The application is for the placement of fill material into an unnamed tributary of Mingo Creek and associated on channel pond to construct a commercial and industrial development and road access, two reinforced concrete boxes, and a new spillway for the existing pond.

The applicant’s proposal would require the placement of 137 CY of clay into approximately 2,589 LF (0.30 AC) of stream channel. Also, the applicant proposes to construct a new channel and reroute waters of the United States for approximately 2,706 LF (0.31 AC) in the uplands. The other proponents would improve the existing pond by constructing a new spillway using clay and Type 1 Class A riprap spillway (with filter blanket) including deeping the pond (using redistribution of fill material), two triple (6- by 12-foot and 12- by 6 foot) RCB’s and wingwalls. The fill material may consist of concrete, gravel, sand, and earthen material. The work would be performed using conventional earth moving equipment.

Public Notice U.S. Army Corps of Engineers Tulsa District

Reply To: U.S. Army Corps of Engineers ATTN: Regulatory Office 2488 East 81St Street Tulsa, Oklahoma 74137-4290

SWT-2019-111 Public Notice No. February 25, 2019 Public Notice Date March 27, 2019 Expiration Date

PURPOSE The purpose of this public notice is to inform you of a proposal for work in which you might be interested and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest. SECTION 10 The U.S. Army Corps of Engineers is directed by Congress through Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) to regulate all work or structures in or affecting the course, condition, or capacity of navigable waters of the United States. The intent of this law is to protect the navigable capacity of waters important to interstate commerce. SECTION 404 The U.S. Army Corps of Engineers is directed by Congress through Section 404 of the Clean Water Act (33 U.S.C. 1344) to regulate the discharges of dredged and fill material into all waters of the United States. These waters include lakes, rivers, streams, mudflats, sandflats, sloughs, wet meadows, natural ponds, and wetlands adjacent to other waters. The intent of the law is to protect these waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical, and biological integrity. NOTICE TO PUBLISHERS This public notice has been provided as a public service and may be reprinted at your discretion. However, any cost incurred as a result of reprinting or further distribution shall not be a basis for claim against the Government.

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, TULSA DISTRICT 2488 EAST 81ST STREET TULSA, OKLAHOMA 74137-4290

Application No. SWT-2019-111 JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS AND OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY (ODEQ) (30-DAY COMMENT PERIOD) Interested parties are hereby notified that the District Engineer (DE) has received an application for a Department of the Army (DA) permit and water quality certification pursuant to Sections 404 and 401 of the Clean Water Act (CWA). The ODEQ hereby incorporates this public notice and procedure as its own public notice and procedure by reference thereto. Applicant:

Mr. Troy Galster The Greenheck Group P.O. Box 410 Schofield, WI 54476

Agent:

Mrs. Rebecca Alvarez Guy Engineering Inc. 6910 E. 14th St Tulsa, OK 74112

Location: The proposed project is in the Southeast 1/4 of Section 20, Township 18 North, Range 13 East, in Tulsa, Tulsa County, Oklahoma. The project site can be found on the Mingo Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 36.193713 and West Longitude 95.837093. Project Description: The application is for the placement of fill material into an unnamed tributary of Mingo Creek and associated on channel pond to construct a commercial and industrial development and road access, two reinforced concrete boxes, and a new spillway for the existing pond. Purpose: The overall purpose of this work is for a commercial development and to manage the 100-year flood frequency event as required by an ordinance from the City of Tulsa. The project is not a water dependent activity and there are no special aquatic sites are located within the project site.

Summary Table of Impacts: Original Proposal Number or Location

Impact Activity

Reinforced Concrete Box "RCB" "Bridge A"

Construction of a RCB/ Riverine Wingwall

Unnamed Tributary of Mingo Creek Stream "A" Unnamed Pond Improvements/

Spillway Unnamed Tributary of Mingo Creek Stream "B"

Placement of Fill Material Placement of Fill Material Placement of Fill Material

Type of Water

Riverine

Pond

Pond

Type of Fill Material

Concrete and Steel Earthen Material/Clay

Redistribution Clay/ 18-inch Riprap

Quantity of Material (CY) below OHWM

242

Footprint (AC and/or LF) 145 LF 0.15 AC

54

1,116LF 0.12 AC

2,300

1.28 AC

181/ 27

0.05 AC

Placement of Fill Earthen Material Riverine Material/Clay 83 Construction RCB of a RCB/ Concrete and "Bridge B" Wingwall Riverine Steel 193 cubic yards (cy), ordinary high water mark (OHWM), acre (ac), linear feet (lf)

1,473 LF 0.18 AC 115 LF 0.12 AC

Description of Work: The applicant's proposal would require the placement of 137 CY of clay into approximately 2,589 LF (0.30 AC) of stream channel. Also, the applicant proposes to construct a new channel and reroute waters of the United States for approximately 2,706 LF (0.31 AC) in the uplands. The other proponents would improve the existing pond by constructing a new spillway using clay and Type 1 Class A riprap spillway (with filter blanket) including deeping the pond (using redistribution of fill material), two triple (6- by 12-foot and 12- by 6 foot) RCB's and wingwalls. The fill material may consist of concrete, gravel, sand, and earthen material. The work would be performed using conventional earth moving equipment. Avoidance and Minimization Information: The applicant provided the following statement with regard to how avoidance and minimization of impacts to aquatic resources was incorporated into the project plan: This applicant did provided a statement to avoidance and minimization of impacts to aquatic resources, including a justification for the proposed project. 2

Mitigation: Furthermore, the applicant proposes the following as compensatory mitigation for the unavoidable impacts to aquatic resources expected from the proposed project: The applicant provided a conceptual mitigation drawing for unavoidable impacts to the unnamed tributary of Mingo Creek. The mitigation stream would be longer that the impacted stream channel (2,706 LF). The constructed channel would be sinuous in nature, including rocks and boulders in and along the channel to re-establish desired condition that simulate the reference stream channel and establish the riparian area. The proposed typical concrete lined channel would be replaced with a natural substrate channel. This mitigation plan is the applicant's proposal. The Corps has made no determination at this time with regard to the adequacy of the proposed mitigation relative to the federal mitigation rules and guidance, including Tulsa District's Mitigation and Monitoring Guidelines Compensatory Mitigation for unavoidable impacts may be required to ensure that this activity requiring a Section 404 permit, if issued complies with the Section 404 (b)(1) Guidelines. The Corps bears the final decision on the need for and extent of mitigation required if the project proposed herein is authorized. Government Authorizations obtained or received: The Corps has not reviewed any copies of other required permits. Project Setting: This project is located within the Oklahoma Ecoregion of Cross Timber Transition, which is part of the Central Great Plains geomorphic province. The Transition is characterized by a series of grasslands and prairies. The project is in the floodplain of Mingo Creek. Existing Condition: The parcel of land is comprised mostly of improved pasture in the uplands. The intermittent stream channel is jurisdictional waters of the United States. The primary use for the land historically was for agriculture purposes, comprised mostly of grazing activities. Cultural Resources: The DE is responsible to ensure compliance with the National Historic Preservation Act of 1966 (NHPA) (Public Law 89-665), as amended, and other cultural resources laws and Executive Orders. A preliminary review of the state's records has been completed for the presence of sites included in, or eligible for, inclusion in the National Register of Historic Places, as well as the Oklahoma Landmark Inventory Database. There are no known historic properties, as defined by the NHPA, in or within the vicinity of the proposed permit area. Threatened and Endangered Species: The following federally listed species are known to occur in the vicinity or are listed for the county in which the proposed action is located: northern long-eared bat (Myotis septentrionalis), least tern (Sterna antillarum), piping plover (Charadrius melodus), red knot (Calidris canutus rufa), and american burying beetle (Nicrophorus americanus). A copy of this notice is being furnished to the U.S. Fish and Wildlife Service and appropriate state agencies. 3

We are currently assessing the potential effects of the proposed action on these species and will comply with the Endangered Species Act with regard to any effect of our decision on this permit application. Evaluation Factors: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof: conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownerships, and, in general, the needs and welfare of the people. A permit will be denied if the discharge does not comply with the Environmental Protection Agency's 404(b)(1) Guidelines. Subject to the 404(b)(1) Guidelines and any other applicable guidelines or criteria, a permit will be granted unless the DE determines that it would be contrary to the public interest. Plans and Data: Plans showing the location of the proposed activity and other data are enclosed with this notice (Enclosure 1 of 6). If additional information is desired, it may be obtained from Mr. Marcus Ware, Tulsa District Corps of Engineers, ATTN: Regulatory Office, 2488 East 81st Street, Tulsa, OK 74137; or telephone 918-669-7400. Comments: In order to consider and evaluate the impacts of this proposed activity the Corps is soliciting comments from the public, federal, state, and local agencies and officials, floodplain administrators, state historic preservation officers, Indian tribes, and other interested parties. Comments concerning the issuance of this permit should be received by the DE no later than the expiration date of this public notice. You may submit comments to mailing address Tulsa District Corps of Engineers, ATTN: Regulatory Office, 2488 East 81st Street, Tulsa, OK 74137; or email CESWT-RO@usace.army.mil, please include the public notice number SWT-2017-607 in the subject line of the message. Comments concerning water quality impacts will be forwarded to ODEQ for consideration in issuing a Section 401 Water Quality Certification for the proposed project. Work may not commence until decisions have been made on both Sections 401 and 404.

Andrew R. Commer Chief, Regulatory Office

4

Enclosures

5

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 1 of 6

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 2 of 6

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 3 of 6

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 4 of 6

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 5 of 6

EXHIBIT 4

SWT-2019-111 Greenheck Campus Stream Channelization, Pond Improvement, RCB Unnamed tributary of Mingo Creek Tulsa County Enclosure 6 of 6

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas