PROPOSED PIPELINES IN EAST BATON ROUGE, WEST BATON ROUGE AND ASCENSION PARISHES

NAME OF APPLICANT: ExxonMobil Pipeline Company, c/o Wood Group USA, Inc., Attn: Mr. Gary B. Allison, 17325 Park Row, Houston, Texas 77084.

LOCATION OF WORK: There are five segments of work under this permit: LA-58B, POB 30.3955, -91.2068, POE 30.1730, -90.7887, East Baton Rouge and Ascension Parish; LA-58C, POB 30.2387, -91.0116, POE 30.2119, -91.0353, Ascension Parish; LA-92B, POB 30.3667, - 91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-93B, POB 30.3667, -91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-114, POB 30.1726, -90.7889, POE -91.2032, Ascension and West Baton Rouge Parish, near Baton Rouge, Louisiana, as shown on the attached vicinity map.

CHARACTER OF WORK: Clear rights-of-ways, grade, conduct trenching operations, perform horizontal directional drills, temporarily stockpile and backfill with approximately 1,048,941 cubic yards of native earthen material, approximately 1,260 cubic yards of hauled in clean native material, approximately 578 cubic yards of gravel, and approximately 125 cubic yards of concrete; all as necessary to install, operate and maintain 32.6 miles of 8-inch propane pipeline, 2.8 miles of 8-inch propane pipeline, 44.5 miles of 8-inch polymer grade propylene pipeline, 14.0 miles of 4-inch butylene pipeline and 14.0 miles of 4-inch iso-butane pipeline as shown on the attached drawings. Project implementation would impact approximately 72.73 acres of jurisdictional wetlands through conversion to herbaceous wetlands, 171.66 acres through temporary construction activities, and 0.63 acres through permanent fill activities. The applicant proposes to purchase compensatory mitigation acres at CEMVN approved mitigation banks in the area.

JOINT PUBLIC NOTICE February 25, 2019 United States Army Corps of Engineers New Orleans District Attn: Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Attn: Water Quality Certification Sec. Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

Project Manager: James W. Little, Jr. (225) 342-3099 / fax: (225) 342-9439 James.little@usace.army.mil Permit Application Number: MVN-2018-00177-WII

Project Manager: Elizabeth Hill (225) 219-3225 / fax: (225) 219-3156 WQC Application Number: WQC 190212-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ X ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). The application has also been mailed to the Louisiana Department of Environmental Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised Statute 30:2074 A(3), and provisions of Section 401 of the Clean Water Act (P.L. 95-17). PROPOSED PIPELINES IN EAST BATON ROUGE, WEST BATON ROUGE AND ASCENSION PARISHES NAME OF APPLICANT: ExxonMobil Pipeline Company, c/o Wood Group USA, Inc., Attn: Mr. Gary B. Allison, 17325 Park Row, Houston, Texas 77084. LOCATION OF WORK: There are five segments of work under this permit: LA-58B, POB 30.3955, -91.2068, POE 30.1730, -90.7887, East Baton Rouge and Ascension Parish; LA-58C, POB 30.2387, -91.0116, POE 30.2119, -91.0353, Ascension Parish; LA-92B, POB 30.3667, 91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-93B, POB 30.3667, -91.1560, POE 30.2235, -91.0582, East Baton Rouge and Ascension Parish; LA-114, POB 30.1726, -90.7889, POE -91.2032, Ascension and West Baton Rouge Parish, near Baton Rouge, Louisiana, as shown on the attached vicinity map. CHARACTER OF WORK: Clear rights-of-ways, grade, conduct trenching operations, perform horizontal directional drills, temporarily stockpile and backfill with approximately 1,048,941 cubic yards of native earthen material, approximately 1,260 cubic yards of hauled in clean native material, approximately 578 cubic yards of gravel, and approximately 125 cubic yards of concrete; all as necessary to install, operate and maintain 32.6 miles of 8-inch propane pipeline, 2.8 miles of 8-inch propane pipeline, 44.5 miles of 8-inch polymer grade propylene pipeline, 14.0 miles of 4-inch butylene pipeline and 14.0 miles of 4-inch iso-butane pipeline as shown on the attached drawings. Project implementation would impact approximately 72.73 acres of jurisdictional wetlands through conversion to herbaceous wetlands, 171.66 acres through temporary construction activities, and 0.63 acres through permanent fill activities. The applicant proposes to purchase compensatory mitigation acres at CEMVN approved mitigation banks in the area.

The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be submitted so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be forwarded to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing, faxing, or emailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.

Based on the South Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as signed on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans District and the U.S. Fish and Wildlife Service, the proposed project was evaluated under the determination key on 12 February 2019 and it has been determined that the proposed activity will have a "No Effect" for any of the species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may result in the destruction or alteration of N/A acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

John M. Herman Chief, Central Evaluation Section Regulatory Branch Enclosure

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas