Proposal for MWRD flood control and streambank stabilization project along Addison Creek in Northlake, Melrose Park, Stone Park, Bellwood, Westchester and Broadview, Cook County, Illinois.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ArmyCorps of Engineers
Chicago District
Public Notice/Application Number: LRC-2014-00674
Comment Period BEGINS: February 13, 2019
Comment Period Expires: March 15, 2019
U.S. Army Corps of Engineers
Illinois Environmental Protection Agency
Applicant
Catherine O'Connor
Metropolitan Water Reclamation District of Greater Chicago
111 East Erie Street
Chicago, Illinois 60611
Proposed Action
Proposal to construct flood control measures along Addison Creek through channel grading and various bank stabilization treatments and improvements. (See attached drawings). A detailed description of this proposal is provided on page 2 of this notice.
Location of Proposed Action
The project is located along Addison Creek beginning at Hirsh Street in Northlake and south extending through Melrose Park, Stone Park, Bellwood, Westchester, and ending near Cermak Road in Broadview, Cook County, Illinois
Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by March 15, 2019 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)
Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2014-00674, Stasi Brown
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Stasi.F.Brown@usace.army.mil.
Project Description
The project includes channel modifications to approximately 30,000 linear feet of Addison Creek, including lowering and widening segments of the creek. The purpose of the project is to prevent flood waters from over-topping the banks and reduce flooding to adjacent infrastructure.
Upon completion of the channel improvements, the banks will be stabilized through a variety of measures including: steel solider retaining wall, gabion basket and gabion baskets with vegetation component, and concrete block walls. Additionally, many areas will be graded and reseeded with native vegetation from the toe of slope to the top of the banks. The resulting channel improvements will impact approximately 0.63 acres of wetland and include the installation of 16,645 linear feet of hard armor bank stabilization measures. There are no High Quality Aquatic Resources (HQARs) on the project site.
Some fringe wetlands along Addison Creek will be partially impacted with remaining portions considered to be viable. Other wetland will be completely impacted, with no remaining viable portions.
Avoidance & Minimization
The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: In the design considerations, multiple objectives were balanced. These included avoiding and reducing impacts to Waters of the U.S., maximizing flood reduction benefits, minimizing the need to acquire additional private properties, minimizing disruption to the existing transportation network, and maintaining cost effectiveness. In reality, given the highly urbanized landscape and modified creek channel, there was little opportunity to avoid impacts, when the goal is to modify a man-made channel to improve flood control benefits.
Mitigation
The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: The applicant is proposing to provide compensatory mitigation for the impact to 0.63 acres of jurisdictional wetland by purchasing 0.95-acres of wetland credits at an USACE-approved wetland mitigation bank within the Des Plaines River watershed.
The Corps has not verified the adequacy of this mitigation proposal at this time and will make a final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.
Regulatory Authority
This proposed action will be reviewed according to the provisions of Section 404 of the Clean Water Act of 1972.
Jurisdiction
This application will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act of 1972 due to placement of fill material within Addison Creek which is found to be jurisdictional due to its connectivity to the Des Plaines River.
Evaluation Factors
The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.
Preliminary Evaluation of Selected Factors
Water Quality:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water quality certification, or waiver thereof, for the proposed activity in accordance with Section 401 of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will not violate applicable water quality standards. The review by the IEPA is conducted in accordance with the Illinois water quality standards under 35 Illinois Administrative Code Subtitle C by providing an antidegradation assessment, which includes an evaluation of alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice, a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
Department of Natural Resources:
The applicant may have to submit an application to the Illinois Department of Natural Resources, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lakes and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Department of Natural Resources
Office of Water Resources
2050 West Stearns Road
Bartlett, Illinois 60103
If you have any questions please contact the IDNR at (847) 608-3116.
Endangered and Threatened Species:
The Corps of Engineers has determined that the proposed activity would not affect any federally-listed endangered or threatened species or critical habitat for any endangered or threatened species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act does not appear to be warranted at this time.
Historic Properties/Cultural Resources:
Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places.
Environmental Impact Statement
A preliminary determination has been made that an environmental impact statement is not required for the proposed work.
Public Hearing
Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later than March 15, 2019. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Stasi Brown of my staff by telephone at (312) 846-5544, or email at Stasi.F.Brown@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting.
You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.
FOR THE DISTRICT COMMANDER:
Original Signed
Kathy Chernich
Chief, East Section
Regulatory Branch
NOTICE TO POSTMASTERS:
It is requested that this notice be conspicuously and continuously posted until March 15, 2019.
PUBLIC NOTICE
APPLICATION FOR PERMIT
U.S. ARMY
CORPS OF ENGINEERS
CHICAGO DISTRICT
PUBLIC NOTICE/APPLICATION NUMBER: LRC-2014-00674
COMMENT PERIOD BEGINS: February 13, 2019
COMMENT PERIOD EXPIRES: March 15, 2019
U.S. Army Corps of Engineers
Illinois Environmental Protection Agency
APPLICANT
Catherine O'Connor
Metropolitan Water Reclamation District of Greater Chicago
111 East Erie Street
Chicago, Illinois 60611
PROPOSED ACTION
Proposal to construct flood control measures along Addison Creek through channel grading and
various bank stabilization treatments and improvements. (See attached drawings). A detailed
description of this proposal is provided on page 2 of this notice.
LOCATION OF PROPOSED ACTION
The project is located along Addison Creek beginning at Hirsh Street in Northlake and south
extending through Melrose Park, Stone Park, Bellwood, Westchester, and ending near Cermak
Road in Broadview, Cook County, Illinois
Interested parties are hereby notified that an application has been received for a Department of
the Army permit for the activity described herein and as shown on the attached drawings. You
are invited to provide your comments by March 15, 2019 on the proposed work, which will
become part of the record and will be considered in the decision. A permit will be issued or
denied under Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)
-2Written comments shall be mailed to:
U.S. Army Corps of Engineers
Chicago District, Regulatory Branch
Attn: LRC-2014-00674, Stasi Brown
231 South LaSalle Street, Suite 1500
Chicago, Illinois 60604-1437
It should be noted that ALL comments received by this office (via hard copy or electronic) will
only be accepted with the full name and address, and email address, if available of the individual
commenting, and must be received by the close of the public notice period. Electronic
comments may be sent to the project manager at Stasi.F.Brown@usace.army.mil.
PROJECT DESCRIPTION
The project includes channel modifications to approximately 30,000 linear feet of Addison
Creek, including lowering and widening segments of the creek. The purpose of the project is to
prevent flood waters from over-topping the banks and reduce flooding to adjacent infrastructure.
Upon completion of the channel improvements, the banks will be stabilized through a variety of
measures including: steel solider retaining wall, gabion basket and gabion baskets with
vegetation component, and concrete block walls. Additionally, many areas will be graded and
reseeded with native vegetation from the toe of slope to the top of the banks. The resulting
channel improvements will impact approximately 0.63 acres of wetland and include the
installation of 16,645 linear feet of hard armor bank stabilization measures. There are no High
Quality Aquatic Resources (HQARs) on the project site.
Some fringe wetlands along Addison Creek will be partially impacted with remaining portions
considered to be viable. Other wetland will be completely impacted, with no remaining viable
portions.
AVOIDANCE & MINIMIZATION
The applicant has stated the following concerning avoidance and minimization of impacts to
Waters of the United States: In the design considerations, multiple objectives were balanced.
These included avoiding and reducing impacts to Waters of the U.S., maximizing flood
reduction benefits, minimizing the need to acquire additional private properties, minimizing
disruption to the existing transportation network, and maintaining cost effectiveness. In reality,
given the highly urbanized landscape and modified creek channel, there was little opportunity to
avoid impacts, when the goal is to modify a man-made channel to improve flood control
benefits.
-3-
MITIGATION
The applicant has stated the following concerning compensatory mitigation for unavoidable
impacts to Waters of the United States: The applicant is proposing to provide compensatory
mitigation for the impact to 0.63 acres of jurisdictional wetland by purchasing 0.95-acres of
wetland credits at an USACE-approved wetland mitigation bank within the Des Plaines River
watershed.
The Corps has not verified the adequacy of this mitigation proposal at this time and will make a
final determination on whether the proposed mitigation is appropriate and practicable in
accordance with 33 CFR Part 332.
REGULATORY AUTHORITY
This proposed action will be reviewed according to the provisions of Section 404 of the Clean
Water Act of 1972.
JURISDICTION
This application will be reviewed according to the provisions of Section 10 of the Rivers and
Harbors Act of 1899 and/or Section 404 of the Clean Water Act of 1972 due to placement of fill
material within Addison Creek which is found to be jurisdictional due to its connectivity to the
Des Plaines River.
EVALUATION FACTORS
The decision whether to issue a permit will be based on an evaluation of probable impact
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The
benefit which reasonably may be expected to accrue from the proposal must be balanced against
its reasonably foreseeable detriments.
All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values,
land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership and, in general, the needs and welfare of the people. In addition, if the
proposed activity involves the discharge of dredged or fill material into waters of the United
States, the evaluation of the impact on the public interest will include application of Section
404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.
The Corps of Engineers is also soliciting comments from the public, Federal, state and local
agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential
impacts of the proposed activity. Once this office completes a review of the comments received,
it will be determined whether to issue, modify, condition, or deny a permit for this proposal.
-4To prepare this decision, comments are taken into consideration to assess impacts on the public
interest factors listed above, as well as endangered species, historic properties, water quality, and
general environmental effects. Comments will be used in the preparation of an Environmental
Assessment and/or Environmental Impact Statement pursuant to the National Environmental
Policy Act. A determination concerning the need for a public hearing will also be based on the
comments received.
PRELIMINARY EVALUATION OF SELECTED FACTORS
WATER QUALITY:
The applicant has applied to the Illinois Environmental Protection Agency (IEPA) for water
quality certification, or waiver thereof, for the proposed activity in accordance with Section 401
of the Clean Water Act. Certification or waiver indicates that the IEPA believes the activity will
not violate applicable water quality standards. The review by the IEPA is conducted in
accordance with the Illinois water quality standards under 35 Illinois Administrative Code
Subtitle C by providing an antidegradation assessment, which includes an evaluation of
alternatives to any proposed increase in pollutant loading that may result from this activity.
The "Fact Sheet" containing the antidegradation assessment for this proposed project may be
found on the IEPA's web site, at www.epa.state.il.us/public-notices/. In the event that the IEPA
is unable to publish the "Fact Sheet" corresponding to the timeframe of this Joint Public Notice,
a separate public notice and "Fact Sheet" will be published by the IEPA at the web site identified
above. You may also obtain a copy of the "Fact Sheet" by contacting the IEPA at the address or
telephone number shown below.
Written comments concerning possible impacts to water quality should be addressed to the
following agency, along with a copy of the comments provided to the Corps of Engineers:
Illinois Environmental Protection Agency
Bureau of Water
Watershed Management Section
1021 N. Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
If you have any questions please contact the IEPA at (217) 782-3362.
DEPARTMENT OF NATURAL RESOURCES:
The applicant may have to submit an application to the Illinois Department of Natural
Resources, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois
Rivers, Lakes and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit
should be addressed to the following agency, along with a copy of the comments provided to the
Corps of Engineers:
Illinois Department of Natural Resources
-5Office of Water Resources
2050 West Stearns Road
Bartlett, Illinois 60103
If you have any questions please contact the IDNR at (847) 608-3116.
ENDANGERED AND THREATENED SPECIES:
The Corps of Engineers has determined that the proposed activity would not affect any federallylisted endangered or threatened species or critical habitat for any endangered or threatened
species, pursuant to the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.).
Therefore, consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the
Endangered Species Act does not appear to be warranted at this time.
HISTORIC PROPERTIES/CULTURAL RESOURCES:
Preliminary review indicates that the proposed activity is not likely to adversely affect any
historic property which is listed, or eligible for listing, on the National Register of Historic
Places.
ENVIRONMENTAL IMPACT STATEMENT
A preliminary determination has been made that an environmental impact statement is not
required for the proposed work.
PUBLIC HEARING
Any person may request in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearing shall state with
particularity the reasons for holding a public hearing. A request for a hearing may be denied if
substantive reasons for holding a hearing are not provided or if there is otherwise no valid
interest to be served.
It should be noted that materials submitted as part of the permit application become part of the
public record and are thus available to the general public under the procedures of the Freedom of
Information Act (FOIA). Individuals may submit a written request to obtain materials under
FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers
Office of Counsel.
Interested parties wishing to comment on the proposed activity must do so in writing no later
than March 15, 2019. It is presumed that all parties receiving this notice will wish to respond to
this public notice; therefore, a lack of response will be interpreted as meaning that there is no
objection to the project as described.
This public notice is not a paid advertisement and is for public information only. Issuance of this
notice does not imply Corps of Engineers endorsement of the project as described.
If you have any questions, please contact Stasi Brown of my staff by telephone at (312) 8465544, or email at Stasi.F.Brown@usace.army.mil. It should be noted that ALL comments
-6received by this office (via hard copy or electronic) will only be accepted with the full name
and address of the individual commenting.
You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for
more information on our program.
FOR THE DISTRICT COMMANDER:
ORIGINAL SIGNED
Kathy Chernich
Chief, East Section
Regulatory Branch
NOTICE TO POSTMASTERS:
It is requested that this notice be conspicuously and continuously posted until March 15, 2019.
Reach 2
Reach 3
Reach 1
Reach 4
Reach 5
Reach 6
Reach 7
Reach 8
Scale:
0
Orientation:
1
Miles
ProjectNumber:160005
°
Date:9/18/2017
Preparedby:
Reach 9
ProjectName:
Legend:
Project Boundary
Addison Creek Channel Improvements
Preparedfor:
Metropolitan Water Reclamation District
LocationInformation:
T.38N.-R.12E., Sections 4, 5, 9, 16, 21, 22
Hey and Associates, Inc.
Engineering, Ecology and Landscape Architecture
ExhibitTitle:
Project Location
Exhibit:
1
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
N
Engineering, Ecology and Landscape Architecture
Engineering, Ecology and Landscape Architecture
Engineering, Ecology and Landscape Architecture