Ed Swanson- Fincantieri Marinette Marine

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: Fincantieri Marinette Marine Corporation has applied for a Department of the Army permit to dredge material from waters of the United States for the purpose of constructing a new side launch facility adjacent to the Menominee River.

PROJECT DESCRIPTION AND PURPOSE: Fincantieri Marinette Marine Corporation has applied for a Department of the Army permit to dredge material from waters of the United States for the purpose of constructing a new side launch facility adjacent to the Menominee River.

Information for File #MVP-2018-01311-RJH Applicant: Ed Swanson- Fincantieri Marinette Marine Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil; (651) 290-5859. Primary County: Marinette Location: Section 05, Township 30 N, Range 24 E Information Complete On: 02-01-2018 Posting Expires On: 03-01-2018 Authorization Type: Section 10 Letter of Permission This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section(s) 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act. PROJECT DESCRIPTION AND PURPOSE: Fincantieri Marinette Marine Corporation, has applied for a Department of the Army permit to dredge material from waters of the United States for the purpose of constructing a new side launch facility adjacent to the Menominee River. NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: Approximately 23,000 cubic yards of alluvium and 62,000 cubic yards of solid rock material would be excavated from a 32,000 square foot area of the Menominee River within the limits of the federal navigation channel as a result of the proposed project. ALTERNATIVES CONSIDERED: No alternatives have been proposed by the applicant. AVOIDANCE AND MINIMIZATION: The applicant proposes to implement erosion control best management practices to minimize potential impacts to waters of the US. COMPENSATORY MITIGATION: Compensatory mitigation has not been proposed by the applicant. DRAWINGS: See attached. Additional details regarding impacts to waters of the United States available upon request.

1

MVP-2018-01311-RJH Figure Page 1 of 2

! Site Location

³

NOTES: 1. Base map from esri.com, courtesy of the National Geographic Society and i-cubed.

This drawing is neither a legally recorded map nor a survey and is not intended to be used as one. This drawing is a compilation of records, information and data used for reference purposes only.

0

1,000

2,000

Feet

FINCANTIERI MARINETTE MARINE FIGURE 1

SITE LOCATION MAP 1600 ELY STREET MARINETTE, WI 54143 Date: DECEMBER 2018 Drawn By: BJW1

Path: Q:\Marinette Marine Corporation\18m106\GIS\mxd\Permit Application\Figure 1 - Site Location Map.mxd

Date: 12/31/2018

Revision Date:

Checked By: RJM7 Project: 18M106

B 10

A 10

MVP-2018-01311-RJH Figure Page 2 of 2

FINCANTIERI MARINETTE MARINE

FIGURE 9 PROPOSED LAUNCH FACILITIES/DREDGE AREAS 1600 ELY STREET MARINETTE, WI 54143 0'

60'

BAR SCALE X:\E-Div Bus Dev\Grants\Fincantieri Marinette Marine\CAD\20181228_FMM Dredge Options_Permit Figures.dwg 1/02/2019 7:44 AM kgk

120'

Date: NOVEMBER 2018 Drawn By: KGK/MGB

Revision Date: JANUARY 2019

Checked By:

Project: 18M106

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas