Home

Omaha District

Run scraper

The District Engineer is considering a request from the Pembina County Water Resource District to construct a new drain identified as Pembina County Drain 82. The 24

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The District Engineer is considering a request from the Pembina County Water Resource District to construct a new drain identified as Pembina County Drain 82. The 24,400 linear foot project is located three miles east of Cavalier on the west side of Highway 18 and is centered on Latitude 48.814052° North, Longitude -97.5580316° West in Pembina County. The new drain will carry flow from a tributary through the new ditch and outlet into a tributary of the Tongue River. Approximately 1.06 acres of wetlands are located within the footprint of the new drain and an additional 4.31 acres may be affected by the drain. The project is proposed to alleviate flooding of infrastructure and farmland. Excavated materials will be used in the reconstruction of Highway 18. Wetlands are expected to establish in the drain bottom, which would result in approximately 6.2 acres of new wetlands created.

The District Engineer is considering a request from the Pembina County Water Resource District to construct a new drain identified as Pembina County Drain 82. The 24,400 linear foot project is located three miles east of Cavalier on the west side of Highway 18 and is centered on Latitude 48.814052° North, Longitude -97.5580316° West in Pembina County. The new drain will carry flow from a tributary through the new ditch and outlet into a tributary of the Tongue River. Approximately 1.06 acres of wetlands are located within the footprint of the new drain and an additional 4.31 acres may be affected by the drain. The project is proposed to alleviate flooding of infrastructure and farmland. Excavated materials will be used in the reconstruction of Highway 18. Wetlands are expected to establish in the drain bottom, which would result in approximately 6.2 acres of new wetlands created.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas