You can copy from here when filling out the rest of the page.
Proposal to replace the existing shoreline protection measures with a new shoreline protection system in Lake Michigan at 999 Lake Road in Lake Forest, Lake County, Illinois.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ArmyCorps of Engineers
Chicago District
Public Notice/Application Number: LRC-2016-00361
Comment Period BEGINS: February 13, 2019
Comment Period Expires: March 14, 2019
U.S. Army Corps of Engineers
Applicant
Ron Garriques
999 Lake Road
Lake Forest, Illinois 60045
Proposed Action
Proposal to replace the existing shoreline protection measures with a new shoreline protection system (See attached drawings). A detailed description of this proposal is provided on page 2 of this notice.
Location of Proposed Action
In Lake Michigan at 999 Lake Road in Lake Forest, Lake County, Illinois (42.258934, Longitude -87.823638).
Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by March 14, 2019 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)
Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2016-00361, Mr. Soren Hall
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Soren.G.Hall@usace.army.mil.
Project Description
The proposed work would include the following:
Install 704 feet of soldier pile and lagging walls to replace the existing 369 feet of failing concrete retaining wall on the bluff slope. This would include a 10-12 foot wide bench behind the new retaining walls to terrace the slope and provide access for future slope maintenance activities. Vegetation would be planted on all re-graded surfaces and drainage features would be constructed to enhance slope stability. All slope work is located above the ordinary high water mark (OHWM) of 581.5’ International Great Lakes Datum-1985, which is the jurisdictional boundary for the Corps.
The existing steel groin in the center of the property would be repaired where erosion has caused the west end of the groin to become exposed and wave uprush now bypasses the groin. This repair would be accomplished using armor stone. All of this work is above the OHWM.
A 110 foot long stone revetment would be constructed at the toe of slope north of the existing steel sheet pile groin and recessed to grade to provide protection from the residual waves that would pass by and over the new stone protective breakwater structures. Most of this work would be above the OHWM.
Construction of a 60 foot long stone breakwater extension on the north side of the existing steel groin at its lakeward end.
A 50 foot long island breakwater would be constructed north of the breakwater extension and east of the revetment construction.
The total fill below the OHWM for all structures is 0.10 acres, primarily for the construction of the breakwaters.
These purpose of the proposed coastal structures is to reduce wave energy from reaching the toe of the bluff to lessen the potential for bluff erosion. The structures are designed to be within the surf zone in maximum lake depths that are currently approximately 8 feet. As a result, it is anticipated that long-shore sediment transport on the lake side of these structures will not be impacted. The structures are proposed to extend offshore less than 125 feet from the toe of the bluff. In addition, sand pre-nourishment is included to minimize the potential of capturing sand from the littoral drift.
The project would enhance the existing beach between the existing steel groins by placing 246 cubic yards of beach nourishment sand. This sand would act in conjunction with the stone revetments at the base of the slope to buttress the slope and, in combination with other slope improvements, would create the required slope stability. The amount of beach nourishment would be 20 percent higher than the amount of estimated sand deposition created by the project.
The new stone revetment at north end of the site would be tucked back into the slope and sand nourishment would be provided in front of the revetment in this area. Therefore, beach access is anticipated to improve when compared to the existing condition. In addition, flat stone would be provided as part of the groin repair at the west end of the existing steel groin to provide access from the north to south side of the groin.
Avoidance & Minimization
The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: Erosion and sediment control measures will be followed. The beach area will be pre-nourished with sand. This fill will assure that the regional sediment transport process will not be altered.
Mitigation
The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: Mitigation is not proposed as impacts do not exceed 0.10 acres.
The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.
Regulatory Authority
This proposed action will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972.
Jurisdiction
This application will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972.
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.
Preliminary Evaluation of Selected Factors
Water Quality:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
Department of Natural Resources:
The applicant has applied to the Illinois Department of Natural, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lake and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Department of Natural Resources
Office of Water Resources
Michael A. Bilandic Building
160 N. LaSalle Street, Suite S-700
Chicago, IL 60601
If you have any questions please contact the IDNR at (312) 793-5947.
Endangered and Threatened Species:
The Corps of Engineers has determined that the proposed activity would not affect any federally-listed endangered or threatened species or critical habitat for any endangered or threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act does not appear to be warranted at this time.
Historic Properties/Cultural Resources:
Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places.
Environmental Impact Statement
A preliminary determination has been made that an environmental impact statement is not required for the proposed work.
Public Hearing
Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later than March 14, 2019. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Mr. Soren Hall of my staff by telephone at (312) 846-5532, or email at Soren.G.Hall@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ARMY
CORPS OF ENGINEERS
CHICAGO DISTRICT
PUBLIC NOTICE/APPLICATION NUMBER: LRC-2016-00361
COMMENT PERIOD BEGINS: February 13, 2019
COMMENT PERIOD EXPIRES: March 14, 2019
U.S. Army Corps of Engineers
APPLICANT
Ron Garriques
999 Lake Road
Lake Forest, Illinois 60045
PROPOSED ACTION
Proposal to replace the existing shoreline protection measures with a new shoreline protection
system (See attached drawings). A detailed description of this proposal is provided on page 2 of
this notice.
LOCATION OF PROPOSED ACTION
In Lake Michigan at 999 Lake Road in Lake Forest, Lake County, Illinois (42.258934, Longitude
-87.823638).
Interested parties are hereby notified that an application has been received for a Department of
the Army permit for the activity described herein and as shown on the attached drawings. You
are invited to provide your comments by March 14, 2019 on the proposed work, which will
become part of the record and will be considered in the decision. A permit will be issued or
denied under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404
Action of the Clean Water Act of 1972(33 U.S.C. 1344)
Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2016-00361, Mr. Soren Hall
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
-2It should be noted that ALL comments received by this office (via hard copy or electronic) will
only be accepted with the full name and address, and email address, if available of the individual
commenting, and must be received by the close of the public notice period. Electronic comments
may be sent to the project manager at Soren.G.Hall@usace.army.mil.
PROJECT DESCRIPTION
The proposed work would include the following:
· Install 704 feet of soldier pile and lagging walls to replace the existing 369 feet of failing
concrete retaining wall on the bluff slope. This would include a 10-12 foot wide bench
behind the new retaining walls to terrace the slope and provide access for future slope
maintenance activities. Vegetation would be planted on all re-graded surfaces and
drainage features would be constructed to enhance slope stability. All slope work is
located above the ordinary high water mark (OHWM) of 581.5' International Great Lakes
Datum-1985, which is the jurisdictional boundary for the Corps.
· The existing steel groin in the center of the property would be repaired where erosion has
caused the west end of the groin to become exposed and wave uprush now bypasses the
groin. This repair would be accomplished using armor stone. All of this work is above
the OHWM.
· A 110 foot long stone revetment would be constructed at the toe of slope north of the
existing steel sheet pile groin and recessed to grade to provide protection from the
residual waves that would pass by and over the new stone protective breakwater
structures. Most of this work would be above the OHWM.
· Construction of a 60 foot long stone breakwater extension on the north side of the
existing steel groin at its lakeward end.
· A 50 foot long island breakwater would be constructed north of the breakwater extension
and east of the revetment construction.
The total fill below the OHWM for all structures is 0.10 acres, primarily for the construction of
the breakwaters.
These purpose of the proposed coastal structures is to reduce wave energy from reaching the toe
of the bluff to lessen the potential for bluff erosion. The structures are designed to be within the
surf zone in maximum lake depths that are currently approximately 8 feet. As a result, it is
anticipated that long-shore sediment transport on the lake side of these structures will not be
impacted. The structures are proposed to extend offshore less than 125 feet from the toe of the
bluff. In addition, sand pre-nourishment is included to minimize the potential of capturing sand
from the littoral drift.
The project would enhance the existing beach between the existing steel groins by placing 246
cubic yards of beach nourishment sand. This sand would act in conjunction with the stone
revetments at the base of the slope to buttress the slope and, in combination with other slope
improvements, would create the required slope stability. The amount of beach nourishment
would be 20 percent higher than the amount of estimated sand deposition created by the project.
The new stone revetment at north end of the site would be tucked back into the slope and sand
nourishment would be provided in front of the revetment in this area. Therefore, beach access is
-3anticipated to improve when compared to the existing condition. In addition, flat stone would be
provided as part of the groin repair at the west end of the existing steel groin to provide access
from the north to south side of the groin.
AVOIDANCE & MINIMIZATION
The applicant has stated the following concerning avoidance and minimization of impacts to
Waters of the United States: Erosion and sediment control measures will be followed. The
beach area will be pre-nourished with sand. This fill will assure that the regional sediment
transport process will not be altered.
MITIGATION
The applicant has stated the following concerning compensatory mitigation for unavoidable
impacts to Waters of the United States: Mitigation is not proposed as impacts do not exceed 0.10
acres.
The Corps has not verified the adequacy of this mitigation proposal at this time and will make
the final determination on whether the proposed mitigation is appropriate and practicable in
accordance with 33 CFR Part 332.
REGULATORY AUTHORITY
This proposed action will be reviewed according to the provisions of Section 10 of the Rivers
and Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972.
JURISDICTION
This application will be reviewed according to the provisions of Section 10 of the Rivers and
Harbors Act of 1899 and Section 404 of the Clean Water Act of 1972 due to placement of..
(Explanation of jurisdiction).
EVALUATION FACTORS
The decision whether to issue a permit will be based on an evaluation of probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced against
its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values,
land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership and, in general, the needs and welfare of the people. In addition, if the
proposed activity involves the discharge of dredged or fill material into waters of the United
States, the evaluation of the impact on the public interest will include application of Section
404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
-4The Corps of Engineers is also soliciting comments from the public, Federal, state and local
agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential
impacts of the proposed activity. Once this office completes a review of the comments received,
it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public
interest factors listed above, as well as endangered species, historic properties, water quality, and
general environmental effects. Comments will be used in the preparation of an Environmental
Assessment and/or Environmental Impact Statement pursuant to the National Environmental
Policy Act. A determination concerning the need for a public hearing will also be based on the
comments received.
PRELIMINARY EVALUATION OF SELECTED FACTORS
WATER QUALITY:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water
quality certification, or waiver thereof, for the proposed activity in accordance with Section 401
of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will
not violate applicable water quality standards. The review by the IEPA is conducted in
accordance with the Illinois water quality standards under 35 Illinois Administrative Code
Subtitle C by providing an antidegradation assessment, which includes an evaluation of
alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be
found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA
is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a
separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified
above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or
telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the
following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
-5DEPARTMENT OF NATURAL RESOURCES:
The applicant has applied to the Illinois Department of Natural, Office of Water Resources
(IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lake and Streams Act (615
ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following
agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Department of Natural Resources
Office of Water Resources
Michael A. Bilandic Building
160 N. LaSalle Street, Suite S-700
Chicago, IL 60601
If you have any questions please contact the IDNR at (312) 793-5947.
ENDANGERED AND THREATENED SPECIES:
The Corps of Engineers has determined that the proposed activity would not affect any federallylisted endangered or threatened species or critical habitat for any endangered or threatened
species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.).
Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the
Endangered Species Act does not appear to be warranted at this time.
HISTORIC PROPERTIES/CULTURAL RESOURCES:
Preliminary review indicates that the proposed activity is not likely to adversely affect any
historic property which is listed, or eligible for listing, on the National Register of Historic
Places.
ENVIRONMENTAL IMPACT STATEMENT
A preliminary determination has been made that an environmental impact statement is not
required for the proposed work.
PUBLIC HEARING
Any person may request in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearing shall state with
particularity the reasons for holding a public hearing. A request for a hearing may be denied if
substantive reasons for holding a hearing are not provided or if there is otherwise no valid
interest to be served.
It should be noted that materials submitted as part of the permit application become part of the
public record and are thus available to the general public under the procedures of the Freedom of
Information Act (FOIA). Individuals may submit a written request to obtain materials under
FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers
Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later
than March 14, 2019. It is presumed that all parties receiving this notice will wish to respond to
-6this public notice; therefore, a lack of response will be interpreted as meaning that there is no
objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this
notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Mr. Soren Hall of my staff by telephone at (312) 8465532, or email at Soren.G.Hall@usace.army.mil. It should be noted that ALL comments
received by this office (via hard copy or electronic) will only be accepted with the full name
and address of the individual commenting. You can also visit our website at
http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.
ARCH D 24" x 36"
ne
N
fl b
olt
nrim
nrim
#4
Driveway
Brick
.
.
.
.
.
.
.
. . . . . . . . . .
.
.
6"
SCALE: 1" = 30'
30
60
BLUFF RESTORATION AND
SHORELINE IMPROVEMENT
PROJECT
6"
6"
#6
6"
CLIENT
6"
GARRIQUES RESIDENCE
6"
999 LAKE ROAD
LAKE FOREST, IL 60045
847 234 9900 TEL
6"
Concrete
Patio
CONSULTANT
6"
Bluestone
Bluestone
Fountain
12"
DIN
I
NG
H
PO
RC
Patio
Walk
Walk
Co
Stoncre
ne te &
Wa
ll
En
Ga glish
rde
n
AECOM TECHNICAL SERVICES, INC.
303 East Wacker Drive Suite 1400
Chicago, IL 60601
312 373 6500 tel
312 373 6800 fax
www.aecom.com
.
.
.
.
.
.
.
.
26"
MH
Bluestone
Approved: WJW
.
Wood Deck
...
...
Walk
CONSULTANTS
...
Bluestone Walk
Checked: WJW
.
Driveway
Designer: SAP
.
Bl
u
e
s
Sto tone
op
.
.
.
.
.
.
.
.
.
.
2 Story Brick & Stone Residence # 999
Bluestone
Project Management Initials:
Driveway
Brick
3.00 Chains (198.00 feet)
F
l
a
gst
Wa one
lk
6"
Wrought-Iron Fence
6"
Wrought-Iron Fence
4"
.
4"
6"
6"
.
.
.
.
.
.
.
.
.
.
. . . .
3.00 Chains (198.00 feet)
4"
6"
4"
. . .
.
Gravel
6"
Swimming Pool
NE
#7
BL-2
12"
...
OL
PO
BLUESTONE
SW
IM
MIN
G
.
.
.
.
.
.
.
6" 6 "
°
ES
TO
BL
U
BL-1
6"
.
0
PROJECT
...
...
4"
...
...
* COORDINATES ARE IN ILLINOIS STATE PLANE
EAST ZONE NAVD88.
.
.
.
.
...
.
.
...
.
...
.
30
...
4"
4"
.
N. Lake Road
nrim
.
.
nrim
.
.
.
' Pi
llar
s
.
2' x
2
2'
x
2' P
illa
rs
nrim
nrim
.. .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
#5
Asphalt Pavement
#8
18"
6"
10"
18"
12"
30"
12"
10"
6"
18"
16"
10"
12"
12"
10"
16"
16"
Last Plotted: 2018-10-06
6"
6"
4"
18"
4"
10"
6"
REGISTRATION
10"
8"
10"
10"
...
Last saved by: PASQUESIS
16"
ISSUE/REVISION
st
Po
Filename: P:\60212688\000_CAD\001_DRAWINGS\SHEETS\C\C-01 EXISTING CONDITIONS.DWG
14"
10"
4
-
-
3
-
-
2
-
-
1
01/31/16
I/R
DATE
FOR PERMIT ONLY
DESCRIPTION
KEY PLAN
NOTES:
1.
2.
3.
4.
5.
6.
BLUFF TOPOGRAPHY AND WALL SURVEY WITHIN THE WORK LIMITS ON THE BLUFF AND
INCLUDING THE BLUFF RETAINING WALLS IS COMPILED FROM AECOM SURVEY
CONDUCTED ON SEPTEMBER 2 AND 3, 2015.
ALL OTHER SURVEY INFORMATION ON THE BLUFF AND UPLAND AREAS WAS PROVIDED BY
R.E. DECKER P.C. LAND SURVEYORS SURVEY CONDUCTED ON MAY 12, 2008.
THE LAKE MICHIGAN BATHYMETRIC SURVEY WAS COMPLETED BY AECOM ON OCTOBER 5,
2011 FOR THE BEACH BELOW APPROXIMATELY ELEVATION 575.
2015 VERTICAL CONTROL POINT: RIM ELEVATION OF 658.90 FOR THE SANITARY MANHOLE
IN LAKE ROAD JUST NORTH OF THE 999 LAKE ROAD SERVICE DRIVEWAY.
2015 HORIZONTAL CONTROL POINTS: THREE NAILS ON THE PROPERTY AS SHOWN ON
THE PLAN VIEW.
ALL ELEVATIONS ARE REFERENCED TO NGVD88.
Printed on ___% Post-Consumer
Recycled Content Paper
PROJECT NUMBER
60317162
SHEET TITLE
EXISTING CONDITIONS AND
GEOMETRIC CONTROL
DRAWING NUMBER
C-01
SHEET NUMBER
3
OF
15
20
0
20
40
SCALE: 1" = 20'
BLUFF RESTORATION AND
SHORELINE IMPROVEMENT
PROJECT
E
C-07
CLIENT
GARRIQUES RESIDENCE
999 LAKE ROAD
LAKE FOREST, IL 60045
847 234 9900 TEL
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
ARCH D 24" x 36"
Approved: WJW
A
C-05
D
C-06
>
Checked: WJW
B
C-05
PROJECT
...
Designer: SAP
C
C-05
MH
Project Management Initials:
B
C-08
...
A
C-08
.
.
.
.
.
.
.
.
.
.
.
.
.
.
N
.
.
.
.
.
.
.
F
C-07
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
CONSULTANT
>
AECOM TECHNICAL SERVICES, INC.
303 East Wacker Drive Suite 1400
Chicago, IL 60601
312 373 6500 tel
312 373 6800 fax
www.aecom.com
>
>
>
CONSULTANTS
>
>
>
>
>
>
>
>
>
>
>
>
Last Plotted: 2018-10-06
>
>
Filename: P:\60212688\000_CAD\001_DRAWINGS\SHEETS\C\C-03 PROPOSED CONDITIONS BLUFF WORK.DWG
...
Last saved by: PASQUESIS
REGISTRATION
ISSUE/REVISION
4
-
-
3
-
-
2
2016-07-13
PERMIT RESPONSE
1
2016-01-31
FOR PERMIT ONLY
I/R
DATE
DESCRIPTION
KEY PLAN
NOTES:
LEGEND
1.
PROPOSED MANHOLE
PROPOSED CATCH BASIN
PROPOSED STORMWATER PIPE
PROPOSED MAJOR CONTOUR
>
>
>
>
AS PART OF THE ONGOING BLUFF MAINTENANCE AND RESTORATION EFFORTS THE LAKE
FOREST CITY FORESTER VISITED THE SITE AND APPROVED THE REMOVAL OF ALL
INVASIVE AND LOW VALUE TREES. THESE TREES WERE REMOVED IN THE FALL OF 2014
AND THE REMOVAL IS NOT REFLECTED IN THESE PLANS. ANY REMAINING TREES OF
VALUE IMPACTED BY THE FINAL BLUFF IMPROVEMENT PLANS WILL BE DESIGNATED AND
PRESERVED OR REPLACED. AS WORK LOCATIONS ARE STAKED, LAKE FOREST CITY
FORESTER WILL VISIT THE SITE AND MEET WITH THE OWNERS REPRESENTATIVE
REGARDING NECESSARY TREE WORK.
PROJECT NUMBER
60317162
SHEET TITLE
PROPOSED CONDITIONS BLUFF
WORK
PROPOSED MINOR CONTOUR
DRAWING NUMBER
BASELINE
Printed on ___% Post-Consumer
Recycled Content Paper
C-03
SHEET NUMBER
5
OF
15