LETTER OF PERMISSION: The applicant, the City of La Crosse c/o Jay Odegaard, is applying for a Department of the Army permit to add a total of 32 slips at the existing Veterans Point Marina in the Black River for the purpose of providing public and transient parking for small watercraft and public fishing.
PROJECT DESCRIPTION AND PURPOSE: The applicant, the City of La Crosse c/o Jay Odegaard, is applying for a Department of the Army permit to add a total of 32 slips at the existing Veterans Point Marina in the Black River for the purpose of providing public and transient parking for small watercraft and public fishing.
Information for File # 2013-03954-KJH
Applicant:
City of La Crosse c/o Jay Odegaard
Corps Contact
Address
E-Mail
Phone
Kerrie J. Hauser
1114 South Oak Street
La Crescent, Minnesota 55941
Kerrie.j.hauser@usace.army.mil
(651) 290-5903
Primary County
La Crosse County
Section
Township
Range
30
16N
7W
Information Complete On: January 25, 2019
Posting Expires On: March 13, 2019
Authorization Type: Section 10 Letter of Permission
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbor Act of 1899. We have made a
preliminary determination that the aquatic resources that would be impacted by the proposed
project are regulated by the Corps of Engineers under Section 10 of the Rivers and Harbor Act
of 1899. Our jurisdictional review and final jurisdictional determination could result in
modifications to the scope of the project's regulated waterbody impacts and compensatory
mitigation requirements identified above.
Project
PROJECT DESCRIPTION AND PURPOSE: The applicant is applying for a
Department of the Army permit to add a total of 32 slips at the existing Veterans
Point Marina in the Black River for the purpose of providing public and transient
parking for small watercraft and public fishing.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT
TO LOSS: The proposed project involves the extension of the existing piers by
placing floating structures secured to four 8-inch piles. Each additional pier
section would consist of four 20-foot finger piers and would result in impacts to
approximately 10,672 square feet (0.24 acre) of the Black River.
ALTERNATIVES CONSIDERED: The no-build alternative would avoid impacts to
aquatic resources but was not selected by the applicant because it failed to
address the purpose of the project. Other properties were not available to the
applicant.
COMPENSATORY MITIGATION: No compensatory mitigation is proposed.
Drawings
See attached.
Legend
Surface Water Data Viewer Map
Dams
Dams with FERC License
Dams
Floodplain Storage
FERC Project Area
Boundaries
Cross Sections
Floodplains
Flood Fringe
Floodway
Flood Hazard Boundaries
Other Boundaries
Limit Lines
SFHA / Flood Zone Boundary
Flood Hazard Zones
1% Annual Chance Flood
Hazard
Regulatory Floodway
Special Floodway
Area of Undetermined Flood
Hazard
0.2% Annual Chance Flood
Hazard
Future Conditions 1% Annual
Chance Flood Hazard
Area with Reduced Risk Due to
Levee
PNW-ASNRI Sensitive
Areas of Lakes
PNW-ASNRI Wild and
Scenic Rivers
PNW-ASNRI Outstanding
and Exceptional Streams
PNW-ASNRI Trout Streams
PNW-ASNRI Wild Rice
Streams
PNW-ASNRI Outstanding
and Exceptional Lakes
PNW-ASNRI Special Area
Notes
0.1
NAD_1983_HARN_Wisconsin_TM
0
0.06
1: 3,960
0.1 Miles
DISCLAIMER: The information shown on these maps has been obtained from various
sources, and are of varying age, reliability and resolution. These maps are not intended to be
used for navigation, nor are these maps an authoritative source of information about legal land
ownership or public access. No warranty, expressed or implied, is made regarding accuracy,
applicability for a particular use, completeness, or legality of the information depicted on this
map. For more information, see the DNR Legal Notices web page: http://dnr.wi.gov/legal/
2013-03954-KJH Page 1 of 2
WEST COPELAND MARINA
Veterans Point Marina
345' +/-
330' +/-
=
EXISTING DOCKS
=
PROPOSED ADDITIONS
900' +/875' +/-
0
200'
400'
2013-03954-KJH Page 2 of 2