The District Engineer is evaluating a permit application from the Wells County Water Resource District for their Hurdsfield Drain Improvement Project. The purpose of the project is to reclaim over 150 acres of farmland, residential property and infrastructure that is inundated. Water levels in Hurdsfield and East Lakes have been on the rise since 1993 and the project would lower levels 6-8 feet. Direct impacts are estimated at 0.001 acre of permanent impact and 0.87 acres of temporary impact. The project is located in Section 16 and 21, Township 146 North, Range 72 West, Latitude 47.464362° North, Longitude -99.842081° West, Wells County, North Dakota.

The District Engineer is evaluating a permit application from the Wells County Water Resource District for their Hurdsfield Drain Improvement Project. The purpose of the project is to reclaim over 150 acres of farmland, residential property and infrastructure that is inundated. Water levels in Hurdsfield and East Lakes have been on the rise since 1993 and the project would lower levels 6-8 feet. Direct impacts are estimated at 0.001 acre of permanent impact and 0.87 acres of temporary impact. The project is located in Section 16 and 21, Township 146 North, Range 72 West, Latitude 47.464362° North, Longitude -99.842081° West, Wells County, North Dakota.

Public Notice Subject: Public Notice of Permit Application Action ID:

NWO-2015-01512-BIS

Comments Period: February 8, 2019 ­ February 23, 2019 SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application to construct a project identified as the Hurdsfield Legal Drain Improvements Project in Wells County. The purpose of the project is to permanently lower the elevation of Hurdsfield and East Lakes to historic levels and restore approximately 150 acres of farmland, residential property and road grades affected by the current elevation. Direct impacts of the project are minimal. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 10 of the Rivers and Harbors Act of 1899 for structures or work in or affecting navigable waters of the United States and/or Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT:

Wells County Water Resource District Attn: Mr. Larry Skiftun 700 Railway Street, Suite #244 Fessenden, North Dakota 58438

LOCATION: Direct impacts of the project will occur in Hurdsfield and East Lakes and wetlands located in Sections 16 and 21, Township 146 North, Range 72 West, Latitude 47.464362° North, Longitude -99.842081° West, Wells County, North Dakota and can be seen on the Chaseley USGS Topographic Quadrangle. PROJECT DESCRIPTION: The applicant is proposing to construct an outlet to the James River capable of lowering Hurdsfield and East Lakes between 6 and 8 feet to restore approximately 150 acres of currently inundated property. Based on the available information, the overall project purpose is to reclaim farmable land, residential property and infrastructure that has been inundated as the lake levels have increased over the last few decades. The applicant believes there is a need for this project as they have been petitioned by adjacent landowners to provide an outlet. East Lake is the natural outlet of Hurdsfield Lake; therefore, there is a need to equalize the elevations between the two lakes to prevent backflow. This would be accomplished by installing a fixed elevation intake/control structure and gravity flow line along the inundated railroad tracks from Hurdsfield Lake to East Lake. A pump station, which would typically operate between April and September, would be constructed on or near 33rd Avenue NE. U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

CENWO-ODR-ND

Page 2

Action ID: NWO-2015-01512-BIS

Water would move north through a buried 10-inch force main installed adjacent 33rd Avenue NE north to 4th Street NE where it would outfall into a ditch. Eventually the water will reach the James River near Harvey, North Dakota. A Draft Operating Plan dated August 2018 indicates daily releases may be between 0.2 and 3 cfs, which would result in approximately 245 acrefeet of water evacuated per year. This would equate to an annual drop in elevation of 0.24 feet; however, this assumes no additional lake inflow and not taking into account evaporation. The Draft Operating Plan also is based on flow data recorded prior to 1994 when USGS Gage 06467600 was decommissioned. A full set of plans is available upon request. ADDITIONAL INFORMATION: The project was authorized in 2016; however, the authorization was allowed to expire in 2017. Apex Engineering has redesigned the project and requested authorization. Direct impacts from the discharge of dredged or fill material are estimated at 0.001 acre permanent and 0.87 acres of temporary. Indirect impacts associated with reclamation of lands inundated for several decades were estimated at 156 acres adjacent to Hurdsfield Lake and 77 acres adjacent to East Lake. Previously provided information alludes to the possibility of reclamation around nearby Lakes and wetlands, at least until elevations are lowered to their natural outlet. It is unknown if any additional reclamation is expected to occur. Environmental Setting. Based on information gleaned from the Hurdsfield Legal Drain Excess Floodwater Removal Project Preliminary Engineering Report dated April 22, 2016, the systems associated with this project started to rise around 1993. This is a very similar situation as has occurred at Devils Lake. Adjacent farmland, township roads, a railroad line and two farmsteads have been affected. Even at the proposed outlet elevation, some of the roads and the railroad line will remain inundated. Due to the prolonged inundation, much of the area Alternatives. The applicant has not provided information concerning project alternatives; however, an alternative design was previously permitted. Additional information concerning project alternatives may be available from the applicant or their agent. Other alternatives may develop during the review process for this permit application. All reasonable project alternatives, in particular those which may be less damaging to the aquatic environment, will be considered. Mitigation. The Corps requires that applicants consider and use all reasonable and practical measures to avoid and minimize impacts to aquatic resources. If the applicant is unable to avoid or minimize all impacts, the Corps may require compensatory mitigation. The applicant has not proposed mitigation at this time. OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, is required under Section 401 of the Clean Water Act. The Section 401 Program is administered by the North Dakota Department of Health, Water Quality Division. A copy of this public notice and design information is being sent to the Department for their consideration. In addition, authorization may be required from the North Dakota State Water Commission. As a partial funding agency, it is assumed applications, if necessary, have already been submitted. HISTORIC PROPERTIES: Based on the available information, the Corps has made a preliminary No Potential to Cause Effect determination for this project as the majority of the U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

