Houston Energy Operating - Sabine Lake drilling

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a 415-foot by 16-foot temporary board mat access road.

Full Public Notice Proposed Plans

PROJECT DESCRIPTION: The applicant proposes to construct a 415-foot by 16-foot temporary board mat access road and a 300-foot by 300-foot drill pad utilizing an existing 12-foot headland road to conduct oil/gas drilling and production activities for the Wildcat Prospect. A 3-foot-high earthen ring levee will be constructed around the perimeter of the drill site and board mats will be laid as a foundation for drilling operations within the leveed drill site area. The well will be drilled with a closed mud loop system and drilling residue will be hauled off for disposal. The applicant’s plans are enclosed in 4 sheets.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas