Home

Baltimore District

Run scraper

The U.S. Army Corps of Engineers (USACE) has completed a Remedial Investigation and a Proposed Plan for the Assateague Island Formerly Used Defense Site (FUDS) in Worcester County

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers (USACE) has completed a Remedial Investigation and a Proposed Plan for the Assateague Island Formerly Used Defense Site (FUDS) in Worcester County, MD. The public is invited to provide feedback on the draft final Proposed Plan for the Assateague Island FUDS site and USACE is conducting a public meeting on May 2, 2019 where the public can learn more.

Army Corps Seeking Public Comment on Draft Final Proposed Plan for the Assateague Island Formerly Used Defense Site

Public Meeting: May 2, 2019, 6:00-8:00 p.m. Assateague Island Environmental Education Center 7206 National Seashore Lane, Berlin, MD 21811.

The U.S. Army Corps of Engineers (USACE) has completed a Remedial Investigation and a Proposed Plan for the Assateague Island Formerly Used Defense Site (FUDS) in Worcester County, MD. The public is invited to provide feedback on the draft final Proposed Plan for the Assateague Island FUDS site and USACE is conducting a public meeting on May 2, 2019 where the public can learn more.

Assateague Island is a 37-mile-long barrier island along the eastern shore of Maryland and Virginia. From 1944 to 1947, the U.S. Navy and the U.S Army Air Corps established two separate rocket ranges on Assateague Island, a Northern Range (Munitions Response Site [MRS] 01) and one in the South (MRS 03), which were used during World War II for target practice by landbased aircraft. No live munitions have been discovered on either range at the Assateague Island National Seashore in Maryland or at the Assateague Island Maryland State Park, where the target ranges were located. Only munitions debris have been uncovered. The Proposed Plan summarizes the remedial investigation and proposes a preferred approach of no further action.

The Proposed Plan and RI Report will be available for public review beginning April 24, 2019 by hard copy and electronic copy at the Worcester County Library – Berlin Branch at 13 Harrison Ave., Berlin, MD. For more information about the library location or hours, please call (410) 641-0650. It will also be available online at: www.nab.usace.army.mil/Missions/Environmental/Formerly-Used-Defense-Sites/

Public Comment Period – April 29, 2019 to June 3, 2019

The USACE will hold a public comment period for the Proposed Plan from April 29 to June 3, 2019. The USACE will consider all formal relevant comments prior to making a final decision. You may submit formal written comments by email or mail postmarked by June 3, 2019 to Christopher Gardner, USACE Baltimore District (address and e-mail below).

For more information regarding the public meeting for the Assateague Island Formerly Used Defense Site, please contact either: Liza Finley (CENAB-ENE-C) Christopher Gardner (CENAB-CC) Project Manager Public Affairs Specialist USACE Baltimore District USACE Baltimore District 2 Hopkins Plaza 2 Hopkins Plaza Baltimore, MD 21201 Baltimore, MD 21201 Ph: (410) 962-2683 Ph: (410) 962-2626 Liza.Finley@usace.army.mil Christopher.P.Gardner@usace.army.mil

Public Meeting – May 2, 2019

A public meeting will be held on May 2, 2019 from 6:00-8:00 p.m. at the Assateague Island Environmental Education Center at 7206, National Seashore Lane, Berlin, MD. The publicmeeting will include a presentation, and poster sessions, where community members can review individual poster stations, discusscompleted activities, meet with project team members, and submit comments.

Meeting Agenda 6:00 pm - 6:30 pm: View displays and speak with staff 6:30 pm – 7:30 pm: Formal presentation followed by a question and answer session 7:30 pm – 8:00 pm: View displays and speak with staff

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas