Proposed Barge Loading/Unloading Facility at Cumberland River Mile 108.5, Right Bank, Lake Barkley, within an area known as “Lock C”, Stewart County, Tennessee
Public Notice No. 19-10
Nashville District
File No. LRN-2018-00164
Date: March 19, 2019 ;Expires: April 18, 2019
Please address comments to:
Nashville District Corps of Engineers,
Regulatory Division,
3701 Bell Road, Nashville, TN 37214
(Attn: Amy Robinson)
SUBJECT: Proposed Barge Loading/Unloading Facility at Cumberland River Mile 108.5, Right Bank, Lake Barkley, within an area known as “Lock C”, Stewart County, Tennessee
TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act (CWA). The proposed work would occur on U.S. Government land; therefore, the project is concurrently being considered for approval to impact lands and waters upon which the U.S. Army Corps of Engineers (USACE) has real estate interest.
APPLICANT: Fort Campbell Military Base
MSS Chief of Staff
101st Airborne Division
39 Normandy Boulevard
Ft. Campbell, Kentucky 42223
LOCATION: Cumberland River Mile 108.5, Right Bank, Lake Barkley, within an area known as “Lock C”, in Indian Mound, Stewart County, Tennessee
(Latitude 36.426075°, Longitude - 87.575198°)
DESCRIPTION: The applicant proposes to construct a barge loading and unloading facility by improving existing facilities located within the area known as “Lock C”. The project would provide an improved marine deployment facility via water for transport of military vehicles and equipment from Fort Campbell Military Base. Discharge of fill material within a total of 1.74 acres of emergent wetlands is required for an equipment staging area of military vehicles and equipment with
some minor road improvements. Approximately 40 square feet of riprap would be placed below the ordinary high water mark (OHWM) of Cumberland River for stabilization of an outlet ditch to drain water from the site. The proposed project is summarized as follows:
Resource:
Impact and Mitigation Requirement
ID
Impact
Impact Type
Mitigation
Feet
Acres
Wetland 1
1.48
Permanent Fill; Staging Area
Yes
Wetland 2
None
N/A
Wetland 3
None
N/A
Wetland 4
0.26
Permanent Fill; Road Improvement
Yes
Cumberland River
20
Riprap for Stabilization Drainage
No
Totals
20
1.74
Additional activities at the project site do not require DA authorization such as construction of low water access ramp and a high water access ramp which are to be constructed in uplands above OHWM.
The applicant has proposed compensatory mitigation for the wetland impacts and is described below.
Plans of the proposed work are attached to this notice. If you wish to view additional plans, please contact this office or visit our web site at:
http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.
PURPOSE AND NEED: The applicant states the purpose of the proposed project is to provide an improved marine deployment facility via water for transport of military vehicles and equipment from the Fort Campbell Military Base. The proposed improvements would provide for mass deployments of equipment and vehicles to and from the base.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based on information submitted in the project application, the applicant performed an Alternatives Analysis for the project including review of no action and onsite design alternatives. Offsite alternatives were reviewed but determined the project is at an optimal location at the existing access area. Onsite design alternatives considered effects to wetlands (quantity and quality), the Cumberland River, forested riparian areas, and location of existing facilities. Additional onsite measures would be employed such as Stormwater Pollution Prevention Plan and best management practices (BMPs).
COMPENSATORY MITIGATION: The applicant proposes to provide compensatory mitigation by purchasing 3.5 credits (2:1 offset ratio) from the Tennessee Wildlife Federation Wetland In-Lieu Fee Program for the permanent fill of 1.74 acres of emergent wetlands.
ENVIRONMENTAL DOCUMENTATION: Pursuant to National Environmental Policy Act (NEPA), the Corps Project Planning Branch is preparing an Environmental Assessment (EA) to address potential environmental consequences of the proposed project on government property including streams and wetlands. This office issued a Scoping Notice, dated September 19, 2018, to solicit comments fromthe public; federal, state and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed activity.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization ofimportant resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. The Corps, Project Planning Branch and Regulatory Division, will consider any comments received prior to a final decision concerning the authorization of the project, i.e. the issuance, modification, or denial of the requested DA permit
and Real Estate Instrument. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
HISTORIC AND CULTURAL RESOURCES: The Corps is consulting with the State Historic Preservation Office and American Indian Tribes under Section 106 of the National Historic Preservation Act under separate cover. A cultural resource survey of the proposed project area will be conducted to determine the presence, extent, and significance of pre-contact and historic archaeological sites. The Corps invites responses to this public notice from American Indian Tribes or tribal
governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. USACE would evaluate any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance.
ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed under the ESA as threatened or endangered or any designated critical habitat. A review of USFWS’s Information for Planning and Conservation (IpaC) website (http://ecos.fws.gov/ipac/) identified the following five federally-listed Threatened (T) and/or Endangered (E) species that may occur or could potentially be affected by the activities in this location:
Group
Common Name/Scientific Name
Status
Determination
Plants
Price’s Potato-bean / Apios priceana
T
May affect; not likely to adversely affect
Plants
Short’s bladderpod / Plysaria gloosa
E
May effect; not likely to adversely affect
Mammal
Indiana bat / Myotis sodalis
E
May affect; not likely to adversely affect
Mammal
Gray bat / Myotis grisescens
E
May affect; not likely to adversely affect
Mammal
Northern Long-Eared Bat /
Myotis septentrionalis
T
May affect; not likely to adversely affect
No threatened or endangered aquatic species were identified in vicinity of the project and the USACE determined there would be no effect to these species. A survey did not reveal the presence of threatened or endangered plant species or suitable habitat. No trees would be removed for the proposed project. No designated critical habitat was identified in vicinity of the project. No significant adverse effects to fish and wildlife, their habitats and human uses are expected to
result from the proposed work. This public notice serves as coordination with the USFWS pursuant to Section 7 of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to threatened and/or endangered species. After receipt of comments, USACE will evaluate potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.
OTHER APPROVALS: In addition to the DA permit reissuance, other federal, state, and/or local approvals may be required for the proposed work, including but not limited to:
1. Before a permit can be issued, water quality certification must be provided by the State of Tennessee Department of the Environment and Conservation, pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated.
2. The project requires Corps Real Estate Division approval for work on U.S. Government land. Therefore, prior to construction, the Corps Real Estate Division must approval for the project to impact lands and waters upon which the government has real estate interests.
3. The project requires a Section 408 Permit. In accordance with USACE's obligation and procedures under Section 408 of the Rivers and Harbors Act, Engineer Circular (EC) 1165-2-216, dated July 31, 2014, Policy and Procedural Guidance for Processing Request to Alter US Army Corps of Engineers Civil Works Projects Pursuant to 33 USC 408, USACE must determine if the proposed work will alter lands and waters upon which the government has real estate interest and/or be injurious to the public interest.
4. Other federal, state, and/or local approvals that may be required for the activity.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.
COMMENT PERIOD: Written statements received by April 18, 2019, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2018-00164, and be directed to the Regulatory Division, Attn: Amy Robinson, at
the above address, or at amy.m.robinson@usace.army.mil.
/s/
Timothy C. Wilder
Chief, West Branch
Regulatory Division
U.S. Army Corps of Engineers