The Corps of Engineers is evaluating the Federal Highway Administration (FHWA)/North Dakota Department of Transportation (NDDOT)/Billings County Draft Environmental Impact Statement (DEIS) for the Little Missouri River Bridge Crossing in western North Dakota. A determination was made that there was a need for a standalone 404(b)(1) Analysis. This notice is to inform interested parties of the availability of the document and solicit comments.

The Corps of Engineers is evaluating the Federal Highway Administration (FHWA)/North Dakota Department of Transportation (NDDOT)/Billings County Draft Environmental Impact Statement (DEIS) for the Little Missouri River Bridge Crossing in western North Dakota. A determination was made that there was a need for a standalone 404(b)(1) Analysis. This notice is to inform interested parties of the availability of the document and solicit comments.

Public Notice Subject: Public Notice of 404 (b)(1) Analysis of the Little Missouri River Crossing, Bridge Construction Project. Action ID:

NWO-2007-00520-BIS

Comments Period: February 12, 2019 ­ February 26, 2019 SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating the FHWA/NDDOT Draft Environmental Impact Statement (DEIS) which was released for public comment on July 6, 2018 and ended on August 20, 2018. The U.S. Army Corps of Engineers (Corps) participated as a Cooperating Agency and has provided information and comments specific to its expertise and authority. The Corps determined there was a need for a standalone 404(b)(1) analysis (40 Code of Federal Regulations (CFR) § 230.1(a)). This notice is to inform interested parties of the availability of this document and solicit additional comments. This notice and the analysis document is available on the Corps web site at http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. The aquatic resources include wetlands, tributaries, and the Little Missouri River. APPLICANT:

North Dakota Department of Transportation 608 East Boulevard Avenue Bismarck, North Dakota 58505-0700

LOCATION: The Little Missouri River Crossing (project) encompasses 4 alternative crossings of the Little Missouri River. Please refer to Figure 4; Alternatives Map in the analysis. The project would construct a new crossing over the Little Missouri River in between the Long X Bridge and I-94 bridges to provide users with a safe, efficient, and reliable local connection between the roadways on the east and west sides of the Little Missouri River within Billings County. The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2007-0520BIS must be submitted to the office listed below on or before February 26, 2019.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

CENWO-ODR-ND

Page 2

Action ID: NWO-2007-00520-BIS

Swade Hammond, Project Manager US Army Corps of Engineers, Omaha District North Dakota Regulatory Office 3319 University Drive Bismarck, North Dakota 58504 Email: swade.d.hammond@usace.army.mil The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant or the Corps' project manager Swade Hammond, (701) 255-0015 extension 2012, swade.d.hammond@usace.army.mil.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/

SECTION 404(b)(1)ALTERNATIVES ANALYSIS

NWO-2007-0520-BIS Little Missouri River Crossing U.S. Army Corps of Engineers Omaha District North Dakota Regulatory Office

Contents 1.

2.

Introduction .......................................................................................................................................... 4 1.1

Section 404(b)(1) Regulatory Background .................................................................................... 4

1.2

Organization of the Report ......................................................................................................... 11

Description of Proposed Project ......................................................................................................... 12 2.1

Proposed Activities ..................................................................................................................... 14

2.2 Avoidance, Minimization and Compensation ................................................................................... 14 2.2.1 Compensation ............................................................................................................................ 15 3.

Basic and Overall Purpose................................................................................................................... 17 3.1

Basic Project Purpose and Water Dependency .......................................................................... 17

3.2 Overall Project Purpose .................................................................................................................... 17 4.

Alternatives Considered (NDDOT, 2018) ............................................................................................ 17 4.1

Alternatives Analyzed in Detail ................................................................................................... 18

4.1.1

Features Common to All Alternatives Analyzed in Detail ................................................... 18

4.1.2

Activities in Waters of the U.S. ........................................................................................... 18

4.1.3

Alternative K, Option 1 (Preferred Alternative) .................................................................. 19

4.1.4

Alternative A ....................................................................................................................... 19

4.1.5

Alternative K, Option 2........................................................................................................ 20

4.1.6

Alternative K, Option 3........................................................................................................ 20

4.1.7

Alternative L, No Build ........................................................................................................ 21

4.2

Alternatives Considered but Rejected ........................................................................................ 21

4.2.1 2006 and 2008 ........................................................................................................................... 21 4.2.2 2010, 2012, and 2015 ............................................................................................................... 21 5.

Existing Site Conditions (NDDOT, 2018).............................................................................................. 22

6.

Impact Analysis ................................................................................................................................... 24 6.1. Physical and Chemical Characteristics of the Aquatic Ecosystem ................................................... 24 6.1.1. Substrate ................................................................................................................................... 24 6.1.2. Suspended Particulates/Turbidity............................................................................................. 25 6.1.3. Current Patterns and Water Circulation ................................................................................... 26 6.1.4. Normal Water Level Fluctuations ............................................................................................. 27 6.1.5. Water ........................................................................................................................................ 27 6.2. Biological Characteristics of the Aquatic Ecosystem ....................................................................... 27

6.2.1. Special Aquatic Sites (wetlands, mud flats, vegetated shallows, riffle and pool complexes, coral reefs, sanctuaries, and refuges) ................................................................................................. 27 6.2.2. Fish, Crustaceans, Mollusks, and Other Aquatic Organisms in the Food Web ......................... 28 6.2.3. Wildlife Values .......................................................................................................................... 29 6.2.4. Threatened and Endangered Species Biological Assessment (NDDOT, 2016).......................... 29 6.2.5. Biological Availability of Possible Contaminants in Dredged or Fill Material ........................... 41 6.3. Human Use Characteristics of the Aquatic Ecosystem .................................................................... 41 6.3.1. Water Supply............................................................................................................................. 41 6.3.2. Recreational and Commercial Fisheries .................................................................................... 41 6.3.3. Water Related Recreation......................................................................................................... 42 6.3.4. Aesthetics (NDDOT, 2018) ........................................................................................................ 42 6.3.5. Parks, National and Historical Monuments, National Seashores, Wilderness Areas, Research Sites, and Similar Areas (NDDOT, 2018) ............................................................................................. 43 6.4. Evaluation and Testing ..................................................................................................................... 45 6.5. Cumulative Impacts ......................................................................................................................... 45 7.0 Actions to Minimize Adverse Effects .................................................................................................... 46 7.1. Planning and Design ......................................................................................................................... 46 7.2. Environmental Commitments Record.............................................................................................. 46 8.0 Compensatory Mitigation (NDDOT, 2018) ............................................................................................ 46 9.0. Literature Cited .................................................................................................................................... 48

1. Introduction The North Dakota Department of Transportation (NDDOT), in conjunction with the Federal Highway Administration (FHWA) and Billings County, is proposing to construct a new bridge that would span the Little Missouri River in western North Dakota. In the area of Billings and Golden Valley counties, there is one bridge (Long X Bridge) that crosses the Little Missouri River on US Highway 85, south of Watford City, and two bridges (one eastbound and one westbound) that cross the Little Missouri River on Interstate 94 (I-94) in Medora. These bridges are nearly 70 highway miles apart. In between these bridges there are 18 unimproved private fords and one unimproved public ford, which are used by some vehicles to cross the Little Missouri River. However, these fords are unreliable because of seasonal conditions and are inaccessible to many types of vehicles. The project would construct a new crossing over the Little Missouri River in between the Long X Bridge and I-94 bridges to provide users with a safe, efficient, and reliable local connection between the roadways on the east and west sides of the Little Missouri River within Billings County. The project would improve local connectivity and system linkage between Billings and Golden Valley counties. NDDOT and FHWA have prepared a Draft Environmental Impact Statement (DEIS) for the project, which was released for public comment on July 6, 2018 and ended August 20, 2018. The U.S. Army Corps of Engineers (Corps) participated as a Cooperating Agency and has provided information and comments specific to its expertise and authority.

1.1 Section 404(b)(1) Regulatory Background The purpose of the Guidelines developed by the U.S. Environmental Protection Agency (EPA) pursuant to Section 404(b)(1) of the Clean Water Act (CWA) is to restore and maintain the chemical, physical, and biological integrity of waters of the United States (WOUS) through the control of discharges of dredged and fill material. 40 Code of Federal Regulations (CFR) § 230.1(a). Fundamental to these Section 404(b)(1) Guidelines is the precept that dredged or fill material should not be discharged into the aquatic ecosystem, unless it can be demonstrated that such a discharge will not have an unacceptable adverse impact either individually or in combination with known and/or probable impacts of other activities affecting the ecosystems of concern. 40 CFR § 230.1(c). Section 404 of the CWA authorizes the Corps to issue permits for the discharge of dredged or fill materials into , including wetlands, defined at 33 CFR Part 328, and as clarified by interagency "Rapanos" guidance published in 2007 and revised in

2008, include coastal and inland waters, lakes, rivers, and streams, including adjacent wetlands and tributaries. The Section 404(b)(1) Guidelines (40 CFR Part 230 et seq.) are the substantive environmental criteria used by the Corps to evaluate permit applications involving the discharge of dredged or fill material into WOUS. The Section 404(b)(1) Guidelines at 40 CFR § 2301.10 impose four restrictions which must be satisfied in order to make a finding that a proposed discharge of dredged or fill material complies with the Section 404(b)(1) Guidelines. The Section 404(b)(1) Guidelines generally state that no discharge of dredged or fill material shall be permitted if: 1. There is a practicable alternative to the proposed discharge which would have less adverse impact on the aquatic ecosystem, so long as the alternative does not have other significant adverse environmental consequences; 2. The discharge would: a) Cause or contribute, after consideration of disposal site dilution and dispersion, to violations of any applicable State water quality standard; b) Violate any applicable toxic effluent standard or prohibition under Section 307 of the CWA; c) Jeopardize the continued existence of species listed as endangered or threatened under the Endangered Species Act of 1973, as amended, or result in likelihood of the destruction or adverse modification of a habitat which is determined by the Secretary of Interior or Commerce, as appropriate, to be a critical habitat under the Endangered Species Act of 1973, as amended; or d) Violate any requirement imposed by the Secretary of Commerce to protect any marine sanctuary designated under title III of the Marine Protection, Research, and Sanctuaries Act of 1972; 3. The discharge would cause or contribute to significant degradation of the WOUS. Findings of significant degradation related to the proposed discharge shall be based upon appropriate factual determinations, evaluations, and tests required by subparts B and G, after consideration of subparts C through F, with special emphasis on the persistence and permanence of the effects outlined in those subparts; 4. And, unless appropriate and practicable steps have been taken which will minimize potential adverse impacts of the discharge on the aquatic ecosystem. An alternative is practicable "if it is available and capable of being done after taking into consideration cost, existing technology, and logistics in light of the overall project purposes." 40 CFR §§ 230.10(a), 230.3(q). "If it is otherwise a practicable alternative, an area not presently owned by an applicant which could reasonably be obtained, utilized,

expanded or managed in order to fulfill the basic purpose of the proposed activity may be considered." 40 CFR § 230.10(a)(2). The term "special aquatic sites," as defined by the Section 404(b)(1) Guidelines, includes "geographic areas, large or small, possessing special ecological characteristics of productivity, habitat, wildlife protection, or other important and easily disrupted ecological values." 40 CFR § 230.3. The Section 404(b)(1) Guidelines specifically name sanctuaries and refuges, wetlands, mud flats, vegetated shallows, coral reefs, and riffle and pool complexes as special aquatic sites. Each of these six special aquatic sites are defined in subpart E of the 404(b)(1) Guidelines. The figures below provide the location and development of the study area as it evolved from 2006 to 2018 (current). Being located in the badlands between the North and South units of Theodore Roosevelt National Part and near the Elkhorn Ranch, several routes were evaluated within this designated study area to adequately evaluate environmental, historical, tribal, and public concerns.

Figure 1: Current Study Area (NDDOT, 2018)

Figure 2: 2008 Study Area (NDDOT, 2018)

Figure 3: 2006 Study Area (NDDOT, 2018)

Figure 4: Alternatives Map (NDDOT, 2018)

If the proposed activity would involve a discharge into a special aquatic site, such as a wetland, the Section 404(b)(1) Guidelines distinguish between those projects that are water dependent and those that are not. A water-dependent project is one that requires access to or proximity to or siting within a special aquatic site to achieve its basic purpose, such as a marina. A non-water-dependent project is one that does not require access to or proximity to or siting within a special aquatic site to achieve its basic purpose, such as a housing development. The Section 404(b)(1) Guidelines establish two presumptions for projects that propose a discharge into a special aquatic site. First, it is presumed that there are practicable alternatives to non-water dependent projects, "unless clearly demonstrated otherwise." 40 CFR § 230.10(a)(3). Second, "where a discharge is proposed for a special aquatic site, all practicable alternatives to the proposed discharge which do not involve a discharge into a special aquatic site are presumed to have less adverse impact on the aquatic ecosystem, unless clearly demonstrated otherwise." 40 CFR § 230.10(a)(3). The thrust of the Section 404(b)(1) Guidelines is that applicants should design proposed projects to meet the overall project purpose while avoiding impacts on aquatic

environments. This approach is emphasized in a Memorandum of Agreement ("MOA") between the EPA and the Department of the Army ("DA") concerning the determination of mitigation under the Section 404(b)(1) Guidelines (EPA 1990), as modified by the Corps and EPA Final Mitigation Rule promulgated at 33 CFR Parts 325, 332; 40 CFR Part 230. The MOA articulates the Section 404(b)(1) Guidelines' "sequencing" protocol as first, avoiding impacts; second, minimizing impacts; and third, providing practicable compensatory mitigation for unavoidable impacts and no overall net loss of functions and services. In addition to the 404(b)(1) guidelines, 33 CFR 320.4 ­ General policies for evaluating permit applications, also requires the Corps to consider a Public Interest Review, which considers the probable impacts, including cumulative impacts, of the proposed activity on public interest, carefully weighing all factors which are relevant in each particular case. The Corps decision on whether to authorize the proposal, and if so, the conditions under which it will be considered are determined by the outcome of this general balancing act. Among the factors considered, including cumulative impacts, are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit would be denied if the discharge that would be authorized by such a permit would not comply with the 404(b)(1) guidelines.

1.2 Organization of the Report This Section 404(b)(1) alternatives analysis is based primarily on the findings of the NDDOT and FHWA Draft Environmental Impact Statement. The impact evaluations herein are summarized as applicable from the DEIS and subsequent reevaluations for the proposed project and its alternatives, and the Section 404(b)(1) alternatives analysis is intended to be a stand-alone document. The DEIS was prepared by FHWA (as the lead federal agency), NDDOT and Billings County in accordance with the requirements of the National Environmental Policy Act (NEPA) (42 USC 4341 et seq.) and in conformance with the Council for Environmental Quality (CEQ) regulations implementing NEPA. This document provides information and analysis that allows the Corps to make a determination of the least environmentally damaging practicable alternative (LEDPA). Section 1 provides the Introduction, including the proposed project background, CWA Section 404(b)(1) regulatory background, and this organization section. Section 2 provides the Description of Proposed Project. Section 3 discusses the Basic and Overall Project Purpose. Section 4 discusses the Alternatives Considered. Section 5 discusses the Existing Conditions as it relates to WOUS. Section 6 discusses the Impact Analysis, as set forth in Subparts C through H of the Section 404(b)(1) Guidelines. Section 7

presents Actions to Minimize Adverse Effects. Section 8 discusses Compensatory Mitigation for unavoidable impacts to Waters of the United States (WOUS). Section 9 is the Corps conclusion on the 404(b)(1) analysis and Section 10 presents the Literature Cited.

2. Description of Proposed Project The proposed project consists of constructing a new bridge over the Little Missouri River in an area that currently lacks an efficient and safe crossing. The general public, industry, and emergency vehicles currently cross the Little Missouri River via a low water crossing, requiring them to drive through the river when environmental conditionals allow. The project would require the construction of new roadway sections that would connect with the existing transportation grid. Several alternatives were developed to properly evaluate the most practicable location for construction.

Figure 5: Alternative K, Option 1 (Preferred Alternative) Wetlands and Other Waters (NDDOT, 2018)

The project would require the establishment of work zones, staging areas, and temporary work zone traffic-control signing before construction begins. Temporary erosion control devices would be installed, as necessary, prior to the onset of construction. The work zone, staging areas, and borrow sites would be cleared and grubbed and topsoil removed and stockpiled for reclamation of sites following completion of project. Construction equipment necessary for road and bridge construction would include cranes, ready-mix trucks, concrete pump trucks, loaders, bulldozers, scrapers, motor graders, backhoes, trucks and rollers.

Earthwork would include a combination of hauling and placing of fill material for construction in areas where additional material would be needed and removing material in cut areas. Existing roadway approaches would be widened and new approaches constructed as needed. Drainage structures, including pipes, would be replaced and installed as required throughout the roadway and approaches to maintain existing drainage patterns. Bypasses and stream diversions would be utilized as necessary for construction of drainage structures and creek crossings. The Little Missouri River Crossing would require in-water work for the construction of concrete abutments and piers. A typical bridge pier consists of foundation piling, a footing, and columns. Riprap would be added at each abutment and pier to reduce stream channel erosion. The bridge superstructure would consist of a reinforced concrete deck, supported by steel plate girders. Clear roadway width through the bridge would be a maximum of approximately 36-ft to provide two 12-ft driving lanes and 6-ft wide shoulder to accommodate large farm and industrial equipment. The total width of the bridge would be a maximum of 38 to 40-ft, depending on traffic barriers, which would be determined during final design. To facilitate access for construction equipment, materials and labor forces, the bridge contractor would need to place temporary fill in the channel to construct a causeway or bypass. River flow would be maintained by the installation of temporary culverts or by leaving part of the river channel open during construction. The contractor may construct a temporary work bridge in lieu of a causeway if water depths and flows allow. Temporary steel cofferdams or earthen ring dikes may also be required for bridge pier construction to provide a dry work area. Once the cofferdams or ring dikes are in place, the contractor would need to excavate the channel bottom inside the cofferdams to the required pier foundation elevation. After the footing is constructed, the excavated material would be backfilled and any excess material would be removed from the channel and disposed of at an approved location. Upon completion of construction, all temporary fills and structures would be removed and the stream bed and banks would be restored to pre-construction condition. The land adjacent to the bridge under construction would be used to facilitate construction by providing areas for the following activities:

Construction equipment staging and maintenance Stockpile areas of raw materials prior to their incorporation into the construction operation Temporary field offices and storage facilities Access to the bridge work area Staging areas

A temporary construction easement would be provided for the project of approximately 400-ft wide and 1500-ft wide. It is anticipated that bridge construction over the Little

Missouri River would be completed concurrently with roadway construction and may require up to two construction seasons to complete. The proposed project would require a CWA Section 404 permit. A revised Aquatic Resource delineation report was submitted to the Corps in September of 2016. The Corps responded with an approved and preliminary jurisdictional determination for the proposed project on November 2, 2016. The approved jurisdictional determination is valid for five years and would expire in November of 2021.

2.1 Proposed Activities The proposed activities relative to the discharge of dredged or fill material would be associated with the reconstruction of existing roadways and the construction of a new bridge structure. Piers, riprap, and approach fills are generally associated with the construction of a bridge. Other discharges associated with the project would result from fill placed during the expansion of existing roadways approaching the Little Missouri River Crossing. This would also require the replacement and/or extension of existing culverts, resulting in temporary and permanent impacts to regulated waters. In order to construct the new bridge, a new portion roadway would need to be constructed to connect the bridge with the existing transportation grid.

2.2 Avoidance, Minimization and Compensation During the initial project design phase, impacts on wetlands and Other Waters within the area were minimized to the maximum extent practicable. For all of the alternatives, the alignment would follow an existing roadway as closely as possible to minimize new roadway construction and potential permanent impacts on wetlands and Other Waters. Unavoidable impacts on wetlands would be mitigated onsite, adjacent to the project, or at an NDDOT-approved mitigation site or bank, as necessary. During final design, a Section 404 permit application (and mitigation plan, if necessary) would be provided to the USACE for their consideration of impacts on wetlands and Other Waters under USACE jurisdiction. Further minimization would occur with the implementation of Best Management Practices (BMP's). Some examples of this include the use of fiber rolls and silt curtains to limit the effects associated with the discharge of fill material on adjacent and downstream aquatic resources. For naturally occurring wetlands outside of USACE jurisdiction requiring mitigation under EO 11990, impacts would be mitigated onsite, offsite, or an approved wetland site or bank. Mitigation would be accomplished in a manner consistent with FHWA's program-wide goal of `net gain' of wetlands through enhancement, creation, and preservation. Temporary impacts, such as fills associated with a causeway in the river for bridge construction and temporary impacts associated with staging areas and borrow sites, would be restored to pre-construction conditions within 90-days following construction. Prior to construction activities, the contractor would be required to obtain a North Dakota Pollutant Discharge Elimination System (NDPDES) permit and develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP would outline phasing for erosion- and sediment-controls, stabilization measures, pollution-prevention measures,

and prohibited discharges. The SWPPP would also include BMPs to minimize erosion, sedimentation, and storm-water runoff (e.g., fiber rolls, straw waddles, erosion mats, silt fencing, turbidity barriers, mulching, filter fabric fencing, sediment traps and ponds, surface water interceptor swales, ditches). The SWPPP would require that secure and contained refueling areas are located away from surface waters, maintenance and monitoring measures are implemented to reduce the potential for spills and leaks, and the amount of stockpiled material is minimized and stored away from surface waters. In addition, waste material would be disposed of in accordance with state and federal laws and in a manner that avoids impacts on the Little Missouri River channel. The Corps initially had concerns regarding the developed alternatives within the DEIS. NDDOT, FHWA, and Kadrmas, Lee and Jackson Inc. met with Corps staff on September 21, 2018, to discuss the development of a Least Damaging Practicable Alternative (LEDPA). Taking the Corps concerns regarding the presented alternatives, FHWA and NDDOT minimized the impacts to wetlands and other waters. The refined impacts to Alternative K1 brought the total impacts below 0.50 acres. Once execution of the project begins, culverts and corrugated pipes would be placed 1ft below the existing channel bottom at locations captured by the North Dakota Regional Conditions for the 2017 Nationwide Permitting Program. This allows for the reestablishment of natural substrate, ensuring sediment related functions and fish passage would remain following construction activities. This is a general form of minimization often used within the State of North Dakota to ensure there are no permanent loss of streams with the installation of concrete box culverts and corrugated pipes. 2.2.1 Compensation Wetland mitigation for the project is anticipated to be accomplished through the creation of wetland mitigation site(s) and/or purchasing credits at a wetland mitigation bank or in lieu fee program. Mitigation would be determined during final design and permitting. Primarily, resources to be impacted include palustrine emergent wetlands, intermittent and ephemeral streams (unnamed tributaries), and larger perennial rivers such as the Little Missouri River. Compensation for impacts to streams and other waters may be required. As per the 2008 Final Mitigation Rule, the fundamental objective of compensatory mitigation is to offset environmental losses resulting from the unavoidable impacts to WOUS authorized by DA permits. The Corps must determine the compensatory mitigation to be required for a DA permit, based on what is practicable and capable of compensating for the aquatic resource functions that would be lost as a result of the permitted activity. In making this determination, the Corps must assess the likelihood for ecological success and sustainability, the location of the compensation site relative to the impact site and their significance within the watershed, and the costs of the compensatory mitigation project. In many cases, the environmentally preferable compensatory mitigation may be provided through mitigation banks or in-lieu fee

programs because they usually involve consolidating compensatory mitigation projects where ecologically appropriate, consolidating resources, providing financial planning and scientific expertise. Compensatory mitigation requirements must be commensurate with the amount and type of impact that is associated with a particular DA permit. For individual permits, the permittee must prepare a draft mitigation plan and submit it to the Corps for review. The approved mitigation plan must contain performance standards that will be used to assess whether the project is achieving its objectives. Performance standards should relate to the objectives of the compensatory mitigation project, so that the project can be objectively evaluated to determine if it is developing into the desired resource type, providing the expected functions, and attaining any other applicable metrics (e.g., acres). For the Little Missouri River Crossing Project, a complete mitigation plan may be required and impacts would be mitigated at a minimum of a 1:1 ratio. It should be noted that several factors may affect the amount of impacts for this project. The Corps is anticipating new guidance and rule-making on the definition of Waters of the U.S. prior to the permitting phase of the project. This would require a re-evaluation of the impacts during the permitting phase as well. It is unknown at this time whether that would result in a decrease or increase in potential impacts of the proposed project. Approved jurisdictional determinations are valid for a 5-year period, so this project may need to be re-evaluated.

3. Basic and Overall Purpose 3.1 Basic Project Purpose and Water Dependency The basic project purpose comprises the fundamental, essential, or irreducible purpose of the proposed project, and is used by the Corps to determine whether the applicant's project is water dependent (i.e., whether it requires access or proximity to or siting within a special aquatic site). The basic project purpose for the proposed project is road construction, which is not water dependent. As noted in Section 1.1, the Section 404(b)(1) Guidelines at 40 CFR § 230.10(a)(3) set forth two rebuttable presumptions when the activity associated with a discharge is proposed in a special aquatic site, as defined at 40 CFR Part 230, subpart E. The Little Missouri River Crossing project would result in a discharge of fill material into special aquatic sites.

3.2 Overall Project Purpose The overall project purpose serves as the basis for the Corps' Section 404(b)(1) alternatives analysis and is determined by further defining the basic project purpose in a manner that more specifically describes the applicant's goals and accounts for logistical considerations for the project while also considering the public's perspectives, and which allows a reasonable range of alternatives to be analyzed. It is critical that the overall project purpose be defined to provide for a meaningful evaluation of alternatives. It should not be so narrowly defined as to give undue deference to the applicant's wishes, thereby unreasonably limiting the consideration of alternatives. Conversely, it should not be so broadly defined as to render the evaluation unreasonable and meaningless. The overall project purpose is to construct a bridge over the Little Missouri River, in order to provide safe and efficient travel for vehicles operated by the general public, industrial and commercial companies, and agricultural equipment.

4. Alternatives Considered (NDDOT, 2018) The FHWA, NDDOT and Billings County have prepared a Draft EIS with the Corps and U.S. Forest Service as cooperating agencies. The EIS was developed in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the regulations of the Council on Environmental Quality (CEQ), 40 CFR parts 1500 through 1508. An EIS is a full disclosure document that details the process through which a project is developed, describes the purpose and need for the action, and includes consideration of a range of reasonable alternatives, analyzes the potential impacts resulting from the alternatives, and demonstrates compliance with other applicable environmental laws and executive orders. During the FHWA EIS process, a multidisciplinary process was undertaken to identify a range of reasonable alternatives to be studied in detail in the EIS. The lead federal agency sent out early notification to, and solicited the views and comments of several federal, state and local agencies; special interest groups; committees; and associations

on February 19 and May 14, 2007 and again on May 30, 2012. Agency Scoping Meetings were held on March 5, 2007 and a 30-day comment period was initiated from March 5 to March 26, 2007. Public scoping meetings were held on March 5, 2007 as well in Medora, North Dakota. Alternatives workshops were held for the project on July 22, 2008 and again on May 23, 2012 with FHWA, NDDOT, KLJ, USACE, USFS, NPS, USFWS, NDGFD, NDDH, NDPRD and NDSHPO. A Public Alternatives workshop was held on July 17, 2008 and again on June 5, 2012. The purpose of the workshops was to provide agencies and the public an opportunity to comment on the proposed project. During the 2008 public alternatives workshops, three build alternatives were eliminated from further review based on opposition from the public because of the close proximity to the Theodore Roosevelt National Park ­ Elkhorn Ranch Unit and Elkhorn Ranchlands. For additional information on Alternatives considered but eliminated from further review, see Section 3.2.1 in the DEIS.

4.1 Alternatives Analyzed in Detail 4.1.1 Features Common to All Alternatives Analyzed in Detail The presented build alternatives that are in the DEIS for evaluation would all require approximately 1-2.5 miles of new roadway construction to connect existing infrastructure with a new bridge. These alternatives would also require a similar amount of overall road work leading up to the construction of the bridge in order to meet design standards for the established speed limit. The total length of these alternatives range from 8-11 miles. Alternatives K1 and K3 would both be 600 feet in length with threespans under the bridge. Both alternatives A and K2 would require five-spans under the bridge as a result of an extended lengths around 850 feet and 800 feet, respectively. See Table 1 below for breakdown. Also refer to the impact tables for wetlands and other waters at the end of this document for the amounts and reasons for discharge. Table 1, Summary of Alternatives (NDDOT, 2018)

4.1.2 Activities in Waters of the U.S. Work to be completed at the discharge sites, within the regulated WOUS, consists of fill for the construction of the roadway embankment, culvert installation, riprap placement, and the placement of piers within the Little Missouri River. The culverts would be placed in several intermittent and ephemeral stream crossings immediately adjacent to the roadway. Riprap would be placed at the inlets and outlets of the culverts to prevent

scour and erosion in an area of North Dakota that consists of highly erodible soils. Other impacts associated with the bridge crossing include approach fills and rip rap to protect the bank of the Little Missouri River adjacent to the proposed bridge. Each alternative that has been proposed for evaluation include the same type of impacts within regulated waters. 4.1.3 Alternative K, Option 1 (Preferred Alternative) Alternative K, Option 1 would be approximately 8.3 miles long; of which, 6.2 miles would closely follow the existing roadway alignment and 2.1 miles would be new roadway construction. Alternative K, Option 1, would require approximately 88 acres of permanent easements from the USFS, approximately 15 acres of permanent ROW from the North Dakota Department of Trust, and approximately 62 acres of permanent ROW and 13 acres of temporary easements private landowners. The alignment would run from Belle Lake Road to Short Road, where it would run north, between a privately-owned feedlot on the west side of the roadway and privately-owned agricultural land on the east side of the roadway. The process for roadway projects is to complete the environmental review, then the project moves toward final design. Once the design is more developed, landowner negotiations begin, and then ultimately construction begins. Since the new roadway under Alternative K, Option 1 (Preferred Alternative) lies primarily on privately-owned land and it would run in between a feed lot and agricultural land, it was necessary for the lead agencies to consider and evaluate a larger area for this alternative. This larger expanded area would facilitate future landowner negotiations to minimize impacts on agricultural operations. It is approximately 671.9 acres and located in portions of Sections 22, 23, 27, and 34, Township 143 North, Range 102 West. Most of the time, during the EIS phase, the lead agencies only design alternatives to a certain point. The expanded area is evaluated to ensure that any portions of the alignment that are off the original Alternative K, Option 1 (Preferred Alternative) would be environmentally cleared. Therefore, any changes to the roadway and bridge alignment after landowner negotiations are completed would have environmental clearance. Bridge-- Alternative K, Option 1 (Preferred Alternative) would include construction of a bridge, approximately 600 feet long with three to five spans, resulting in one to three piers located within the banks of the Little Missouri River. The final number of spans and piers would be determined during the final design phase and would be dependent on detailed hydraulic and geotechnical studies. The clear roadway width through the bridge would be a maximum of 36 feet. The total width of the bridge would be a maximum of 38 to 40 feet, depending on the traffic barriers, which would be determined during final design. 4.1.4 Alternative A Alternative A would connect Belle Lake Road with Magpie Creek Road on the north end of Billings County. The route under Alternative A would be approximately 11 miles long; of which, 10.1 miles would closely follow the existing roadway alignment and 0.9 miles

would be new roadway construction. Alternative A would cross over Buckhorn Creek, and therefore, one crossing would need to be installed within Buckhorn Creek to allow for flows under the roadway. Approximately 174 acres of permanent easements would need to be acquired from the USFS and approximately 73 acres of permanent ROW and 4 acres of temporary easements would need to be acquired from private landowners. Alternative A would cross over Buckhorn Creek, and therefore, one crossing would need to be installed within Buckhorn Creek to allow its waters to flow under the roadway. Alternative A would be the longest of the build alternatives carried forward for further detailed analysis. This alternative has the most rugged terrain and would involve the most earthwork. Bridge-- Alternative A would include construction of a bridge, approximately 850 feet long with five to seven spans, resulting in two to four piers located within the banks of the Little Missouri River. The final number of spans and piers would be determined during the final design phase and would be dependent on detailed hydraulic and geotechnical studies. According to NDDOT, the clear roadway width through the bridge would be a maximum of 36 feet. The total width of the bridge would be a maximum of 38 to 40 feet, depending on the traffic barriers, which would be determined during final design. The bridge would be constructed where the current public unimproved ford is located. 4.1.5 Alternative K, Option 2 Roadway-- Alternative K, Option 2 would be approximately 8.4 miles long; of which, 5.8 miles would closely follow the existing roadway alignment and 2.6 miles would be new roadway construction. Roadway and Bridge ROW/Easements' would require approximately 94 acres of permanent easements from the USFS, approximately 15 acres of permanent ROW from the North Dakota Department of Trust, and approximately 55 acres of permanent ROW and 1 acre of temporary easements from private landowners. Bridge-- Alternative K, Option 2 would include construction of a bridge, approximately 800 feet long with five to seven spans, resulting in two to four piers located within the banks of the Little Missouri River. The final number of spans and piers would be determined during the final design phase and would be dependent on detailed hydraulic and geotechnical studies. The clear roadway width through the bridge would be a maximum of 36 feet. The total width of the bridge would be a maximum of 38 to 40 feet, depending on the traffic barriers, which would be determined during final design. 4.1.6 Alternative K, Option 3 Roadway-- Alternative K, Option 3 would be approximately 9.9 miles long; of which, 7.9 miles would closely follow the existing roadway alignment and 2 miles would be new roadway construction. Roadway and Bridge ROW/Easements' would require approximately 125 acres of permanent easements from the USFS, approximately 11 acres of permanent ROW from the North Dakota Department of Trust, and approximately 61 acres of permanent ROW and 16 acres of temporary easements from

private landowners. In addition to crossing over Roosevelt Creek, Alternative K, Option 3 would also cross over Crooked Creek. Therefore, the crossing over Crooked Creek would need to be replaced as a result of the roadway alignment and grade change required to improve the existing roadway. The replacement structure would be a crossing of similar size or a box culvert of equivalent water capacity. Bridge-- Alternative K, Option 3 would include construction of a bridge, approximately 600 feet long with three to five spans, resulting in one to three piers located within the banks of the Little Missouri River. The final number of spans and piers would be determined during the final design phase and would be dependent on detailed hydraulic and geotechnical studies. The clear roadway width through the bridge would be a maximum of 36 feet. The total width of the bridge would be a maximum of 38 to 40 feet, depending on the traffic barriers, which would be determined during final design. 4.1.7 Alternative L, No Build CEQ regulations require consideration of the No Action Alternative (no-build). The No Action Alternative serves as a baseline against which the impacts of potential build alternatives can be evaluated. Under Alternative L, construction of a new bridge across the Little Missouri River and associated roadway improvements would not occur. Existing roadways associated with Alternative A and Alternative K (all options) would persist. The width of these gravel roadways is variable and narrow (i.e., typically less than 24 feet). In addition, existing roadways have limited sight distance due to sharp curves and steep grades. Routine maintenance of existing roadways within the study area would continue.

4.2 Alternatives Considered but Rejected Several alternatives were originally evaluated in the EIS. Over a period of several years (2006-present), Alternatives evolved and were refined based on comments from agencies and the general public. 4.2.1 2006 and 2008 Alternative B, C and D were evaluated for the purposes of connecting Blacktail Road in Billings County with Forest Highway 2 and Bella Lake Road in Golden Valley County. These alternatives were presented at a public alternatives workshop July 17 and 22, 2008. Agencies were also presented these three alternatives at an alternatives workshop on July 22, 2008. Both the agencies and the general public opposed the project location in these areas due to the projects proximity to the Theodore Roosevelt National Park (TRNP) ­ Elk Horn Ranchlands. 4.2.2 2010, 2012, and 2015 Alternatives E, F, G, H, I, and J were evaluated as other areas that could provide logical termini. These were developed after a study that collected data regarding the areas current roadway network, location of existing fords, and roadway links that could be used in the development of alternatives. During the expansion and revision of the study area, Alternative E was eliminated from farther analysis due to its proximity to TRNP ­ Elk Horn Ranchlands. Alternatives F, G, H, and I were dismissed as they would not

meet the 10 percent grade requirement. Additionally, the majority of these alternatives would require significantly more roadwork to complete the termini connection. The increase in roadwork required would have more impacts to the natural environment. Alternative J was eliminated as it was proposing a route through McKenzie County. As a result of Billings County funding the proposed project, it must be developed within the county. McKenzie County had no mechanism to fund the project and had no desire or intent to construct it.

5. Existing Site Conditions (NDDOT, 2018) Within the project area, the largest surface water feature is the Little Missouri River. In addition to the Little Missouri River, other surface waters include small creeks, drainageways, and wetlands. The Little Missouri River flows across western North Dakota in a northeasterly direction to join the Missouri River. The Little Missouri River is approximately 274 miles long and is the only designated State Scenic River in North Dakota. The river winds through the TRNP ­ South Unit, LMNG, Theodore Roosevelt Elkhorn Ranch and Greater Elkhorn Ranchlands National Historic District, Elkhorn Ranchlands, and TRNP ­ North Unit. Major tributaries of the Little Missouri River include Cherry Creek, Beaver Creek, Little Beaver Creek, and Box Elder Creek (Clausen 2011, ND PRD Undated b). Wetlands are addressed in section '5.12. Wetlands and Other Waters' on page 69. According to the US Geological Survey (USGS) National Water Information System, the recorded monthly mean discharge rate of the Little Missouri River at the Medora Station (immediately south of the study area in Billings County) varied in 2014 due to seasonal fluctuations. 12 The discharge rate refers to the volume of water moving down a stream or river per unit of time (commonly expressed in cubic-feet per second). The highest discharge rates of the Little Missouri River at the Medora Station were recorded in the spring in March and April at 2,966 and 1,413 cubic-feet per second, respectively. The lowest discharge rates were recorded in the late fall-early winter in November and December at 67.3 and 48.4 cubic-feet per second, respectively. The USGS uses the term `gage height' (measured in feet) when referring to the height of water in streams or rivers. The latest monthly mean gage height of the Little Missouri River at the Medora Station was recorded in April through September in 2015. The highest gage height was recorded in June at approximately 3.8 feet, and the lowest gage height was recorded in September at approximately 2.1 feet (USGS 2016). Consultation with the NDSWC indicated that there are no floodplains identified or mapped within the project areas. A review of the Federal Emergency Management Agency Flood Insurance Rate Map for the project areas verified that there are no mapped floodplains within the project areas (FEMA Undated). However, floodplains, as defined in terms of river morphology, are present in the project areas in association with numerous named and unnamed streams and creeks, and the Little Missouri River.

These riverine floodplains and riparian corridors are confined to the immediate area and are generally less than 100 feet wide. Field wetland investigations were conducted within project areas for Alternative A and Alternative K (all options) during the growing seasons of 2012, 2013, 2015, and 2016. The wetland delineations were conducted in accordance with the USACE Wetland Delineation Manual (USACE 1987) and Regional Supplement to the USACE Wetland Delineation Manual: Great Plains Region (USACE 2010). A Field Wetland Delineation Report ­ Little Missouri River Crossing (2016) and Field Wetland Delineation Report ­ Little Missouri River Crossing Expanded Study Area (2016) were completed by KLJ and submitted to the USACE for jurisdictional determination. The reports are appended by reference. Wetland boundaries were determined by completing USACE Wetland Determination Data Forms for paired test hole points and observing vegetation and hydrology in the area. Sample point locations were determined using the USFWS National Wetlands Inventory (NWI) and USGS Topo Quadrangle maps, as well as visual observation of sites that exhibited a hydrophytic (i.e., water-loving) plant community and characteristics of wetland hydrology. The field wetland investigations identified the following:

A total of 9 wetland segments (approximately 2.97 acres) within the project area of Alternative A. A total of 43 wetland segments (approximately 11.36 acres) within the project area of Alternative K, Option 1 (Preferred Alternative). A total of 31 wetland segments (approximately 3.02 acres) within the project area of Alternative K, Option 2. A total of 37 wetland segments (approximately 2.71 acres) within the project area of Alternative K, Option 3.

In the EIS please refer to 'Figure 49, Alternative A Wetlands and Other Waters' on page 70; 'Figure 50, Alternative K, Option 1 (Preferred Alternative) Wetlands and Other Waters' on page 71; 'Figure 51, Alternative K, Option 2 Wetlands and Other Waters' on page 72; and 'Figure 52, Alternative K, Option 3 Wetlands and Other Waters' on page 73 for overviews of the wetlands identified. The wetlands identified are classified as palustrine, emergent wetlands. Palustrine wetlands refer to all non-tidal wetlands dominated by trees, shrubs, emergent vegetation, mosses, or lichens. Emergent wetlands are characterized by erect, rooted, herbaceous hydrophytes, excluding mosses and lichens. Vegetation in these wetlands areas are present for most of the growing season in most years and are dominated by perennial plants (USFWS 2016a). During the field investigations, Other Waters were delineated where ordinary highwater marks were observed, as defined in USACE Regulatory Guidance Letter No. 05-05: Ordinary High-Water Mark Identification (USACE 2005). The Other Waters identified include the following:

A total of 10 segments of Other Waters (16,945 feet in length [approximately 5.11 acres]) within the project area of Alternative A. A total of 27 segments of Other Waters (26,895 feet in length [approximately 16.32 acres]) within the project area of Alternative K, Option 1 (Preferred Alternative). A total of 21 segments of Other Waters (16,673 feet in length [approximately 3.69 acres]) within the project area of Alternative K, Option 2. A total of 22 segments of Other Waters (18,296 feet in length [approximately 5.83 acres]) within the project area of Alternative K, Option 3.

In the EIS please refer to 'Figure 49, Alternative A Wetlands and Other Waters' on page 70; 'Figure 50, Alternative K, Option 1 (Preferred Alternative) Wetlands and Other Waters' on page 71; 'Figure 51, Alternative K, Option 2 Wetlands and Other Waters' on page 72; and 'Figure 52, Alternative K, Option 3 Wetlands and Other Waters' on page 73 for overviews of the Other Waters identified. All of the identified Other Waters are classified as naturally occurring creeks, intermittent streams, or the Little Missouri River. On November 2, 2016, the USACE provided jurisdictional determination for the Field Wetland Delineation Reports, stating that the following waters are not jurisdictional waters of the United States: Wetland Numbers 2 and 3 (Alternative A project area); Wetland Number 17 (Alternative K [shared portion] project area); and Wetland Numbers 101, 102, 103, 104, and 106 (Alternative K, Option 1 expanded area). Therefore, a Section 404 permit would not be required for these wetland areas. The USACE also prepared a preliminary jurisdictional determination for the remaining aquatic resources identified within the expanded area of Alternative K, Option 1, stating that the waterways in the expanded area may be jurisdictional waters of the United States. If Alternative K, Option 1 includes impacts on any of these jurisdictional wetland areas, a Section 404 permit would be required prior to commencement of construction activities. However, if construction activities associated with Alternative K, Option 1 did not result in a discharge of dredged or fill material into waters of the United States, a permit pursuant to Section 404 would not be required.

6. Impact Analysis 6.1. Physical and Chemical Characteristics of the Aquatic Ecosystem 6.1.1. Substrate The existing aquatic resources consist of naturally occurring wetlands associated with terraces, drainages, depressions and delineated Other Waters (OW). Wetlands and intermittent tributaries flow directly or indirectly into the Little Missouri River. All of the proposed alternatives would impact wetlands, intermittent tributaries, and the Little Missouri River. The substrate within these resources, as indicated in the aquatic resource delineation data sheets, consists of fine sandy loams, silty clay,

silts, loamy sand, and/or sandy clayey loams. The western portion of North Dakota has highly erodible soils. Substrate in this area consists of granular material between sand and clay. Undercut banks, scour, and the destruction of terrestrial vegetation are indicators that substrate within these resources consist of deposited granular material. Alternative L: The "No Action" alternative would have no effect on the substrate found within the existing alignment. The dynamics of sediment movement within the river channel and across the floodplain wetlands would persist in the future as they currently exist. With No-Action, while the character of the substrate in any particular location can be expected to vary over time in response to episodic events, the substrate in the Study Area as a whole is expected to retain a similar range and relative abundance of sediment-substrate types and to continue along the recent trajectory of improving water quality and higher macro-invertebrate diversity. The "No Build" alternative would continue to have some effect on the aquatic ecosystem by individuals who would continue to use low-water crossing on the Little Missouri River. There could be some disturbance on a regular basis to the substrate of the river. Alternatives A, K1, K2, and K3 would have similar impacts on substrate within these aquatic resources, because they all would require similar construction methods. Inert material such as soil and riprap would be placed within these wetlands, tributaries and the Little Missouri River to reconstruct portions of existing roadways and construct a new bridge over the Little Missouri River. During the development of the EIS and recently refined impacts, Alternative K, Option 1, would have the least amount of permanent impacts within Wetlands and Other Waters (total), including the Little Missouri River in comparison with Alternative K2. Alternative A has less wetland resources within the project area but requires a significantly larger bridge structure and more earthwork along the existing roadway, resulting in a more environmental impacts. Alternative A would cumulatively result in 1870 LF of impacts to tributaries adjacent to the existing roadway and the Little Missouri River. Alternative K1 would result in significantly less permanent impacts to 792 LF of tributaries and the Little Missouri River. 6.1.2. Suspended Particulates/Turbidity The aquatic resources within Alternatives A, K1, K2, and K3 regularly experience increases in turbidity during precipitation events with high levels of suspended particulate matter within the water column. Particulates settle and turbidity decreases after precipitation events; however, these resources generally maintain a high level of suspended particulates with increased turbidity. Alternative L: Under the No-Action Alternative, concentrations of suspended sediments in the river and wetlands in the floodway would fluctuate within historic norms. Sediment would continue to be mobilized by high flows, but retained within the banks of the river channel except during rare and relatively brief episodes of overbank flooding. Wetlands in the floodway would continue to experience pulses of

sediment in runoff during heavy rain and high flows. The "No Build" alternative would continue to have some effect on the aquatic ecosystem by individuals who would continue to use low-water crossing on the Little Missouri River. There could be some disturbance on a regular basis to the substrate of the river. Alternatives A, K1, K2, and K3 would have similar impacts on suspended particulates and turbidity. As a result of construction activities, wetlands and tributaries in the project area would experience a temporary increase in turbidity and suspended particulates. These impacts would be similar for each alternative. Best Management Practices (BMP's) would be required by the North Dakota Regulatory Office and would be identified within the state required Stormwater Pollution Prevention Plan. During construction, temporary disturbance would occur due to the use of heavy equipment required to complete the work, but those impacts would be relatively short in duration. These temporary impacts would subside following construction activities as temporarily impacted areas must be restored and stabilized. 6.1.3. Current Patterns and Water Circulation Water currently flows through the wetlands and tributaries into the Little Missouri River. In areas where the resources are bisected by existing roadways, culverts provide the hydrologic connection and maintain flows to downstream waters. The majority of the flows throughout the proposed alternatives are intermittent and ephemeral with shallow water depths. During larger rain events, water depths and the amount of flows can change, but typically remain short in duration. Alternative L: With the "No Action" alternative current patterns and water circulation would remain as they are today and there would be no effect. Alternatives A, K1, K2, and K3 would not result in significant permanent impacts to current patterns and water circulation. As a general requirement of Section 404 permits, NDDOT would be required to maintained natural flows. Bypasses and stream diversions would be utilized as necessary for construction of drainage structures/creek crossings. Construction of the Little Missouri River crossing would require temporary structures, such as causeway and cofferdams. Any temporary structures or fill would be removed and pre-construction conditions would be restored. These methods of construction would be common among all proposed alternatives. Minor permanent effects would result from the placement of bridge piers within the Little Missouri River. As indicated in the DEIS, each alternative requires piers to be placed in the Little Missouri River. Both alternatives A and K2 would require 2-4 piers to be placed below the OHWM and alternative K3 would require 1-3 piers to be placed within the banks of the Little Missouri River. The preferred alternative, K1, would require 1-3 piers within the river and the least amount of overall environmental disturbance in comparison to other alternatives. As a result, the preferred alternative would have the least amount of impact on current patterns and water circulation within the Little Missouri River. However, alternatives

A and K3 would have the most permanent impacts to tributaries and other waters. These impacts, in comparison with the applicants preferred alternative, would have the most potential for long term effects to water patterns and circulation. 6.1.4. Normal Water Level Fluctuations Water levels fluctuate significantly throughout the growing season within this portion of western North Dakota. During the aquatic resource delineation, it was noted that several wetlands did not have surface water but maintained a high water table. Earlier in the growing season, wetlands and tributaries are likely to contain more water, while water levels are typically lower in the latter portion of the growing season. By utilizing existing infrastructure in alternatives A, K1, K2, and K3 normal water fluctuations would be maintained. During construction, there may be temporary fluctuations in water levels during earth-work activities. Such impacts would cease once construction is completed. Impacts to wetland functions such as flood flow alteration, sediment removal, and nutrient and toxic removal are likely to be minimal and would be mitigated by requiring compensatory mitigation. Furthermore, the preferred alternative would have the least amount of piers in the river, resulting in minimal effects to normal water level fluctuations. 6.1.5. Water After evaluating impacts to the existing substrate, suspended particulates and turbidity, water circulation, and normal water level fluctuations it has been determined that each alternative would have similar effects on water within regulated aquatic resources. These impacts would be minimal and temporary. If the proposed project is verified under a Nationwide Permit, it is likely that water quality certification has already been issued. Should the project require review under an Individual Permit, Section 401 water quality conditions would become special conditions of the Corps permit. Lastly, because the proposed project would occur in aquatic resources that typically experience turbid conditions, the deposition of clean fill material would not have an adverse impact on water.

6.2. Biological Characteristics of the Aquatic Ecosystem 6.2.1. Special Aquatic Sites (wetlands, mud flats, vegetated shallows, riffle and pool complexes, coral reefs, sanctuaries, and refuges) Special aquatic sites such as wetlands are present within the project area. These features are Palustrine emergent wetlands that create anaerobic conditions which support the establishment of hydrophytic vegetation. The wetland delineation identified common three-square (Schoenoplectus pungens), Prairie cordgrass Spartina pectinata), broadleaf cattail (Typha latifolia), sandbar willow (Salix interior), foxtail barley (Hordeum jubatum), and common spikerush (Eleocharis palustris) as some of the dominant species regularly found within the proposed review areas for each alternative.

Alternative L: The "No Build" alternative would have no impact on special aquatic sites. Alternatives A, K1, K2, and K3 would impact wetlands as the deposition of fill would convert portions of these aquatic resources to uplands. Each of these alternatives would be constructed using the same type of inert material and have similar effects. Alternative A would have less wetland impacts in the project area but would require more piers to be placed within the Little Missouri River and would result in 1870 LF of impacts to streams adjacent to the existing roadway. Alternative K1 would discharge the least amount of inert material (total) in wetlands compared with alternative K3 and less than half (792 LF) of impacts to streams and tributaries to the Little Missouri River when compared to alternative A. Alternative K2 and K1 have similar impacts while alternative A has less impacts within the aquatic ecosystem but is the longest project with the largest proposed bridge structure. 6.2.2. Fish, Crustaceans, Mollusks, and Other Aquatic Organisms in the Food Web Some wetlands in the project area are not regularly inundated and do not provide ample amounts of habitat for fish, crustaceans and mollusks. Additionally, some of the intermittent streams and ephemeral tributaries within the project area do not sustain flows long enough to support vertebrates adapted for life in an aquatic environment. Wetlands associated with the Little Missouri River would provide areas for food, spawning and rearing of young, and cover from predators. However, amphibious species would frequent these wetlands for feeding, breeding, and cover from predators. The Little Missouri River does provide viable habitat for organisms adapted for life in aquatic environments such as fish crustaceans and mollusks. Alternative L: The "No Build" alternative would continue to have some effect on the aquatic ecosystem by individuals who would continue to use low-water crossing on the Little Missouri River. There could be some disturbance on a regular basis to the substrate of the river. All of the presented alternatives would have minimal impacts to the biological integrity of wetlands, tributaries, and the Little Missouri River. As a general requirement all fill material must be clean and free of debris. In order to prevent impacts on spawning, work within regulated waters would be prohibited from April to June. Some habitat loss would be expected, requiring aquatic species to seek out new places of refuge. Alternative A would require the most piers in the Little Missouri River and has greater potential for habitat destruction below the rivers OHWM. This would include the permanent structure and temporary structures to install the piers within the river. Of the presented alternatives, K1 would have the least amount of piers within the river and have the least amount of habitat destruction below the Little Missouri River's OHWM.

6.2.3. Wildlife Values Wildlife such as waterfowl, birds, and small mammals may use the wetlands for cover and food or water sources when present. The Little Missouri River is also a valuable source of food, water, and cover for several terrestrial mammals and bird species, including waterfowl. The proposed routes are located in a rural setting with little development in remote areas of the badlands. Surrounding land use is mostly ranching activities and oil well pads. Large cities and towns are not located within the proposed routes. Alternative L: The distribution, abundance, and diversity of other wildlife under the No-Action Alternative would remain largely as they are under existing conditions Alternatives A, K1, K2, and K3, would have minimal impacts on wildlife values at each proposed crossing. Most of these impacts would be temporary as noise and increased human activity during construction would discourage wildlife from using the Little Missouri River adjacent to the project area. Permanent effects following construction would include a small increase in traffic as the crossing is utilized by the travelling public. However, the area is rural and traffic numbers are low enough for animals to cross the roadway safely. Alternatives A, K2, and K3 would require more piers in the river resulting in more temporary impacts to wildlife values associated with the Little Missouri River and adjacent wetlands. More piers in the river would require additional temporary structures. Additionally, alternative A would require significant amounts of earthwork that would destroy other wildlife values. Alternative K1 would reduce effects associated with temporary and permanent impacts with fewer piers in the river. Limiting the number of piers and associated fill within the Little Missouri River, reduces the destruction of food and cover for wildlife species that frequent aquatic resources. Lastly, this would require less fill and other construction material that may affect water during construction. 6.2.4. Threatened and Endangered Species Biological Assessment (NDDOT, 2016) This section evaluates potential impacts to listed Threatened and Endangered Species. FHWA is the lead federal agency and ultimately responsible for consultation under Section 7 of the Endangered Species Act. The following discussion is located in the Biological Assessment for the proposed project which encompasses the Corps action area as it relates to regulated WOUS and immediately adjacent uplands. Current population and habitat conditions are described for each applicable species. Potential habitat in relation to the proposed action is discussed. Potential habitat occurring in the action area is based on information provided through agency coordination, desktop analysis and onsite observations. Prior to conducting field surveys, agency coordination including project-specific email correspondence with USFWS, US Forest Service (USFS) and North Dakota Parks and Recreation Department (NDPR) occurred regarding known occurrences

of species in the area. Prior to, and throughout the survey process, coordination with various agencies was organized and specific procedures were followed to gather the appropriate information for the project evaluation. Pre-survey preparation included incorporating information from aerial photographs, topographic maps, data searches and prior personal knowledge of the area. Detailed biological/botanical pedestrian surveys occurred within a 500-foot wide corridor centered on the proposed alignment during the 2012 and 2013 field seasons to facilitate preparation of a USFS Biological Assessment of Threatened and Endangered Species & Biological Evaluation of Sensitive Species. In addition, biological/botanical pedestrian surveys were conducted within the expanded study area in 2016. As part of these surveys, all flora and fauna observed were documented, and predominant plant communities, unique habitats, rare species and invasive species were recorded. Outside of USFS lands, general observations of habitats and species were made. A field wetlands delineation was conducted during the 2012 and 2015 field seasons on all lands within a 500-foot wide corridor centered on the proposed alignment. In addition, a field wetlands delineation was conducted within the expanded study area in 2016. Areas exhibiting wetland vegetation, soils and hydrology were documented, as well as Other Waters of the US where an ordinary high water mark was observed. In areas where Other Waters were recorded and/or the wetland delineation study area deviated from the existing roadway alignment, a tree and shrub count was conducted. In addition, drainage structures within the wetland delineation study area were examined for northern long-eared bat habitat suitability. Black-Footed Ferret (Mustela nigripes) Historically, the black-footed ferret could be found throughout the Rocky Mountains and Great Plains. In North Dakota, the black-footed ferret may potentially be present within prairie dog towns; the species has not been confirmed in North Dakota for over 20 years, though unconfirmed reports exist from the southwest portion of the state (USFWS, 2013b). Preferred habitat includes areas around prairie dog towns, as black-footed ferrets rely on prairie dogs for food and live in prairie dog burrows. In the wild, black-footed ferret density is correlated with prairie dog town size, at a rate of one ferret per 99 to 148 acres of occupied prairie dog habitat (USFWS, 2013a). One prairie dog town was identified within the action area, though the entire action area was not surveyed extensively in the field. The town spanned approximately 21.4 acres, which is not large enough to sustain black-footed ferrets. Please refer to Figure 5 below, Alternative K1 Prairie Dog Towns.

Figure 6, Alternative K1 Prairie Dog Towns (NDDOT, 2016)

Gray Wolf (Canis lupus) The gray wolf is the largest wild canine species in North America. It is found throughout northern Canada, Alaska, the forested areas of Northern Michigan, Minnesota, and Wisconsin, and has been re-introduced to Yellowstone National Park in Wyoming. While the gray wolf is not common in North Dakota, occasionally individual wolves do pass through the state (USFWS, 2013d). Gray wolves utilize a variety of habitat types, including forest, grassland and waterbodies. Gray wolves in the Midwest live in packs of four to eight members on average, although some individuals roam alone (USFWS, 2006). According to North Dakota Game and Fish Department (NDGF) records for the period from March 1987 to October 2015, no verified reports1 of gray wolves were recorded in Billings or Golden Valley Counties. Two probable unverified sightings2 were recorded during that period in Billings County. None of the known sighting

1

Verified means evidence available, including a carcass of livecaptured wolf, photograph or video, DNA analysis results, or tracks, scat, kill or attacks confirmed as being that of a gray wolf by a qualified wildlife professional. 2 Probable unverified means no evidence available, but report, animal description, and/or location are plausible. Improbable unverified and unfounded reports were not included in this report.

locations occurred within the action area.3 Please refer to Figure 6 below, Alternative K1 Reported Gray Wolf Sightings.

3

Location information for one probable unverified sighting in Billings County was not available.

Figure 7, Alternative K1 Reported Gray Wolf Sightings (NDDOT, 2016)

Whooping Crane (Grus americana) The whooping crane is the tallest bird in North America. In the United States (US), the species can occur throughout the Midwest and Rocky Mountain regions from North Dakota to Texas. They use shallow, seasonally and semi-permanently flooded palustrine (marshy) wetlands for roosting, and various cropland and emergent wetlands for feeding (USFWS, 2012). In addition, whooping cranes are often recorded in riverine habitats. Suitable migratory stopover habitat for whooping cranes includes areas of shallow water without visual obstructions (e.g., high or dense vegetation). Whooping cranes have been documented utilizing a wide range of wetland sizes for roosting, from small natural palustrine wetlands and manmade stock ponds to large lakes and rivers. Feeding and palustrine roosting sites are typically less than 0.5 mile apart; however, distance from feeding to lacustrine or riverine roosting sites can be separated by more than one mile (Austin and Richert, 2001). Currently, there are four wild populations of whooping cranes; of these flocks, only the Aransas Wood Buffalo Population (AWBP) is self-sustaining. Winter 2014-2015 survey results estimated the population of the AWBP to be 308 individuals (USFWS, 2015b). Whooping cranes are documented annually during migration using roosting and feeding habitat in North Dakota along a band running from the south central to the northwestern part of the state. The migration period for the AWBP whooping cranes in North Dakota generally occurs from April 1 to May 15 and September 10 to October 31 (Austin and Richert, 2001). Migration can take two to six weeks, with stopovers lasting from one night to up to four weeks (Travsky and Beauvais, 2004). The proposed action is located on the western edge of the whooping crane migratory corridor in a swath where approximately 12.5 percent of whooping cranes pass through during migration. According to USFWS data spanning from 1955 through the spring of 2009, two confirmed whooping crane sightings were reported in Billings County; none were reported in Golden Valley County. Please refer to Figure 7 below, Alternative K1 Whooping Crane Migration Corridor and Sightings. In general, the action area is characterized by rolling and rugged topography, which acts to limit viewing distance. There are approximately 169.5 acres of cultivated lands present within the action area. According to the US Geological Survey National Hydrography Dataset and the USFWS National Wetlands Inventory, there are approximately 5.9 acres of open water habitat and 106.7 acres of wetlands, respectively, within the action area. A field wetland delineation extending 250 feet on either side of the proposed roadway alignment and incorporating the expanded study area determined that 11.35 acres of wetlands and 16.32 acres of Other Waters of the US are present within that study area. There are several existing human disturbances within the action area, including roadways, residences and other building sites with human activity, and oil and gas

development that may deter whooping cranes from the area. In addition, there are overhead utility lines within the action area that currently act as strike hazards for birds in flight. Please refer to Figure 8 below, Alternative K1 Whooping Crane Potential Habitat and Disturbances. The limited availability of potential stopover habitat due to visual obstructions from topography and existing disturbances, coupled with the lack of historical observation of the species in the action area, indicates that the action area does not provide ideal stopover habitat for the whooping crane.

Figure 8, Alternative K1 Whooping Crane Migration Corridor and Sightings (NDDOT, 2016)

Figure 9, Alternative K1 Whooping Crane Potential Habitat and Disturbances (NDDOT, 2016)

Northern Long-Eared Bat (Myotis septentrionalis) The northern long-eared bat is a medium-sized bat that occurs across central, eastern and northern portions of the US and across Canada. The main factor in the proposal to list the species under Section 4 of the ESA is dramatic population decline due the fungal disease, white-nose syndrome. The Western Population of northern long-eared bats occurs partially in North Dakota, where the bats have been observed during the summer in the Turtle Mountains, Missouri River Valley and the Badlands. While no hibernacula (overwintering sites such as caves, abandoned mines, or similar constructions) are known to exist in the state, this may be a function of lack of adequate survey data (USFWS, 2013c). Further, no data on the northern long-eared bat nor its habitat (i.e., hibernacula or maternity roost trees) in Billings or Golden Valley Counties is available in the state Natural Heritage Inventory database. During summer months, the species commonly roosts singly or in colonies in the trees of forested areas, and to a lesser extent in caves, mines and the built environment. Foraging for insects occurs at night within and near forested areas. For females, the home range has been documented to be from 47 to 425 acres in size. Roost sites change frequently and can be up to approximately one mile apart from one another. From mid-summer to fall, bats move to hibernacula to breed and

hibernate. The distance between roost and hibernacula can range from five to 168 miles (USFWS, 2013c). In a statewide survey of bat distribution, the northern long-eared bat was observed within Theodore Roosevelt National Park (North and Elkhorn Ranch Units) and the Little Missouri National Grasslands (Gillam and Barnhart, 2011). None of Gillam and Barnhart's sampling locations occurs within the action area (E. Gillam, personal communication, November 25, 2015). Approximately 1,579.7 acres of wooded habitat occurs within the action area. Given that the northern long-eared bat utilizes a variety of forested and interspersed nonforested areas during the summer maternity season, it is reasonable to assume the wooded habitat within the action area is suitable habitat for the species. Four large (greater than 60 inches in diameter) corrugated steel pipes are present within the action area that may be impacted by roadway improvements. These structures did not exhibit cracks or crevices that would be appropriate for most bat species to roost during the summer maternity season (i.e. approximately 0.5 to 1.25 inches wide and 12 inches deep). While a bridge present within the action area did contain cracks and crevices of appropriate size, they exhibited signs of water seepage, thus were not sealed and would not be appropriate for most bat species to roost (Keeley and Tuttle, 1999). No evidence of bat use was observed on or beneath the bridge. In addition, it is reasonable to assume that caves having the potential to function as hibernacula may be present within the action area. Considering the information provided above and the proposed elements of the project, NDDOT and FHWA made effect determinations for each species and is provided below. The Corps action area remains within the boundaries of wetlands and below the OHWM of the Little Missouri River. Immediately adjacent uplands is also included in the Crops action area. The overall review area established by FHWA as the lead federal agency encompasses the Corps scope of analysis for threatened and endangered species. Table 2 below includes the determinations for the federally listed threatened and endangered species.

Table 2, Alternative K1 Summary of Effects (NDDOT, 2016)

A. Black-Footed Ferret The proposed action is expected have no effect on the black-footed ferret. The proposed action would not impact the identified prairie dog colony. Prairie dog colonies of adequate size to serve as suitable habitat for the black footed ferret are not known to occur within the action area. This, coupled with the lack of historical sightings of the species in North Dakota, makes it unlikely that black-footed ferrets would inhabit the action area. B. Gray Wolf The proposed action is expected have no effect on the gray wolf. While potential dispersal habitat would be impacted within the action area, the proposed action would be located far from any known gray wolf populations. Should wolves occur within the action area, it not anticipated that additional transportation development in this rural area would impact the species, as it is a wide-ranging species known to survive in urban settings, where tolerated (USFWS, 2011). Substantial similar habitat exists in the region that is available for use by the gray wolf. Further, much of the proposed action follows existing roadways, with little new roadway construction proposed, and traffic volumes are not projected to substantially increase after construction of the proposed project. C. Whooping Crane The proposed action may affect, but is not likely to adversely affect, the whooping crane. The proposed action would permanently impact up to approximately 14.25 acres of cultivated lands; this area constitutes approximately 8.41 percent of the total

cultivated area within the action area and is likely an overestimate given the conservative calculation of land use impacts. The proposed action would permanently impact4 up to approximately 1.65 acres of delineated wetlands and 1.91 acres of delineated Other Waters of the US; these values are likely an overestimate given the conservative calculation of impacts. At the request of the Corps, impacts to aquatic resources was refined for the proposed K1 option expanded review area. Based on the updated information, the project would permanently impact 0.39 acres of Section 404 regulated wetlands (total) and permanently impact 756 Linear Feet regulated tributaries and streams (total). Wetland impacts would be mitigated onsite, adjacent to the proposed action or at an NDDOT approved mitigation bank to prevent a net loss of wetland habitat. Permanent impacts to cultivated lands are minor in relation to the setting of the proposed action. Substantial similar habitat exists in the region along that will remain available for use by whooping cranes. Given that action area does not provide ideal stopover habitat for the whooping crane, these land use impacts are not anticipated to adversely affect the whooping crane. Temporary water quality disturbance to Little Missouri River habitat as a result of construction activities would be minimized by implementing conditions of the SWPPP and BMPs. BMPs may include, but are not limited to, mulching, matting, and netting; filter fabric fencing; sediment traps and ponds; surface water interceptor swales and ditches; minimizing the amount of stockpiled material; and storing stockpiles away from surface waters. After construction of the proposed river crossing, the river is expected to experience less sedimentation and disturbance than under existing conditions due to a reduction in vehicles driving directly through the river. In addition, waste material would be disposed of in accordance with state and federal laws and in a manner that avoids impacts to water channels and riparian areas. To minimize the risk of spreading ANS, the contractor would conduct equipment cleaning and inspections prior to placing any equipment within waters of the state (i.e., the Little Missouri River). While no new overhead utility lines would be installed as a result of the proposed action, lines may need to be raised or offset. Within one mile of suitable whooping crane stopover habitat, adjusted lines would be marked with bird diverters at a 1:1 ratio and newly installed lines would be marked at a 2:1 ratio to minimize potential impacts to whooping cranes in flight. Modifications to overhead lines would follow USFWS guidance. After any overhead utility line relocation, the potential for bird strikes on lines would still be present; however, the shift in utility line location would

4

Permanent impacts along the proposed alignment were calculated using the area inside of approximate construction limits. Within the expanded study area where the alignment is yet to be determined, the most conservative estimate of impacts was generated by considering hypothetical routes and assuming a 500foot wide footprint, with the exception of one location where the footprint was expanded to account for rugged terrain.

be minor and the inclusion of bird diverters that are currently not on the utility lines would prevent additional collision hazards compared to existing conditions. Construction activities have the potential to disturb (e.g., flushing from roosts or habitat) migrating whooping cranes present within the action area. Rugged topography within the action area is expected to minimize the reach of construction related stressors (e.g., noise, vibration, visual). The contractor would be required to notify the project engineer immediately in the event a whooping crane is identified within one mile of the project. The project engineer would then cease all construction activities, establish an avoidance area and immediately notify and coordinate with USFWS, FHWA and NDDOT. The contractor would not be permitted to resume work within the avoidance area until the project engineer has confirmed that the bird(s) have left the area. Operation of traffic on the roadway has the potential to cause whooping cranes migrating through the area to alter their flight and landing patterns to avoid disturbance, however, the proposed action occurs on the outer edge of the migration corridor and substantial habitat exists in the region along the Little Missouri River that is available for use by whooping cranes. Further, much of the proposed action follows existing roadways, with little new roadway construction proposed, and traffic volumes are not projected to substantially increase after construction of the proposed project. Rugged topography within the action area is expected to minimize the reach of traffic related stressors (e.g., noise, visual). D. Northern Long-Eared Bat The proposed action may affect, but is not likely to adversely affect, the northern long-eared bat. The proposed action would permanently impact up to approximately 5.71 acres of woodlands that may serve as summer maternity habitat; this area constitutes approximately 0.36 percent of the total woodland area within the action area and is likely an overestimate given the conservative calculation of land use impacts. Tree removal has the potential to affect northern long-eared bats that may be in and around the trees; however, the action is located outside of the White Nose Syndrome Zone, thus incidental take is not prohibited (USFWS, 2016). Tree removal would not occur from June 1 through July 31 to avoid adversely impacting potential maternity roost trees during pup season. Woody vegetation mitigation measures are not proposed due to the abundance of similar habitat within the action area (KLJ, 2015). Drainage structures that may be impacted by the proposed project do not provide suitable roosting habitat. No known caves or other structures are expected to be impacted by the proposed action. Bats present in the action area during the summer maternity season have the potential to be disturbed by construction activities and operation of traffic upon project completion. Garner et al. found evidence that Indiana bats, a species similar to the northern long-eared bat in many respects,

continue to roost and forage in the midst of heavy machinery operation (1991), thus effects of construction noise are not anticipated to adversely affect the northern longeared bat. Traffic volumes are not anticipated to increase significantly as a result of the proposed project. Further, much of the proposed action follows existing roadways, with little new roadway construction proposed. The Corps agrees with the information provided in the Biological Assessment dated September, 2016. At the time of final design and permitting, FHWA as the lead federal agency would be required to consult and receive concurrence from the USFWS on the "May Affect, Not Likely to Adversely Affect" determinations for the Northern Long-eared bat and Whooping crane. Based on similar construction methods and materials between alternatives A, K1, K2, and K3 it has been determined that the effects mentioned above would be similar of all ranges of alternatives. However, alternative K1 is both a shorter route with less piers in the Missouri River. 6.2.5. Biological Availability of Possible Contaminants in Dredged or Fill Material The Corps requires that applicants only use clean fill from an NDDOT approved source. Each alternative would use the same type of inert material. Although the source of material is not known at the time of final design and permitting, sites which have already been reviewed and cleared by NDDOT would be utilized for obtaining fill.

6.3. Human Use Characteristics of the Aquatic Ecosystem 6.3.1. Water Supply The Little Missouri River provides a source of water for farming activities, industrial businesses, and smaller towns located near the river. Although it is not certain how many are located directly downstream of the regulated activities at each evaluated alternative, NDDOT would be required to complete work in a manner that meets North Dakota State Water Quality Standards. The conditions of the Water Quality Certifications become special conditions of the Corps authorization. Alternative L: The "No build" alternative would have no impact on water supply and conditions would remain the same as they are now. Alternatives A, K2, and K3 would require more work within the OHWM of the river in order to install more piers. Alternative K1 would have less impacts on water supply because it would limit the amount of piers below the OHWM. Material to be discharged must be clean and free of debris as a general requirement. Based on the construction methods, the majority of material for the bridge and associated riprap would be composed of inert material. 6.3.2. Recreational and Commercial Fisheries According to the North Dakota Game and Fish, the Little Missouri River contains predominantly catfish with some sauger and walleye during the spring spawning

period (2019). Throughout the Little Missouri River, public access can be found with public lands owned by the USFS and the NPS. Although the Little Missouri River does not have a diverse fishery it still provides the general public with the ability to fish from shore or smaller vessels such as kayaks and canoes. Alternative L: The "No build" alternative would have no impact on recreational or commercial fisheries. All build alternatives would require the placement of fill and piers within the Little Missouri River. Temporary impacts during construction may occur as overall use of the area immediately surrounding the project would be hindered with the use of equipment and temporary structures that may be necessary to complete construction activities. Alternative K1 has the least amount of piers within the river and below the banks, resulting in less impacts to the recreational fishing activities. 6.3.3. Water Related Recreation As previously mentioned above, smaller vessels could be used for fishing and/or other recreational activities on the Little Missouri River. This could also include the hunting of waterfowl species. Alternative L: The "No build" alternative would have no impact on water related recreation. All build alternatives would include the construction of a new bridge would have minor temporary and permanent effects to water related recreation. Should members of the general public choose to recreate in the project area during construction, this would likely impact recreation as individuals would have to avoid construction equipment and temporary cofferdams. Once construction is completed, smaller vessels would have to avoid the piers below the OHWM. These impacts would be minimal for all alternatives as the Little Missouri River is not a Section 10 waterway and larger vessels do not utilize the shallow river. Each alternative would require the construction of piers within the banks of the Little Missouri River. Alternative K1 would have the least amount of piers permanently located within the river. This would have less impacts on individuals that would like to utilize the river for recreation. 6.3.4. Aesthetics (NDDOT, 2018) The general area associated with the alternatives is characterized as a diverse landscape comprised of badlands, buttes, and plateaus accented by wooded draws, all of which support a variety of vegetation types. Cultivated fields, farmsteads, and oil and gas developments are scattered throughout the area, and the Little Missouri River flows north through the rugged topography in the area. The transportation system in the area is comprised of rural, unpaved gravel/graded roads, primitive roadways, and trails.

For purposes of this analysis, visual resources are characterized from the vantage point of the user of the areas in the vicinity of the new roadway and bridge (e.g., local residents, recreationists, tourists). Human-made visual resources within the immediate vicinity of Alternative A include a seasonal residence. The seasonal residence is located approximately 0.1 miles east-northeast of the new roadway and bridge. This seasonal residence could likely be within the viewshed of the new roadway and bridge. Alternative L: The "No build" alternative would have no impact on the visual aesthetics and the viewshed would remain as it is today. Human-made visual resources within the immediate vicinity of Alternative K (all options) include two farmsteads. One farmstead, located approximately 0.6 miles east-southeast of the new roadway and bridge under Alternative K, Option 1 (Preferred Alternative) and 0.4 miles north-northwest of the new roadway and bridge under Alternative K, Option 2, could likely be within the viewshed of these alternatives. The other farmstead, located approximately 0.4 miles south of the new roadway and bridge under Alternative K, Option 3, could likely be within the viewshed of this alternative. The bridge would likely have a small impact on aesthetics in the immediate vicinity because it would be a new crossing. The bridge would be constructed with a low profile and designed to blend in with the surrounding environment. Additionally, depending on where individuals are hunting, camping, and/or floating the Little Missouri River, the rough terrain in the badlands and vegetation provide a natural obstruction. 6.3.5. Parks, National and Historical Monuments, National Seashores, Wilderness Areas, Research Sites, and Similar Areas (NDDOT, 2018) As discussed in the DEIS, Alternatives K1, K2, and K3 are south of the northern unit of Theodore Roosevelt National Park (TRNP). Photos were taken from various boundary lines within TRNP, in order to evaluate potential visual effects on the park. The same approach was taken for Alternative A which is located a few miles north of TRNP. No direct impacts on the viewshed of the Elkhorn Ranchlands, TRNP ­ Elkhorn Ranch Unit, or National Historic District would be expected. Results of the viewshed analyses indicate that the new roadway and bridge under Alternative A would not be able to be seen from the Elkhorn Ranchlands, TRNP ­ Elkhorn Ranch Unit, Elkhorn Ranch Headquarters, or National Historic District. Further, Alternative A would not alter the viewshed or diminish the integrity of the view from the Elkhorn Ranchlands, TRNP ­ Elkhorn Ranch Unit, Elkhorn Ranch Headquarters, or National Historic District.

Alternative A is not expected to generate new traffic. An additional 1 percent would be added to the 2.5-percent annual baseline traffic growth rate to account for the redistribution of local trips that may be attracted to the new bridge. Therefore, under Alternative A, a total annual traffic growth rate of 3.5 percent would be expected for roads associated with the alternative and adjacent roadways. There would be a slight increase in fugitive dust emissions from vehicles using roadways within the study area. However, since Alternative A is located more than 2 miles from the Elkhorn Ranchlands, TRNP ­ Elkhorn Ranch Unit, and National Historic District and the traffic increase would be negligible, potential visual impacts from fugitive dust emissions would be minor. Overall, fugitive dust emissions during and upon completion of construction are not anticipated to alter the viewshed or diminish the integrity of the view from nearby areas, the Elkhorn Ranchlands, the TRNP ­ Elkhorn Ranch Unit, or the National Historic District. Very minimal light pollution from the headlights of vehicles using the roadways within the study area would be expected. Since the traffic increase would be negligible, potential light pollution is not anticipated to alter the natural lightscapes of the seasonal residence, TRNP ­ North Unit, or TRNP ­ South Unit or result in visual impacts on natural night skies. Construction activities would generate particulate matter emissions as fugitive dust from ground-disturbing activities. Fugitive dust emissions from construction activities would be greatest during initial site-preparation activities and would vary from day to day, depending on the construction phase, level of activity, and prevailing wind and weather conditions. All fugitive dust emissions from construction activities would be localized and temporary in nature. Impacts on farmsteads located within approximately 0.6 miles of the new roadway and bridge under Alternative K, Option 1 (Preferred Alternative); 0.4 miles of the new roadway and bridge under Alternative K, Option 2; and 0.4 miles of the new roadway and bridge under Alternative K, Option 3 would be expected. These farmsteads could likely be within the viewshed of the alternatives. However, context-sensitive solutions would be applied to the final bridge design: the bridge would be low-profile and constructed to blend with the surrounding environment to the maximum extent practicable. The new roadway would be constructed similar to the existing roadways in the study area. The new roadway and bridge are not anticipated to diminish the integrity of the view from any of the farmsteads. No direct impacts on the viewshed of the TRNP ­ Elkhorn Ranch Unit or National Historic District would be expected. Results of the viewshed analyses indicate that the roadways and bridges under Alternative K (all options) would not be able to be seen from the Elkhorn Ranchlands, TRNP ­ Elkhorn Ranch Unit, Elkhorn Ranch Headquarters, or National Historic District. Further, Alternative K (all options) would not alter the viewshed or diminish the integrity of the view from the Elkhorn

Ranchlands, TRNP ­ Elkhorn Ranch Unit, Elkhorn Ranch Headquarters, or National Historic District. Impacts from fugitive dust emissions and light pollution associated with Alternative K (all options) would be the same as those described for Alternative A. As a result of the historical significance of the Badlands and TRNP, NDDOT has developed mitigation measures and design criteria to be implemented at the time of permitting. For all of the alternatives, the alignment would follow an existing roadway as closely as possible to minimize new roadway construction. In addition, contextsensitive solutions would be applied to the final bridge design: the bridge would be low-profile and constructed to blend with the surrounding environment to the maximum extent practicable. Prior to construction activities, the contractor would be required to develop a SWPPP, which would include dust control measures during construction. Upon completion of construction activities, Billings County would implement dust-control, such as applying water, calcium chloride, and/or magnesium chloride to the roadway, as necessary and when feasible to prevent traffic hazards, damages, and nuisances to adjacent property owners. In addition, the county uses clay in their surface aggregate to help control dust.

6.4. Evaluation and Testing Evaluation must be completed in accordance with the requirements of 40 CFR § 230.60, and if testing is required, must comply with the requirements of 40 CFR §230.61. Only fill material composed of soil from uncontaminated sources would be used to minimize potential impacts to WOUS from fill material. The Contractor would be required to provide fill material that is from an approved borrow source certified by the North Dakota Department of Transportation. No contaminated material would be placed in the WOUS.

6.5. Cumulative Impacts Cumulative impacts are considered as the collective effect of a number of individual discharges of dredge or fill material. An analysis of impacts associated with past, present and reasonably foreseeable projects when considered with the proposed project was completed in accordance with 40 CFR §230.11(g). Past and current actions in the project area having the potential to discharge dredged or fill material into the WOUS primarily include agricultural activities, oil and development, and roadway construction/maintenance. These impacts would have varied from temporary adverse impacts to permanent loss of aquatic resources. In the past 5 years, authorized permits in the Middle Missouri River watershed (10110203) have resulted in 1.58 - acres of authorized fill in WOUS (Total).

Approximately 46 Nationwide Permits have been verified, resulting in a permanent loss of 1.3 acres. The Corps has also authorized impacts to approximately 505 LF of streams (total). Approximately 205 LF was authorized by 1 Individual Permit. The Corps required compensatory mitigation for 0.82 acres of wetlands and 205 LF (0.1 ­ acres) of stream permanently lost in the watershed. As of January 17, 2019, the Corps does not have any pending actions within the Middle Missouri River Hydrologic Unit Code 10110203. When viewed cumulatively, these past projects have resulted in minimal impacts to regulated waters within the watershed, wildlife resources and recreational hunting activities. Proper avoidance and minimization techniques would reduce potential impacts that may occur. While future impacts are not expected at this time, the requirement to mitigate these impacts assist in minimizing the cumulative impacts associated with these projects, as the functions provided by these resources would be re-established and/or created within the watershed.

7.0 Actions to Minimize Adverse Effects 7.1. Planning and Design During the initial planning of the proposed crossing, under the preferred alternative, NDDOT presented a larger area with greater impacts. In total, Alternative K1 included approximately 1.25 ­ acres of permanent impacts and 0.14 of temporary impacts. The larger area was chosen by NDDOT and KLJ to present a worst case scenario which would be further refined at final design and permitting. For purposes of completing a Section 404 (b)(1), the expanded review area was refined to represent the amount of impacts in a more accurate manner. As of January 18, 2019, Alternative K1 would permanently impact 0.39 ­ acres of wetlands (total). Additionally, when compared with Alternatives A, K2, and K3, impacts would be minimized with K1 because the current design requires less piers within the Little Missouri River. Alternatives K1 and K2 share a difference of 0.07 acres of overall wetland impacts and would have the same amount of impacts to 792 LF of streams. These impacts would be similar; however, alternative K2 would likely require more piers in the Missouri River.

7.2. Environmental Commitments Record A number of environmental commitments have been identified and are explained within the DEIS. The commitments also include environmental impacts as they relate to aquatic resources. Please refer to the DEIS, Table ES-I, Environmental Commitments Summary. The implementation of these commitments further promote avoidance and minimization of impacts associated with the discharge of fill material.

8.0 Compensatory Mitigation (NDDOT, 2018) Unavoidable impacts on wetlands would be mitigated onsite, adjacent to the project, or at an NDDOT-approved mitigation site or bank, as necessary. During final design,

a Section 404 permit application (and mitigation plan, if necessary) would be provided to the USACE for their consideration of impacts on wetlands and Other Waters under USACE jurisdiction. For naturally occurring wetlands outside of USACE jurisdiction requiring mitigation under EO 11990, impacts would be mitigated onsite, offsite, or an approved wetland site or bank. Mitigation would be accomplished in a manner consistent with FHWA's program-wide goal of `net gain' of wetlands through enhancement, creation, and preservation.

9.0 Conclusion The 404(b)(1) Guidelines are the substantive environmental standards by which all Section 404 permit applications are evaluated. The Guidelines, which are binding regulations, were published by the Environmental Protection Agency at 40 CFR Part 230 on December 24, 1980. The fundamental precept of the Guidelines is that discharges of dredged or fill material into waters of the United States, including wetlands, should not occur unless it can be demonstrated that such discharges, either individually or cumulatively, will not result in unacceptable adverse effects on the aquatic ecosystem. The Guidelines specifically require that "no discharge of dredged or fill material shall be permitted if there is a practicable alternative to the proposed discharge which would have less adverse impact on the aquatic ecosystem, so long as the alternative does not have other significant adverse environmental consequences." 40 CFR 230.10(a). Based on this provision, the applicant is required in every case (irrespective of whether the discharge site is a special aquatic site or whether the activity associated with the discharge is water dependent) to evaluate opportunities for use of non-aquatic areas and other aquatic sites that would result in less adverse impact on the aquatic ecosystem. A permit cannot be issued, therefore, in circumstances where a less environmentally damaging practicable alternative for the proposed discharge exists (except as provided for under Section 404(b)(2)). (40 CFR 1502.14, 33 CFR Part 325 Appendix B(7) and 40 CFR 230.5(c)). However, this regulatory statue does not limit the inherent flexibility provided in the Guidelines for implementing these provisions. The preamble to the Guidelines is very clear in this regard: Of course, as the regulation itself makes clear, a certain amount of flexibility is still intended. For example, while the ultimate conditions of compliance are "regulatory", the Guidelines allow some room for judgment in determining what must be done to arrive at a conclusion that those conditions have or have not been met. In conclusion, based on the information provided and the public interest review; the Corps has determined that Alternative K with options 1 or 2 are very similar in impacts and would be considered the Least Environmentally Damaging Practicable Alternatives (LEDPA) for the Little Missouri River Crossing Project.

10.0. Literature Cited Austin, JE and AL Richert. (2001). A Comprehensive Review of Observational and Site Evaluation Data of Migrant Whooping Cranes in the United States, 194399. United States Geological Survey, Northern Prairie Wildlife Research Center. Accessed online March 4, 2013. Retrieved from http://www.npwrc.usgs.gov/resource/birds/wcdata/pdf/wcdata.pdf. Clausen, E. (2011, December 28). "Little Missouri River drainage basin landform origins, Wyoming, Montana, and South and North Dakota, USA, overview essay." A Geomorphic History Based on Topographic Map Evidence. Retrieved on 22 March 2016, from http://geomorphologyresearch.com/2011/12/28/littlemissouririverdrainagebasinlandform originswyomingmontanaandsouthandnorthdakotausaoverviewessay/ FEMA. (Undated). FEMA Flood Map Service Center. Retrieved on 3 January 2018, from https://msc.fema.gov/portal Gardner, JE, JD Garner and J Hofmann. (1991). Summer roost selection and roosting behavior of Myotis sodalis (Indiana bat) in Illinois. Final Report. Gillam, E and E Barnhart. (2011). Distribution and Habitat Use of the Bats of North Dakota. Keeley, BW and MD Tuttle. (1999). Bats in American Bridges. Accessed online October 26, 2015 Retrieved from http://www.batcon.org/pdfs/BatsinBridgesManual.pdf. KLJ. (2015). Little Missouri River Crossing EIS June 29, 2015, Meeting Minutes. Meeting held at NDDOT Central Office, Bismarck, ND, with teleconference. NDDOT. (2016). Biological Assessment: Little Missouri River Crossing. Bismarck, ND: ETS Division, NDDOT. NDDOT. (2018). Draft Environmental Impact Statement: Little Missouri River Crossing. Bismarck, ND: ETS Division, NDDOT. NDGF. (2018). 2018 North Dakota Fishing Waters. Retrieved on 16 January 2019, from https://gf.nd.gov/magazine/2018/marapr/fishingwaters#sw Travsky, A and GP Beauvais. (2004). Species Assessment for the Whooping Crane (Grus Americana) In Wyoming. USDOI, Bureau of Land Management. Accessed online March 4, 2013. Retrieved from http://www.blm.gov/pgdata/etc/medialib/blm/wy/wildlife/animalassessmnts. Par.82221.File.dat/WhoopingCrane.pdf. USACE. (1987). Corps of Engineers Wetland Delineation Manual. Wetlands Research Program Technical Report Y871 (online edition). USACE (2005, December 7). Regulatory Guidance Letter Number 0505: Ordinary HighWater Mark (OHWM) Identification.

USACE. (2010, March). Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Great Plains Regions (Version 2.0). ERDC/EL TR101. USFWS. (2006). Gray Wolf Biology Questions and Answers. Accessed online October 26, 2015. Retrieved from http://www.fws.gov/home/feature/2007/qandasgraywolfbiology.pdf. USFWS. (2012). Whooping crane (Grus americana). Accessed online March 4, 2013. Retrieved from http://ecos.fws.gov/speciesProfile/profile/speciesProfile.action?spcode=B003. USFWS. (2013a). BlackFooted Ferret Draft Recovery Plan, Second Revision. Accessed online November 3, 2015. Retrieved from www.fws.gov/mountainprairie/species/mammals/ blackfootedferret/2013DraftRevisedRecoveryPlan.pdf. USFWS. (2013b). Blackfooted Ferret Fact Sheet. Accessed online March 4, 2013. Retrieved from http://www.fws.gov/northdakotafieldoffice/endspecies/species/blackfooted_ferret.htm. USFWS. (2013c). Federal Register, 50 CFR Part 17, Endangered and Threatened Wildlife and Plants; 12 Month Finding on a Petition To List the Eastern Small Footed Bat and the Northern Long Eared Bat as Endangered or Threatened Species; Listing the Northern LongEared Bat as an Endangered Species; Proposed Rule. Accessed online January 24, 2014. Retrieved from http://www.gpo.gov/fdsys/pkg/FR20131002/pdf/201323753.pdf. USFWS. (2013d). Gray Wolf (Canis lupus). Accessed online March 4, 2013. Retrieved from http://www.fws.gov/northdakotafieldoffice/endspecies/species/gray_wolf.htm USFWS. (2015b). Whooping Crane Survey Results: Winter 20142015. Accessed online October 19, 2015. Retrieved from http://www.fws.gov/refuge/Aransas/wwd/science/updates.html. USFWS. (2016). Federal Register, 50 CFR Part 17, Endangered and Threatened Wildlife and Plants; 12 Month Finding on a Petition To List the Eastern Small Footed Bat and the Northern Long 4(d) Rule for the Northern Long Eared Bat; Final Rule. Accessed online February 1, 2016. Retrieved from http://www.gpo.gov/fdsys/pkg/FR20160114/pdf/201600617.pdf. USFWS. (2016a). Wetland Classification Codes: Wetland Code Interpreter. Last updated 22 January 2016. Retrieved on 16 March 2016, from http://www.fws.gov/wetlands/Data/Wetland Codes.html USGS. (2016). National Water Information System: Web Interface. USGS 06336000 Little Missouri River at Medora, North Dakota. Last modified on 22 March 2016. Retrieved on 22 March 2016, from http://waterdata.usgs.gov/nd/nwis/inventory/?site _ no=06336000&agency _ cd=USGS

Wetland Location Number

Wetland Type

Wetland USACE Feature Jurisdictional

Alt A Perm. Impact (acres)

4b 4c 4d 12 13a 13b 13c 13d 14a 14b 14c 14d 14e 15a 15c 15d 15e 15f 16c 19c 19f 19g 19h 25 105a 105c 107a 107c

Terrace Terrace Terrace Depression Stream Channel Stream Channel Stream Channel Stream Channel Drainage Drainage Drainage Drainage Drainage Stream Channel Stream Channel Stream Channel Stream Channel Stream Channel Drainage Drainage Drainage Drainage Drainage Terrace Riverine Riverine Riverine Riverine

Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural Natural

Total

Sec. 8, T144N, R102W Sec. 8, T144N, R102W Sec. 8, T144N, R102W Sec. 11 & 14, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 9, T142N, R102W Sec. 9 & 10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 5, T143N, R102W Sec. 31, T143N, R102W Sec. 31, T143N, R102W Sec. 31, T143N, R102W Sec. 31, T143N, R102W Sec. 35, T143N, R102W Sec 27, T143N, R102W Sec 22 & 27, T143N, R102W Sec 22, T143N, R102W Sec 22, T143N, R102W

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

0.11 -

Alt K, Opt 1 Perm. Impact (refined) (acres) 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.03 0.17 0.15 0.00 0.00

Alt K, Opt 2 Perm. Impact (acres) 0.01 0.01 0.01 0.01 0.03 0.19 -

Alt K, Opt 3 Perm. Impact (acres) 0.14 0.01 0.01 0.01 0.05 0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.03 -

0.11

0.39

0.26

0.49

Alt A Temp. Impact (acres)

-

Alt K, Opt 1 Temp. Impact (refined) (acres) 0.02 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.05 0.42 0.36 0.03 0.05

Alt K, Opt 2 Temp. Impact (acres) 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.05 -

Alt K, Opt 3 Temp. Impact (acres) 0.04 0.01 0.01 0.01 0.01 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.05 -

0.07

1.00

0.14

0.22

0.01 0.01 0.05 -

Wetland Reason for Discharge Number

Existing Structure

Alt A Proposed Structure Alt K, Opt 1 Proposed Alt K, Opt 2 Proposed Structure Structure

Alt K, Opt 3 Proposed Structure

Wetland Number (for sorting)

Wetland Applicable Letter Alternative(s) (for sorting)

4b 4c 4d 12 13a 13b 13c 13d 14a 14b 14c 14d 14e 15a 15c 15d 15e 15f 16c 19c 19f 19g 19h 25 105a 105c 107a 107c

None None None None Pipe culvert Same as wetland 13a Same as wetland 13a Same as wetland 13a None Pipe culvert Same as wetland 14b Same as wetland 14b Same as wetland 14b 50' 1-span bridge Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Pipe culvert None Pipe culvert Same as wetland 19f Same as wetland 19f None None None None None

850' 5- to 7-span bridge 850' 5- to 7-span bridge 850' 5- to 7-span bridge -

600' 3- to 5-span bridge Bridge or box culvert Same as wetland 13a Same as wetland 13a Same as wetland 13a None Pipe culvert Same as wetland 14b Same as wetland 14b Same as wetland 14b Bridge or box culvert Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Pipe culvert None Pipe culvert Same as wetland 19f Same as wetland 19f -

4 4 4 12 13 13 13 13 14 14 14 14 14 15 15 15 15 15 16 19 19 19 19 25 105 105 107 107

b c d

Roadway and bridge construction Roadway and bridge construction Roadway and bridge construction Bridge construction Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway construction Roadway construction and improvement, structure replacement Roadway construction and improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway and bridge construction Roadway and bridge construction Roadway and bridge construction Roadway improvement Roadway improvement

Bridge or box culvert Bridge or box culvert Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Same as wetland 15a Pipe culvert Pipe culvert None None Pipe culvert Pipe culvert Same as wetland 19f Same as wetland 19f Same as wetland 19f Same as wetland 19f 800' 5- to 7-span bridge 600' 3- to 5-span bridge600' 3- to 5-span bridgeNone None -

a b c d a b c d e a c d e f c c f g h a c a c

A A A K3 K3 K3 K3 K3 K3 K3 K3 K3 K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K2 K1 K1 K1 K1

Alt K, Opt 2 Temp. Impact (linear feet)

150 38 7

37 76 22 27 12 5 64 528 29 134 362 113

Alt K, Opt 3 Temp. Impact (linear feet) 240

37 76 22 27 12 5 64 528 29 134 362 113

45

124 42

1803

3083

1604

1860

Alt K, Opt 3 Perm. Impact (linear feet) 36

92

74 32

25 99

90

123 221 258 29

1308 436 106 6

Alt A Temp. Impact (acres)

Alt K, Opt 1 Temp. Impact (refined) (acres)

Alt K, Opt 2 Temp. Impact (acres)

Alt K, Opt 3 Temp. Impact (acres)

Alt A Temp. Impact (linear feet)

36

719 1046 69

Alt K, Opt 2 Perm. Impact (linear feet)

36

92

74 32

25 99

90

123 221

1.01

0.01 0.14 0.01 0.01

0.01 0.01 0.00 0.01 0.02 0.01 0.01 0.01 0.01 0.01 0.05 0.01 0.01 0.03 0.01

1.71 0.05

0.53 0.01 0.01

0.01 0.02 0.01 0.01 0.01 0.01 0.01 0.05 0.01 0.01 0.03 0.01

1.80

0.01 0.02 0.01 0.01 0.01 0.01 0.01 0.05 0.01 0.01 0.03 0.01

0.01

0.01 0.01

1870

792

792

2935

1.18

1.97

0.74

2.02

Location

Local Waterway Name

Alt A Perm. Impact (acres)

Alt K, Opt 1 Perm. Impact (refined) (acres)

Alt K, Opt 2 Perm. Impact (acres)

Alt K, Opt 3 Perm. Impact (acres)

Alt A Perm. Impact (linear feet)

OW 1a OW 1f OW 1g OW 3a OW 3b OW 4a OW 4b OW 5e OW 6a OW 6b OW 6g OW 6h OW 7a OW 7b OW 8a OW 8b OW 8c OW 9a OW 9b OW 9c OW 10a OW 11 OW 13a OW 13b OW 15a OW 15b OW 16b OW 16c OW 105b OW 107b

Sec.11 &14, T142N, R102W Sec. 8, T144N, R102W Sec. 35, T143N, R102W Sec.3, T142N, R102W & Sec. 34, T143N, R102W Sec. 34, T143N, R102W Sec.4, T142N, R102W Sec.4, T142N, R102W Sec.4, T142N, R102W Sec. 31 & 32, T143N, R102W & Sec. 5, T142N, R102W Sec. 5, T142N, R102W Sec. 4 & 5, T142N, R102W Sec. 4, T142N, R102W Sec. 31, T143N, R102W Sec. 31, T143N, R102W Sec. 36, T143N, R103W Sec. 36, T143N, R103W Sec. 36, T143N, R103 W & Sec. 31, T143N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 4, T142N, R102W Sec. 17, T144N, R102W Sec. 9, 10 & 11, T144N, R102W Sec. 7, T144N, R101W Sec. 6 & 7, T144N, R101W Sec. 9 &10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec. 10, T142N, R102W Sec 22 & 27, T143N, R102W Sec 22, T143N, R102W

Little Missouri River Little Missouri River Little Missouri River

Roosevelt Creek

Buckhorn Creek

Crooked Creek Crooked Creek Little Missouri River Mike's Creek

0.02

0.04 0.01 0.01

0.00 0.00 0.01 0.00 0.02 0.01 0.00 0.01 0.01 0.00 0.01 0.00 0.00 0.01 0.02

0.03 0.00

0.02

0.01

0.02 0.01

0.01 0.01

0.01

0.01 0.02

0.03

0.01

0.02 0.01

0.01 0.01

0.01

0.01 0.02 0.02 0.01

0.21 0.03 0.01 0.01

0.08

0.13

0.12

0.42

Total

156

63 1513 48 23

Alt K, Opt 1 Temp. Impact (refined) (linear feet)

38 18 0 37 76 22 27 12 5 64 528 29 134 362 113

501 1117

Alt K, Opt 1 Perm. Impact (refined) (linear feet)

0 0 92 0 74 32 0 25 99 0 90 0 0 123 221

36 0

OW Number

OW Number

Reason for Discharge

Existing Structure

Alt A Proposed Structure Alt K, Opt 1 Proposed Structure

Alt K, Opt 2 Proposed Structure

Alt K, Opt 3 Proposed Structure

OW Number (for sorting)

OW Applicable Letter Alternative(s) (for sorting)

OW 1a OW 1f OW 1g OW 3a OW 3b OW 4a OW 4b OW 5e OW 6a OW 6b OW 6g OW 6h OW 7a OW 7b OW 8a OW 8b OW 8c OW 9a OW 9b OW 9c OW 10a OW 11 OW 13a OW 13b OW 15a OW 15b OW 16b OW 16c OW 105b OW 107b

Bridge construction Bridge construction Bridge construction Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement Roadway improvement Roadway improvement Roadway improvement Roadway improvement Roadway improvement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement Roadway improvement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway construction improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Roadway improvement, structure replacement Bridge construction Roadway improvement

None None None Pipe culvert Same as OW 3a Pipe culvert Same as OW 4a 50' 1span bridge Pipe culvert Same as OW 6a Pipe culvert Same as OW 6g None Pipe culvert None None None None Pipe culvert Same as OW 9b None None Pipe culvert Same as OW 13a Pipe culvert Same as OW 15a Pipe culvert Same as OW 16b None None

850' 5 to 7span bridge

None None Pipe culvert Same as OW 13a

800' 5 to 7span bridge Pipe culvert Same as OW 3a Pipe culvert Same as OW 4a Bridge or box culvert Pipe culvert Same as OW 6a Pipe culvert Same as OW 6g None Pipe culvert None None None None

600' 3 to 5span bridge

Pipe culvert Same as OW 4a Bridge or box culvert Pipe culvert Same as OW 6a Pipe culvert Same as OW 6g None Pipe culvert None None None None Pipe culvert Same as OW 9b

Pipe culvert Same as OW 15a Bridge or box culvert Same as OW 16b

1 1 1 3 3 4 4 5 6 6 6 6 7 7 8 8 8 9 9 9 10 11 13 13 15 15 16 16 105 107

a f g a b a b e a b g h a b a b c a b c

Pipe culvert Same as OW 3a Pipe culvert Same as OW 4a Bridge or box culvert Pipe culvert Same as OW 6a Pipe culvert Same as OW 6g None Pipe culvert None None None None

600' 3 to 5span bridge None

a b a b b c b b

K3 A K2 K1, K2 K1, K2 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K1, K2, K3 K3 K3 A A A A K3 K3 K3 K3 K1 K1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas