Home

Omaha District

Run scraper

Waterway:

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Salvation Army is proposing to restore a dam that was breached during the September 2013 flood event, and enlarge an existing online pond. The project as proposed will permanently impact 650 linear feet (0.04-acre) of Tahosa Creek and 0.94 acre of abutting wetland.

PUBLIC NOTICE Application No: Project:

US Army Corps of Engineers Omaha District

Applicant: Waterway: Issue Date: Expiration Date:

NWO-2014-02204-DEN Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration) The Salvation Army Tahosa Creek February 22, 2019 March 22, 2019

REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901 FAX (303) 979-0602

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS Notice The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army Section 404 Permit application from The Salvation Army, 1370 Pennsylvania Street, Denver, Colorado 80203; Attn: Will Raihl. Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material in the nation's waters. Summary The Salvation Army is proposing to restore a dam that was breached during the September 2013 flood event, and enlarge an existing online pond. The project, as proposed, will permanently impact 650 linear feet (0.04-acre) of Tahosa Creek and 0.94-acre of abutting wetlands. Location The project is located to the west of State Highway 7, in Section 27 within Township 4 North and Range 73 West in Estes Park, Larimer County, Colorado. The approximate project center latitude is 40.2819 and the longitude is -105.5430. Existing Conditions The project is located along Tahosa Creek, which is a perennial stream that from the northwest to the southeast across the property. The area surrounding the project is lightly developed with The Salvation Army recreation camp and undeveloped forests. Historically, the project area contained three ponds (Pond #4, Pond #5, and Pond #6). The September 2013 flood event caused a breach in the dams that contained Ponds #4 and #5 and resulted in all of the ponds draining. Due to the lack of control of the water within all of these ponds, Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration) Corps File No: NWO-2014-02204-DEN Waterway: Tahosa Creek Applicant: The Salvation Army

Page 1

significant sedimentation has occurred in Tahosa Creek and Pond #4, which has greatly reduced the capacity. Description of Work The September 2013 flood event breached the dams associated with Ponds #4 and #5. The project consists of the restoration and improvements to the dam associated with Pond #4, as well as the enlargement of this pond in order to consolidate the water from Ponds #5 and #6. Prior to the dam breach, Pond #4 was 1.58 surface acres. The enlarged pond will be 3.64 surface acres at normal water level. Please refer to the attached figures. Pond #4 will remain a very important feature of the High Peak Camp and will continue to serve as a source for fire protection water, as well as other recreational uses. Project Purpose and Need The basic project purpose is dam reconstruction. The overall project purpose is to reconstruct the dam and efficiently store their water rights onsite. Impacts and Mitigation The proposed project would require the unavoidable discharge of fill material into Tahosa Creek, a water of the U.S. and its abutting wetlands within the project area. The approximate amounts of fill that would be permanently placed within waters of the U.S., including wetlands, are as follows: · · · · ·

11,768 cubic yards of clean fill material 6,200 cubic yards of dam core zone material 130 linear feet of 24-inch diameter C905 PVC outlet pipe 660 cubic yards of gravel bedding 55 cubic yards of concrete pipe cradle

The project would result in 927 cubic yards of fill material. Unavoidable permanent impacts include 650 linear feet (0.04-acre) of Tahosa Creek and 0.94-acre of abutting wetlands associated with the reconstruction of the dam and enlargement of Pond #4. The proposed project has been designed to minimize impacts to Tahosa Creek, and its associated wetlands to the greatest extent practicable. In addition to avoiding and minimizing direct impacts, the project would include best management practices (BMPs) during construction to minimize indirect impacts on adjacent areas. As proposed, temporary and permanent impacts on waters of the U.S. and adjacent wetlands would be mitigated for on-site, in-kind, and at a 1:1 ratio using a combination of restoration, compensatory mitigation, and improvements to the aquatic ecosystem. ********************* The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 7701Cherry Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. For further information, please contact the Colorado Water Quality Control Division at (303) 692-3500. Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration) Corps File No: NWO-2014-02204-DEN Waterway: Tahosa Creek Applicant: The Salvation Army

Page 2

In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. The Corps will evaluate input by the State Historic preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic properties, if warranted. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Ms. Brooke Davis at brooke.a.davis@usace.army.mil or by phone at (303) 979-4120 or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration) Corps File No: NWO-2014-02204-DEN Waterway: Tahosa Creek Applicant: The Salvation Army

Page 3

public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

Corps of Engineers' Section 404 Public Notice: Salvation Army High Peak Camp Dams (High Peak Dam 4 Restoration) Corps File No: NWO-2014-02204-DEN Waterway: Tahosa Creek Applicant: The Salvation Army

Page 4

ADJUDICATED POND BOTTOMS WETLANDS DalNEATED ON ADJUDICATED POND BOTTOMS (NOT TO BE MmGATED) WETLAND DELINEATION BOUNDARY UPLAND. (NON-WETLAND) AREA PROP. NWL (NORMAL WATER LEVEL) PROP. HWL FLOOD STAGE PREVIOUS. NWL (NORMAL WATER LEVEL) PERMANENTLY IMPACTED WETLANDS POND f5 Nv.t. EU:V. 894a56 a.ans SURFACE AC. BREACHED (TO 8E USED FOR WE'TLAND MITIGATION)

PONO {14 BOTTOM WITHIN Y£TLAND DELINEATION 1.2825 ACRES {LESS UPLAND AND STREAM AREAS)

PORTION OF POND fl6 TO REMAIN NOT PERMENAllEY INUNDATED (TO BE USED FOR WETLAND MlllGATION 0.124D AC OF 0.6696 AC.)

WE11.AND 2 0.5652 AC.

SCALE 200

..., 0

INCH

=

200 FEET

0

100

200

400

~-i~

l

l

l

GAUTHIERE ENGINEERING, INC. 2157 Buena Vista Drive Greeley, Colorado 80634 Phone: (970) 330-0855 E-mail: John@gaulhier&-englneerlng.com

Scale: AS SHOWN

Drawn By: JGG File:SA

POND #4 ENLARGEMENT 3.64 SURFACE AC. AT NORMAL WAlER LEVEL

THE SALVATION ARMY-HIGH PEAK CAMP DAM #4 REHABILITATION PROJECT WETLANDS Date: FEB. 01, 2019

FIGURE 2 - WETLAND IMPACT MAP

,r1' 1!

·Il,

l1I

jl '1 I, I

.,!,

HIGH PEAK CAMP DAM #4 REHABILITATION PROJECT SALVATION ARMY

!I

WATER DIVISION 1 WATER DISTRICT 5 STRUCTURE ID 3692 LARIMER COUNTY, COLORADO DRAWING INDEX SHEET NUMBER

DESCRIPTION

§

PROJECT CONTROL:

tl.M)8a\'ERTICM.

STATIPUJl[GRl>lfORIZONT.41.

,!;

snt

<5

COHTROl Vlf't.S

11

GENERAL NOTES

I! .,·I

STRUCTURAL NOTES

11

EXISTINO SITE LAYOUT

!·

t:na7574.804 Dn:U9l.70

ii:

Lo t: 40'17'13.09'72"11 Lon: 1WJ2'40.39004-W

z

EXISTING DAM 14 PLAN AND CROSS SECTIONS

II

i' i1,.'

U:134$302.Ul

el

a..,.,au1.JO

LoU0"16'6l.l4012"H lon:IOSJ2'l5.42048"W

lt: IJHi200.7J9 E:29075~.650

EXISTING DAM 111 Pl.AN AND CROSS SECTIONS

lAt40'17 '0(U481211 LM:1~·JJ'4 1.21l 154"'W

,;~::I

"'

~

!;.

~

~

::,

STECOt-rmot.POIHTCDI

EXISTING DAM #5 PLAN AND CROSS SECTIONS

,a

JS~ ...5z ~ii

SfftCOl'ITROLvtAS E:298196J.:lOJ

I"

!

ia;;. ...... z

H:1l47J&l.141

COVER SHEET, VICINITY r.lAP, DRAWING INDEX

o.v;e,50.~

BORING LOG CROSS SECTIONS

DETAILS

10

DETAILS

11

DETAILS

12

DETAI LS

13

DETAILS

_________________,. 14

DETAILS

15

EROSION PROTECTION, RIPRAP & BEDDING DETAILS

16

EROSION CONTROL

I HEREBY CCRTlfY TlU.T ll!ESE PlAAS rOA TttE tt<,tt PfAK CAI.IP tu.U REWa.lTAllOI I PROJECT lllJl't PREPN!m 8V UE (OR UHOER UY OIR£CT SUPIFASll)tl) roR ~ E R TlOEOf,

,l't-.f!ii01t, P.L CoWIWSo P.E, /22131 N>PRCMD Oil TllE _ _ _ _ OAY

NOTES:

or _ _ _ _, o _

SIAIE OIGlllta btPUIY Sl.4.IE UIW:UR lHE5£ PlJ.llS REPR£SDrT THE AS-COUSTRUCm> COtlO/OOttS Of' toctt Pr»: CAMP CW.,S TO TllE BtST or OUR I0/0'111..EDCE NIO JVOCOIOO, BASm II PAAf 011 1/lf'ORIJA'OOtl f'UfflnSHro fJ'I' OTHERS M or TIIE DAY Of - - , . _ .)OIIU G.. GI.UTHl(R(, P,E.

f

2ZIJ6

~07-01-2016

PRELIMINARY NOT FOR CONSTRUCTION

C-

3A

PROJ ECT CONTROL: HA\ '088\-tRllC>,L

StATE Pl.At£ trro ttORIZotlfAl SITE cotfTROL \'IIPI..$ N.:1J· 7J&J 2 41

E:2961.$1U0 4 Etrr.899370 lol:40'17'l3 09612"tl Lon.: IOS"JZ'-40.JiOCU ~ SrTEcotmtot.\'HP\.S H1J·.5JS2622 £:1H1H320J [J,...-.89 41.30 lol:40'16'5J,1 · 0 12"N Lqn: I0S·Jz'J5420 · &'W

SIT£ CCfflROL POffl CO I H1346200739 C:2.H7$.4SASO Orr.H 50.5 · La\:40'17'00.«812"» t.on;IOS'J2'4126154"W

SCAl.t- ·-

....

o,,n;07-0 l -2016

...,, -

38

SIT[ ComROl \'HPLS lt130Jal.241

E:.29117578.801

£l tr.!99l.70 Lol:40'17'1l.09672"N Lon:105"J2'«).lg()()l'W

COHmOl \'HPt.S ltll-'5362.622 E:29117116J.20l

SfT[

o......eu1.JO

I.Dt:40'16'5l.14012"N L<>rcl0S'J2'JS.420tll'W

srrttomffOlPOa

D..-:119.50..54 Lot:40'17'00.4481211 Lon:IOS'J2' · 1.26151'W

/ w I

I-

PRELIMINARY NOT FOR CONSTRUCTION

C-

-

3C

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas