Home

Chicago District

Run scraper

Proposal to construct a commercial refueling station and associated amenities impacting 2.57 acres of wetland near the southwest intersection of I-94 and IN-421 near Michigan City

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Proposal to construct a commercial refueling station and associated amenities impacting 2.57 acres of wetland near the southwest intersection of I-94 and IN-421 near Michigan City, LaPorte County, Indiana.

PUBLIC NOTICE

APPLICATION FOR PERMIT

U.S. ArmyCorps of Engineers

Chicago District

Public Notice/Application Number: LRC-2016-00619

Comment Period Begins: Friday March 1, 2019

Comment Period Expires: Monday April 1, 2019

PUBLIC NOTICE

U.S. Army Corps of Engineers

Applicant

Jim Lyons - Route 421 Partners LLC

Proposed Action

Proposal to develop the proposed site into a Love’s Travel Stop truck stop including parking for 107 semi-trucks and other amenities (see attached drawings). A detailed description of this proposal is provided on page 2 of this notice.

Location of Proposed Action

This project is located near the southwest corner of I-94 and IN-421 near Michigan City, LaPorte County, Indiana

Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by Monday April 1, 2019 on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 404 Action of the Clean Water Act of 1972(33 U.S.C. 1344)

Comments shall be emailed to:

Stasi.f.brown@usace.army.mil

Project Description

The proposed development includes construction of a Love’s Travel Stop including: 107 parking spots for semi-trucks, with an additional 105 spots for standard and recreational vehicles. The site will also include a 13,000 square foot building with two restaurants and a convenience store. The site will also include a 10,445 square foot building for truck tire maintenance. Finally the site will also include stormwater management facilities to manage runoff from the site.

The purpose of the project is to provide refueling and other services to truck traffic utilizing I-94 and IN-421. Currently, the area is developed with light industrial and commercial properties as well as a landfill south of the I-94 corridor. The total impacts to the site will be 2.57 acres of emergent wetlands. Direct effects to the wetlands include the placement of fill material within the wetlands along with the potential for a change in localized hydrology and sedimentation during construction, which may have long term indirect effects to the remaining wetlands on site. Additionally, pollutants, including petroleum, may be introduced into the wetlands and groundwater from the construction of the refueling station.

The applicant has proposed to utilize the Indiana Department of Natural Resources (IDNR) In-Lieu Fee (ILF) Program to purchase compensatory mitigation credits. The ratios at which the applicant will purchase credits has not been finalized at this time.

Mitigation

If a permit is issued for the proposed project, the Corps will determine what is appropriate and practicable compensatory mitigation in accordance with 33 CFR Part 332. The amount of compensatory mitigation to be determined shall be commensurate with the anticipated impacts of the project.

Regulatory Authority This proposed action will be reviewed according to the provisions of Section 404 of the Clean Water Act of 1972.

Jurisdiction

This application will be reviewed according to the provisions of Section 404 of the Clean Water Act of 1972 due to placement of fill material in wetlands which are hydrologically connected to a tributary of Trail Creek.

Evaluation Factors

The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.

All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.

The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.

To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.

Preliminary Evaluation of Selected Factors

Water Quality:

A DA permit, if otherwise warranted, will not be issued on this project until a Section 401 Water Quality Certification (WQC) from the Indiana Department of Environmental Management (IDEM) is on file in this office or it is considered waived. This Public Notice serves as the notice for a Clean Water Act, Section 401 application for water quality certification from the IDEM. IDEM will review this proposal for compliance with the applicable provisions of Section 301, 302, 303, 306 and 307 of the CWA, including the state water quality standards currently set forth at 327 IAC 2. They will consider comments regarding this proposal postmarked by the closing date of this notice. Comments to IDEM should be addressed to:

IDEM, Office of Water Quality

100 N. Senate Ave., MC65-42 WQC 1255

Indianapolis, Indiana 46206-6015.

The applicant is responsible for obtaining the certification from IDEM.

Environmental Impact Statement

A preliminary determination has been made that an environmental impact statement is not required for the proposed work.

Public Hearing

Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.

Interested parties wishing to comment on the proposed activity must do so in writing no later than Monday April 1, 2019. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described. This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.

If you have any questions, please contact Stasi Brown of my staff by telephone at (312) 846-5544, or email at stasi.f.brown@usace.army.mil.

It should be noted that ALL comments received by this office will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx

FOR THE DISTRICT COMMANDER:

//ORIGINAL SIGNED//

Keith L. Wozniak

Chief, Regulatory Branch

NOTICE TO POSTMASTERS:

It is requested that this notice be conspicuously and continuously posted until Monday April 1, 2019.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas