CITGO Products Pipeline Company - Trinity River pipeline

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to partially decommission in-place as well as partially remove an approximate 6,400-foot section of an existing pipeline.

Full Public Notice Project Plans

PROJECT DESCRIPTION: The applicant proposes to partially decommission in-place as well as partially remove an approximate 6,400-foot section of an existing pipeline. Approximately 600 feet of the pipe crossing the Trinity River will be removed entirely via cutting and ramming/pulling from workspaces at each end of the pipe section. The remaining 5,800 feet of onshore portions of the pipe will be filled with cement slurry (grout), capped, and abandoned in-place. Proposed temporary impacts consists of a 75-foot by 150-foot (.26 acres) westward temporary workspace located in emergent wetlands, as well as a 150-foot by 200-foot (0.69 acres) eastward temporary workspace that’s located in uplands. Proposed workspaces are located within a previously disturbed right-of-way (ROW).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas