You can copy from here when filling out the rest of the page.
The applicant requests a ten-year extension of time.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant requests a 10-year extension of time for Department of the Army (DA) Permit SWG-1992-02707, which will expire on 31 December 2019. The existing permit authorizes maintenance dredging at the South Texas Project Electric Generating Station intake pumping facility. The applicant approximates dredging operations every 3 years, and averaging 15,000 to 18,000 cubic yards per event. This permit also authorizes maintenance dredging directly in front of the intake structure. Periodic dredging is necessary to assure a reliable intake water supply for cooling required by the generating station.