HICKORY BRANCH MITIGATION BANK IN CALCASIEU PARISH
NAME OF APPLICANT: Matrix New World Engineering, obo The Mitigation Group, L.L.C.; Attn: Charles Jones; 2798 O’Neal Lane, Building F, Baton Rouge, Louisiana 70816.
LOCATION OF WORK: The 654.7 acre site is located approximately 7.57 miles northwest of Moss Bluff, in Sections 3, 10, and 15, ,Township 08 South, Range 09 West, Calcasieu Parish Louisiana, as shown on attached drawings.
Center of Location: Latitude: 30.380188° N, Longitude: 93.279762° W.
Hydrologic Unit Code: 08080203 – Upper Calcasieu.
CHARACTER OF WORK: Hickory Branch Mitigation Bank is proposing the removal of 625.1 acres of loblolly pine plantation and the enhancement of 1.6 acres of chinese tallow dominated wetlands for the establishment of native longleaf pine savanna and bottomland hardwood habitats. Additional site restoration activities will consist filling of a man-made drainage conveyance, prescribed burning, and planting of desirable vegetation. Of the 652.5 acres proposed for Hickory Branch Mitigation Bank, 592.7 acres are longleaf pine savannah rehabilitation, 1.7 acres are longleaf pine savannah re-establishment, 30.7 acres are bottomland hardwood rehabilitation, 1.6 acres are bottomland hardwood enhancement, 22.4 acres are bottomland hardwood wetland preservation, and 1.7 acres are upland buffer preservation.
JOINT PUBLIC NOTICE
February 25, 2019
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Ave.
New Orleans, La. 70118
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-1280/ FAX (504) 862-2289
Brandon.D.Gaspard@usace.army.mil
Project Manager
Brandon Gaspard
Permit Application Number
MVN-2018-00361-MG
(225) 219-3225 FAX (225) 325-8250
Elizabeth.Hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 190221-01
Interested parties are hereby notified that a prospectus and permit application have been
received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or
[ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
HICKORY BRANCH MITIGATION BANK IN CALCASIEU PARISH
NAME OF APPLICANT: Matrix New World Engineering, obo The Mitigation Group, L.L.C.; Attn:
Charles Jones; 2798 O'Neal Lane, Building F, Baton Rouge, Louisiana 70816.
LOCATION OF WORK: The 654.7 acre site is located approximately 7.57 miles northwest of
Moss Bluff, in Sections 3, 10, and 15, ,Township 08 South, Range 09 West, Calcasieu Parish
Louisiana, as shown on attached drawings.
Center of Location: Latitude: 30.380188° N, Longitude: 93.279762° W.
Hydrologic Unit Code: 08080203 Upper Calcasieu.
CHARACTER OF WORK: Hickory Branch Mitigation Bank is proposing the removal of 625.1
acres of loblolly pine plantation and the enhancement of 1.6 acres of chinese tallow dominated
wetlands for the establishment of native longleaf pine savanna and bottomland hardwood
habitats. Additional site restoration activities will consist filling of a man-made drainage
conveyance, prescribed burning, and planting of desirable vegetation. Of the 652.5 acres
proposed for Hickory Branch Mitigation Bank, 592.7 acres are longleaf pine savannah
rehabilitation, 1.7 acres are longleaf pine savannah re-establishment, 30.7 acres are bottomland
hardwood rehabilitation, 1.6 acres are bottomland hardwood enhancement, 22.4 acres are
bottomland hardwood wetland preservation, and 1.7 acres are upland buffer preservation.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
-2comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources. After receipt of comments
from this public notice the Corps will evaluate potential impacts and consult with the State
Historic Preservation Officer and Native American Tribes in accordance with Section 106 of the
national Historic Preservation Act, as appropriate.
Our initial finding is that the proposed work would neither affect any species listed as
endangered, nor affect any habitat designated as critical to the survival and recovery of any
endangered species listed by the U.S. Department of Commerce,
-3Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana
(SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans
and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that
the proposed activity would have no effect on any species listed as endangered by the U.S.
Department of the Interior.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interested in the matter.
for
Enclosure
Martin S. Mayer
Chief, Regulatory Branch
Prospectus for the Proposed Hickory Branch Mitigation Bank
Calcasieu Parish, Louisiana
MVN-2018-00361
February 2019
Sponsor:
Name:
Address:
The Mitigation Group, LLC
Jay Fear
311 West Russell
Welsh, Louisiana 70591
Agent:
Matrix New World Engineering
Charles Jones
2798 O'Neal Lane, Building F
Baton Rouge, Louisiana 70816
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
TABLE OF CONTENTS
1.
INTRODUCTION .................................................................................................... 1
1.1
SITE LOCATION ..................................................................................................... 1
2.
PROJECT GOALS AND OBJECTIVES ............................................................... 4
3.
ECOLOGICAL SUITABILITY OF THE SITE.................................................... 4
3.1.1
Land Use ....................................................................................................... 4
3.1.2
Historical Land Use ...................................................................................... 4
3.1.3
Existing/Current Land Use ........................................................................... 5
3.2 SOILS..................................................................................................................... 5
3.3 HYDROLOGY ......................................................................................................... 6
3.3.1
Contributing Watershed ................................................................................ 6
3.3.2
Historical Hydrology and Drainage Patterns .............................................. 7
3.3.3
Existing/Current Hydrology and Drainage Patterns .................................... 7
3.3.4
Jurisdictional Wetlands ................................................................................ 7
3.4 VEGETATION ......................................................................................................... 7
3.4.1
Historical Plant Community ......................................................................... 7
3.4.2
Existing Plant Community ............................................................................ 8
3.5 GENERAL NEED FOR THE PROJECT IN THIS AREA .................................................. 8
4.
ESTABLISHMENT OF THE MITIGATION BANK .......................................... 9
4.1 SITE RESTORATION PLAN ...................................................................................... 9
4.1.1
Soils/Hydrologic Work ................................................................................ 10
4.1.2
Vegetative Work .......................................................................................... 10
4.2 TECHNICAL FEASIBILITY ..................................................................................... 13
4.3 CURRENT SITE RISKS .......................................................................................... 13
4.4 LONG-TERM SUSTAINABILITY OF THE SITE ......................................................... 13
5.
PROPOSED SERVICE AREA.............................................................................. 13
6.
OPERATION OF THE BANK .............................................................................. 13
6.1
6.2
6.3
6.4
6.5
7.
PROJECT REPRESENTATIVES ................................................................................ 13
QUALIFICATIONS OF THE SPONSOR...................................................................... 14
PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES .... 14
SITE PROTECTION ................................................................................................ 14
LONG-TERM STRATEGY ...................................................................................... 14
REFERENCES........................................................................................................ 15
i
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
TABLE OF CONTENTS (CONTINUED)
Tables
Table 1
Table 2
Table 3
Table 4
Pre-Restoration Habitat Acreage Summary
Soil Map Unit Components and Hydric Status
Post-Construction Habitat Acreage Summary
Bottomland Hardwood Species Selection List
Figures
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Figure 12
Figure 13
Figure 14
Figure 15
Figure 16
Vicinity Map
Site Location Map
Land Use Map
1952 Aerial Photograph
1967 Aerial Photograph
1985 Aerial Photograph
1998 Aerial Photograph
2010 Aerial Photograph
2017 Aerial Photograph
Soils Map
Contributing Watershed Map
LIDAR Map
Existing Site Plan
Restoration Site Plan
Typical Ditch and Spoil Bank Cross Section
Service Area Map
Appendices________________________________________________________
Appendix A
Preliminary JD
ii
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
1. INTRODUCTION
Matrix New World Engineering on behalf of The Mitigation Group, LLC (TMG) is pleased
to present this prospectus and site restoration plan for the Hickory Branch Mitigation Bank
(HBMB) to the Interagency Review Team (IRT) and U.S. Army Corps of Engineers
(USACE), New Orleans District. HBMB is approximately 654.7 acres located west of
Gillis, Calcasieu Parish, Louisiana. The purpose of this report is to summarize the existing
conditions of the proposed HBMB and assess the potential for establishing a mitigation
bank to provide compensatory wetland mitigation for unavoidable impacts to wetlands
associated with Department of the Army (DA) permits authorized under Section 404 of the
Clean Water Act and Section 10 of the Rivers and Harbors Act issued by the USACE, New
Orleans District.
1.1 Site Location
The 654.7-acre HBMB is approximately 7.57 miles northwest of Moss Bluff, Louisiana,
centered at approximate Latitude 30.380188°; Longitude -93.279762° in Sections 3, 10,
and 15, Township 08 South, Range 09 West of Calcasieu Parish, Louisiana (Figures 1 and
2). Access to the Site is via Bushnell Road and Hickory Branch Road, approximately 10.8
miles north-northwest of I-10 at Lake Charles. The following are coordinates for the
HBMB site boundary and a legal description for the 3,018-acre tract of which the site
HBMB is a part of.
The perimeter of the Bank is defined as shown on Figure 2 in Attachment A by the
following coordinates in decimal degrees:
Corner ID
1
2
3
4
5
6
7
8
Latitude
30.389722°
30.390397°
30.386469°
30.370556°
30.370670°
30.377963°
30.378022°
30.384440°
Longitude
-93.280842°
-93.277082°
-93.266608°
-93.266710°
-93.279342°
-93.279292°
-93.280071°
-93.281480°
Legal Description of a 3,018-acre tract of land situated in Sections 2, 3, 4, 9, 10, 11, 15,
16, 21 & 22, T 8 S R 9 W, Calcasieu Parish, Louisiana, further described as follows;
BEGINNING at an iron pipe at the northeast corner of Section 15, T 8 S R 9 W, Calcasieu
Parish, Louisiana; thence run South 01°11'06" West along the east line of Section 15 for
1330.87 feet to an iron pipe at the southeast corner of the Northeast One Quarter of the
Northeast One Quarter of said Section 15; thence run North 89°22'14" West along the
south line of said Northeast One Quarter of the Northeast One Quarter for 1340.85 feet to
an iron pipe at the southwest corner thereof; thence run South 01°09'12" West along the
1
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
east line of the Southwest One Quarter of the Northeast One Quarter for 1335.35 feet to an
iron pipe at the southeast corner thereof; thence run North 89°33'45" West along the south
line of the North One Half of Section 15 for 4018.93 feet to an iron pipe at the West One
Quarter Corner of Section 15; thence run South 01°01'35" West along the west line of
Section 15 for 1348.78 feet to an iron pipe at the northwest corner of the South One Half
of the Southwest One Quarter; thence run South 89°35'20" East along the north line of said
South One Half of the Southwest One Quarter for 2676.54 feet to an iron pipe at the
northeast corner thereof; thence run South 01°07'19" West along the east line of said South
One Half of the Southwest One Quarter for 1347.56 feet to an iron pipe at the South One
Quarter Corner of Section 15; thence run North 89°36'56" West along the south line of
said Section 15 for 1337.15 feet to a rebar at the northeast corner of the Northwest One
Quarter of the Northwest One Quarter of Section 22; thence run South 00°54'23" West
along the east line of said Northwest One Quarter of the Northwest One Quarter for 1312.51
feet to a rebar at the southeast corner thereof; thence run North 89°20'47" West along the
south line of said Northwest One Quarter of the Northwest One Quarter for 1334.23 feet
to a point at the southwest corner thereof; thence run North 88°40'47" West along a
boundary agreement line for 2666.62 feet to an iron pipe being referred to as the southeast
corner of the Northwest One Quarter of the Northwest One Quarter; thence run North
00°52'02" East along the eastern line as referred to as the Northwest One Quarter of the
Northwest One Quarter approximately 85 feet to a point in the water's edge of the left bank
of Calcasieu West Fork; thence run northerly along said water's edge approximately 522
feet to a point in the said eastern line; thence run North 00°52'02" East along said eastern
line approximately 775 feet to an iron pipe at the North One Quarter Corner of Section 21;
thence run North 89°44'45" West long the north line of Section 21 approximately 1168
feet to a point in the water's edge of the left bank of said Calcasieu West Fork; thence run
in a westerly direction along said water's edge approximately 774 feet to a point in the said
north line of Section 21; thence run North 89°44'45" West along said north line
approximately 434 feet to a point in the centerline of said Calcasieu West Fork; thence run
northerly along said centerline approximately 3251 feet to a point in the west line of Section
16; thence run North 01°11'03" East along said west line approximately 383 feet to a bar
at the West One Quarter Corner; thence run North 02°48'45" East along the west line of
said Section 16 approximately 142 feet to a point in the centerline of Hickory Branch
Creek; thence run northerly along said centerline approximately 864 feet to a point in the
west line of said Section 16; thence run North 02°48'45" East along said west line
approximately 962 feet to a point in the centerline of said Hickory Branch Creek; thence
run in a northerly direction along said centerline approximately 2159 feet to a point in the
north line of said Section 16; thence run South 89°18'11" East along said north line
approximately 3311 feet to an iron pipe at the southwest corner of the Southeast One
Quarter of the Southeast One Quarter of Section 9; thence run North 01°00'53" East along
the west line of said Southeast One Quarter of the Southeast One Quarter for 1329.49 feet
to a rebar at the northwest corner thereof; thence run South 89°15'14" East along the north
line of said Southeast One Quarter of the Southeast One Quarter for 1310.02 feet to an iron
pipe at the northeast corner thereof; thence run North 00°59'51" East along the east line of
Section 9 for 1328.60 feet to a rebar at the East One Quarter Corner; thence run North
2
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
89°10'25" West along the south line of the Southeast One Quarter of the Northeast One
Quarter for 1313.97 feet to a rebar at the southwest corner thereof; thence run North
00°50'12" East along the west line of said Southeast One Quarter of the Northeast One
Quarter for 1328.63 feet to a rebar at the northwest corner thereof; thence run North
89°04'49" West along the south line of the Northwest One Quarter of the Northeast One
Quarter for 1314.59 feet to a rebar at the southwest corner thereof; thence run North
00°46'54" East along the west line of said Northwest One Quarter of the Northeast One
Quarter for 1329.77 feet to a rebar at the northwest corner thereof; thence run South
89°10'01" East along the south line of Section 4 for 1318.54 feet to a rebar at the southeast
corner of the Southwest One Quarter of the Southeast One Quarter of said Section 4; thence
run North 00°50'16" East along the east line of said Southwest One Quarter of the
Southeast One Quarter for 1342.14 feet to an iron pipe at the northeast corner thereof;
thence run North 89°10'05" West along the north line of said Southwest One Quarter of
the Southeast One Quarter for 1321.36 feet to an iron pipe at the northwest corner thereof;
thence run North 00°43'02'" East along the west line of the East One Half of Section 4 for
4027.94 feet to an iron pipe at the North One Quarter Corner thereof; thence run South
89°20'34" East along the north line of said Section 4 for 2659.54 feet to the northeast
corner thereof; thence run South 89°20'34" East along the north line of Section 3 for
2659.56 feet to a point at the North One Quarter Corner; thence run South 00°33'05" West
along the west line of the Northeast One Quarter for 1347.42 feet to the southwest corner
of the North One Half of the Northeast One Quarter; thence run South 89°13'22" East
along the south line of said North One Half of the Northeast One Quarter for 1340.50 feet
to an iron pipe; thence run SOUTH for 69.00 feet to a point; thence run South 89°35'17"
East for 1348.53 feet to a point in the east line of said Section 3; thence run North
00°26'17" East along said east line for 65.55 feet to a point at the southwest corner of the
Northwest One Quarter of the Northwest One Quarter of Section 2; thence run South
89°26'30" East along the south line of said Northwest One Quarter of the Northwest One
Quarter for 1328.60 feet to a point at the southeast corner thereof; thence run South
00°44'12" West for 56.38 feet to a point; thence run South 89°50'10" East for 1337.69 feet
to a point in the east line of the West One Half of Section 2; thence run South 00°41'14"
West along said east line for 1743.49 feet to a point in the centerline of a canal; thence run
South 78°13'01" West along said centerline for 532.91 feet to a point; thence run South
76°37'34" West along said centerline for 627.07 feet to a point; thence run South
00°36'46" West for 1960.65 feet to an iron pipe in the south line of said Section 2; thence
run South 01°08'29" West for 1187.98 feet to a nail in the centerline of Bushnell Road;
thence run North 81°13'55" West along said centerline for 81.72 feet to a point; thence run
North 70°04'42" West along said centerline for 41.78 feet to a point; thence run North
61°48'01" West along said centerline for 89.20 feet to a point in the east line of the West
One Half of the Northwest One Quarter of Section 11; thence run South 01°08'29" West
along said east line for 82.41 feet to a bar; thence run North 88°24'54" West along a fence
for 1327.79 feet to a fence post in the east line of Section 10; thence run South 01°18'36"
West along the east line of Section 10 for 4167.03 feet to an iron pipe and The Point Of
Beginning.
3
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
The above described tract of land is situated in Sections 2, 3, 4, 9, 10, 11, 15, 16, 21 & 22,
T 8 S R 9 W, Calcasieu Parish, Louisiana as shown on plat of survey, File Number 9224,
Plat M-2204, as surveyed by Jeffrey M. Messinger, Professional Land Surveyor, containing
3018 acres and is subject to all existing easements.
2. PROJECT GOALS AND OBJECTIVES
The goals of HBMB are to rehabilitate 592.7 acres and re-establish 1.7 acres of longleaf
pine savannah and to rehabilitate 30.7 acres, enhance 1.6 acres, and preserve 22.4 acres of
bottomland hardwood wetlands and 1.7 acres of hardwood uplands.
The objectives of HBMB are as follows:
· Increase longleaf pine savannah habitat within its natural range
· Increase biodiversity
· Provide habitat for wildlife, including threatened and endangered species
· Provide for water quality rehabilitation
· Provide for increased flood storage
3. ECOLOGICAL SUITABILITY OF THE SITE
3.1.1 Land Use
3.1.2 Historical Land Use
Based on information from the Natural Resources Conservation Service Longleaf Pine
Initiative, HBMB and the surrounding areas historically supported longleaf pine savanna
and bottomland hardwood habitats. Based on 1952, 1967, and 1985 aerial photography, the
HBMB site was cleared and in agricultural use. The 1952 aerial photograph indicates that
the existing at-grade road on the site had been constructed. The 1985 aerial photograph
indicates that the site had been leveled. The 1998 aerial photograph shows that the site was
becoming forested. The historical aerial photographs are attached as Figures 4 through
9.
Pre-impact hydrology was primarily attributed to backwater flooding from Hickory Branch
and West Fork Calcasieu River and associated tributaries, rainfall, and sheet flow. Aerial
photography suggests that HBMB historically drained from north-northeast to south to a
tributary of West Fork Calcasieu River.
During the mid-20th century, the longleaf pine (Pinus palustris) was cleared from HBMB,
and the land adapted to agricultural production with the construction of levees to control
hydrology. Aerial photography suggests that this was a common practice in the area at the
time, as adjacent properties also transitioned from pine savannah to agricultural fields.
Typically, hydrology was severely hampered through the use of levees and culverts that
allowed farmers to control the water levels in the fields during rice production. Levees and
culverts appear to have been removed. A ditch and spoil piles remain along the western
boundary.
4
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
3.1.3
Existing/Current Land Use
The major land use on HBMB consists of timber production in the form of loblolly pine
plantation. Bottomland hardwoods flank the tributary of West Fork Calcasieu River that
extends from south to north into the site.
Table 1 contains pre-restoration habitat descriptions and acreages of the jurisdictional
wetlands associated with the 654.7-acre tract proposed for re-establishment, rehabilitation,
enhancement, and preservation activities within the HBMB.
Table 1: Pre-Restoration Habitat Acreage Summary
Class
Habitat
Acreage
Loblolly Pine
623.5
Bottomland Hardwood Forest
23.7
Tallow-Dominant
1.6
Upland Spoil Bank
Bottomland Hardwood Forest
1.2
Upland
Bottomland Hardwood Forest
0.4
Jurisdictional Wetlands
Other Waters
2.2
Existing Road
2.1
TOTALS
654.7
The site is bordered on the north by a pipeline, gravel road, and pine plantation, the east by
pasture and pine plantation, the south by pine plantation, and the west by approximately
3,400 feet of ditch and spoil bank and pine plantation. An at-grade dirt and gravel road
extends south from the north site boundary through the middle of the site to the tributary
of West Fork Calcasieu River. Several shooting lanes extend from east to west through the
site.
The adjacent land use includes timber production in the form of loblolly plantations,
bottomland hardwoods, and livestock pasture. Surrounding land use is shown on Figure 3.
3.2
Soils
The NRCS Web Soil Survey was used to determine mapped soil series. The official series
descriptions were used to confirm profile matrix, redox features, and texture of soils
underlying the Site. The Web Soil Survey shows that the Site may be underlain by eight
soil map units (NRCS Web Soil Survey 2018): Caddo-Messer complex, 0 to 1 percent
slopes (Cd); Glenmora silt loam, 1 to 3 percent slopes (Ge); Guyton and Bienville,
frequently flooded (GU); and Guyton silt loam, 0 to 1 percent slopes, occasionally flooded
5
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
(Go). The table below lists the hydric soil map unit's individual soil components,
component percentage, and hydric status within Calcasieu Parish (NRCS Web Soil Survey,
February 6, 2018). A soils map is attached as Figure 10.
Table 2: Soil Map Unit Components and Hydric Status
Map Unit Name
Soil Series/ Component
Caddo-Messer complex, 0 to 1 percent slopes
Caddo
Messer
Guyton
Glenmora
Glenmora silt loam, 1 to 3 percent slopes
Glenmora
Messer
Caddo
Kinder
Guyton and Bienville, frequently flooded
Guyton
Bienville
Kinder
Gore
Caddo
Basile
Acadia
Guyton silt loam, 0 to 1 percent slopes, occasionally flooded
Guyton
Glenmora
Caddo
Messer
Component
Percentage
Hydric
Status
60
30
5
5
Yes
No
Yes
No
90
5
3
2
No
No
Yes
Yes
55
25
4
4
4
4
4
Yes
Yes
No
No
No
No
No
85
5
5
5
Yes
No
Yes
No
The 1952 and 1967 aerial photographs show that there may have historically been pimple
mounds on the site. The site appears to have been leveled in the 1985 aerial photograph
and the pimple mounds are no longer visible. Additionally, field observations confirmed
that the pimple mounds were leveled.
3.3 Hydrology
3.3.1 Contributing Watershed
Figure 11 shows the site in the northern portion of the 23.2 square mile Moss Gully-West
Fork Calcasieu River Watershed. Hydrology on the site is primarily attributed to
backwater flooding from Hickory Branch and West Fork Calcasieu River and associated
tributaries, rainfall, and sheet flow. Hydrology indicators observed on HBMB include
surface water, a high-water table, saturation and oxidized root channels within the upper
6
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
twelve inches of soil profiles, water marks, water stained leaves, moss trim lines, and
positive FAC-neutral tests.
3.3.2 Historical Hydrology and Drainage Patterns
Calcasieu Parish is part of a broad region of the southeastern United States that has a humid,
subtropical climate. The parish is dominated by warm, moist, tropical air from the nearby
Gulf of Mexico (USDA 1980). Average annual rainfall for Calcasieu Parish ranges from
60-62 inches (Di Luzio 2007). The Site is in the Upper Calcasieu Watershed; within United
States Geological Survey (USGS) Hydrologic Cataloguing Unit 08080205. Hydrology on
the Site is primarily restricted to backwater flooding from Hickory Branch and West Fork
Calcasieu River and associated tributaries, rainfall, and sheet flow. Elevation contours
show that HBMB naturally drains from north-northeast to south. The overall wetland
hydrology of the wet flats appears to be essentially intact, as evidenced by the observed
hydrology indicators. LIDAR elevation data is provided on Figure 12.
3.3.3 Existing/Current Hydrology and Drainage Patterns
Approximately 3,400 feet of ditch and spoil bank are located along the western site
boundary. The ditch originates on land owned by the Sponsor and exits the site through a
culvert beneath a gravel road at the northwest corner of the site. The sponsor proposes to
fill the ditch with the spoil to return the area to natural grade rendering the culvert disfunctional. The ditch and spoil bank are shown on Figures 13, 14, and 15.
3.3.4 Jurisdictional Wetlands
A wetland delineation was conducted by Matrix on behalf of the Sponsor in January 2018.
A copy of the preliminary JD is included as Appendix A.
3.4 Vegetation
3.4.1 Historical Plant Community
The NRCS Longleaf Pine Initiative identifies the site as being within the historical range
of longleaf pine savannah. It appears that longleaf pine was likely the dominant tree species
on HBMB, with a diverse herbaceous component likely consisting of broomsedges
(Andropogon spp.), panic grasses (Panicum spp.) three-awn grasses (Aristida spp.) plumegrasses (Erianthus spp.), beak-rushes (Rhychospora spp.), yellow-eyed grasses (Xyris
spp.). The habitat also likely supported a variety of forb species, such as lobelias (Lobelia
spp.), gerardias (Rhexia spp.), milkworts (Polygala spp.), and bladderworts (Utricularia
spp.).
Bottomland hardwoods were likely found along the tributaries of West Fork Calcasieu
River. The dominant species likely consisted of water oak (Quercus nigra), laurel oak
(Quercus laurifolia), cherry-bark oak (Quercus pagoda), swamp chestnut oak (Quercus
michauxii), red maple (Acer rubrum drummondii), sweetgum (Liquidambar styraciflua),
7
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
black gum (Nyssa sylvatica), Elliott's blueberry (Vaccinium elliottii), yaupon (Ilex
vomitoria), arrowwood (Viburnum dentatum), and southern bayberry (Morella cerifera).
3.4.2 Existing Plant Community
The overstory on the majority of the HBMB is a monoculture of loblolly pine (Pinus taeda,
FAC). Dominant species identified in the pine plantation habitat includes primarily
loblolly pine with scattered sweet-gum (Liquidambar styraciflua, FAC), Chinese tallow
tree (Triadica sebifera, FAC), southern bayberry (Morella cerifera, FAC), yaupon (Ilex
vomitoria, FAC), Elliot's blueberry (Vaccinium elliotii, FACW), long-leaf wood oats
(Chasmanthium sessiliflorum, FAC), slender wood oats (Chasmanthium laxum, FAC),
lamp rush (Juncus effusus, OBL), angle-stem beak sedge (Rhynchospora caduca, OBL),
bushy bluestem (Andropogon glomeratus, FACW), broom-sedge bluestem (Andropogon
virginicus, FAC), cypress panic grass (Dichanthelium dichotomum, FAC), Baldwin's
yellow-eyed grass (Xyris baldwiniana, OBL), coastal plain St. John's wort (Hypericum
brachyphyllum, FACW), saw-tooth blackberry (Rubus argutus, FAC), cat greenbrier
(Smilax glauca, FAC), and yellow meadow-beauty (Rhexia lutea, FACW).
Dominant species identified in the bottomland hardwood habitat includes water oak
(Quercus nigra, FAC), laurel oak (Quercus laurifolia, FACW), cherry-bark oak (Quercus
pagoda, FACW), swamp chestnut oak (Quercus michauxii, FACW), red maple (Acer
rubrum drummondii, FAC), sweetgum, Chinese tallow tree, American holly (Ilex opaca,
FAC), black gum (Nyssa sylvatica, FAC), Elliott's blueberry, yaupon, arrowwood
(Viburnum dentatum, FAC), Chinese privet (Ligustrum sinense, FAC), palmetto (Sabal
minor, FACW), long-leaf wood oats (Chasmanthium sessiliflorum), and slender wood oats
(Chasmanthium laxum). There is generally very little understory throughout the majority
of the Site. Figure 13 shows the existing plant communities on the site.
3.5 General Need for the Project in this Area
As noted in the Natural Communities of Louisiana, western longleaf pine savannahs
provide critical habitat for many animal and plant species (LNHP, 2009). At the beginning
of the 17th century, there were an estimated 90 million acres of longleaf pine forests with
nearly 900 different plant species in the southeastern United States. In western Louisiana,
the historic range of longleaf pine included all or parts of Acadia, Allen, Avoyelles,
Beauregard, Calcasieu, Evangeline, Jefferson Davis, Natchitoches, Rapides, Sabine, St.
Landry, and Vernon Parishes. The habitat type has been reduced by 95-99% of its original
extent in the Lower West Gulf Coastal Plain ecoregion in the southwest and west central
portions of Louisiana. Threats to western longleaf pine savannahs include construction of
roads, pipeline or utilities, conversion to loblolly pine plantations, fire exclusion or
inappropriate fire regimes, use of chemical herbicides or fertilizers, invasive or alien
species, and hydrological alterations.
The need for compensatory wetland mitigation is evident based on the recent, ongoing, and
projected industrial, commercial, and residential growth in the Lake Charles area. The
Southwest Louisiana Region is poised to undergo a prolonged period of economic growth,
8
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
with the announcement of over $65 billion in capital projects that are expected to bring
over 18,000 permanent jobs to the area. The future job growth rate ove the next 10 years is
estimated to be 43.6 percent.
In early 2014, the Lake Charles Metropolitan Statistical Area (MSA), Calcasieu and
Cameron Parishes, began to see the first evidence of a massive boom unlike any seen before
in the southwest corner of the state. For the first time since 2008, employment in the Lake
Charles MSA set a regional record. In 2015 employment passed 100,000 for the first-time
in the MSA's history pulling it ahead of Houma to become the fourth largest MSA in the
state, and Lake Charles has now been the fastest growing MSA in the state for three straight
years, adding 12,500 jobs and expanding by 4.7% a year. A growth rate that places the
region among the national leaders for employment and population growth.
By mid-year 2016 the Southwest Louisiana Economic Development Alliance (SWLA) had
identified almost $96.4 billion in announced industrial projects for the Lake Charles MSA
since 2012. Of this total, SWLA has estimated that $45.4 billion of these projects are
already underway or completed, and approximately $72 billion are at the financing,
permitting, or potential project stage. SWLA projects 50,000 new residents in the Lake
Charles area by 2020.
As development activity escalates in the coming years, the anticipated growth and new
revenue will provide great opportunity to initiate strategies and land use principles that will
help protect the environment and wetlands that play such an important role in coastal
sustainability. With ongoing development projected and the substantial amount of
wetlands in the region that will be impacted, many compensatory wetland mitigation
credits will be required to offset the wetland impacts.
In addition, longleaf pine savannahs provide habitat for 23 species of conservation concern
in Louisiana, including the federally-listed red-cockaded woodpecker (Picoides borealis)
and American chaffseed (Schwalbea americana), and the candidate species Louisiana pine
snake (Pituophis ruthveni).
4. ESTABLISHMENT OF THE MITIGATION BANK
4.1 Site Restoration Plan
The Sponsor proposes to rehabilitate 592.7 acres and re-establish 1.7 acres of longleaf pine
savannah, rehabilitate 30.7 acres and preserve 22.4 acres of bottomland hardwood wetlands
and preserve 1.7 acres of hardwood uplands.
Table 3 contains post-construction habitats and acreage descriptions for the proposed reestablishment, rehabilitation, enhancement, and preservation of wetlands associated with
the 654.7-acre tract.
9
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
Table 3: Post-Construction Habitat Acreage Summary
Rehabilitation
(Currently
Pine
Plantation)
Reestablishment
(Currently
Mixed
HardwoodPine Uplands
and Ditch)
Enhancement
(Currently
Tallow
Dominant
Wetlands)
Preservation
30.7 acres
N/A
1.6 acres
22.4 acres
592.7 acres
1.7
N/A
N/A
Upland Buffer
N/A
N/A
N/A
1.7
Totals
625.1 acres
1.7 acres
1.6 acres
24.1 acres
Habitat
Bottomland
Hardwood
Wetlands
Longleaf Pine
Savannah
Wetlands
This section provides information on the proposed soils/hydrologic and vegetative work
that was determined to be necessary for restoration of the proposed site.
4.1.1 Soils/Hydrologic Work
The spoil banks along the ditch on the western site boundary will be graded to fill the ditch
to natural grade (Figures 13, 14, and 15). The majority of the site was historically leveled
for rice farming and currently maintains wetland hydrology. A Nationwide 27 permit will
be obtained from the New Orleans District prior conducting hydrologic restoration work at
the site.
4.1.2 Vegetative Work
Commercial Logging of Undesirable Pine and Hardwoods
To facilitate restoration, commercial logging of undesirable trees across 623.5 acres,
comprising the loblolly pine plantation will be performed immediately as weather permits
for minimal impact on soil and vegetation. Planted loblolly pine, as well as any naturallyoccurring hardwoods, will be removed in longleaf savannah rehabilitation areas (592.7
acres). In addition, loblolly pine will be removed in the bottomland hardwood rehabilitation
areas (30.7 acres). Once all commercial-grade timber is removed from HBMB, residual
slash will be mechanically piled on existing windrows for burning. All logging events will
be carefully designed, implemented immediately as weather permits, and monitored by
experienced professionals.
10
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
Vegetative Plantings
Longleaf Pine
Following logging, site preparation, and hydrologic restoration longleaf pine seedlings will
be planted on 592.7 acres during the standard planting season (December-March). As lower
planting densities are optimal for longleaf pine ecosystem restoration, seedlings shall be
planted using 12 x 12 spacing for an initial stocking level of 302 trees per acre. The planted
areas will be subsequently thinned to mimic natural clusters of longleaf pine to achieve
targeted stocking and to create the park-like effect of the historical savanna. The Sponsor
will target 125 - 150 trees per acre for the 1-year survival criteria and 25 - 65 longleaf pine
trees per acre for Year 5.
Herbaceous understory will be re-established through natural recruitment. The native
ground cover communities that historically characterized the great majority of the bank
have been severely impacted by the pine plantation management. Prescribed fire will be
the most important long-term management tool used on the tract to reestablish the native
grasses, forbs, and herbaceous plants. Burning is essential for re-establishment of grassherbaceous ground-cover communities. Among other effects, properly timed fires
stimulate native grass and herbaceous plants to grow vigorously, flower and produce seeds,
stimulate longleaf pine to grow out of the "grass-stage", and control brown spot needleblight on young longleaf.
Bottomland Hardwoods
Approximately 30.7 acres of bottomland hardwood rehabilitation will be planted with an
appropriate species mixture of bottomland hardwoods during the standard planting season
(December-March). Seedlings will be planted on approximately 9 x 9 spacing for an initial
stand density of at least 537 seedlings per acre. A mixture of at least 60 percent hard-mast
and a maximum of 40 percent soft-mast-producing species will be planted in accordance
with the following species selection list (Table 4). If seedling availability renders a
discrepancy of more than five percent from the desired mixture of hard-mast to soft-mast
species, New Orleans District approval to modify the plan will be obtained. A mixture of
the following species will be planted to restore bottomland hardwoods:
11
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
Table 4: Bottomland Hardwood Species Selection List
COMMON NAME SCIENTIFIC NAME
MAST
Laurel oak
Quercus laurifolia
Hard
Nuttall oak
Quercus texana
Hard
Cherrybark oak
Quercus pagodafolia
Hard
Willow oak
Quercus phellos
Hard
Water oak
Quercus nigra
Hard
Water hickory
Carya aquatica
Hard
Percent Composition
Sweet gum
Liquidambar styraciflua
Soft
Bald cypress
Taxodium distichum
Soft
Red maple
Acer rubrum
Soft
Persimmon
Diospyros virginiana
Soft
Sugar-berry
Celtis laevigata
Soft
Percent Composition
%
10
10
10
10
10
10
60%
5
20
5
5
5
40%
Fire Management Regime
Prescribed fire will be the most important regular management tool used on the tract.
Burning is essential for longleaf pine regeneration, preclusion of unwanted hardwoods and
shrubs, and re-establishment of the herbaceous ground-cover communities. Application of
frequent fire is necessary to help restore the native distribution of longleaf pine and slash
pine-pond cypress habitats into areas that have been overtaken by hardwoods and other
pines. Further, properly timed fires stimulate native herbaceous plants to grow vigorously,
flower and produce seeds, stimulate longleaf pine to grow out of the "grass-stage", and
control brown spot needle blight on young longleaf.
The Sponsor proposes to reestablish a fire regime within the longleaf pine savannah areas
on the HBMB through a strictly regulated ecological burning program. Growing season
burns, that mimic historical wildfire occurrences (late March June), will be favored over
dormant season burns. The regulated burning program will commence the first year as a
site preparation burn and continued every two years for the first six years and then on a
two to three-year rotation as needed. Natural or existing fire breaks will be used whenever
possible to reduce unnatural disturbances to the bank and allow burns to mimic natural fire
behavior.
Controlled burns will be administered in large blocks, to mimic a natural wildfire, by a
contractor properly equipped and trained on the techniques of prescribed burning. Fire
breaks will be set along the boundaries of the bottomland hardwood areas. While the site
is practically inaccessible by the public, adjacent landowners, as well as local fire officials
will be made aware of planned burns in advance. Prescribed fire is common to this area
and has been implemented on this property in the past.
12
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
4.2 Technical Feasibility
The limited construction work required to develop the bank is routine in nature. The site
will be clear-cut to remove plantation loblolly pine and planted with longleaf pine and
bottomland hardwood seedlings. The site was previously leveled for rice production. A
ditch on the western site boundary will be closed. No other hydrological management will
be required.
4.3 Current Site Risks
The Sponsor owns the land to the north, west, and south of the HBMB and plans to
incorporate the land into the bank in the future. Land to the east is primarily in agricultural
use. The HBMB site is zoned A1- Agricultural. There are no liens, rights-of-way,
servitudes, or easements on the HBMB. There is a mortgage on the property which will
be subordinated to the Mitigation Banking Instrument.
4.4 Long-Term Sustainability of the Site
Long-term viability and sustainability of the HBMB will be ensured through active and
adaptive management including, but not limited to, fire management regime, invasive
species control, appropriate monitoring, and long-term maintenance. There is no
maintenance of hydrological features proposed for the Bank.
5. PROPOSED SERVICE AREA
HBMB is located with the Upper Calcasieu Watershed (USGS HUC 08080203) of the
Calcasieu Basin, which includes portions of Allen, Beauregard, Calcasieu, Jefferson Davis,
Natchitoches, Rapides, and Vernon Parishes. HBMB will service HUCs 08080203,
08080204, 08080205, and 08080206 of the Calcasieu Basin. The Calcasieu Basin includes
the current and historic range of the western longleaf pine savannah. The proposed service
area for the HBMB is attached as Figure 16.
6. OPERATION OF THE BANK
This section describes how the proposed Bank will be operated, as stated in 33 CFR
332.8(d)(2) (ii) and provides details on the proposed ownership arrangements and longterm management strategy for the mitigation bank, as stated in 33 CFR 332.8(d)(2) (v.)
6.1 Project Representatives
Sponsor:
The Mitigation Group, LLC
311 West Russell
Welsh, Louisiana 70591
Jayfear@themitgroupllc.com
(337) 338-0162
13
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
Agent:
Charles Jones, Director of Ecological Services
Matrix New World Engineering
2798 O'Neal Lane Building F
Baton Rouge, Louisiana 70816
cjones@matrixneworld.com
225-247-3352
Landowner:
The Mitigation Group, LLC
311 West Russell
Welsh, Louisiana 70591
Jay_fear1@hotmail.com
(337) 338-0162
6.2 Qualifications of the Sponsor
Members of The Mitigation Group team have over 30 years of experience in ownership
and operation of mitigation banks in the New Orleans, Vicksburg, and Galveston Districts
of the Corps of Engineers.
6.3 Proposed Long-Term Ownership and Management Representatives
TMG will serve as the sponsor and long-term owner. However, the Sponsor may appoint
a long-term steward if such appointment is approved by the IRT. The anticipated long-term
management will consist of monitoring, invasive species control, prescribed burning, forest
management, boundary maintenance, and site protection.
6.4 Site Protection
The Bank will be protected in perpetuity by a Conservation Servitude held by a non-profit
conservation group (pursuant to the Louisiana Conservation Servitude Act, R.S. 9:1271 et.
seq.) on the entirety of the 654.7-acre tract. A copy of the Conservation Servitude will be
filed in the real estate records of the Mortgage and Conveyance Office of Calcasieu Parish
and shall be provided to the USACE for review and approval prior to filing. After filing, a
copy of the recorded Conservation Servitude, clearly showing the book, page, and date of
filing, will be provided to the USACE.
6.5 Long-Term Strategy
Long-term management will consist of monitoring, vegetation management via a
prescribed fire regime, invasive species control, boundary maintenance, site protection, and
the funding of such activities. Prescribed burns will be conducted on a two- to three-year
basis during the growing season to mimic historical wildfire occurrences. The burns will
be conducted by a contractor properly equipped and trained on the techniques of prescribed
burning. The wetland habitats will be managed to increase and maintain the biological,
14
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
chemical, and physical wetland functions of the HBMB and to provide forested habitat
capable of supporting populations for priority wildlife species.
A long-term management plan will be included with the Draft Mitigation Banking
Instrument, which will detail long-term management needs and costs, and identify a
funding mechanism. The Sponsor or Long-term Steward will be responsible for protecting
lands contained within the HBMB in perpetuity. An interest-bearing long-term
management account, specifically an escrow account, will be established to insure adequate
funding is available to cover the costs of these activities in the future.
7. REFERENCES
Adrian, Mitchel and J. Icaza. Estimations for Job Growth in the Tertiary and Quaternary
Sectors in Southwest Louisiana: Predicting Permanent "Post Boom" Employment Based
Upon Anticipated Population Growth. McNeese State University.
Allen, J.A., Keeland, B.D., Stanturf, J.A., Clewell, A.F., and Kennedy, H.E., Jr., 2001
(revised 2004), A guide to bottomland hardwood restoration: U.S. Geological Survey,
Biological Resources Division Information and Technology Report USGS/BRD/ITR
2000-0011, U.S. Department of Agriculture, Forest Service, Southern Research Station,
General Technical Report SRS40, 132 p.
America's Longleaf Restoration Initiative. 2009. Range-Wide Conservation Plan for
Longleaf Pine. http://www.americaslongleaf.org/
Demers, Chris, A. Long, and P. Moinogue. 2013. Longleaf Pine Regeneration (SS-FOR13). Gainesville: University of Florida Institute of Food and Agricultural Sciences.
http://edis.ifas.ufl.edu/DLN/.
Di Luzio, Mauro. 2007. Data from: Seamless Daily Precipitation for the Conterminous
United States. USDA/NRCS Geospatial Data Gateway. https://gdg.sc.egov.usda.gov/
Lester, Gary. D., S. G. Sorensen, P. L. Faulkner, C. S. Reid, and I. E. Maxit. 2005.
Louisiana Comprehensive Wildlife Conservation Strategy. Louisiana Department of
Wildlife and Fisheries. Baton Rouge. 455 pp.
Lichvar, R.W., M. Butterwick, N.C. Melvin, and W.N. Kirchner. 2014. The National
Wetland Plant List: 2014 Update of Wetland Ratings. Phytoneuron 2014-41: 1-42.
Longleaf Pine Initiative. 2011. Longleaf Pine Initiative Fact Sheet. Natural Resources
Conservation Service.
http://www.nrcs.usda.gov/wps/portal/nrcs/detailfull/national/programs/initiatives/?cid=nr
csdev11_023913
Louisiana Natural Heritage Program. 2009. The Natural Communities of Louisiana.
Louisiana Department of Wildlife and Fisheries.
15
THE MITIGATION GROUP, LLC
HICKORY BRANCH MITIGATION BANK
Smith, Latimore. 1996. The Rare and Sensitive Natural Wetland Plant Communities of
Interior Louisiana. Louisiana Department of Wildlife and Fisheries, Louisiana Natural
Heritage Program. 40pp.
Soil Survey Staff, Natural Resources Conservation Service, United States Department of
Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/
Accessed [11/7/2016].
United States Department of Agriculture, Soil Conservation Service. 1980. Soil Survey of
Allen Parish, Louisiana.
16
FIGURES
£
_
^
Project Center
Latitude 30.380457°
Longitude -93.273809°
Legend
Vicinity Map
Hickory Branch Mitigation Bank (654.7 acres)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
4
2
0
4
Miles
Source: Base map comprised of ESRI StreetMap USA data.
Approved By
CEJ
Date
5/7/2018
1
Drawing No.
17-438-A032
Figure No.
£
Latitude 30.389722°
Longitude -93.280842°
Latitude 30.390397°
Longitude -93.277082°
Latitude 30.386469°
Longitude -93.266608°
Latitude 30.384440°
Longitude -93.281480°
Latitude 30.378022°
Longitude -93.280071°
Latitude 30.377963°
Longitude -93.279292°
Latitude 30.370556°
Longitude -93.266710°
Latitude 30.370670°
Longitude -93.279342°
Legend
Site Location Map
Hickory Branch Mitigation Bank (654.7 acres)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
2,000
Source: Base map comprised of U.S.G.S. 7.5-minute topographic map(s), "Buhler, LA" dated
1998; and "Gordon, LA" dated 1994.
1,000
0
2,000
Feet
Approved By
CEJ
Date
5/17/2018
2
Drawing No.
17-438-A033
Figure No.
£
Legend
Land Use Map
Hickory Branch Mitigation Bank (654.7 acres)
Land Use
Open Water
Mixed Forest
Developed, Open Space
Shrub/Scrub
Developed, Low Intensity
Herbaceuous
Developed, Medium Intensity
Hay/Pasture
Barren Land
Cultivated Crops
Deciduous Forest
Woody Wetlands
Evergreen Forest
Emergent Herbaceuous Wetlands
Source: Base map comprised of ESRI World Imagery. Land use data obtained from the
USDA/NRCS 2011 National Land Cover Dataset (NLCD).
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
2,500
1,250
0
2,500
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A034
3
Figure No.
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
1952 Aerial Photograph
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID: ARA000960122039
[aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, March 24, 1952.
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A035
4
Figure No.
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
1967 Aerial Photograph
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID:
AR1VBWB00020159 [aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, December 3,
1967.
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A036
5
Figure No.
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
1985 Aerial Photograph
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID: AR5850035512101
[aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, December 15, 1985.
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A037
6
Figure No.
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
1998 Aerial Photograph
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: Base map comprised of 1998 aerial photography from the Louisiana Oil Spill
Coordinators Office (LOSCO).
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A038
7
Figure No.
£
Legend
Hi
ck o ry Bra nc
hMi
ti
ga ti
o nBa nk (
654.
7a c
res )
2010 Aerial Photograph
Mitigation Bank Prospectus
Ca lc
asi
eu Pa ri
s h,Lo ui
si
a na
The Mitigation Group
1,
000
Source: Ba s ema p c
o mp ri
s edo f2010a eri
a l p ho to gra p hy f
ro m theLo ui
si
a na Go verno r 's
Of
f
i
ceo fHo mela ndSec
uri
ty a ndEmergency Prep a rednes s (
GOHSEP)
.
Hi
cko ry Bra nc
hMi
ti
ga ti
o nBa nk
500
0
1,
000
Feet
Approved By
CEJ
Date
5/
7/
2018
Drawing No.
17438A039
8
Fi
gureNo .
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
2017 Aerial Photograph
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: Base map comprised of 2017 aerial photography from USDA/FSA Aerial Photography
Field Office, National Agriculture Imagery Program (NAIP).
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A040
9
Figure No.
Mb
Ge
Go
Gy
Ge
Mb
£
Gy
Mb
GU
Gg
Ge
Cd
Go
Ge
GU
Ge
Ge
Legend
Soils Map
Hickory Branch Mitigation Bank (654.7 acres)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
Soils
Cd - Caddo-Messer complex, 0 to 1 percent slopes
Ge - Glenmora silt loam, 1 to 3 percent slopes
Go - Guyton silt loam, 0 to 1 percent slopes, occasionally flooded
GU - Guyton and Bienville soils frequently flooded
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
Source: Base map comprised of ESRI World Imagery. Soils data obtained from Natural
Resources Conservation Service (NRCS) Web Soil Survey.
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A041
10
Figure No.
£
Legend
Hickory Branch Mitigation Bank (654.7 acres)
Contributing Watershed Map
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
Moss Gully-West Fork Calcasieu River Watershed (23.2 miles)
The Mitigation Group
Hickory Branch Mitigation Bank
2
1
0
2
Miles
Source: Base map comprised of U.S.G.S. 100K topographic map, "Lake Charles, LA" dated
1986. Watershed boundaries obtained from the Watershed Boundary Dataset (USDANRCS/USGS/EPA).
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A042
11
Figure No.
£
Legend
LIDAR Map
Hickory Branch Mitigation Bank (654.7 acres)
Elevation Contours (feet)
6 - 11
28 - 30
12 - 15
31 - 34
16 - 20
35 - 37
21 - 24
38 - 40
25 - 27
41 - 47
Source: Base map comprised of ESRI World Imagery. LIDAR Contours calculated from
USACE/LOSCO Digital Elevation Model, dated 2002/2009.
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
1,000
500
0
1,000
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A043
12
Figure No.
£
End of
Ditch and Spoil Bank
Inset A
See Inset A
Beginning of
Ditch and Spoil Bank
See Inset B
Inset B
Legend
Hickory Branch Mitigation Bank (654.7 acres)
Existing Site Plan
Drainage Flow
Pine-Dominant Wetlands (100% Wet; 623.0 acres)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
Pine-Dominant Wetlands (66% Wet; 0.5 acres)
Tallow-Dominant Wetlands (100% Wet; 1.6 acres)
The Mitigation Group
Bottomland Hardwoods (100% Wet; 22.9 acres)
Bottomland Hardwoods (66% Wet; 1.2 acres)
Other Waters of the U.S. (2.2 acres)
Spoil Bank (1.2 acres)
Existing At-Grade Roads (2.1 acres)
Source: Base map comprised of 2017 aerial photograph from USDA/FSA Aerial Photography
Field Office, National Agriculture Imagery Program (NAIP).
Hickory Branch Mitigation Bank
1,000
500
0
1,000
Feet
Approved By
CEJ
Date
1/16/2019
13
Drawing No.
17-438-A117
Figure No.
£
End of
Ditch and Spoil Bank
Inset A
See Inset A
Beginning of
Ditch and Spoil Bank
See Inset B
Inset B
150'
150
'
Legend
Restoration Site Plan
Hickory Branch Mitigation Bank (654.7
acres)
Bottomland Hardwood Rehabilitation
(100% Wet; 30.4 acres)
Longleaf Pine Savannah ReEstablishment (Filled Ditch; 0.5 acre)
Bottomland Hardwood Rehabilitation
(66% Wet; 0.4 acre)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
Longleaf Pine Savannah ReEstablishment (Graded Spoil Banks; 1.2
acres)
Bottomland Hardwood Enhancement
(100% Wet; 1.6 acres)
The Mitigation Group
Longleaf Pine Savannah Rehabilitation
(592.7 acres)
Bottomland Hardwood Preservation
(100% Wet; 19.2 acres)
Other Waters of the U.S. (1.7 acres)
Bottomland Hardwood Preservation
(66% Wet; 4.9 acres)
Drainage Flow
Existing At-Grade Roads (2.1
Source: Base map comprised of 2017 aerial photograph from USDA/FSA Aerial Photography
Field Office, National Agriculture Imagery Program (NAIP).
