The Salvation Army is proposing to restore a dam that was breached during the September 2013 flood event, and enlarge an existing online pond. The project as proposed will permanently impact 650 linear feet (0.04-acre) of Tahosa Creek and 0.94 acre of abutting wetland.
PUBLIC NOTICE
Application No:
Project:
US Army Corps
of Engineers
Omaha District
Applicant:
Waterway:
Issue Date:
Expiration Date:
NWO-2014-02204-DEN
Salvation Army High Peak Camp Dams
(High Peak Dam 4 Restoration)
The Salvation Army
Tahosa Creek
February 22, 2019
March 22, 2019
REPLY TO:
Denver Regulatory Office
9307 South Wadsworth Blvd
Littleton, CO 80128-6901
FAX (303) 979-0602
30 DAY NOTICE
PUBLIC NOTICE
FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
Notice
The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the
Army Section 404 Permit application from The Salvation Army, 1370 Pennsylvania Street, Denver,
Colorado 80203; Attn: Will Raihl. Permits are issued under Section 404 of the Clean Water Act
(Section 404) which regulates the placement of dredged or fill material in the nation's waters.
Summary
The Salvation Army is proposing to restore a dam that was breached during the September 2013 flood
event, and enlarge an existing online pond. The project, as proposed, will permanently impact 650
linear feet (0.04-acre) of Tahosa Creek and 0.94-acre of abutting wetlands.
Location
The project is located to the west of State Highway 7, in Section 27 within Township 4 North and
Range 73 West in Estes Park, Larimer County, Colorado. The approximate project center latitude is
40.2819 and the longitude is -105.5430.
Existing Conditions
The project is located along Tahosa Creek, which is a perennial stream that from the northwest to the
southeast across the property. The area surrounding the project is lightly developed with The
Salvation Army recreation camp and undeveloped forests.
Historically, the project area contained three ponds (Pond #4, Pond #5, and Pond #6). The
September 2013 flood event caused a breach in the dams that contained Ponds #4 and #5 and resulted
in all of the ponds draining. Due to the lack of control of the water within all of these ponds,
Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration)
Corps File No: NWO-2014-02204-DEN
Waterway: Tahosa Creek
Applicant: The Salvation Army
Page 1
significant sedimentation has occurred in Tahosa Creek and Pond #4, which has greatly reduced the
capacity.
Description of Work
The September 2013 flood event breached the dams associated with Ponds #4 and #5. The project
consists of the restoration and improvements to the dam associated with Pond #4, as well as the
enlargement of this pond in order to consolidate the water from Ponds #5 and #6. Prior to the dam
breach, Pond #4 was 1.58 surface acres. The enlarged pond will be 3.64 surface acres at normal water
level. Please refer to the attached figures. Pond #4 will remain a very important feature of the High
Peak Camp and will continue to serve as a source for fire protection water, as well as other recreational
uses.
Project Purpose and Need
The basic project purpose is dam reconstruction. The overall project purpose is to reconstruct the
dam and efficiently store their water rights onsite.
Impacts and Mitigation
The proposed project would require the unavoidable discharge of fill material into Tahosa Creek, a
water of the U.S. and its abutting wetlands within the project area. The approximate amounts of fill
that would be permanently placed within waters of the U.S., including wetlands, are as follows:
·
·
·
·
·
11,768 cubic yards of clean fill material
6,200 cubic yards of dam core zone material
130 linear feet of 24-inch diameter C905 PVC outlet pipe
660 cubic yards of gravel bedding
55 cubic yards of concrete pipe cradle
The project would result in 927 cubic yards of fill material. Unavoidable permanent impacts include
650 linear feet (0.04-acre) of Tahosa Creek and 0.94-acre of abutting wetlands associated with the
reconstruction of the dam and enlargement of Pond #4.
The proposed project has been designed to minimize impacts to Tahosa Creek, and its associated
wetlands to the greatest extent practicable. In addition to avoiding and minimizing direct impacts,
the project would include best management practices (BMPs) during construction to minimize
indirect impacts on adjacent areas.
As proposed, temporary and permanent impacts on waters of the U.S. and adjacent wetlands would
be mitigated for on-site, in-kind, and at a 1:1 ratio using a combination of restoration, compensatory
mitigation, and improvements to the aquatic ecosystem.
