The application is to reroute approximately 700 linear feet of an unnamed tributary of Boomer Creek resulting in the placement of 0.27 acres of fill.
The proposed construction would involve the removal of an existing sidewalk, wooden light poles, a gravel parking lot, and concrete blocks currently lining the stream channel. A 30 inch reinforced concrete pipe headwall would also be installed. A new sidewalk with drainage structures to carry roadside and surface runoff to the stream channel would be added. A pedestrian bridge will be placed across the stream channel with no fill placed into the stream. Meanders would be added to the stream with a natural substrate lining replacing the current straight concrete lined channel.