Proposed Discharge of Fill Material into Waters of the United States Associated with the Construction of a 13,000 Foot Long Railroad Support Yard Adjacent to the Existing Mainline Track in the Greenbrier Community of Huntsville, Limestone County, Alabama. The Support Yard Includes Three Support Tracks and a Stone Access Road.

Public Notice No. 19-13 Nashville District Application No. LRN-2019-00045 Date: April 3, 2019

All comments should be received no later than 30 days from the date of this notice. Please address all comments to: Nashville District Corps of Engineers Western Regulatory Field Office 2424 Danville Road SW Suite N Decatur, AL 35603 Attn: William E. Sinclair

JOINT PUBLIC NOTICE US ARMY CORPS OF ENGINEERS and STATE OF ALABAMA

SUBJECT: Proposed Discharge of Fill Material into Waters of the United States Associated with the Construction of a 13,000 Foot Long Railroad Support Yard Adjacent to the Existing Mainline Track in the Greenbrier Community of Huntsville, Limestone County, Alabama. The Support Yard Includes Three Support Tracks and a Stone Access Road.

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344). Before a permit can be issued, certification must be provided by the State of Alabama, Department of Environmental Management (ADEM), pursuant to Section 401(a)(1) of the CWA, that applicable water quality standards would not be violated.

APPLICANT: Norfolk Southern Railway Company (NSRC) Attn: Mr. Mike Wigley 1200 Peachtree Street Atlanta, Georgia 30309

LOCATION: The 13,000 liner foot project area is located immediately north of the existing NSRC mainline track in the Greenbrier area of Huntsville, Limestone County, Alabama. Within the project is a wetland abutting an unnamed tributary of Limestone Slough, a tributary to the Tennessee River Mile 310.7, Right Bank. USGS Quadrangle – Greenbrier, AL; Latitude 34.66031°N, Longitude 86.86031°W. (HUC 06030002).

EXISTING CONDITIONS: The 13,000 foot long project area consists almost entirely of agricultural land. The wetland within the project area is an equal mixture of young forest and hayfield. Larger trees within the wetland were removed during the winter of 2018-2019.

WORK PROPOSED: The proposed project involves the permanent discharge of fill material into 1.13 acres of wetland and the temporary discharge of fill material into 0.20 acre of wetland. The proposed discharge of fill would facilitate construction of a support yard adjacent to the existing mainline track. The support yard includes three support tracks and a stone access road.

Plans and location maps of the proposed project are provided in this notice. If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The project avoids wetlands that are located approximately 100 feet west of the western end of the project and 125 feet east of the eastern end of the project. The 1.33 acres of wetland proposed to be filled is part of a larger wetland that extends to the north that will remain unfilled.

COMPENSATORY MITIGATION PROPOSAL: The applicant proposes to offset the proposed permanent impacts to 1.13 wetland acres through the acquisition of 2.26 wetland credits from Robinson Spring Mitigation Bank in Jackson County, Alabama, whose service area includes the project location.

NEPA PROJECT PURPOSE AND NEED: The purpose for the project is to construct a support rail yardadjacent the existing mainline track in the Greenbrier community of Huntsville, Alabama. Expansionof heavy industries in the area has increased the need for additional capacity in rail transportation.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The DA permit decision will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. The DA permit decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the work will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. The evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Environmental Protection Agency (EPA), under authority of Section 404(b)(1) of the CWA (40 CFR Part 230).

SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An EA will be prepared prior to a final decision concerning issuance or denial of the requested DA Permit.

HISTORIC AND CULTURAL RESOURCES: A review of historic resources within the permit area as well as a limited area surrounding it was conducted by the Corps. No National Register of Historic Places (NRHP) properties were present within the immediate vicinity of the proposed project.

This public notice serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. The Corps invites responses to this public notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. Copies of this public notice are being provided to the AHC and Native American Tribes.

ENDANGERED/THREATENED SPECIES REVIEW: Based on a review of the U.S. Fish and Wildlife’s Information for Planning and Conservation (IPaC) website (http://ecos.fws.gov/ipac/), the following federally-listed species are known to or believed to occur in the project area.

• MAMMALS: Gray bat (Myotis grisescens) (E); Indiana bat (Myotis sodalis) (E); Northern Long-Eared Bat (Myotis septentrionalis) (T) • FISHES: Spring Pygmy Sunfish (Elassoma alabamae) (T) • CLAMS: Pink Mucket (pearlymussel) (Lampsilis abrupta) (E); Rough Pigtoe(Pleurobema plenum) (E) • SNAILS: Anthony’s Riversnail (Athearnia anthonyi) (E); Armored Snail (Pyrgulospis pachyta) (E); Slender Campeloma (Campeloma decampi) (E)

A copy of this notice is being furnished to the USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the USFWS, if required.

ADDITIONAL INFORMATION: Section 401 Water Quality Certification from the State of Alabama is required for the proposed work in accordance with Section 401(a)(1) of the Clean Water Act. Other federal, state, and/or local approvals may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Western Regulatory Field Office, Attention: William E. Sinclair at the above address, and/or email at william.e.sinclair@usace.army.mil. It is not necessary to comment separately to ADEM since copies of all comments will be sent to them and become part of their records on the proposal.

If you received this notice by mail and wish to view all of the attachments, visit our web site at:http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Mr. Sinclair at the above address or telephone 256-350-5620, or email william.e.sinclair@usace.army.mil.

Timothy C. Wilder Chief, West Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas