You can copy from here when filling out the rest of the page.
Nebraska Department of Transportation (NDOT) - The NDOT proposes to construct a new 11.5-mile-long four-lane divided freeway along the southern perimeter of the City. The project begins on U.S. Highway 77 (US-77) between Saltillo Road and Bennet Road and traverses east to the intersection of South 120th Street and Nebraska Highway 2 (N-2), where it then continues east on N-2 until the intersection at South 148th Street. Interchanges are proposed along the freeway at US-77, Saltillo Road, 27th Street, 68th Street, 84th Street, and 120th Street. Overpass structures are proposed along the freeway at 25th Street, the Homestead Trail, the BNSF Railroad, 54th Street, Saltillo Road (East of 98th Street), and the OPPD Rail Spur. The roadway will be designed to NDOT freeway standards.
Nebraska Department of Transportation (NDOT) - The NDOT proposes to construct a new 11.5-mile-long four-lane divided freeway along the southern perimeter of the City. The project begins on U.S. Highway 77 (US-77) between Saltillo Road and Bennet Road and traverses east to the intersection of South 120th Street and Nebraska Highway 2 (N-2), where it then continues east on N-2 until the intersection at South 148th Street. Interchanges are proposed along the freeway at US-77, Saltillo Road, 27th Street, 68th Street, 84th Street, and 120th Street. Overpass structures are proposed along the freeway at 25th Street, the Homestead Trail, the BNSF Railroad, 54th Street, Saltillo Road (East of 98th Street), and the OPPD Rail Spur. The roadway will be designed to NDOT freeway standards.