You can copy from here when filling out the rest of the page.
The U. S. Army Corps of Engineers, Nashville District has prepared a draft Integrated Detailed Project Report and Environmental Assessment (DPR/EA), dated March 2019 for the Cumberland River Tributaries, Nashville, Tennessee Flood Risk Management Study.
The U. S. Army Corps of Engineers, Nashville District has prepared a draft Integrated Detailed Project Report and Environmental Assessment (DPR/EA), dated March 2019 for the Cumberland River Tributaries, Nashville, Tennessee Flood Risk Management Study. The draft DPR/EA
analyzes potential solutions for flooding problems within the Browns Creek, Richland Creek, and Whites Creek watersheds in Nashville, Davidson County, Tennessee. A wide variety FRM measures were developed and combined into plans. The team evaluated the plans for cost efficiency and flood risk reduction effectiveness, which resulted in a final array of three plans per tributary stream.