CENWO-ODR-ND

Page 3

Action ID: NWO-2015-01512-BIS

work will occur in previously disturbed areas. If information becomes available that was not considered in making this determination, the Corps will initiate consultation with the State Historic Preservation Officer under Section 106 of the National Historic Preservation Act, as appropriate. ENDANGERED SPECIES: The previously permitted project, which essentially provides the same relief, was coordinated under the Endangered Species Act in May of 2016. The Corps made a May Affect, Not Likely to Adversely Affect determination on the Whooping Crane (Grus americana). The US Fish and Wildlife Service concurred in June 2016. The Corps will reinitiate consultation if the Service deems necessary. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

CENWO-ODR-ND

Page 4

Action ID: NWO-2015-01512-BIS

SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2015-01512BIS must be submitted to the office listed below on or before February 23, 2019. Toni R. Erhardt, Project Manager US Army Corps of Engineers, Omaha District North Dakota Regulatory Office 3319 University Drive Bismarck, North Dakota 58504 Email: Toni.R.Erhardt@usace.army.mil The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant or the Corps' project manager Toni R. Erhardt at (701) 255-0015, extension 2003 or Toni.R.Erhardt@usace.army.mil. Attachments: 5 drawings

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

CONSTRUCTION DOCUMENTS FOR HURDSFIELD LEGAL DRAIN IMPROVEMENTS

WELLS COUNTY, NORTH DAKOTA

CERTIFICATIONS

SECTION 08

SECTION 09

I hereby certify that the attached plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of North Dakota.

SECTION 10

ENGINEER NAME, PE Date

WELLS COUNTY

XXXX

PROJECT LOCATION SECTION 17

CHASELEY TOWNSHIP T146N R72W SECTION 16

33RD AVE NE

PROJECT LOCATION

Lic. No.

4TH ST NE

SECTION 15

NORTH DAKOTA STATE LOCATION MAP

3RD ST NE EAST LAKE

HURDSFIELD LAKE

CHASELEY SECTION 20

SECTION 21

SECTION 22

HWY 200

N

NO SCALE

LOCATION MAP

WELLS COUNTY WATER RESOURCE DISTRICT APEX PROJECT NUMBER: 18.354.0098

RY A IN IM OR ON L I F E PR NOT UCT R ST N CO

Bismarck - Detroit Lakes Dickinson - Fargo 600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com K:\Projects\2018\18.354.0098 Wells Co WRD - Hurdsfield Legal Drain\Design\Drawings\18.354.0098-G.00.dwg

1

2

3

5

4

6

7

8

9

SECTION 09

SECTION 08

11

13

12

SECTION 10 DITCH EXCAVATION

4th ST NE

A

10

A

CHASELEY TOWNSHIP T146N R72W

B

B 10" HDPE FORCEMAIN WEST ROW OF 33RD AVE. NE

AIR RELEASE MANHOLE

SECTION 16

SECTION 17

SECTION 15

C

33rd AVE NE

C

D

D

20' PERMANENT ACCESS EASEMENT

3rd ST NE

HURDSFIELD LAKE WSE 1841.68 (SURVEYED 8-22-18)

E

N

PUMP STATION LOCATION

0

EAST LAKE WSE 1834.78 (SURVEYED 8-22-2018)

500

1000

E

SCALE: 1 INCH = 1000 FEET

APPROX. CENTERLINE ABANDONED B.N.S.F.

