The proposed project will stabilize 610 linear feet of bank along the Yellowstone River using approximately 678 cubic yards of rock riprap to protect an existing irrigation inlet structure. The project entails reshaping the near vertical bank to a 2:1 slope and placing a 3-foot wide by 3-foot deep toe at the embankment water surface interface.
The proposed project will stabilize 610 linear feet of bank along the Yellowstone River using approximately 678 cubic yards of rock riprap to protect an existing irrigation inlet structure. The project entails reshaping the near vertical bank to a 2:1 slope and placing a 3-foot wide by 3-foot deep toe at the embankment water surface interface.