You can copy from here when filling out the rest of the page.
The Los Angeles District of the U.S. Army Corps of Engineers plans to prepare an Environmental Assessment and, if warranted, a Finding of No Significant Impact to evaluate impacts associated with proposed geotechnical investigations for the Santiago Creek Project. Proposed geotechnical investigations will occur within and around the Santiago Reservoir and along the lower channel of Santiago Creek, between Interstate 5 and the confluence with the Santa Ana River. Current plans include 42 boring locations and 30 test pits. Data from geotechnical investigations will inform project design and construction.