You can copy from here when filling out the rest of the page.
In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the City of Ontario has requested permission, through the San Bernardino County Flood Control District, from the U.S. Army Corps of Engineers (USACE) to alter the Cucamonga Creek Channel.
The City of Ontario is proposing to perform a geotechnical investigation within the concrete-lined Cucamonga Creek Channel. A total of two hollow-stem auger borings are proposed at a depth of up to 80 feet. The purpose and need for the borings as part of the geotechnical investigation is to inform geotechnical design and construction for the replacement of the Merrill Avenue bridge over the Cucamonga Creek Channel. With the information obtained from analyzing the collected subsurface soil, the bridge will be able to be designed consistent with appropriate standards and regulations.