Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SPL-2019-00065-ERS RMV Riding Park Recurrent Maintenance Dredging

The proposed project would involve sediment removal within the main stormwater channel that passes through RMV Riding Park for the purpose of ensuring adequate flood capacity of the channel (Exhibit 2). Maintenance would be authorized on a recurrent, as-needed basis.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas