You can copy from here when filling out the rest of the page.
Reconstruct approximately 10.4 miles of US-2 from the western limits of the Town of Chinook to 2.1 miles from the border of Hill/Blaine county. The standard finish will consist of two, 12-foot wide travel lanes and two, 8-foot wide shoulders. Passing and turning lanes have been incorporated into the project design along with the replacement of four structures along this stretch of roadway. The roadway has been designed for a desirable stopping sight distance for a 70 mph design speed in level terrain.
Reconstruct approximately 10.4 miles of US-2 from the western limits of the Town of Chinook to 2.1 miles from the border of Hill/Blaine county. The standard finish will consist of two,12-foot wide travel lanes and two, 8-foot wide shoulders. Passing and turning lanes have been incorporated into the project design along with the replacement of four structures along this stretch of roadway. The roadway has been designed for a desirable stopping sight distance for a 70 mph design speed in level terrain.