Home

Omaha District

Run scraper

Martin Marietta Materials plans to expand the mining operations of the Du Bois quarry south on a 153-acre parcel of land. The current Du Bois quarry is just north of the proposed expansion area. The expansion is planned to be mined in 14 blocks. The proposed expansion will mine through and relocate 2

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Martin Marietta Materials plans to expand the mining operations of the Du Bois quarry south on a 153-acre parcel of land. The current Du Bois quarry is just north of the proposed expansion area. The expansion is planned to be mined in 14 blocks. The proposed expansion will mine through and relocate 2,827 linear feet of an unnamed tributary of the South Fork Big Nemaha River. A total of 0.034 acres of PEMA/C riverine wetlands will also be impacted by the mine expansion.

Martin Marietta Materials plans to expand the mining operations of the Du Bois quarry south on a 153-acre parcel of land. The current Du Bois quarry is just north of the proposed expansion area. The expansion is planned to be mined in 14 blocks. The proposed expansion will mine through and relocate 2,827 linear feet of an unnamed tributary of the South Fork Big Nemaha River. A total of 0.034 acres of PEMA/C riverine wetlands will also be impacted by the mine expansion.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas