PUBLIC NOTICE: Benton County (County) proposes to reconstruct approximately 5 miles of County Road (CR) 78 in Benton County and CR 286 in Morrison County from County State Aid Highway 2 (Benton) to CR 236 (Morrison). The proposed project would widen the roadway from 28 feet to 40 feet, which satisfies the State Aid Standard.
PROJECT DESCRIPTION AND PURPOSE: Benton County (County) proposes to reconstruct approximately 5 miles of County Road (CR) 78 in Benton County and CR 286 in Morrison County from County State Aid Highway 2 (Benton) to CR 236 (Morrison). The proposed project would widen the roadway from 28 feet to 40 feet, which satisfies the State Aid Standard.
Public Notice
APPLICANT:
Benton County Public
Works
REFER TO:
MVP-2018-00139-BBY
ISSUED: 11 February 2019
EXPIRES: 13 March 2019
SECTION: 404 - Clean Water Act
1. APPLICATION FOR PERMIT TO authorize the discharge of fill material into tributaries,
wetlands, wetlands confined to linear ditches and linear ditches along an approximately 5-mile
long segment of roadway.
2. SPECIFIC INFORMATION
APPLICANT:
Mr. Mark Loidolt
Benton County Public Works
7752 Highway 25 NE, PO Box 247
Foley, Minnesota 56329
PROJECT LOCATION: The project site in Sections 1, 12, 13, 24, and 25, Township 38 North,
Range 31 West, and Sections 6, 7, 18, 19, and 30, Township 38 North, Range 30 West, Benton
County, and Section 31, Township 39 North, Range 30 West, and Section 36, Township 39
North, Range 31 West, Morrison County, Minnesota. The approximate coordinates are UTM
Zone 15N, N 411898.828019, E 5070527.344281; Latitude 45.782685, Longitude -94.133356.
DESCRIPTION OF PROJECT: Benton County (County) proposes to reconstruct approximately
5 miles of County Road (CR) 78 in Benton County and CR 286 in Morrison County from County
State Aid Highway 2 (Benton) to CR 236 (Morrison). The proposed project would widen the
roadway from 28 feet to 40 feet, which satisfies the State Aid Standard. The proposed project
will also flatten in-slopes to 1:4 within the clear zone and increased to 1:3 where feasible. Clear
zones will be constructed with a minimum of 25 feet. Additionally, the proposed project will
modify or replace existing road crossings at Zuleger Creek, Bunker Hill Creek, and three
unnamed tributaries. The project plans are shown in the enclosed figures MVP-2018-00139BBY Page 1 of 14 through Page 14 of 14.
The purpose of the proposed project is to improve the safety and stability of the existing
roadway. When completed, the reconstructed roadway will comply with State Aid design
standards for roadway width, in-slopes, and clear zone design.
QUANTITY, TYPE, AND AREA OF FILL: The proposed project would result in the discharge of
fill material into 7.83 acre (ac) of wetlands and 229 linear feet (2,643 square feet) of tributaries.
Wetland impacts will include 5.84 ac of permanent fill and 1.99 ac of temporary fill.
VEGETATION IN AFFECTED AREA: The wetlands within the project area consist of seasonally
flooded basin (Type 1) wetlands, fresh (wet) meadow (Type 2) wetlands, shallow marsh (Type
3) wetlands, scrub swamp (Type 6) wetlands, and hardwood swamp (Type 7) wetlands.
SOURCE OF FILL MATERIAL: Benton County and its contractors would be required to use
suitable fill material free of pollutants.
Regulatory Branch (File No. Enter file number)
SURROUNDING LAND USE: Surrounding land uses primarily agricultural/open space and
residential uses.
DESCRIPTION OF DREDGING OR EXCAVATION: The proposed impacts do not include any
dredging or excavation activities.
THE FOLLOWING POTENTIALLY TOXIC MATERIALS COULD BE USED AT THE PROJECT
SITE: The applicant does not propose to use any potentially toxic materials. All fill material
used on-site would be free of contaminates.
THE FOLLOWING PRECAUTIONS TO PROTECT WATER QUALITY HAVE BEEN
DESCRIBED BY THE APPLICANT: Benton County has not provided a detailed description of
precautions to protect water quality during the construction of the proposed project. However,
Benton County intends to implement best management practices in accordance with federal,
state, and local water quality and effluent standards.
MITIGATION: Appropriate compensatory mitigation would be required to offset the unavoidable
impacts to waters of the U.S. Benton County proposes to satisfy those requirements by debiting
Corps-approved wetland credits from a mitigation bank, serving Bank Service Area 7.
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR
THEIR CRITICAL HABITAT
None were identified by the applicant or are known to exist in the permit area. However, Benton
and Morrison Counties are within the known or historic range of the following Federally-listed
species:
Northern Long-Eared Bat
Hibernates in caves and mines swarming in
surrounding wooded areas in autumn. Roosts and
forages in upland forests during spring and summer.
This application is being coordinated with the U.S. Fish and Wildlife Service. Any comments it
may have concerning Federally-listed threatened or endangered wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
4. JURISDICTION
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 08-02.
5. STATE SECTION 401 WATER QUALITY CERTIFICATION
Valid Section 404 permits cannot be issued for any activity unless state water quality
certification for the activity is granted or waived pursuant to Section 401 of the Clean Water Act.
The state Section 401 authority in Minnesota is the Minnesota Pollution Control Agency
(MPCA). The St. Paul District has provided this public notice and a copy of the applicant's
Section 404 permit application form to the MPCA. If MPCA needs any additional information in
order for the Section 401 application to be considered complete by MPCA, the MPCA has
indicated that it will request such information from the applicant.
Page 2 of 4
Regulatory Branch (File No. Enter file number)
It is the permit applicant's responsibility to ensure that the MPCA has received a valid, complete
application for state Section 401 certification and to obtain a final Section 401 action from the
MPCA.
The MPCA has indicated that this public notice serves as its public notice of the application for
Section 401 water quality certification under Minnesota Rules Part 7001 Section 401 of the
Clean Water Act (33 U.S. Code 1341(a)(1)). The MPCA has indicated that if, at a later date, it
makes a preliminary anti-degradation determination regarding Section 401 Water Quality
Certification, it will at that time plan to issue an additional public notice under Minnesota Rules
Part 7001.
Any comments relative to MPCA's Section 401 Certification for the activity proposed in this
public notice may be sent to:
Minnesota Pollution Control Agency
Resource Management and Assistance Division
Attention: 401 Certification
520 Lafayette Road North
St. Paul, Minnesota 55155-4194
6. HISTORICAL/ARCHAEOLOGICAL
This public notice is being sent to the National Park Service and the State Archaeologist for their
comments. The Corps will review information on known cultural resources and/or historic
properties within and adjacent to the project area. The Corps will also consider the potential
effects of the project on any properties that have yet to be identified. The results of this review
and the Corps' determination of effect will be coordinated with the State Historic Preservation
Officer independent of this public notice. Any adverse effects on historic properties will be
resolved prior to the Corps authorization, or approval, of the work in connection with this project.
7.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, in
detail, the reasons for holding a public hearing. A request may be denied if substantive reasons
for holding a hearing are not provided or if there is otherwise no valid interest to be served.
8. PUBLIC INTEREST REVIEW
The decision whether to issue a permit will be based on an evaluation of the probable impact,
including cumulative impacts, of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced
against its reasonably foreseeable detriments. All factors which may be relevant to the proposal
will be considered, including the cumulative effects. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber
production and, in general, the needs and welfare of the people. Environmental and other
documents will be available for review in the St. Paul District Office.
Page 3 of 4
Regulatory Branch (File No. Enter file number)
The Corps of Engineers is soliciting comments from the public; Federal, State, and local
agencies and officials; Indian tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by
the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
9.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within
30 days of the date of this notice. These statements should bear upon the suitability of the
location and the adequacy of the project and should, if appropriate, suggest any changes
believed to be desirable. Comments received may be forwarded to the applicant.
Replies may be addressed to:
Regulatory Branch
St. Paul District Corps of Engineers
180 Fifth Street East, Suite 700
St. Paul, MN 55101-1678
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Brian Yagle at the Saint Paul
office of the Corps, telephone number (651) 290-5975.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your
information in the New Registration Box.
Kristen Hafer
Chief, Southwest Section
Enclosures:
NOTICE TO EDITORS: This public notice is provided as background information and is not a
request or contract for publication.
Page 4 of 4
MVP-2018-00139-BBY Page 1 of 14
MVP-2018-00139-BBY Page 2 of 14
1.73
4.32
229
3,299
MVP-2018-00139-BBY Page 3 of 14
///
///
CO RD 40 (165TH ST NE)
CO RD 40 (160TH ST NE)
BENTON COUNTY
///
///
///
///
///
///
///
CO RD 77 (155TH ST NE)
MORRISON COUNTY
///
///
WETLAND: W29
TYPE:3
DELINEATION AREA: 0.25 ACRE
TEMPORARY IMPACTS: 0.06 ACRE
PERMANENT IMPACTS: 0.18 ACRE
///
///
///
CR 286
///
///
///
///
///
///
WETLAND: W26
TYPE:1/3
DELINEATION AREA: 0.82 ACRE
TEMPORARY IMPACTS: 0.11 ACRE
PERMANENT IMPACTS: 0.68 ACRE
///
///
///
///
///
///
///
///
WETLAND: W24
TYPE:1/3
DELINEATION AREA: 0.37 ACRE
TEMPORARY IMPACTS: 0.10 ACRE
PERMANENT IMPACTS: 0.25 ACRE
CR 78
/
///
//
///
NE
///
RD
///
EN
///
///
///
///
WETLAND: W21
TYPE:3/2
DELINEATION AREA: 0.18 ACRE
TEMPORARY IMPACTS: 0.04 ACRE
PERMANENT IMPACTS: 0.11 ACRE
ZULEGER CREEK IMPACTS:
5 LF; 23 SQ. FT.
END C.P. 005-078-005
BEGIN C.P. 049-286-001
STA. 568+15.04
ASP
///
WETLAND: W19
TYPE: 3
DELINEATION AREA: 0.18 ACRE
TEMPORARY IMPACTS: 0.05 ACRE
PERMANENT IMPACTS: 0.04 ACRE
UNNAMED TRIBUTARY 3 IMPACTS:
28 LF, 262 SQ. FT.
WETLAND: W25
TYPE:1
DELINEATION AREA: 0.66 ACRE
TEMPORARY IMPACTS: 0.15 ACRE PERMANENT
IMPACTS: 0.44 ACRE
///
WETLAND: W22
TYPE:3
DELINEATION AREA: 0.17 ACRE
TEMPORARY IMPACTS: 0.05 ACRE
PERMANENT IMPACTS: 0.05 ACRE
ZULEGER CREEK IMPACTS:
6 LF; 30 SQ. FT.
WETLAND: W28
TYPE:3/7
DELINEATION AREA: 0.49 ACRE
TEMPORARY IMPACTS: 0.10 ACRE
PERMANENT IMPACTS: 0.35 ACRE
BUNKER HILL CREEK IMPACTS:
28 LF; 854 SQ. FT.
WETLAND: W27
TYPE:3/6
DELINEATION AREA: 0.11 ACRE
TEMPORARY IMPACTS: 0.03 ACRE
PERMANENT IMPACTS: 0.07 ACRE
///
///
WETLAND: W23
TYPE:1/3
DELINEATION AREA: 0.41 ACRE
TEMPORARY IMPACTS: 0.11 ACRE
PERMANENT IMPACTS: 0.24 ACRE
///
WETLAND: W20
TYPE: 3
DELINEATION AREA: 0.03 ACRE
TEMPORARY IMPACTS: 165 SQ. FT.
PERMANENT IMPACTS: 0.01 ACRE
UNNAMED TRIBUTARY 3 IMPACTS:
25 LF, 185 SQ. FT.
///
WETLAND: W30
TYPE:3
DELINEATION AREA: 0.09 ACRE
TEMPORARY IMPACTS: 0.02 ACRE
PERMANENT IMPACTS: 0.05 ACRE
BUNKER HILL CREEK IMPACTS:
32LF; 429 SQ. FT.
MVP-2018-00139-BBY Page 4 of 14
303+00
304+00
305+00
306+00
307+00
308+00
309+00
310+00
311+00
312+00
313+00
314+00
315+00
316+00
317+00
318+00
319+00
320+00
321+00
322+00
323+00
324+00
325+00
326+00
327+00
328+00
329+00
330+00
315+00
316+00
PI: 328+44.16
BP: 301+61.00
302+00
301+61
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 5 of 14
330+00
331+00
332+00
333+00
334+00
335+00
336+00
337+00
338+00
339+00
340+00
341+00
342+00
343+00
344+00
343+00
344+00
345+00
346+00
347+00
348+00
349+00
350+00
351+00
352+00
353+00
354+00
355+00
356+00
357+00
358+00
PI: 355+25.76
329+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 6 of 14
358+00
359+00
360+00
361+00
362+00
363+00
364+00
365+00
366+00
367+00
368+00
369+00
370+00
371+00
372+00
371+00
372+00
373+00
374+00
375+00
376+00
377+00
378+00
379+00
380+00
381+00
382+00
383+00
384+00
385+00
386+00
PC: 376+98.67
PT: 386+48.67
357+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 7 of 14
386+00
399+00
400+00
387+00
388+00
389+00
390+00
391+00
392+00
393+00
394+00
395+00
396+00
397+00
398+00
399+00
400+00
401+00
402+00
403+00
404+00
405+00
406+00
407+00
408+00
409+00
410+00
411+00
412+00
413+00
414+00
PI: 408+34.37
PT: 386+48.67
385+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 8 of 14
414+00
415+00
416+00
417+00
418+00
419+00
420+00
421+00
422+00
423+00
424+00
425+00
426+00
427+00
428+00
427+00
428+00
429+00
430+00
431+00
432+00
433+00
434+00
435+00
436+00
437+00
438+00
439+00
440+00
441+00
442+00
PC: 431+19.70
PT: 440+19.70
413+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 9 of 14
442+00
443+00
444+00
445+00
446+00
447+00
448+00
449+00
450+00
451+00
452+00
453+00
454+00
455+00
456+00
455+00
456+00
457+00
458+00
459+00
460+00
461+00
462+00
463+00
464+00
465+00
466+00
467+00
468+00
469+00
470+00
PI: 462+41.81
441+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 10 of 14
470+00
471+00
472+00
473+00
474+00
475+00
476+00
477+00
478+00
479+00
480+00
481+00
482+00
483+00
484+00
483+00
484+00
485+00
486+00
487+00
488+00
489+00
490+00
491+00
492+00
493+00
494+00
495+00
496+00
497+00
498+00
PI: 489+36.17
469+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 11 of 14
498+00
499+00
500+00
501+00
502+00
503+00
504+00
505+00
506+00
507+00
508+00
509+00
510+00
511+00
512+00
511+00
512+00
513+00
514+00
515+00
516+00
517+00
518+00
519+00
520+00
521+00
522+00
523+00
524+00
525+00
526+00
PI: 516+27.93
497+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MVP-2018-00139-BBY Page 12 of 14
525+00
526+00
527+00
528+00
529+00
530+00
531+00
532+00
533+00
534+00
535+00
536+00
537+00
538+00
539+00
540+00
WETLAND: W27
TYPE:3/6
DELINEATION AREA: 0.11 ACRE
TEMPORARY IMPACTS: 0.03 ACRE
PERMANENT IMPACTS: 0.07 ACRE
/
///
///
///
///
///
544+00
545+00
546+00
547+00
548+00
549+00
550+00
551+00
552+00
553+00
/
WETLAND: W28
TYPE: 3/7
DELINEATION AREA: 0.49 ACRE
TEMPORARY IMPACTS: 0.10 ACRE
PERMANENT IMPACTS: 0.35 ACRE
BUNKER CREEK IMPACTS: 28 LF; 854 SQ. FT.
//
/
//
///
WETLAND: W27
TYPE:3/6
DELINEATION AREA: 0.11 ACRE
TEMPORARY IMPACTS: 0.03 ACRE
PERMANENT IMPACTS: 0.07 ACRE
543+00
//
542+00
PI: 542+47.71
541+00
540+00
///
//
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
///
///
//
///
//
/
/
///
//
//
/
/
//
/
//
/
WETLAND: W29
TYPE: 3
DELINEATION AREA: 0.25 ACRE
TEMPORARY IMPACTS: 0.06 ACRE
PERMANENT IMPACTS: 0.18 ACRE
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
///
539+00
WETLAND: W30
TYPE: 3
DELINEATION AREA: 0.09 ACRE
TEMPORARY IMPACTS: 0.02 ACRE
PERMANENT IMPACTS: 0.05 ACRE
BUNKER HILL CREEK IMPACTS: 32 LF; 429 SQ. FT.
DELINEATED WETLANDS
CONSTRUCTION LIMITS
554+00
MVP-2018-00139-BBY Page 13 of 14
555+00
556+00
557+00
558+00
559+00
560+00
561+00
562+00
563+00
564+00
565+00
566+00
567+00
568+00
PERMANENT IMPACTS
TEMPORARY IMPACTS
OPEN WATER IMPACTS
DELINEATED WETLANDS
CONSTRUCTION LIMITS
MORRISON
COUNTY
BENTON
COUNTY
554+00
PC: 563+65.10
553+00
MVP-2018-00139-BBY Page 14 of 14
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
PT: 572+65.10
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
582+00
WETLAND #6
TYPE: 2
DELINEATION AREA: 0.20 ACRE
TEMPORARY IMPACTS: 0.02 ACRE
PERMANENT IMPACTS: 0.18 ACRE
///
///
///
///
///
///
///
581+00
///
///
///
///
///
///
580+00
///
///
///
579+00
///
///
///
///
///
///
578+00
///
///
///
577+00
///
///
///
///
///
576+00
///
///
///
575+00
WETLAND #8
TYPE:2
DELINEATION AREA: 0.09 ACRE
PERMANENT IMPACTS: 0.09 ACRE
///
///
574+00
///
///
///
///
///
///
573+00
///
///
572+00
571+00
570+00
569+00
568+00
567+00
///
///
///
//
/
/
//
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
//
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
OPEN WATER IMPACTS
///
///
///
///
///
///
/
///
///
///
///
WETLAND #2
TYPE:3
DELINEATION AREA: 0.33 ACRE
TEMPORARY IMPACTS: 0.08 ACRE
PERMANENT IMPACTS: 0.13 ACRE
WETLAND #4
TYPE:3
DELINEATION AREA: 0.46 ACRE
TEMPORARY IMPACTS: 0.05 ACRE
PERMANENT IMPACTS: 0.41 ACRE
TEMPORARY IMPACTS
///
///
BENTON
COUNTY
/
///
///
///
///
///
///
PERMANENT IMPACTS
///
/
///
//
///
///
///
///
///
///
///
///
//
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
///
///
//
///
///
/
/
//
//
/
/
PC: 584+46.13
//
//
/
///
/
///
//
///
/
///
///
//
///
///
/
///
///
//
///
///
///
///
///
///
///
///
///
///
///
///
/
///
///
WETLAND #1
TYPE:3
DELINEATION AREA: 0.34 ACRE
TEMPORARY IMPACTS: 0.07 ACRE
PERMANENT IMPACTS: 0.18 ACRE
DELINEATED WETLANDS
596+00
595+00
594+00
593+00
592+00
591+00
590+00
WETLAND #3
TYPE:2
DELINEATION AREA: 0.05 ACRE
PERMANENT IMPACTS: 0.05 ACRE
//
///
///
/
///
///
589+00
//
///
///
588+00
///
///
///
587+00
//
/
WETLAND #5
TYPE:3
DELINEATION AREA: 0.42 ACRE
TEMPORARY IMPACTS: 0.03 ACRE
PERMANENT IMPACTS: 0.25 ACRE
///
586+00
///
585+00
PT: 593+96.13
584+00
//
583+00
/
582+00
//
581+00
WETLAND #7
TYPE:2
DELINEATION AREA: 0.11 ACRE
TEMPORARY IMPACTS: 0.01 ACRE
PERMANENT IMPACTS: 0.10 ACRE
WETLAND #9
TYPE:2
DELINEATION AREA: 0.05 ACRE
PERMANENT IMPACTS: 0.05 ACRE
///
MORRISON
COUNTY
///
CONSTRUCTION LIMITS
///