You can copy from here when filling out the rest of the page.
Modification of Department of the Army Permit LRN-2017-00187, originally advertised on Public Notice 17-15, for Proposed Upgrades to Pickwick Landing Dam at Tennessee River Mile 206.8, Hardin County, Tennessee (Pickwick Dam South Embankment Seismic Upgrade Project)
Public Notice No. 19-11
Nashville District
Corps Application No. LRN-2017-00187
Date: March 21, 2019; Expires: April 5, 2019
Please address all comments to:
Nashville District Corps of Engineers
Regulatory Division (Attn: Amy Robinson)
3701 Bell Road,
Nashville, TN 37221
SUBJECT: Modification of Department of the Army Permit LRN-2017-00187, originally advertised on Public Notice 17-15, for Proposed Upgrades to Pickwick Landing Dam at Tennessee River Mile 206.8, Hardin County, Tennessee (Pickwick Dam South Embankment Seismic Upgrade Project)
TO ALL CONCERNED: The project described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the CleanWater Act (CWA).
APPLICANT: Tennessee Valley Authority
Attn: Mr. Michael Turnbow
1101 Market Street
LP 5D-C
Chattanooga, Tennessee 37402
LOCATION: Pickwick Landing Dam, Tennessee River Mile 206.6, Pickwick Lake (upstream side) and upper Kentucky Lake (downstream side), in Hardin County, Tennessee; Latitude 35.063523, Longitude -88.246762
BACKGROUND and ORIGINAL PROPOSAL: Public Notice 17-15 was issued on June 22, 2017 advertising proposed upgrades to the south embankment of the Pickwick Landing Dam to improve performance of the dam during and following a large earthquake, should one occur. This project was authorized by DA permit on September 14, 2017 for the following impacts:
Upstream side: Fill material (riprap and crushed stone) would be placed below the ordinary high water mark (OHWM) elevation of 414’ and displace approximately 14.7 acres of open water reservoir. In order to prevent the new underwater fill from being a navigation hazard, a riprap berm would be constructed on top of the fill (to provide a physical and visual barrier for boaters). The navigation berm would have a top elevation 420’, which is approximately 6’ above the OHWM elevation
of 414’.
Downstream side: Structural fill material (sand, gravel, silt and clay) would be placed into wetlands and stream channels on the downstream side (Kentucky Lake side) of the embankment. Wetland 003 (1.3 acres) and 004 (0.8 acres) would be completely filled and Wetland 001 would have a permanent loss of
0.1 acre and temporary impacts to 0.1 acres. W002 would have temporary impacts to 0.5 acre. A total of 2.2 acres of permanent wetland fill and 0.6 acres of temporary wetland fill would be required. In addition, the project would require the encapsulation of approximately 656 linear feet of perennial stream channel; approximately 130 linear feet of Stream 7 and 526 linear feet of Stream 8. Each stream is man- made and are part of the toe drain system of the dam to carry seepage away from the toe.
Compensatory mitigation was provided for the stream and wetland fills by purchasing 4.4 wetland mitigation bank credits from the Tennessee Mitigation Fund Mitigation Bank and 656 stream in-lieu fee (ILF) credits from the Tennessee Stream Mitigation Program ILF.
DESCRIPTION OF PROPOSED MODIFICATIONS: After TVA completed their final Environmental Assessment (EA) and the DA permit was issued for the original project, TVA made changes to the design to reduce overall risks to the integrity of the dam during construction and to address construction challenges. To address potential shallow failures of the embankment, berms would be constructed along the toe of the upstream and downstream sides of the embankment. To address deeper failure modes, extended fill areas would be placed in select locations on each of the embankment.
Overall, the proposed project modifications would result in an additional permanent loss of 0.3 acres of wetlands, reduce temporary impacts to wetlands from 0.6 acres to 0.07 acres, reduce the length of stream encapsulation from 526 linear feet to 482 linear feet, and increase open water impacts from 14.7 to 15.38 acres. The following table provides a comparison of impacts originally permitted and impacts proposed for the project modifications:
Construction of the project is underway, however, the work in the vicinity of waters has been limited to removal of trees in the original permitted area.
If you received this notice by mail and wish to view all of the diagrams, visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.
ENVIRONMENTAL DOCUMENTATION: For activities of TVA for which a DA permit is requested or required, USACE’s and TVA’s memorandum of Understanding designates TVA as the lead Federal Agency for the coordination and conduct of all environmental reviews required for compliance under the National Environmental Policy Act (NEPA) including Section 7 of the EndangeredSpecies Act (ESA) and Section 106 of the National Historic Preservation Act (NHPA). TVA completed a final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI), dated September 2016, documenting potential effects of the original proposed project. TVA stated that since the EA was completed, there have been changes to the design to reduce overall risks to the integrity of the dam during
construction and to address construction challenges. A Draft Supplement Environmental Assessment (SEA) was prepared by TVA to evaluate the implementation of the necessary design changes and address any environmental consequences of the modifications. On January 9, 2019, TVA issued a final SEA and FONSI for the proposed changes to implement the necessary design changes to complete its upgrades at Pickwick Landing Dam. Information on the SEA can be found at:
https://www.tva.gov/Environment/Environmental-Stewardship/Environmental- Reviews/Pickwick-Landing-Dam-South-Embankment-Seismic-Upgrade.
PURPOSE AND NEED: The applicant indicated the purpose of the proposed project is to provide upgrades to the south embankment of Pickwick Landing Dam to improve performance of the dam during and following a large earthquake, should one occur. The overall stability and integrity of the south embankment would be improved from existing conditions.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based on information submitted in the original project application and the proposed modification application, the applicant has designed the project site to minimize impacts to streams and wetlands by minimizing the amount of riprap and other filling activities to the amount necessary to stabilize the south embankment. The permanent impacts to wetlands increased by 0.3 acres due to the need for additional permanent fill, instead of temporary impacts. In addition, proposed stream encapsulation decreased by 44 linear feet. The applicant evaluated alternatives including the no action alternative within their EA and SEA and was available for public comment. Additional onsite measures would be employed such as best management practices (BMPs) and as required in the Stormwater Pollution Prevention Plan.
COMPENSATORY MITIGATION: Original Proposal: Compensatory mitigation was provided for the original authorized project by purchasing 4.4 wetland mitigation bank credits (2:1 offset ratio) from the Tennessee Mitigation Fund (TMF) Mitigation Bank and purchasing 656 stream in-lieu fee (ILF) credits (1:1 offset ratio) from the Tennessee Stream Mitigation Program ILF.
Proposed Modification: Wetland impacts would increase by 0.3 acres and to offset this additional impact, TVA proposes to purchase an additional 0.6 wetland mitigation credits (2:1 ratio) from the TMF Mitigation Bank. Since the actual amount of stream mitigation purchased for the original project is 44 credits more than the proposed modification may require, TVA does not propose additional stream mitigation. In addition, TVA does not propose compensatory mitigation for the
loss of open water.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to reissue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. These public interest factors and cumulative effects were considered and addressed within the EA prepared for the original proposal and will be considered in any supplemental documentation. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA), supplemental EA, and/oran Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
HISTORIC AND CULTURAL RESOURCES: Public Notice 17-15 was issued in June 2017 advertising the proposed project and the Corps’ consultation of National Register of Historic Places (NRHP). TVA provided (with their original application) their effects determinations and documentation ofprevious consultation with the Tennessee Historical Commission (THC) and other consulting parties on the subject project. THC concurred with TVA’s determination that no historic properties eligible for listing the National Register of Historic Places would be impacted. The Corps determines that the plan modifications advertised here do not affect the original no effect determination, and it remains valid for the proposed project. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area.
ENDANGERED/THREATENED SPECIES REVIEW: TVA provided (with their application and in their SEA) theireffects determinations and previous coordination with the U.S. Fish and Wildlife Service on the subject project. The proposed activities, including tree clearing, are addressed in TVA’s programmatic biological assessment on routine actions and federally listed bats in accordance with Endangered Species Act (ESA) Section 7(a)(2) (TVA 2017). They determined the project area does not
occur in any known habitat for either Indiana bat or Northern long-eared bat (NLEB) and any effects to federally-listed bat species are expected to be minor. No other T&E species were identified in vicinity of the permit area. Since authorization of the original project, trees have been removed from the project site including wetland and stream areas. Additionally, no designated critical habitat has been identified. No significant adverse effects to fish and wildlife, their habitats and human uses are expected to result from the proposed work. This public notice serves as coordination with the USFWS pursuant to Section 7 of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to T&E species from the proposed project modifications. After receipt of comments, USACE will evaluate potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.
OTHER APPROVALS: In addition to the DA permit reissuance, other federal, state, and/or local approvals may be required for the proposed work. Water quality certification has been issued for the proposed modifications by the state of Tennessee, Department of the Environment and Conservation, pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), effective date November 21, 2018 [NRS 17.055] stating that applicable water quality standards will not be violated.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.
COMMENT PERIOD: Written statements received by April 5, 2019, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2017-00187, and be directed to the Regulatory Division, Attn: Amy Robinson, at the above address, or at amy.m.robinson@usace.army.mil.
/s/
Timothy C. Wilder
Chief, West Branch
Regulatory Division