*********************
The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 7701Cherry
Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state
certification in accordance with the provisions of Section 401 of the Clean Water Act. The
certification, if issued, will express the State's opinion that the operations undertaken by the applicant
will not result in a violation of applicable water quality standards. For further information, please
contact the Colorado Water Quality Control Division at (303) 692-3500.
Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration)
Corps File No: NWO-2014-02204-DEN
Waterway: Tahosa Creek
Applicant: The Salvation Army
Page 2
In compliance with the Endangered Species Act, a preliminary determination has been made that the
described work will not affect species designated as threatened or endangered or adversely affect
critical habitat. In order to complete our evaluation of this activity, comments are solicited from the
U.S. Fish and Wildlife Service and other interested agencies and individuals.
The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of
1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. The Corps will
evaluate input by the State Historic preservation Office, Tribes, and the public in response to this
public notice, and we may conduct or require a survey of the permit area to check for unknown
historic properties, if warranted.
The decision whether to issue a permit will be based on an evaluation of the probable impacts including
cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefits which
reasonably may be expected to accrue from the proposal must be balanced against the reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the people. In
addition, the evaluation of the impact of the work on the public interest will include application of the
guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of
Section 404(b) of the Clean Water Act (40 C.F.R. Part 230).
The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of
this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and other public interest factors listed above. Comments are used in the
preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need for a public hearing
and to determine the overall public interest of the proposed activity.
Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive
full consideration in subsequent actions on this application. Any agency or individual having an
objection to the work should identify it as an objection with clear and specific reasons. All replies to
the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office,
9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please
contact Ms. Brooke Davis at brooke.a.davis@usace.army.mil or by phone at (303) 979-4120 or
visit the Denver Regulatory Office web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx
The District Engineer will consider requests for holding a public hearing, for the purpose of gathering
additional information. Before the expiration date of this notice, anyone may request, in writing, that a
public hearing be held. Requests for a public hearing should state specifically the reasons for holding a
Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration)
Corps File No: NWO-2014-02204-DEN
Waterway: Tahosa Creek
Applicant: The Salvation Army
Page 3
public hearing, and what additional information would be obtained. Should the District Engineer decide
that additional information is required and a public hearing should be held, interested parties will be
notified of the date, time and location.
Comments received after the close of business on the expiration date of this public notice will not
be considered.
Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration)
Corps File No: NWO-2014-02204-DEN
Waterway: Tahosa Creek
Applicant: The Salvation Army
Page 4
ADJUDICATED POND BOTTOMS
WETLANDS DalNEATED ON
ADJUDICATED POND BOTTOMS
(NOT TO BE MmGATED)
WETLAND DELINEATION BOUNDARY
UPLAND. (NON-WETLAND) AREA
PROP. NWL (NORMAL WATER LEVEL)
PROP. HWL FLOOD STAGE
PREVIOUS. NWL (NORMAL WATER LEVEL)
PERMANENTLY IMPACTED WETLANDS
POND f5 Nv.t.
EU:V. 894a56
a.ans SURFACE AC.
BREACHED
(TO 8E USED FOR
WE'TLAND MITIGATION)
PONO {14 BOTTOM WITHIN Y£TLAND DELINEATION
1.2825 ACRES {LESS UPLAND AND STREAM AREAS)
PORTION OF POND fl6 TO REMAIN NOT PERMENAllEY INUNDATED
(TO BE USED FOR WETLAND MlllGATION 0.124D AC OF 0.6696 AC.)
WE11.AND 2
0.5652 AC.
SCALE
200
...,
0
INCH
=
200 FEET
0
100
200
400
~-i~
l
l
l
GAUTHIERE ENGINEERING, INC.
2157 Buena Vista Drive Greeley, Colorado
80634 Phone: (970) 330-0855
E-mail: John@gaulhier&-englneerlng.com
Scale: AS SHOWN
Drawn By: JGG
File:SA
POND #4 ENLARGEMENT
3.64 SURFACE AC. AT
NORMAL WAlER LEVEL
THE SALVATION ARMY-HIGH PEAK CAMP
DAM #4 REHABILITATION PROJECT
WETLANDS
Date: FEB. 01, 2019
FIGURE 2 - WETLAND IMPACT MAP
,r1'
1!
·Il,
l1I
jl
'1
I,
I
.,!,
HIGH PEAK CAMP DAM #4 REHABILITATION PROJECT
SALVATION ARMY
!I
WATER DIVISION 1 WATER DISTRICT 5 STRUCTURE ID 3692
LARIMER COUNTY, COLORADO
DRAWING INDEX
SHEET NUMBER
DESCRIPTION
§
PROJECT CONTROL:
tl.M)8a\'ERTICM.
STATIPUJl[GRl>lfORIZONT.41.
,!;
snt
<5
COHTROl Vlf't.S
11
GENERAL NOTES
I!
.,·I
STRUCTURAL NOTES
11
EXISTINO SITE LAYOUT
!·
t:na7574.804
Dn:U9l.70
ii:
Lo t: 40'17'13.09'72"11
Lon: 1WJ2'40.39004-W
z
EXISTING DAM 14 PLAN AND CROSS SECTIONS
II
i'
i1,.'
U:134$302.Ul
el
a..,.,au1.JO
LoU0"16'6l.l4012"H
lon:IOSJ2'l5.42048"W
lt: IJHi200.7J9
E:29075~.650
EXISTING DAM 111 Pl.AN AND CROSS SECTIONS
lAt40'17 '0(U481211
LM:1~·JJ'4 1.21l 154"'W
,;~::I
"'
~
!;.
~
~
::,
STECOt-rmot.POIHTCDI
EXISTING DAM #5 PLAN AND CROSS SECTIONS
,a
JS~
...5z ~ii
SfftCOl'ITROLvtAS
E:298196J.:lOJ
I"
!
ia;;.
......
z
H:1l47J&l.141
COVER SHEET, VICINITY r.lAP, DRAWING INDEX
o.v;e,50.~
BORING LOG CROSS SECTIONS
DETAILS
10
DETAILS
11
DETAILS
12
DETAI LS
13
DETAILS
_________________,.
14
DETAILS
15
EROSION PROTECTION, RIPRAP & BEDDING DETAILS
16
EROSION CONTROL
I HEREBY CCRTlfY TlU.T ll!ESE PlAAS rOA TttE tt<,tt PfAK CAI.IP tu.U
REWa.lTAllOI I PROJECT lllJl't PREPN!m 8V UE (OR UHOER UY OIR£CT
SUPIFASll)tl) roR
~ E R TlOEOf,
,l't-.f!ii01t, P.L CoWIWSo P.E, /22131
N>PRCMD Oil TllE _ _ _ _ OAY
NOTES:
or _ _ _ _, o _
SIAIE OIGlllta
btPUIY Sl.4.IE UIW:UR
lHE5£ PlJ.llS REPR£SDrT THE AS-COUSTRUCm> COtlO/OOttS Of' toctt Pr»: CAMP
CW.,S TO TllE BtST or OUR I0/0'111..EDCE NIO JVOCOIOO, BASm II PAAf 011
1/lf'ORIJA'OOtl f'UfflnSHro fJ'I' OTHERS M or TIIE DAY Of - - , . _
.)OIIU G.. GI.UTHl(R(, P,E.
f
2ZIJ6
~07-01-2016
PRELIMINARY
NOT FOR
CONSTRUCTION
C-
3A
PROJ ECT CONTROL:
HA\ '088\-tRllC>,L
StATE Pl.At£ trro ttORIZotlfAl
SITE cotfTROL \'IIPI..$
N.:1J· 7J&J 2 41
E:2961.$1U0 4
Etrr.899370
lol:40'17'l3 09612"tl
Lon.: IOS"JZ'-40.JiOCU ~
SrTEcotmtot.\'HP\.S
H1J·.5JS2622
£:1H1H320J
[J,...-.89 41.30
lol:40'16'5J,1 · 0 12"N
Lqn: I0S·Jz'J5420 · &'W
SIT£ CCfflROL POffl CO I
H1346200739
C:2.H7$.4SASO
Orr.H 50.5 ·
La\:40'17'00.«812"»
t.on;IOS'J2'4126154"W
SCAl.t- ·-
....
o,,n;07-0 l -2016
...,,
-
38
SIT[ ComROl \'HPLS
lt130Jal.241
E:.29117578.801
£l tr.!99l.70
Lol:40'17'1l.09672"N
Lon:105"J2'«).lg()()l'W
COHmOl \'HPt.S
ltll-'5362.622
E:29117116J.20l
SfT[
o......eu1.JO
I.Dt:40'16'5l.14012"N
L<>rcl0S'J2'JS.420tll'W
srrttomffOlPOaD..-:119.50..54
Lot:40'17'00.4481211
Lon:IOS'J2' · 1.26151'W
/
w
I
I-
PRELIMINARY
NOT FOR CONSTRUCTION
C-
-
3C