PIPELINE REMOVAL AND ABANDONMENT IN CAMERON PARISH

NAME OF APPLICANT: Columbia Gulf Transmission, c/o Golder Associates, Inc., 5170 Peachtree Road, Suite 300, Atlanta, Georgia 30341.

LOCATION OF WORK: Near Little Pecan Bayou, located in Rockefeller Wildlife Management Area and Game Preserve, near the community of North Island, in Cameron Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 29.734528° N / Longitude: -92.71345° W, Hydrologic Unit Code: 08080202 – Mermentau Basin.

CHARACTER OF WORK: Excavate approximately 68,684 cubic yards of earthen material to remove a 4.0-mile section of the 6.8-mile long 16-inch diameter East Cameron 23 Field Pipeline, place approximately 83,588 cubic yards of earthen material within temporary spoil placement areas, and abandon in place the remaining 2.8-mile section of the pipeline within the Rockefeller Wildlife Management Area and Game Preserve. Approximately 5.03 acres of emergent wetlands, and 0.37 of an acre of non-wetland waters would be temporarily impacted via excavation operations. Approximately 7.04 acres of emergent wetlands and 0.74 of an acre of non-wetland waters would be temporarily impacted via filling operations. A project total of approximately 12.07 acres of emergent wetlands and 1.11 acres of non-wetland waters would be temporarily impacted via project implementation. The applicant will be required to restore all temporarily impacted wetlands to be verified after one growing season from project completion, and will compensate for any unrepairable wetland impacts through acquisition of in-kind credits at a Department of the Army approved mitigation bank, should a DA permit be granted.

JOINT PUBLIC NOTICE February 25, 2019 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118-3651

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2284 Sara.B.Fortuna@usace.army.mil Project Manager Sara Fortuna Permit Application Number MVN-2018-01539-WKK

(225) 219-3225 Elizabeth.Hill@la.gov Project Manager Elizabeth Hill WQC Application Number WQC 190212-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). PIPELINE REMOVAL AND ABANDONMENT IN CAMERON PARISH NAME OF APPLICANT: Columbia Gulf Transmission, c/o Golder Associates, Inc., 5170 Peachtree Road, Suite 300, Atlanta, Georgia 30341. LOCATION OF WORK: Near Little Pecan Bayou, located in Rockefeller Wildlife Management Area and Game Preserve, near the community of North Island, in Cameron Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 29.734528° N / Longitude: -92.71345° W, Hydrologic Unit Code: 08080202 ­ Mermentau Basin. CHARACTER OF WORK: Excavate approximately 68,684 cubic yards of earthen material to remove a 4.0-mile section of the 6.8-mile long 16-inch diameter East Cameron 23 Field Pipeline, place approximately 83,588 cubic yards of earthen material within temporary spoil placement areas, and abandon in place the remaining 2.8-mile section of the pipeline within the Rockefeller Wildlife Management Area and Game Preserve. Approximately 5.03 acres of emergent wetlands, and 0.37 of an acre of non-wetland waters would be temporarily impacted via excavation operations. Approximately 7.04 acres of emergent wetlands and 0.74 of an acre of non-wetland waters would be temporarily impacted via filling operations. A project total of approximately 12.07 acres of emergent wetlands and 1.11 acres of non-wetland waters would be temporarily impacted via project implementation. The applicant will be required to restore all temporarily impacted wetlands to be verified after one growing season from project completion, and will compensate for any unrepairable wetland impacts through acquisition of in-kind credits at a Department of the Army approved

-2mitigation bank, should a DA permit be granted. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

-3The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this public notice are being sent to the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. The New Orleans District has determined that 1.11 acres of the project footprint is in waters known to be utilized by the West Indian Manatee (Trichechus manatus) and determined the activity is not likely to adversely affect this species based on the Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office. If this permit modification/time extension is issued, the applicant has agreed to follow the Standard Manatee Conditions for In-Water Activities. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 1.11 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Darrell S. Barbara Chief, Western Evaluation Section Regulatory Branch Enclosure

Point of Ending Latitude 29°45'30.51"N Longitude 92°42'36.78"W

Point of Beginning Latitude 29°39'48.04"N Longitude 92°43'51.24"W

2

1

0

2 Miles Copyright:© 2013 National Geographic Society, i-cubed

Legend Existing CGT Pipeline Existing CGT Pipeline To Be Abandoned (6.8 Miles) CGT Pipeline Abandoned in 2014

Site Location Map East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/26/18

Checked By

MDB

10/26/18

Approved By

MDB

10/26/18

Project Number Drawing Number

1

001

Figure

18100064

Little Islands Canal

Superior Canal

Site 5

Vehicle Access

Joseph Harbor Boat Launch

Site 4

o Amoc Louis

ia n a

High w a

Rockefeller Wild

y 82

life

Can al Humble

C anal

0

Canal

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

0.5

Aquatic Access

Refuge Boun

dary

1

l

Site 3

Aquatic Access

Union

Ca n a

Site 2

Aquatic Access

Site 1

1 Miles

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Legend Access Proposed Removal (4.0 Miles) ! ! ! ! !

Proposed Abandon In Place (2.8 Miles) Proposed Abandon In Place and Grout (0.03 Mile) CGT Pipeline Abandoned in 2014 Existing CGT Pipeline

Overview Map East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/26/15

Checked By

MDB

10/26/15

Approved By

MDB

10/26/15

Project Number

Drawing Number

2

002

Figure

18100064

!!! !!! !! !!! ! !!

Pipe t from o be Pigg ed N Tem po S or Site ite 1 to E rary Lau thward 5 (Se nche xistin r e Fig g ure 7 Receive at r at for R eceiv Loca er tion)

!!! !!

!! !!! !

!!! !!

Excavation with Shore Box (60' x 30' x 12' deep) For Installation of Temporary Pig Launcher and to Cap Pipe for Abandonment

!!! !!! !! !!! !!

Temporary Spoil (60' x 30' x 12' high)

!!!

Barge Staging and Workspace Within Canal

!!! !!

B'

Aquatic A (8' Dee ccess p Min.)

Temporary Spoil (85' x 85' x 8' high)

Excavation within Canal (250' x 30' x 15' deep)

Union C anal

A

B A' Temporary Spoil (85' x 85' x 8' high)

Ma r sh

Excavation (60' x 30' x 12' deep)

Temporary Spoil (60' x 30' x 12' high) Workspace (650' x 200') 200

100

0

200 Feet

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Legend

Site 1

Project Area (57.5 Acres) 16" Pipeline Previously Abandoned 16" Pipeline Previously Removed (40 Feet) !!!!!

16" Pipeline Proposed Abandon In Place (2.8 Miles) 16" Pipeline Proposed Removal (4.0 Miles) Timber Mats

Legend Notes MHW = +2.2

Former Meter Station 4216 Interconnect Removed in 2014 East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/13/18

Checked By

MDB

10/13/18

Approved By

JBA

10/13/18

Project Number

MLW = +0.7

Drawing Number

3

003

Figure

18100064

Workspace (400' x 150') Marsh

Excavation (60' x 30' x 12' deep) Barge Staging and Workspace Within Canal

Temporary Spoil (60' x 30' x 12' high)

B'

A

A' Aquatic Access From St. Joseph Harbor

Temporary Spoil (85' x 50' x 8' high) Rockefeller Wildlife Refuge Boundary Canal

Excavation Within Canal (150' x 30' x 15' deep) B A

A'

Excavation with Shore Box To Cap Pipe For Abandonment (60' x 30' x 12' deep)

Temporary Spoil (85' x 50' x 8' high)

Temporary Spoil (60' x 30' x 12' high) Marsh

100

50

0

100 Feet

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Legend Project Area (57.5 Acres) Ñ Ñ Ñ Ñ Ñ Ñ

18 Wheeler Access 16" Pipeline Proposed Removal (4.0 Miles)

!!!!!

16" Pipeline Proposed Abandon In Place (2.8 Miles) 16" Pipeline Proposed Abandon In Place and Grout (0.03 Mile) Timber Mats

Notes Legend MHW = +2.2

MLW = +0.7

Site 2 East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/13/18

Checked By

MDB

10/13/18

Approved By

JBA

10/13/18

Project Number Drawing Number

4

004

Figure

18100064

Marsh

Workspace 4' of Sand Fill and 12" Timber Mats (350' x 200', 10,370 cu. yds.) Excavation with Shore Box (60' x 30' x 12' deep) Lou isi

ana

D Hig hw

Excavation with Shore Box (60' x 30' x 12' deep)

ay 8

Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ

2

Marsh D'

Temporary Spoil (60' x 30' x 12' high)

C

C'

Workspace (450' x 350')

Temporary Spoil (60' x 30' x 12' high)

Marsh

200

100

0

200 Feet

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Legend Project Area (57.5 Acres) Ñ Ñ Ñ Ñ Ñ Ñ

18 Wheeler Access 16" Pipeline Proposed Removal (4.0 Miles)

!!!!!

16" Pipeline Proposed Abandon In Place (2.8 Miles) 16" Pipeline Proposed Abandon In Place and Grout (0.03 Mile) Timber Mats

Notes Legend

Approximately 10,370 yds3 of sand will be used as temporary fill.

Site 3 East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/13/18

Checked By

MDB

10/13/18

Approved By

JBA

10/13/18

Project Number Drawing Number

5

004

Figure

18100064

Workspace (450' x 200')

Marsh

Temporary Spoil (60' x 30' x 12' high)

Excavation (60' x 30' x 12' deep)

A

B'

A'

Excavation within Canal (150' x 30' x 15' deep)

Temporary Spoil (85' x 50' x 8' high) Aquatic Access From Superior Canal (8' Deep Min.)

Amoco Canal

Barge Staging and Workspace Within Canal

Temporary Spoil (85' x 50' x 8' high) A

Excavation (60' x 30' x 12' deep)

B

A'

Temporary Spoil (60' x 30' x 12' high)

Marsh

80

40

0

80 Feet

Legend Project Area (57.5 Acres) 16" Pipeline Proposed Removal (4.0 Miles)

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Site 4 East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia

Legend Notes MHW = +2.2

MLW = +0.7

Drawn By

MDB

10/13/18

Checked By

MDB

10/13/18

Approved By

JBA

10/13/18

Project Number Drawing Number

6

005

Figure

18100064

Aquatic Access From Superior Canal (8' Deep Min.)

Barge Staging (100' x 40') 4' Thick Sand Pad & 12" Crane Mats (45' x 55', 367 cu. yds. of sand)

F

}

Workspace (240' x 230' max)

}

}

}

}

Platform to remain (60' x 50')

}

}

}

}

}

}

}

}

}

E'

}

}

E

}

}

}

}

Existin 0

50 Feet

Legend Project Area (57.5 Acres) 16" Pipeline Proposed Removal (4.0 Miles) 12" Pipeline Proposed Removal (215 Feet)

Legend Notes Approximately 367 yds3 of sand will be used as temporary fill. MHW = +2.2 MLW = +0.7

h

}

25

F'

M ar s

}

g A cc ess R

Meter Station 505 with Fence (90' x 50')

Pipe to be Pigged Northward from Temporary Launcher at Site 1 to Existing Receiver at Site 4 (See Figure 3 for Launcher Location)

}

}

oa d

}

}

}

50

Platform to be removed (45' x 35'). Includes existing pig receiver, mainline valve, and tap

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Site 5 East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/13/18

Checked By

MDB

10/13/18

Approved By

JBA

10/23/13

Project Number Drawing Number

7

006

Figure

18100064

Marsh

G

G'

Excavation (10' wide x 7' deep) Temporary Spoil (10' wide x 7' high)

Marsh 30

15

0

30 Feet

Legend Spoil Excavation Temporary Work Space (100' Wide Max.) Proposed 16" Pipeline Removal (4.0 Miles)

Legend Notes Pipeline depths average 7 feet within marsh, excluding canal and road crossings; minimum 4.7 feet; maximum 10.5 feet. See Pecan Island Survey Figures for detailed depths.

Typical Site Plan for Pipeline Removal in Marsh East Cameron 23 6.8-Mile Field Line Abandonment Cameron Parish, Louisiana

Columbia Gulf Transmission Charleston, West Virginia Drawn By

MDB

10/23/18

Checked By

MDB

10/23/18

Approved By

JBA

10/23/18

Project Number Drawing Number

8

007

Figure

18100064

Last Edited By: jarmiller Date: 2018-11-21 Time:8:56:34 AM | Printed By: JarMiller Date: 2018-11-21 Time:8:58:20 AM Path: \\Atlanta\CADD\Columbia-Gulf_18100064\ | File Name: Columbia_Gulf_Transmission_Rev1.dwg

200'

A

A'

TEMPORARY WORKSPACE 65'

30'

TEMPORARY WORKSPACE

EXCAVATION

65'

30'

10'

TEMPORARY WORKSPACE

TEMPORARY SPOIL PILE

12'

12'

16" DIAMETER PIPELINE

B'

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A

B 250' MAX

EXCAVATION NOTES: THE SPOIL PLACEMENT AS SHOWN ON CROSS SECTION B - B' IS FOR ILLUSTRATIVE PURPOSES TO SHOW THAT SPOIL WILL BE STAGED TEMPORARILY WITHIN AND ALONG THE BANKS OF THE CANAL. THE SPOIL WILL NOT BE PLACED DIRECTLY OVER THE PIPE AS SHOWN ON CROSS SECTION B - B', BUT ADJACENT TO THE PIPE AS SHOWN ON PLATS.

0 1" = 30'

30

60 FEET

TEMPORARY SPOIL

EXCAVATION

WATER BOTTOM

NOTES: MHW = + 2.2 MLW = + 0.7

16" DIAMETER PIPELINE

CLIENT

PROJECT

Columbia Gulf Transmission Charleston, West Virginia

EAST CAMERON 23 6.81 - MILE FIELD LINE ABANDONMENT CAMERON PARISH, LOUISIANA

CONSULTANT

12'

8' MIN.

TEMPORARY SPOIL EXCAVATION

15' MAX.

12'

CANAL

YYYY-MM-DD

2018-09-26

DESIGNED

KPL

PREPARED

JRM

REVIEWED

MB

APPROVED

MB

TITLE

CROSS SECTION A - A' AND B - B' PROJECT NO.

PHASE

REV.

181000064

04

A

FIGURE

9

Last Edited By: jarmiller Date: 2018-11-21 Time:8:56:34 AM | Printed By: JarMiller Date: 2018-11-21 Time:8:58:02 AM Path: \\Atlanta\CADD\Columbia-Gulf_18100064\ | File Name: Columbia_Gulf_Transmission_Rev1.dwg

C

C' 450' TEMPORARY WORKSPACE 210'

30'

TEMPORARY WORK SPACE

10'

EXCAVATION AREA WITH SHORE BOX

30'

170' TEMPORARY WORKSPACE

TEMPORARY SPOIL PILE

12'

12'

D

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A

16" DIAMETER PIPELINE. PROPOSED ABANDON IN PLACE AND GROUT

D' 350' 90' TEMPORARY WORKSPACE (4' OF SAND FILL AND 12" TIMBER MATS) 190'

30'

EQUIPMENT ACCESS

10'

EXCAVATION AREA WITH SHORE BOX

30' TEMPORARY SPOIL PILE

TIMBER MATTS

TIMBER MATTS

12'

12' SAND

SAND

16" DIAMETER PIPELINE. PROPOSED ABANDON IN PLACE AND GROUT

0 1" = 30'

30

60 FEET

CLIENT

PROJECT

Columbia Gulf Transmission Charleston, West Virginia

EAST CAMERON 23 6.81 - MILE FIELD LINE ABANDONMENT CAMERON PARISH, LOUISIANA

CONSULTANT

YYYY-MM-DD

2018-09-26

DESIGNED

KPL

PREPARED

JRM

REVIEWED

MB

APPROVED

MB

TITLE

CROSS SECTION C - C' AND D - D' PROJECT NO.

PHASE

REV.

181000064

04

A

FIGURE

10

Last Edited By: jarmiller Date: 2018-11-21 Time:8:56:34 AM | Printed By: JarMiller Date: 2018-11-21 Time:8:57:43 AM Path: \\Atlanta\CADD\Columbia-Gulf_18100064\ | File Name: Columbia_Gulf_Transmission_Rev1.dwg

E

E' 240' TEMPORARY WORKSPACE

PLATFORM TO REMAIN

METER STATION 505

50' 4'

FENCE

20'

50'

45'

10'

20'

4' THICK SAND PAD WITH 12" CRANE MATS

GRAVEL SPOIL

EXCAVATION

EXISTING GRAVEL ROAD

12" DIAMETER PIPELINE

40'

55'

45'

F'

PLATFORM TO BE REMOVED

BARGE STAGING

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A

4'

F

20'

10' 16" DIAMETER PIPELINE

TEMPORARY BRIDGE 4' DRAFT MAX

10'

BARGE

TIMBER MATS

30'

8' DEEP MIN. SAND

0 1" = 30'

30

60 FEET

EXCAVATION DEPTH VARIES. (SEE PECAN ISLAND PIPELINE SURVEY MAP AND TABLE)

12" DIAMETER PIPELINE

WATER BOTTOM

CLIENT

PROJECT

Columbia Gulf Transmission Charleston, West Virginia

EAST CAMERON 23 6.81 - MILE FIELD LINE ABANDONMENT CAMERON PARISH, LOUISIANA

CONSULTANT

YYYY-MM-DD

2018-09-26

DESIGNED

KPL

PREPARED

JRM

REVIEWED

MB

APPROVED

MB

TITLE

CROSS SECTION E - E' AND F - F' PROJECT NO.

PHASE

REV.

181000064

04

A

FIGURE

11

Last Edited By: jarmiller Date: 2018-11-21 Time:9:20:03 AM | Printed By: JarMiller Date: 2018-11-21 Time:9:20:14 AM Path: \\Atlanta\CADD\Columbia-Gulf_18100064\ | File Name: Columbia_Gulf_Transmission_Rev1.dwg

G

G' 100' PROJECT WORK AREA

5' 10'

25'

IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A

45'

TEMPORARY SPOIL PILE

10'

4'

EXCAVATION

DEPTH VARIES (SEE PECAN ISLAND PIPELINE SURVEY MAPS AND TABLE)

0 1" = 20'

20

40 FEET

16" DIAMETER PIPELINE

CLIENT

PROJECT

Columbia Gulf Transmission Charleston, West Virginia

EAST CAMERON 23 6.81 - MILE FIELD LINE ABANDONMENT CAMERON PARISH, LOUISIANA

CONSULTANT

YYYY-MM-DD

2018-09-26

TITLE

DESIGNED

KPL

PREPARED

JRM

TYPICAL SITE PLAN FOR PIPELINE CROSS SECTION G - G'

REVIEWED

MB

APPROVED

MB

PROJECT NO.

PHASE

REV.

181000064

04

A

FIGURE

12

EAST CAMERON 23 PIPELINE ABANDONMENT PROJECT

Feature 16" Pipe Expose for Removal Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal and Temporary Pig Launcher Installation ­ Canal Crossing Above Banks 16" Pipe Expose for Removal and Temporary Pig Launcher Installation ­ Canal Crossing Above Banks 16" Pipe Expose for Cap/Removal - Canal Crossing Above Banks 16" Pipe Expose for Cap/Removal - Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Within Banks

Work Area

ENVIRONMENTAL REPORT Table 1-2 Project Impacts Detail Linear Impact Dimensions Figure # Feet Along Description (Feet) Pipe

Acres

Volume (cubic yards)

Habitat

Impact Type

Site 1*

3, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 1*

3, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 1*

3, 9

Excavation

60

250x30x15

0.17

4,167

Waterbody

Temporary

Site 1*

3, 9

Spoil

0

85x85x8

0.17

2,083.5

Waterbody

Temporary

Site 1*

3, 9

Spoil

0

85x85x8

0.17

2,083.5

Waterbody

Temporary

Site 1*

3, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 1*

3, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 2

4, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 2

4, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 2

4, 9

Excavation

60

150x30x15

0.10

2,500

Waterbody

Temporary

4

EAST CAMERON 23 PIPELINE ABANDONMENT PROJECT

Feature 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal - Canal Crossing Above Banks 16" Pipe Expose for Removal - Canal Crossing Above Banks 16" Pipe Expose to Grout Hwy 82 Crossing 16" Pipe Expose to Grout Hwy 82 Crossing 16" Pipe Expose to Grout Hwy 82 Crossing 16" Pipe Expose to Grout Hwy 82 Crossing Sand Fill for Timber Mat Placement 16" Pipe Expose for Removal Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal Canal Crossing Within Banks

Work Area

ENVIRONMENTAL REPORT Table 1-2 Project Impacts Detail Linear Impact Dimensions Figure # Feet Along Description (Feet) Pipe

Acres

Volume (cubic yards)

Habitat

Impact Type

Site 2

4, 9

Spoil

0

85x50x8

0.10

1,250

Waterbody

Temporary

Site 2

4, 9

Spoil

0

85x50x8

0.10

1,250

Waterbody

Temporary

Site 2

4, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 2

4, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 3

5, 10

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 3

5, 10

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 3

5, 10

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 3

5, 10

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 3

5, 10

Nonnative Fill

0

350x200x4

1.61

10,370

Wetland

Temporary

Site 4

6, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 4

6, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 4

6, 9

Excavation

150

150x30x15

0.10

2,500

Waterbody

Temporary

Site 4

6, 9

Spoil

0

85x50x8

0.10

1,250

Waterbody

Temporary

5

EAST CAMERON 23 PIPELINE ABANDONMENT PROJECT

Feature 16" Pipe Expose for Removal Canal Crossing Within Banks 16" Pipe Expose for Removal Canal Crossing Above Banks 16" Pipe Expose for Removal Canal Crossing Above Banks Sand Fill for Timber Mat Placement 16" Pipe Expose for Removal Typical within 100' Work Space 16" Pipe Expose for Removal Typical within 100' Work Space 12" Pipe Expose for Removal Typical within 100' Work Space 12" Pipe Expose for Removal Typical within 100' Work Space 12" Pipe Expose for Removal Typical within 100' Work Space 12" Pipe Expose for Removal Typical within 100' Work Space Total Length Along 16" Pipe Total Length Along 12" Pipe

ENVIRONMENTAL REPORT Table 1-2 Project Impacts Detail Linear Impact Dimensions Figure # Feet Along Description (Feet) Pipe

Work Area

Acres

Volume (cubic yards)

Habitat

Impact Type

Site 4

6, 9

Spoil

0

85x50x8

0.10

1,250

Waterbody

Temporary

Site 4

6, 9

Excavation

60

60x30x12

0.04

800

Wetland

Temporary

Site 4

6, 9

Spoil

0

60x30x12

0.04

800

Wetland

Temporary

Site 5

7, 11

Nonnative Fill

0

55x45x4

0.06

367

Wetland

Temporary

20,439**

20,439x10x7

4.70

52,990

Wetland

Temporary

0

20,439x10x7

4.70

52,990

Wetland

Temporary

90

90x4x4

0.01

53

Wetland

Temporary

0

90x4x4

0.01

53

Wetland

Temporary

125

125x4x4

0.01

74

Upland

Temporary

0

125x4x4

0.01

74

Upland

Temporary

--

21,189

--

--

--

--

Temporary

--

215

--

--

--

--

Temporary

4.0mile portion of 16" pipe to be 3, 4, 5, 6, Excavation removed, not to include features 7, 8, 12 listed above 4.0mile portion of 16" pipe to be 3, 4, 5, 6, Spoil removed, not to include features 7, 8, 12 listed above 90 feet of 12" pipe to be removed from platform to Meter Station 505 7, 8 Excavation at Site 4 90 feet of 12" pipe to be removed from platform to Meter Station 505 7, 8 Spoil at Site 4 125 feet of 12" pipe to be removed from platform to Meter Station 505 7, 8 Excavation at Site 4 125 feet of 12" pipe to be removed from platform to Meter Station 505 7, 8 Spoil at Site 4

6

EAST CAMERON 23 PIPELINE ABANDONMENT PROJECT

Feature

ENVIRONMENTAL REPORT Table 1-2 Project Impacts Detail Linear Impact Dimensions Figure # Feet Along Description (Feet) Pipe

Work Area

Acres

Volume (cubic yards)

Habitat

Impact Type

Total Upland Excavation

--

--

--

0.01

74

Upland

Temporary

Total Upland Fill

--

--

--

0.01

74

Upland

Temporary

Total Waterbody Excavation

--

--

--

0.37

9,167

Waterbody

Temporary

Total Waterbody Fill

--

--

--

0.74

9,167

Waterbody

Temporary

Total Wetland Excavation

--

--

--

5.03

59,443

Wetland

Temporary

Total Wetland Fill

--

--

--

7.04

74,347

Wetland

Temporary

* Includes former Meter Station 4216 Interconnect; Removed in 2014; FERC Docket CP1114000; CUP 20111177 ** 35,989 feet (6.8 miles) 16" pipe total abandonment. 14,800 feet (2.8 miles) 16" pipe to be abandoned in place. 21,189 feet (4.0 Miles) 16" pipe to be removed ­ 750 = 20,439.

7

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas