You can copy from here when filling out the rest of the page.
SPL-2019-00065-ERS RMV Riding Park Recurrent Maintenance Dredging
The proposed project would involve sediment removal within the main stormwater channel that passes through RMV Riding Park for the purpose of ensuring adequate flood capacity of the channel (Exhibit 2). Maintenance would be authorized on a recurrent, as-needed basis.