Hickory Branch Mitigation Bank
1,000
500
0
1,000
Feet
Approved By
CEJ
Date
2/7/2019
14
Drawing No.
17-438-A118
Figure No.
Spoil Bank
Remnant
Agricultural Ditch
Spoil Bank
8'
6'
8'
£
2'
3'
Pre-Restoration
Graded
Spoil Bank
Filled
Ditch
Graded
Spoil Bank
Post-Restoration
Typical Ditch and Spoil Bank
Cross Section
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
The Mitigation Group
Hickory Branch Mitigation Bank
5
2.5
0
5
Feet
Approved By
CEJ
Date
5/7/2018
Drawing No.
17-438-A046
15
Figure No.
£
08080203
08080204
08080205
08080206
Legend
Service Area Map
Hickory Branch Mitigation Bank (654.7 acres)
Service Area (Calcasieu Basin)
Mitigation Bank Prospectus
Calcasieu Parish, Louisiana
Hydrologic Unit Boundary
The Mitigation Group
Hickory Branch Mitigation Bank
15
Source: Base map comprised of ESRI World Imagery. Hydrologic Unit boundaries obtained
from the Watershed Boundary Dataset (USDA-NRCS/USGS/EPA).
7.5
0
15
Miles
Approved By
CEJ
Date
5/17/2018
16
Drawing No.
17-438-A048
Figure No.
APPENDIX A
PRELIMINARY JURISDICTIONAL
DETERMINATION
(MVN 2018-00361)
'(3$570(172)7+($50<
&25362)(1*,1((561(:25/($16',675,&7
/($.($9(
1(:25/($16/$
)HEUXDU\
2SHUDWLRQV'LYLVLRQ
6XUYHLOODQFHDQG(QIRUFHPHQW6HFWLRQ
0U&KDUOHV-RQHV
0DWUL[1HZ:RUOG
%OXHERQQHW%OYG6WH(
%DWRQ5RXJH/RXLVLDQD
'HDU0U-RQHV
5HIHUHQFHLVPDGHWR\RXUUHTXHVWRQEHKDOIRI7KH0LWLJDWLRQ*URXS//&IRUD86$UP\
&RUSVRI(QJLQHHUV MXULVGLFWLRQDOGHWHUPLQDWLRQRQSURSHUW\ORFDWHGLQ6HFWLRQV
DQG7RZQVKLS6RXWK5DQJH:HVW&DOFDVLHX3DULVK/RXLVLDQD
HQFORVHGPDS 6SHFLILFDOO\WKLVSURSHUW\LVLGHQWLILHGDV7KH+LFNRU\%UDQFKVLWHD
DFUHWUDFWORFDWHGRQDQGQRUWKRI:DWWV5RDGDQG:HVW)RUN&DOFDVLHX5LYHUDQGRQDQGHDVW
RI+LFNRU\%UDQFKQHDU*LOOLV
%DVHGRQUHYLHZ RIUHFHQWPDSVDHULDOSKRWRJUDSK\VRLOVGDWDWKHLQIRUPDWLRQSURYLGHG
ZLWK\RXUUHTXHVWDQGDILHOGLQVSHFWLRQRIWKHSURSHUW\FRQGXFWHGRQ1RYHPEHUZH
KDYHGHWHUPLQHGWKDWSDUWRIWKHSURSHUW\LVZHWODQGDQGPD\EHVXEMHFWWR&RUSV MXULVGLFWLRQ
7KHDSSUR[LPDWHOLPLWVRIWKHZHWODQGDUHGHVLJQDWHGLQUHGRQWKHPDS$'HSDUWPHQWRIWKH
$UP\ '$ SHUPLWXQGHU6HFWLRQRIWKH&OHDQ:DWHU$FWZLOOEHUHTXLUHGSULRUWRWKH
GHSRVLWLRQRUUHGLVWULEXWLRQRIGUHGJHGRUILOOPDWHULDOLQWRMXULVGLFWLRQDOZHWODQGRUWKH
QRQZHWODQGZDWHUVVKRZQLQEOXHRQWKHPDS$OVRDSRUWLRQRIWKHQRQZHWODQGZDWHUV
LQGLFDWHGLQEOXHRQWKHPDSPD\EHVXEMHFWWR&RUSV MXULVGLFWLRQXQGHU6HFWLRQRIWKH5LYHUV
DQG+DUERUV$FW 5+$ $'$6HFWLRQSHUPLWZLOOEHUHTXLUHGSULRUWRDQ\ZRUNLQZDWHUVRI
WKH8QLWHG6WDWHVLQFOXGLQJZHWODQGVVXEMHFWWR&RUSVMXULVGLFWLRQXQGHU6HFWLRQRIWKH5+$
OBERLIES.BRIAN.MC
INNIS.1230779739
Digitally signed by OBERLIES.BRIAN.MC
INNIS.1230779739
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=USA, cn=OBERLIES.BRIAN.MC INNIS.1230779739
Date: 2019.02.06 10:00:00 -06'00'
IRU0DUWLQ60D\HU
&KLHI5HJXODWRU\%UDQFK
(QFORVXUHV
£
%HDXUHJDUG3DULVK
&DOFDVLHX3DULVK
5RVLH 6FKZDPHQIHOG
&KDUOHV -RQHV
65
Hic
ko
ry
Bra
nch
+LFNRU\%UDQFK5G
%XVKQHOO5G
B
e
c
k
w
it
h
e
Cr
%LOO3
3DXO:KLWH5G
ek
U N5
G
&OLIIRUG5G
:DWWV5G
EUR
RN3
D
We
s
Ca t F
l c a ork
si
Ri
v e eu
r
-R
0R KQ3
RU DX
H 5 O
G
5G
%HQRLW
5G
UHZLWW
+RO
/HJHQG
/LPLWVRI'HOLQHDWLRQ DFUHV
1RQZHWODQG :DWHUV RI
3RWHQWLDO-XULVGLFWLRQDO:HWODQGV
:HVW )RUN &DOFDVLHX 5LYHU
:HWODQGV DFUHV
:HWODQGV DFUHV
ZHW DFUHV
ZHW DFUHV
ZHW DFUHV
6LWH3ODQ2YHUYLHZ
:HWODQG'DWD5HSRUW5HTXHVWIRU
3UHOLPLQDU\-XULVGLFWLRQDO'HWHUPLQDWLRQ
&DOFDVLHX3DULVK/RXLVLDQD
7KH0LWLJDWLRQ*URXS
:HWODQGV DFUHV
:HWODQGV DFUHV
3RWHQWLDO-XULVGLFWLRQDO2WKHU:DWHUVRIWKH86
DFUHV
1RQZHWODQG :DWHUV
([LVWLQJ3DYHG5RDGV
7LMLH'U
+LFNRU\%UDQFK7UDFW
)HHW
$SSURYHG%\
&(7
'DWH
'UDZLQJ1R
$
)LJXUH1R