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

100' RAILROAD ROW

CONCRETE CONTROL STRUCTURE

F SECTION 20

SECTION 21

SECTION 22

24" HDPE GRAVITY SEWER

REVISIONS Issue #

Description

WELLS COUNTY WATER RESOURCE DISTRICT

G

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

Date

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

SCOPE OF WORK

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

G.02

Jennifer M.

Approved By: 1

F

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

STORM PIPE

A

A

VARIES

4.0' MIN.

VARIES

6.0' MINIMUM

6.0' MINIMUM

FLARED END SECTION

TOE

B FLOW

B NOTE: PIPE DIA. < 42" = FIBER ROLL 12IN PIPE DIA. > FIBER ROLL 20IN

FIBER ROLL END OF PIPE PROTECTION

X

C

4.0'

2'.0' 4.0'

2'.0'

NO SCALE

CHANNEL AND DITCH APPLICATIONS (3.5 STAPLES PER SQ. YD)

20"

5.0' POSTS @ 8.0' MAX SPACING. MAY BE ALTERNATED ON GRADES LESS THAN 2.0%.

19"

6.5' BLANKET

C FL OW

8.0' BLANKET 1.0' TO 3.0'

NOTES: CHECK SLOT 1. 2. 3.

STRAW OR WOOD FIBER 12'' DIA. ROLL ENCLOSED IN PLASTIC OR POLYESTER NETTING.

DI OF REC FL TIO OW N

2.0' MIN.

4.

D

DIG 6"x6" TRENCH LAY BLANKET END INTO TRENCH STAPLE BLANKET IN BOTTOM OF TRENCH EVERY 1.5' BACKFILL TRENCH WITH SOIL AND COMPACT

DITCH PLACEMENT BIOROLL

. AX

'M

4.0

D .

AX

'M 4.0

NOTE: INSTALL BIOROLL ALONG LEVEL CONTOUR IF POSSIBLE.

BACKFILLED TRENCH

#

2'' X 2'' X 18'' LONG WOODEN STAKES AT 2' 0'' SPACING. DRIVE THROUGH NETTING AND FIBER ROLL.

PLAN VIEW

EROSION CONTROL BLANKET INSTALLATION DETAILS

.

AX

NOTES: 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY.

NO SCALE LENGTH

4.0

AX

'M

.

'M

4.0

REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.

3.

SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.

2'

STORM PIPE

5.0' MIN. LENGTH POST AT 8.0' MAX. SPACING WIDTH

2'

RIPRAP LOCATIONS

F

SITE LOCATIONS FORCEMAIN OUTFALL

LENGTH (FT) 10.0

WIDTH (FT) 15.0

DEPTH (FT) 1.5

HURDSFIELD INLET

5.0

5.0

2.0

EAST LAKE OUTLET

16.0

16.0

2.0

#

RIPRAP DETAIL

#

NO SCALE

SLOPE VARIES

ROPE TIE 4" MAX.

6" MIN.

DIRECTION OF FLOW

BIOROLL 9" HIGH MIN.

FABRIC ANCHORAGE IN TRENCH. BACKFILL W/ TAMPED ORIGINAL SOIL

SLOPE VARIES

ROPE TIE BIOROLL

EXTEND WIRE MESH INTO TRENCH

4" MIN.

Description

2"x2" WOOD STAKES

HEAVY DUTY SILT FENCE DETAILS

#

NO SCALE

2"x2" WOOD STAKES

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

2"x2" WOOD STAKES OR PINS PLACED A MAX. 4.0' APART

BIOROLL INSTALLATION DETAILS

WELLS COUNTY WATER RESOURCE DISTRICT

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo 600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

EROSION CONTROL DETAILS

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

G.06

Jennifer M.

Approved By: 1

F

NO SCALE

Date

G

BIOROLL 9" HIGH MIN.

SECTION VIEW

REVISIONS Issue #

E

12" MIN.

NOTE: 1. PLACE RIPRAP FABRIC PRIOR TO RIPRAP PLACEMENT.

Permanent Impact due to installation of Riprap at Hurdsfield Inlet and East Lake Outlet

2.0' MIN. POST EMBEDMENT

2'

OVERLAP GEOTEXTILE FABRIC 6" & FASTEN AT 2' INTERVALS.

30" MIN. WIRE MESH

FLARED END SECTION

WIRE MESH REINFORCEMENT GEOTEXTILE FABRIC, 4"-8'' WIDE BACKFILLED TRENCH

BIOROLL INSTALL BIOROLL NEAR SLOPE WHERE IT TRANSITIONS INTO A STEEPER SLOPE.

12" MIN.

E

V AL ER VA ON TIC RIE G T AL S HE SPA BE F C TW AC IN EE E O G M N F T EA 10 H S .0 E UR ' & SL E 10 OP D 0.0 E '

4" MAX.

2.

xxxx 12

13

3

2

4

6

5

8

7

10

9

13

12

EDGE OF WATER BODY HALLIDAY S1R 3048 ALUMINUM HATCH

TOE OF SLOPE A

A

CONTROL STRUCTURE

FLOTATION SILT CURTAIN, TYPE STILL WATER

r.. \!.!

CENTERLINE STATION

RIM.EL.

BASE EL.

18+50

1645.00

)()()()()()(

DIRECTION

PIPE SIZE

E

24"

w

24"

GATE LOCATION

GATE

WIDTH OF GATE OPENING

PIPE INVERT

25"

)()()()()()(

30" X48" ALUMINUM HATCH

)()()()()()(

SILT FENCE

' .

B

PLAN VIEW

NOTES: 1. WALL OPENINGS FOR PIPES REQUIRING GATES SHALL HAVE A MAXIMUM DIAMETER EQUAL TO THE "WIDTH OF GATE OPENING".

---EDGE OF WATER BODY

8" WALLS (TYP)

B 24" HOPE

2. WHERE GATES ARE TO BE INSTALLED REINFORCED CONCRETE PIPES SHALL BE SAWED FLUSH WITH THE INTERIOR WALL OF THE STRUCTURE

FLUSH OPERATOR ACCESS TO NON-RISING GATE STEM

WATER SURFACE VARIABLE LENGTH

v

CURTAIN FABRIC

2FTTO 10FT CURTAIN DEPTH

@@

c

CD @ @

CURTAIN WEIGHT

SECTION

!:lQ!5§;.

8" PRECAST COVER WITH HATCH

6'

FOR ANCHOR AND WEIGHT REQUIREMENTS, SEE SPEC.????. 8" (TYP)

WATER DEPTH CAN BE 0 TO 10 FEET. SILT CURTAIN HEIGHT INCLUDES

c

MAXIMUM WAVE HEIGHT FOR WATER BODY.

© IF 6 INCHES OR LESS OF WATER, USE

FLUSH MOUNTED WHIPPS MODEL 924 STAINLESS STEEL NON-RISING STEM SLIDE GATE

BALE BARRIERS.

A-A

STEEL TENSION CABLE AND CARRIER FLOAT 8" WALLS (TYP)

D

D

8"

FRONT VIEW

FLOTATION SILT FENCE CURTAIN DETAILS # -----------

0

8" BASE (TYP)

N O SCALE

CONTROL STRUCTURE 6'x4' PRECAST MANHOLE #

0

EXISTING SURFACE WATER (FIELD VERIFIED 8-22-18) HURDSFIELD LAKE ELEV.1841.68

E -

NO SCALE

E

Temporary Impact due to constructing and removing cofferdam at Hurdsfield Inlet

-

F

Xro REMOVED AFTER CONSTRUCTION

COFFERDAM DETAIL - HURDSFIELD INLET x-------

0

N O SCALE

REVISIONS Issue #

Description

WELLS COUNTY WATER RESOURCE DISTRICT

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

Date

EROSION CONTROL DETAILS

600 South 2nd Street, Suite# 145

Project#:

Bismarck, North Dakota 58504

Date:

18.354.0098 SEPTEMBER

Office: 701-323-3950

Drawn By:

www.apexenggroup.com

Checked By:

Josh

3

4

5

6

7

8

9

K:

11

10 Projects

2018

18.354.0098 Wells Co WRD -

J.

G

G.07

JenniferM.

Approved By:

2

10, 2018

)()()()(

12

13

Hurdsfield Legal Drain Design Drawings 18.354.0098-G.OX-G.OX

EROS-DETL.dwg

1

2

3

5

4

6

7

8

9

10

11

33.0' STATUTORY R/W

A

1.

2+00

2.

GRAVEL DRIVEWAY

12

B

.0'

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

4.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

Plug Valve 5.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

6.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

7.

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

39 18

3 1838

4

PUMP STATION

1838

B

CONSTRUCTION NOTES 1

1837

25.0' TEMPORARY CONSTRUCTION EASEMENT

1+00

2.0' 33.0' STATUTORY R/W

A

C

10' x 10' CONCRETE PAD @ 1838.5

BUILDING

D

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

3.

1

C

13

12

GENERAL NOTES

2 1836

190 SY - AGGREGATE BASE CLASS 5

2

65 SY - TYPE 2 RIPRAP

3

REMOVE SALVAGE AND REINSTALL FENCE AS NECESSARY

4

INSTALL GATE

5

SMOOTH BORE FLEXIBLE PVC SUCTION LINE

6

SUCTION LINE DETAIL G.04

D 5

20.0' DRAINAGE EASEMENT

E

E

10.0'

EDGE OF WATER ELEV. 1834.78 (SURVEYED 08-22-2018)

0+00

10.0'

F

N

VARIES TEMPORARY CONSTRUCTION EASEMENT

6

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

0

15

30

SCALE: 1 INCH = 30 FEET

REVISIONS Issue #

Description

WELLS COUNTY WATER RESOURCE DISTRICT

G

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

Date

HURDSFIELD LEGAL DRAIN SITE PLAN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.01

Jennifer M.

Approved By: 1

F

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES

33rd AVE NE

10.0'

Plug Valve

1855

1845 PUMP STATION

0+00

4+00

5+00

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

7.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR. ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

6+00

1

460 SY - AGGREGATE BASE CLASS 5

2

SEE SHEET C.01 FOR PUMP STATION IMPROVEMENTS

3

PROTECT TREES

8+00

9+00

1854.39

1853.34

1852.30

1851.44

1850.39

1849.03

7+00

1830

0

10+00

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

2

3

4

5

6

7

8

9

10

11

F

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

G

C.02

Jennifer M.

Approved By: 1

C

1840

REVISIONS Issue #

6.

M

PE F

1847.66

1846.20

1844.77

1844.67

1844.36

1843.14

1842.81

1842.59

1841.98

1840.26

1837.81

1835.81

1841.85

3+00

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

B

E

1835

2+00

5.

1845

CONCRETE ANCHOR

1+00

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

D

N

-1+00

4.

1850

5.0'

1834.75

1830

D 10" H

Plug Valve STA: 1+64

1831.91

F

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

A

CONSTRUCTION NOTES

1855

10" D.I. 90° BEND

3.

8.

1860

1835

FORCEMAIN SHALL BE INSTALLED IN A GENERAL UPHILL OR DOWN HILL MANNER WITH NO DIPS OR HUMPS TOWARDS AN AIR RELEASE VALVE OR OUTFALL TO PREVENT AIR POCKETS.

11+00

1860

1840

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

33rd AVE NE

1850

E

10+00

3rd ST NE

D

1+00 2

9+00

8+00

7+00

6.5' MIN. BURY DEPTH

C

6+00

2+00

VARIES TEMPORARY CONSTRUCTION EASEMENT

-0+50 0+00

5+00

4+00

3+00

23.0'

3

10.0'

EAST LAKE

20.0' DRAINAGE EASEMENT

EDGE OF WATER ELEV. 1834.78 (SURVEYED 08-22-2018)

BUILDING

B

25.0' TEMPORARY CONSTRUCTION EASEMENT

A

33.0' STATUTORY R/W

20.0' PERMANENT ACCESS EASEMENT

10.0' TEMPORARY CONSTRUCTION EASEMENT

1.

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES 1.

10.0'

17+00

16+00

15+00

14+00

18+00

19+00

20+00

2.

FORCEMAIN SHALL BE INSTALLED IN A GENERAL UPHILL OR DOWN HILL MANNER WITH NO DIPS OR HUMPS TOWARDS AN AIR RELEASE VALVE OR OUTFALL TO PREVENT AIR POCKETS.

3.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

4.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

5.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

6.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

7.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

10.0'

11+00

10+00

13+00

12+00

20.0' DRAINAGE EASEMENT

B

0.08 acres of temporary impact due to 10" forcemain installation.

10.0' TEMPORARY CONSTRUCTION EASEMENT

33.0' STATUTORY R/W

A

23.0'

33rd AVE NE

C

8.

1865

1865

1860

1860

1855

1855

1850

10" HDPE FM

12+00

13+00

14+00

15+00

16+00

17+00

18+00

19+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

1858.18

1858.42

1858.65

1858.88

1858.70

1858.10

1857.51

1856.90

1856.25

1855.53

1854.82

1854.11

1854.30

1854.07

1854.50

11+00

2

3

4

5

C

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

E

0

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

20+00

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

6

7

8

9

10

11

F

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

G

C.03

Jennifer M.

Approved By: 1

B

D

N

1854.61

1840

1854.71

1840

1854.81

1845

10+00

A

1850

1845

1854.39

F

6.5' MIN. BURY DEPTH

1870

1854.16

E

1870

1854.35

D

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES

10.0'

0.07 acres of temporary impact due to 10" forcemain installation.

10.0' TEMPORARY CONSTRUCTION EASEMENT

A

20.0' DRAINAGE EASEMENT

33.0' STATUTORY R/W

1.

2.

FORCEMAIN SHALL BE INSTALLED IN A GENERAL UPHILL OR DOWN HILL MANNER WITH NO DIPS OR HUMPS TOWARDS AN AIR RELEASE VALVE OR OUTFALL TO PREVENT AIR POCKETS.

3.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

4.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

B

23+00

22+00

21+00

20+00

24+00

27+00

26+00

25+00

29+00

30+00

23.0'

10.0'

33rd AVE NE

28+00

5.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

6.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

7.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

C 8.

1875

1875

1870

1870

1865

1865 6.5' MIN. BURY DEPTH

1860

21+00

22+00

24+00

25+00

26+00

27+00

28+00

29+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

1867.23

1867.08

1866.96

1866.84

1866.55

1866.04

1865.54

1865.13

1864.68

1864.20

1863.72

1863.36

1862.01

1861.70

23+00

0

50

100

RY A IN R M I L FO ION E PR NOT UCT TR S N O C

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.04

Jennifer M.

Approved By: 1

F

Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

C

E

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

30+00

B

D

N

20+00

1860.77

1845

1859.67

1845

1858.44

1850

1858.41

1850

1858.18

F

1855

A

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

1860

M

10" HDPE F

1855

1858.19

E

1862.77

D

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES

1

AIR RELEASE MH (48" )

23.0'

10.0'

33rd AVE NE

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

FORCEMAIN SHALL BE INSTALLED IN A GENERAL UPHILL OR DOWN HILL MANNER WITH NO DIPS OR HUMPS TOWARDS AN AIR RELEASE VALVE OR OUTFALL TO PREVENT AIR POCKETS.

3.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

4.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

40+00

39+00

38+00

37+00

36+00

35+00

34+00

33+00

32+00

31+00

30+00

10.0'

B

10.0' TEMPORARY CONSTRUCTION EASEMENT

A

20.0' DRAINAGE EASEMENT

33.0' STATUTORY R/W

1.

5.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

6.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

7.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

C 8.

A

B

C

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

CONSTRUCTION NOTES 1

1880

1880 1875

31+00

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

1859.19

1859.48

1859.77

1860.06

1855

1860.17

1863.36

1864.38

1865.06

1865.35

1865.65

1865.95

1866.26

1866.56

1866.86

1867.23

30+00

FM

1850

N

1867.14

1850

F

DPE

CONCRETE ANCHOR

1860.19

10" H

1855

E

1860

1860.33

1860

1865

1860.48

5.0' 5.0'

1861.31

1865

E

1870

1862.33

1870

D

1875

AIR RELEASE MH (48") STA: 30+23 RIM: 1867.81 INV S 1859.90 (10" HDPE FM) INV N 1859.90 (10" HDPE FM) 6.5' MIN. BURY DEPTH

D

1 EA - AIR RELEASE MANHOLE

0

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

40+00

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.05

Jennifer M.

Approved By: 1

F

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES

B

42+00

41+00

40+00

48+00

50+00

49+00

23.0'

10.0'

33rd AVE NE

1

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

FORCEMAIN SHALL BE INSTALLED IN A GENERAL UPHILL OR DOWN HILL MANNER WITH NO DIPS OR HUMPS TOWARDS AN AIR RELEASE VALVE OR OUTFALL TO PREVENT AIR POCKETS.

3.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

4.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

END FORCEMAIN STA: 48+88

47+00

46+00

45+00

44+00

43+00

10.0' TEMPORARY CONSTRUCTION EASEMENT

10.0'

A

20.0' DRAINAGE EASEMENT

33.0' STATUTORY R/W

1.

5.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

6.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

7.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

C 8.

A

B

C

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

CONSTRUCTION NOTES 11.

D

1870

1870

1865

1865

1860

1855 1850

20.0' FLAT

-2.36

%

42+00

43+00

44+00

45+00

46+00

47+00

48+00

49+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

1848.68

1849.42

1850.19

1850.98

1851.55

1853.46

1853.78

1854.47

1854.83

1855.22

1855.63

1856.01

1856.34

1856.71

1857.08

1857.42

1857.81

1859.19

1858.80

41+00

1845 1840

N

40+00

1858.29

1845

1854.10

CONCRETE ANCHOR STA: 45+44

1840

E

10" HDPE FM

1850

F

D

1860

END FORCEMAIN STA: 48+88

6.5' MIN. BURY DEPTH

1855

E

MAINTAIN NATURAL DITCH DRAINAGE TO THE NORTH.

0

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

50+00

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.06

Jennifer M.

Approved By: 1

F

xxxx 12

13

5

4

6

7

8

EASEMENT

33rd AVE NE

GENERAL NOTES

58+00

00 57+

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

3.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

4.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

5.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

6.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

7.

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

33.0' STATUTORY R/W

56+00

13

12

1.

1850

1850

D

11

59+00

10.0' TEMPORARY CONSTRUCTION EASEMENT

10.0'

C

55+00

10

1845

A

B

C

23.0'

52+00

51+00

50+00

54+00

53+00 10.0'

B

20.0' DRAINAGE EASEMENT

33.0' STATUTORY R/W

A

9

4th ST NE

3

2

60+00

1

D

1845

-2.36

%

1840

1840 -2.87

%

1835

1835

E

E

-1.50%

1830

51+00

52+00

54+00

55+00

56+00

57+00

58+00

59+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

1829.90

1830.18

1830.82

1831.45

1832.09

1832.93

1833.94

1834.47

1834.81

1835.78

1836.54

1837.47

1838.70

1840.00

1841.30

1842.72

53+00

N

50+00

1843.77

1820

1845.04

1820

1846.38

1825

1847.72

1825

1848.68

F

1830

-0.80%

0

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

60+00

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.07

Jennifer M.

Approved By: 1

F

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES A

10.0'

33.0' STATUTORY R/W

1.

B

4th ST NE

D

20.0' DRAINAGE EASEMENT

9.7' TEMPORARY CONSTRUCTION EASEMENT

10.0' C

1845

1845

1840

1840

1835

1835

1830

E

2.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

3.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

4.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

5.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

6.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

7.

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

60+00

61+00

62+00

63+00

64+5464+00

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

A

B

C

D

1830

E

-0.15%

1825

1825

1820

1820

1815

1815

64+00

63+00

62+00

61+00

1829.90

1829.96

1830.01

1830.07

1830.12

1829.89

1829.65

1829.32

F

1829.41

N

0

60+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE FORCEMAIN

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.08

Jennifer M.

Approved By: 1

F

xxxx 12

13

1

3

2

5

4

6

7

8

9

10

11

13

12

GENERAL NOTES

0.31 acres of temporary impact due to 24" gravity sewer installation.

C

20.0' TEMPORARY CONSTRUCTION EASEMENT

5+00

4+00

3+00

0+00

1+00

2+00

2

EDGE OF WATER ELEV. 1834.78 (SURVEYED 08-22-2018) EAST LAKE

CL ABANDONED BNSF RAILROAD

35.1' TEMPORARY CONSTRUCTION EASEMENT

1

MH 2 (48")

6+00

50.0'

7+00

100.0' BNSF RR R/W

CL ABANDONED BNSF RAILROAD

8+00

25.0'

9+00

50.0' DRAINAGE EASEMENT

10+00

50.0'

25.0'

A

B

1.

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

3.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

4.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

5.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

6.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

7.

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

A

B

C

CONSTRUCTION NOTES 1

1 EA - CONCRETE MANHOLE

2

CHANNEL EXCAVATION

D

D

1855

1855

MH 2 (48") STA: 7+50 RIM: 1843.53 INV E 1836.68 24" HDPE INV W 1836.68 24" HDPE

1850

1850

1845

1845

E

E 1

1840

1840

24" HDPE

2

1835.34

1840.02

1839.40

1839.82

1840.38

1840.47

1840.61

1840.67

1840.74

1841.06

1841.42

1841.59

1841.91

1842.50

1843.53

1843.07

F

1842.86

1830

1843.17

1830

1843.49

1835

1843.58

1835

N

0

10+00

9+00

8+00

7+00

6+00

5+00

4+00

3+00

2+00

1+00

0+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

-1+00

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE CHANNEL

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.09

Jennifer M.

Approved By: 1

F

xxxx 12

13

3

2

5

4

6

7

8

9

0.19 acres of temporary impact due to 24" gravity sewer installation.

A

3

EDGE OF WATER ELEV. 1841.68 (SURVEYED 08-22-2018)

C

11

GENERAL NOTES

25.0'

16+00

0.22 acres of temporary impact due to 24" gravity sewer installation.

15+00

14+00

13+00

13

12

1.

12+00

MH13 (48")

11+00

10+00

CL ABANDONED BNSF RAILROAD

26.8' TEMPORARY CONSTRUCTION EASEMENT

22 +1 3 22 +0 0

100.0' BNSF RR R/W

2

17+00

25.0'

MH 5 (60")

18+00

50.0' DRAINAGE EASEMENT

19+00

50.0'

21+00

20+00

1

50.0'

MH 4 (CONTROL STRUCTURE)(4' X 6')

B

10

20.0' TEMPORARY CONSTRUCTION EASEMENT

1

THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO ENSURE THAT NO OVERLOADING OF ROADWAYS OCCUR DUE TO CONTRACTOR, SUBCONTRACTOR, OR SUPPLIERS. ANY ROAD DAMAGED SHALL BE REPLACED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2.

ALL UTILITY COMPANIES WERE NOTIFIED TO MARK THEIR SERVICES. ALL UNDERGROUND UTILITIES SHOWN HEREON WERE EITHER MARKED BY THEIR OWNERS OR TAKEN FROM MAPS SUPPLIED TO APEX ENGINEERING GROUP, INC. BY THE OWNERS AT THE TIME OF THIS SURVEY.

3.

APEX ENGINEERING GROUP, INC. DOES NOT CERTIFY TO THE COMPLETENESS AND/OR ACCURACY OF THESE LOCATIONS. PERSONS USING THIS SURVEY SHOULD CONTACT EACH UTILITY COMPANY TO VERIFY THAT ALL LINES ARE SHOWN HEREON.

4.

CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING UTILITIES. ANY DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

5.

CONTRACTOR SHALL ENSURE THAT ACCESS TO ALL RESIDENCES AND BUSINESSES IS MAINTAINED THROUGHOUT THE PROJECT. REFER TO THE TRAFFIC CONTROL PLANS FOR SPECIFIC REQUIREMENTS.

6.

ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO EXISTING RIGHTS-OF-WAY AND EASEMENTS AS SHOWN ON THE PLANS. ADDITIONAL AREAS FOR STAGING, MATERIALS, ACCESS, ETC. SHALL BE OBTAINED BY THE CONTRACTOR.

7.

ANY REMOVAL AND REPLACEMENT OF EXISTING UTILITIES TO FACILITATE THE WORK NOT COVERED BY PAY ITEMS SHALL BE INCIDENTAL. TEMPORARY SERVICE SHALL BE PROVIDED.

A

B

C

CONSTRUCTION NOTES 1

2 EA - CONCRETE MANHOLE

2

1 EA - CONCRETE MANHOLE CONTROL STRUCTURE

3

1 EA - CONCRETE FLARED END SECTION

HURDSFIELD LAKE D

D

1855

1855

MH 3 (48") STA: 12+50 RIM: 1845.77 INV E 1837.17 24" HDPE INV W 1837.17 24" HDPE

MH 4 (CONTROL STRUCTURE)(4' X 6') STA: 17+50 RIM: 1845.00 INV E 1837.66 24" HDPE INV W 1837.66 24" HDPE

1850

1850

1845

1845 E

1

1840

3 24" RCP

24" HDPE

1843.58

1844.20

1845.96

1844.84

1845.21

1845.55

1845.73

1845.90

1845.86

1845.81

1845.65

1845.50

1845.33

1845.05

1844.76

1844.81

1835

1844.71

1844.58

1844.45

1844.45

1840.06

1838.65

1830

1844.64

1835

1844.44

MH 5 (60") STA: 21+01 RIM: 1845.00 INV E 1837.89 24" HDPE INV SW 1837.89 24" RCP

1845.74

1840

F

1

2

E

N

1830

0

22+00

21+00

20+00

19+00

18+00

17+00

16+00

15+00

14+00

13+00

12+00

REVISIONS Issue #

Description

Date

WELLS COUNTY WATER RESOURCE DISTRICT

G

11+00

10+00

50

100

VERTICAL: SCALE: 1 INCH = 10 FEET HORIZONTAL: SCALE 1 INCH = 100 FEET

RY A IN R M I L FO ION E PR NOT UCT TR S N O C Sheet:

Bismarck - Detroit Lakes Dickinson - Fargo

HURDSFIELD LEGAL DRAIN PLAN AND PROFILE CHANNEL

600 South 2nd Street, Suite # 145 Bismarck, North Dakota 58504 Office: 701-323-3950 www.apexenggroup.com

Project #: Date:

18.354.0098 SEPTEMBER 10, 2018

Drawn By:

Josh J.

Checked By:

2

3

4

5

6

7

8

9

10

11

G

C.10

Jennifer M.

Approved By: 1

F

xxxx 12

13

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas