
Elmore
Elmore
Iowa
S:\Projects\21000 PRO J\21700-21799\21756 Benz Wetland Bank-Pilot G rove Township MN\21756 G IS\21756 MapDocs\21756 Prospectus Maps\21756 F igure 11 - Monitoring Plan Map.mxd
q
08
11
1096
1098
MVP-2018-01893-MJB (Public Notice) Page 8 of 16
PLAN VIEW
NTS
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
0$5.$25,*(5
WETLAND OUTLET STRUCTURE DETAIL
NTS
AG300
/,&12
'$7(
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
/,&12
'$7(
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC.
AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
BENZ
WETLAND BANK
TRASH FENCE & RIPRAP DETAIL
NTS
MINNESOTA
PILOT GROVE TWP
5(9,6,216&+('8/(
'$7(
'(6&5,37,21
%<
PROJECT NO.
21756 DETAILS
CAD FILE NAME
DRAWN BY
JAG
DESIGNED BY
MAO/JAG
REVIEWED BY
MAO
ORIGINAL ISSUE DATE
--/--/--
CLIENT PROJECT NO.
-
TITLE
DETAILS
SHEET
4
'(7$,/6
2)
MVP-2018-01893-MJB (Public Notice) Page 9 of 16
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
0$5.$25,*(5
/,&12
'$7(
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
/,&12
'$7(
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC.
AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
BWSR TILE BLOCK/REMOVAL
TYPICAL DROP INTAKE REMOVAL
NTS
NTS
AG280
BENZ
AG310
WETLAND BANK
MINNESOTA
PILOT GROVE TWP
5(9,6,216&+('8/(
'$7(
'(6&5,37,21
%<
PROJECT NO.
21756 DETAILS
CAD FILE NAME
DRAWN BY
JAG
DESIGNED BY
MAO/JAG
REVIEWED BY
MAO
ORIGINAL ISSUE DATE
--/--/--
CLIENT PROJECT NO.
-
TITLE
DETAILS
SHEET
5
'(7$,/6
2)
MVP-2018-01893-MJB (Public Notice) Page 10 of 16
(526,21&21752//(*(1'
6<0%2/
,7(0
12
'(6&5,37,21
81,76
48$17,7<
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
0$5.$25,*(5
'$7(
/,&12
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
/,&12
'$7(
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC.
AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
BENZ
WETLAND BANK
PILOT GROVE TWP
MINNESOTA
5(9,6,216&+('8/(
'$7(
PROJECT NO.
CAD FILE NAME
'(6&5,37,21
%<
21756 EROSION
DRAWN BY
JAG
DESIGNED BY
MAO/JAG
REVIEWED BY
MAO
ORIGINAL ISSUE DATE
--/--/--
CLIENT PROJECT NO.
-
TITLE
EROSION CONTROL
PLAN
6&$/(,1)((7
SHEET
7
(526,21&21752/3/$1
2)
MVP-2018-01893-MJB (Public Notice) Page 11 of 16
6((',1*/(*(1'
6<0%2/
'(6&5,37,21
81,76
48$17,7<
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
0$5.$25,*(5
'$7(
/,&12
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
/,&12
'$7(
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC.
AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
BENZ
WETLAND BANK
PILOT GROVE TWP
MINNESOTA
5(9,6,216&+('8/(
'$7(
PROJECT NO.
CAD FILE NAME
'(6&5,37,21
%<
21756 EROSION
DRAWN BY
JAG
DESIGNED BY
MAO/JAG
REVIEWED BY
MAO
ORIGINAL ISSUE DATE
--/--/--
CLIENT PROJECT NO.
-
TITLE
SITE RESTORATION
6&$/(,1)((7
SHEET
8
6,7(5(6725$7,21
2)
MVP-2018-01893-MJB (Public Notice) Page 12 of 16
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
0$5.$25,*(5
'$7(
/,&12
,+(5(%<&(57,)<7+$77+,63/$163(&,),&$7,2125
5(3257:$635(3$5('%<0(2581'(50<',5(&7
683(59,6,21$1'7+$7,$0$'8/,&(16('
352)(66,21$/(1*,1((581'(57+(/$:62)7+(
67$7(2)0,11(627$
/,&12
'$7(
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC.
AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
PROJECT
BENZ
WETLAND BANK
PILOT GROVE TWP
MINNESOTA
5(9,6,216&+('8/(
'$7(
PROJECT NO.
CAD FILE NAME
'(6&5,37,21
%<
21756 PROPOSED
DRAWN BY
JAG
DESIGNED BY
MAO/JAG
REVIEWED BY
MAO
ORIGINAL ISSUE DATE
--/--/--
CLIENT PROJECT NO.
-
TITLE
OVERALL
PROPOSED SITE
PLAN
6&$/(,1)((7
SHEET
10
29(5$//352326('6,7(3/$1
2)
MVP-2018-01893-MJB (Public Notice) Page 13 of 16
Performance Standards
/Z
ZZZ
ZZD/WZZZZZZ
Z
,ZZWZ
^Z
ZZZ
Z
W^ZZ'Z^ZZZ
D/ZZZZZZ
ZZZZZZ
^ZD/ZZZZZ
ZZZZZZZ
tDZtZZZZZ
ZZ
/sZ
WZ^
ZZ
ZZZZ
Z
W^ZZ'Z^ZZZ
DZEE/Z/EE/
^ZDZEE/Z/EE/Z
ZZZZ
tDZZEE/Z/EE/Z
ZZZZ
hZEE/Z/EE/ZZ
Z
tZZhZEE/
/sZ
WZ^
ZZ
ZZZZ
Z
W^ZZ'Z^ZZZ
DZEE/Z/EE/
^ZDZEE/Z/EE/Z
ZZZZ
tDZZEE/Z/EE/Z
ZZZZ
hZEE/Z/EE/ZZ
Z
tZZhZEE/
&sZ
WZ^
ZZ
ZZ
ZZ
ZZ&tZZZ
DZEE/Z/EE/
^ZDZEE/Z/EE/Z
ZZZZ
tDZZEE/Z/EE/Z
ZZZZ
hZEE/Z/EE/ZZ
Z
tZZhZEE/
EE/EEZ///W^WZ^
Page 9 of 11
MVP-2018-01893-MJB (Public Notice) Page 14 of 16
Credit Release Schedule
This release schedule is linked to the Performance Standards laid out in the Vegetation Establishment, Management and Monitoring Plan.
/sZ
WZ
^Z
ZZ
ZZ
ZZ
/sZ
WZ
^Z
ZZ
ZZ
Z
&sZ
WZ
^Z
Z&t
ZZZ
dZZZ
dZ
WZ
dZ
t
ZZ
&
WZ
/
Z
,ZZ
WZ^
ZZ
ZZZ
ZZ
t
D
ZZ
t
^Z
D
ZZ
t
t
DZ
hZ
ZZZ
ZZ
h
dZ
Page 10 of 11
MVP-2018-01893-MJB (Public Notice) Page 15 of 16
d Z ZZ Z ZZ Z
Z Z Z Z Z
7DEOH([LVWLQJYV3URSRVHG3HDN)ORRG(OHYDWLRQV
&ZZZZdZZ
ZZZZZ
ZdZZZ
ZZdZZZ
^ZZZZZZZZ
Z^ZZZ
Z,/ddhZE'/EZ/E'Es/ZKEDEd>W>EE/E'
MVP-2018-01893-MJB (Public Notice) Page 16 of 16
)LJXUH3URSRVHG\U)ORRG0DS
)LJXUH3URSRVHG\U)ORRG0DS
)LJXUH3URSRVHG\U)ORRG0DS
Z,/ddhZE'/EZ/E'Es/ZKEDEd>W>EE/E'