PUBLIC NOTICE: The Lake Superior Wetland Bank (LSWB) was approved by the St. Paul District in 2015 and is currently undergoing construction. Since construction was completed in Zone A over the summer of 2018, the LSWB has finished construction on all of the proposed activities from the approved 2015 Mitigation Banking Instrument (MBI). On January 30, 2019, the bank Sponsor requested that the St. Paul District consider a modification to that instrument. The Sponsor has proposed the inclusion of 3 additional areas into the existing LSWB.

PROJECT DESCRIPTION AND PURPOSE: The Lake Superior Wetland Bank (LSWB) was approved by the St. Paul District in 2015 and is currently undergoing construction. Since construction was completed in Zone A over the summer of 2018, the LSWB has finished construction on all of the proposed activities from the approved 2015 Mitigation Banking Instrument (MBI). On January 30, 2019, the bank Sponsor requested that the St. Paul District consider a modification to that instrument. The Sponsor has proposed the inclusion of 3 additional areas into the existing LSWB.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas