The application is for the placement of fill material in waters of the United States, for the proposed construction of Mission Point Commercial Development, consisting of 52 acres. Approximately 1,485 linear feet of Little River, a perennial stream, would be filled/rerouted to accommodate the proposed project.
The project would include the placement of fill material into approximately 1,485-lf of Little River, which is a tributary of the Canadian River.
Approximately 11,135-cys of earthen fill would be placed into 1,485-lf of stream channel.
The project is anticipated to shift the stream channel east approximately 300 feet and would be constructed by creating a new 1,422-lf stream channel, in a sinuous pattern, and stabilizing the channel and banks using native rock to create stable banks and proper pool riffle sequences. The new channel would be constructed and stabilized prior to opening the existing channel to flow into the new channel to minimize the amount of sediment carried downstream. After the new channel is established and functioning properly, the old channel alignment would be dammed off and filled in a manner to prevent any sediment from entering the downstream water system. There would be no dredge or fill material discharged into the downstream creek as a result of this project. The channel would be protected from sediment during development using silt fence and silt dikes. The work would be completed with standard earth moving equipment (e.g. backhoe, bulldozer, trackhoe, haul truck, and compactor).