The application is to continue the excavation of gravel at this location by utilizing a track hoe and bulldozer. The applicant's primary source of gravel would be along the left descending bank (east side) bordering the Illinois River. Fill material for the proposed project would consist of the redistribution of dredged material by the operation of the bulldozer. This material would consist of gravel throughout various locations along the project area and would include two work roads utilized by Sequoyah County and the Oklahoma Department of Wildlife Conservation. This project was previously authorized with a Department of the Army permit

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is to continue the excavation of gravel at this location by utilizing a track hoe and bulldozer. The applicant's primary source of gravel would be along the left descending bank (east side) bordering the Illinois River. Fill material for the proposed project would consist of the redistribution of dredged material by the operation of the bulldozer. This material would consist of gravel throughout various locations along the project area and would include two work roads utilized by Sequoyah County and the Oklahoma Department of Wildlife Conservation. This project was previously authorized with a Department of the Army permit, Number OKR3015100, which is expired.

The proposed project is in located in and adjacent to the Illinois River, near Gore, Sequoyah County, Oklahoma. The project site can be found on the Gore, Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 35.522744 and West Longitude -95.088154. The overall purpose of this work is to excavate gravel to be used for Sequoyah County road maintenance. The project is not a water dependent activity. The applicant proposes to use a track hoe and bulldozer to excavate approximately 15,000 cubic yards of gravel per year. All excavated materials would be loaded and hauled to a worksite. All equipment will be stored above the Ordinary High Water Mark of the Illinois River. The proposed primary sources of gravel would be along the left descending bank (east side) bordering the Illinois River. Fill material for the project would consist of the redistribution of dredged material by the operation of the bulldozer and the maintenance of Roads 1 and 2.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas